Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

Similar documents
PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

HUDSON TUNNEL PROJECT

Liquid Waste Coordination Committee

VTA s BART Silicon Valley Phase II Extension

KIEWIT FOUNDATIONS GROUP

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project

TBM Selection and Specification

Multiple Large Diameter Microtunnels with Limited Ground Cover

Contracts and Risk. Building blocks for success. Miami, November 14 th, 2016

Tunnel Support Design

Soft Ground Tunneling through Contaminated Groundwater

VTA s BART Silicon Valley Phase II Extension

Tel: Neil: Tony: Website:

KIEWIT FOUNDATIONS CO.

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro

Compaction and Jet Grouting

Forensics by Freezing

Fifty Feet of Peat: Design Challenges of Three Long HDD Crossings of the Sacramento River

Introduction to Tunnel Construction

Construction Ground-Borne Noise & Vibration

Fast-Track Emergency Replacement of Collapsed Sewer by Tunneling in Miocene Clay

Pipe Ramming with HDD. Presentation Outline

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

WARNING DO NOT BID ON THIS PROJECT

KIEWIT FOUNDATIONS GROUP

Risk Management of the Restoration of Shanghai Metro Line 4

UK POWER NETWORKS BATTERSEA CABLE TUNNEL: POWERING A RENAISSANCE AT BATTERSEA S ICONIC POWER STATION

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

Tunnelling and Underground. Construction Technology

Presentation Outline

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

CC1602 Microtunneling

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

SHAFT CONSTRUCTION SECANT PILE

Ground Freezing for Tunnel, Shafts, and Adits

Addendum Geotechnical Report Dewatering and Settlement Sanitary Sewer Improvements at Bush IAH, Project No. 699 HVJ Project No.

Seattle, WA SHORING * GROUNDWATER CONTROL * ENVIRONMENTAL

Design and Implementation of the South Hartford CSO Tunnel

KIEWIT FOUNDATIONS GROUP

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

Project Purpose. Federal Railroad Administration

Presented by: Frank Guyamier

Tunnel. Immersed Tunnels

Remedial Foundation Solutions for Existing Tanks

Appendix C. Gallery Place Chinatown Station Structural Assessment

An Introduction to Keller in the UK COLCRETE EURODRILL GETEC PHI GROUP. Piling and Ground Improvement. Grouting, Soil Nails and Anchors

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley

> GRouTING systems. The experience and expertise to deliver the right grouting solution for the job. Grouting is the most diverse

CITY OF LOS ANGELES CALIFORNIA Addendum No. 1 June 8, 2016

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

Sioux City Iowa Utilizes HDD to Install Twin 36 Casings for Sanitary Sewer Siphons

Use of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii

Ground Freezing to Repair Leaks in a Slurry Wall Shaft

Pushing the Envelope For 100 Years

Special Committee on Bay-Delta Item 3b January 24, 2017

EL VALOR DE INNOVACION EN TUNELES

Grouting Bilfinger Spezialtiefbau GmbH

SEMINARI MAGGIO Management of Geotechnical Risks

COMPANY PROFILE. HARKE Capability Statement. Insideout

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

Ching Guan Kee ABSTRACT

Take Me to the Other Side:

Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP)

Final Estimates Level 2

DIFFICULT GROUND SOLUTIONS:

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

IEEE 18-May Intake. Tunnel. Outlet

RECORD KEEPING AND INSPECTION NOTES FOR FUTURE NEEDS

Trenchless Pipeline Crossings

Ask the right questions

IAC Presentation, August 17, 2017 Ground Movement Impact Assessment. Trevor O Shannessy

Waterview Connection Project Cross Passage Tunnels: Safety in Design and Construction

A case study of twin bored tunnelling under mixed-face soil - Bendemeer MRT station project (Downtown Line 3), Singapore

6 Preliminary Assessment of Construction Method and Constructability Issues

Geo-Strata. Urban Geotechnical ALSO. Building Careers and Developing Leadership. May/June 2014

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM TUNNELING & UNDERGROUND CONSTRUCTION

Assessment of Tunnel Stability with Geotechnical Monitoring

UNDERPINNING A CRANE FOUNDATION

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

Alaska Way Viaduct Replacement Project

Contents. Glossary 9. Foreword 10

2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995

Selection of alignment and tunnelling methods in urban settings

MTR Shatin to Central Link Contract 1103 Hin Keng to Diamond Hill Tunnels Hong Kong, China

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

Construction Management

Principles for Tunnel Design

EARTH RETENTION AND DEEP FOUNDATIONS WHYTERRA.COM

UPDATE ON THE WATERFIX TUNNELS PROJECT. Breakthroughs in Tunneling September 2018

4th International Engineering and Construction Conference - July 28, 2006

ASCE Seattle Section Geotechnical Group and Seattle Geo-Institute Chapter

Experts in tunneling with Tunnel Boring Machines

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.

