Automated Permitting and Routing for OS/OW. GIS-T, 2010 Session Jay Adams - Oklahoma DOT

Similar documents
The Benefits of Automated Permitting, Routing, and Bridge Analysis Systems

Adaptation of HERS-ST Models for the South Carolina Interactive Interstate Management System

Managing Freight Mobility. Statewide Traffic Mobility Manager

Oversize/Overweight Permitting Practices Research Project

RAPID INCIDENT SCENE CLEARANCE (RISC)

Emergency Harvest Permits with Route Authorizations

APPENDIX N EXAMPLE REQUIREMENTS SPECIFICATION

RIDOT S Statewide Roadway and Asset Data Collection Project

ODOT Transportation Systems Management & Operations Plan

INDUSTRY. Transportation

Data Driven Results: North Carolina s Strategic Prioritization Process through SPOT On!ine. NCDOT Strategic Prioritization Office April 4, 2016

PennDOT s Road Closure Reporting System ( )

APPENDIX A6: OPERATIONAL CONCEPTS BY SERVICE CATEGORY

4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot.

Keeping people and products moving safely and efficiently

Will County Community Friendly Freight Mobility Plan: Executive Committee Update

Best Practices in Permitting Oversize and Overweight Vehicles. Final Report

Technical Memorandum. 720 SW Washington Suite 500 Portland, OR dksassociates.com. DATE: July 12, 2017

FASTLANE Grant Project US-69 through Calera. Oklahoma Traffic Engineering Association 2017 Fall Meeting

NCHRP 20-7 Guide to Benchmarking Operations Performance Measures Incident Duration - Pilot Test Results

Wall Asset Management Implementation at Colorado Department of Transportation. Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson

Office of Transportation Data (OTD)

UNIT V TRAFFIC MANAGEMENT

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

Examining the Economic Trade-offs of Alternative Transportation Funding NC I-95 Economic Assessment

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

BMS2 Release Notes. Detailed BMS2 Release Notes. Release Version 5.13 (AMS Release 50)

Building West Virginia DOT s Geospatial Capabilities:

One Maryland One Centerline. GIS-T 2014 May 7, 2014

Truck Parking Information Management System (TPIMS) Glossary

Gateway Cities Council of Governments Intelligent Transportation Systems Implementation Plan for Goods Movement

INDUSTRIAL/COMMERCIAL FACILITIES AIRPORT INTERSTATE BRIDGE MARINA

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

Click to edit Master title style

CHAPTER 3 SCOPE SUMMARY

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

ATTACHMENT D. Open Roads Policy

High picking performance

Iowa Department of Transportation Intelligent Work Zone Deployments

Transportation Management Plan

Special Events Planning

100 Design Controls and Exceptions

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

ACCOMMODATING OVERSIZE AND OVERWEIGHT LOADS: INSTRUCTOR AND STUDENT GUIDE

AASHTO Transportation Safety Information Management System (TSIMS) Phase 1 Summary

Joint Meeting- Stakeholder Committee & Technical Committee

LOCATION AND DESIGN DIVISION

INTERSTATE CORRIDOR PLANNING

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E.

4.11 TRAFFIC AND CIRCULATION

MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE. REQUEST FOR INFORMATION TRANSPORT PERMIT SYSTEM RFI#MoTI-TPS

Creating Master Data Sets Build it once, use it a bunch

A GIS Methodology to Map Routes from a Truck Permit Database Utilizing a Linear Reference System and Network Analysis

Pennsylvania Public Private Transportation Partnership Board

Tracy Scriba, FHWA Work Zone Conference March 2009

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

Developing Resilient Freight Systems

EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID:

North Central Texas Council of Governments 157

SECTION TRAFFIC REGULATIONS

Texas Model Border Crossing Project

PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA

Traffic/Mobility Analytics

TxDOT Internal Audit Texas Permit Routing Optimization System (1404-2) Department-wide Report

Using Random Samples to Assess Roadway Condition. Faith Johnson GIS Specialist, NCDOT

Puget Sound Regional ITS Architecture Update. Why does the region need an ITS Architecture?

Safety Management System for Israel

Between existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL

State of Qatar ITS Architecture. Customized Service Package Diagrams. Advanced Traffic Management Systems (ATMS)

WASHINGTON STATE TRANSPORTATION COMMISSION Mission, Roles and Responsibilities. Presentation to Eastside Transportation Association April 26, 2011

Smarter Work Zones Paul Pisano FHWA Work Zone Management Team

White Paper April 23, 2018

Chattanooga Regional ITS Architecture Update Workshop. September 24, 2013

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

Oklahoma Commercial Vehicle Information Systems (CVISN) Program Plan

2017 Highway Safety Improvement Program Call

TEXAS FREIGHT MOBILITY PLAN: DRAFT KEY POLICY RECOMMENDATIONS

BQE Atlantic to Sands Project Overview. 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities

Updating Virginia s Statewide Functional. Brad Shelton, VDOT Chris Detmer, VDOT Ben Mannell, VDOT

eperformance Chapter 1. Primary reviewer completing the employee s appraisal

Smarter Work Zones Webinar Series

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House

Recommended Roadway Plan Section 3 Existing Facilities & System Performance

APPENDIX A: USER S MANUAL RSAP Version 3.0.0

OPEN DATA & PROJECT TRACKER. Michael Chamberlain TPP, Data Management

Intelligent Transportation System - I

2.1 The Contractor shall furnish and maintain this system for measuring and delivering realtime messages for the work zone.

Precast Concrete Pavement (R05)

Incorporating Hauling Permits Into the RUMA Process

Functional Requirements

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma)

RIDOT S Statewide Roadway and Asset Data Collection Project

Enhanced Analysis of Work Zone Safety through Integration of Statewide Crash Data with Lane Closure System Data

Benefit Cost Analysis Narrative

Oversize/Overweight Permitting Practices Review. FINAL REPORT October Submitted by

New Jersey Turnpike Authority

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL

Introduction. Minnesota Trucking Regulations

Transcription:

Automated Permitting and Routing for OS/OW GIS-T, 2010 Session 4.3.1 Jay Adams - Oklahoma DOT

Agenda Business Problem Project Background and Goals High-Level Needs Project Approach Expected Benefits Solution Overview Status of Project

Business Problem Experienced exponential growth in OS/OW truck traffic Agriculture, Oil, and Gas Industries power the Oklahoma Economy Issues more than 200,000 permits per year (~800 per day) Limited resources to fill the requests Increased pressure by the trucking industry Carriers were waiting three days to a week for a permit Economic issues were prevalent Delay in permits encouraged carriers to operate without a permit

Project Background and Goals In 2008 the Oklahoma Legislature met with ODOT and established improvement to the OS/OW permitting and routing process as a priority Goals Improve public safety Improve