Transcription:

Purdue Geotechnical Society Workshop Digging Deep April 8, 2011 Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective David Chapman, P.E. Lachel & Associates, Inc. Morristown, NJ

Hudson River Tunnels Project Overview Selected technical challenges Shaft breakout Cross passage construction Timber pile removal Some project risk factors Mega Projects - Issues

Hudson River Tunnels Project Access to the Region s Core (ARC) Trans-Hudson Express (THE) Tunnel Project Direction - Partnership New Jersey Transit Port Authority of New York and New Jersey Funding Formula Federal Transit Administration - $3 billion Port Authority of NY and NJ - $3 billion State of New Jersey - $2.7 billion Cost overruns State of New Jersey Project cancelled by NJ Governor October 2010

ARC Project Scope

ARC Project - Major Tunnel Contracts Palisades Tunnel work was in progress Rock tunnels twin, 5,100 ft long (diabase and sedimentary rock), 6 cross passages Portal and 126-ft diameter Hoboken Shaft Manhattan Tunnel contractor selected 150-ft diameter 12 th Avenue shaft, twin 130-ft long SEM adits at Hudson River Tunnels break-in Rock tunnels twin, 5,500 ft long (metamorphic rock), 6 cross passages

ARC Project - Major Tunnel Contracts Hudson River Tunnel (HRT) under bid when project cancelled Start from Hoboken shaft Ground improvement and underpinning Twin 7,200 ft long tunnels in rock, mixedface, and soft ground, 24.5-ft i.d. 9 cross passages (6 in soft ground) Terminate at 12 th Avenue Shaft in Manhattan

Geotechnical Profile - HRT

Geotechnical Profile - HRT

TBM Type Selection - EPB Well suited to soils Avoids use of bentonite and slurry separation requirements

Final Segmental Lining 5+1 universal segmented lining 6 feet ring average length 18 inches thick Sixteen different positions to achieve alignment curvature Auxiliary elements: Steel bolts, dowels, alignment rods, packers, gaskets and hydrophilic rubber sealant

Hoboken Shaft - Stratigraphy

Hoboken Shaft Breakout Main Considerations Control ground displacements due to volume loss in mixed-face tunneling areas Prevent groundwater drawdown and associated settlements in estuarine deposits Facilitate TBM launch and optimize TBM installation

Hoboken Shaft Ground Improvement Approach Jet Grout Block 37 ft 120 ft Contingency Grout Block geometry 5 feet below tunnel invert 10 feet above tunnel crown 120 feet long Jet grouting system: triple fluid (per specs) No access and overhead constraints Contingency grouting program

HBLR Track Crossing Light Rail Tunnel line Start of mixed-face Cross Passage Buried 230 kv cable

HBLR Tracks Settlement Issue zone with settlement > limit. value composite settlement trough Jet Grout Treated Area Approach Jet grouting system: triple fluid (per specs) Alternative methods to improve soil stiffness Battered micropile canopy above tunnel crown Compensation grouting program Contingency grouting from first bore

Cross Passages in Soil Pipe-spile Canopy Pilot test in CP-1 Ground Freezing + Grouted pipespiles Frozen Soil Ground Freezing by Moretrench

Cross Passages in Soil Construction Sequence Drill & install grouted pipe-spiles Drill & Install Stuffing Box Packer Start Ground Freezing Operation Install Temporary Support Frames & Bulkheads Demolish Segmental Lining SEM Top heading advance SEM Invert-Bench Install Waterproofing Permanent Lining

Cross Passages - Schematic Rock Rock CP#1 CP#2,3&4 CP#5,6&7 CP#8&9 Hoboken Shaft 12 th Ave. Shaft Soil Soil

Bulkhead Concept and Details

Hudson River Bulkhead

Timber Pile Interference

Timber Pile Removal

Hudson River Bulkhead Pile Removal Land Side River Side Hudson River Bulkhead Timber Piles No surface work allowed from river side No significant surface work allowed from land side

Project Risks Design and Construction Stringent settlement limits Congested ground surface limited access for ground modification Mixed face tunneling soft soil and rock Hyperbaric interventions for TBM cutterhead maintenance below river Cross passages below river Manhattan Bulkhead pile removal

Other Project Risks Schedule liquidated damages One or two TBM s? Insurance Owner Controlled Insurance Program (OCIP) provisions Professional liability typical standard of care negligent performance of professional services sounds reasonable No guarantee OCIP program will last through project duty to provide equivalent coverage if owner opts not to continue

Project Insurance Provisions Professional liability insurance Minimum limit - $10M per occurrence Deductible up to $10 M borne by NJ Transit - Briefly! NJ Transit then to make Assessment against insured parties negligence will not be the sole criteria no project limit Ruinous upside potential and uninsurable as professional liability covers only negligent performance not contractual liability

ARC Issues ARC Project a Mega Project Forecast cost overruns led to project cancellation Professional liability insurance provisions poor risk for design engineers FTA audit found inadequate plans to manage project finances

External Risk Factors Mega Project complexity leads to external risk factors Budget and schedule, contingency Funding availability and stability Owner s PM structure, governance and decision-making Owner realism and transparency Owner s contracting policies and decisions

Not Only Engineering! Mega Projects are highly public and political Studies show that expertise of project owner critical to project success According to research, underestimation of costs and overestimate of revenues are frequent occurrences, and not necessarily based on error

On the basis of the evidence we conclude that cost estimates used in public debates, media coverage and decision-making for transport infrastructure development are highly, systematically, and significantly deceptive. Bent Flyvbjerg et al, Management and Risk.

Noted commentators have concluded that cost underestimation and overrun have not decreased over the past 70 years. Cost underestimation and overrun cannot be explained by error and seem to be best explained by strategic misrepresentation, namely lying, with a view toward getting projects started. Bent Flyvbjerg et al, Management and Risk.

Smoother Road for Megaprojects? Owner organizations should include large project experience Cost estimates - range of outcomes, include a risk-based component. Risk register process becoming more common. Contracting should address equitable means of sharing and allocating risk Standard of care and indemnification provision should be negligence-based

Recommended Reading Mega Projects Challenges and Recommended Practices edited by David J. Hatem and David H. Corkum, American Council of Engineering Companies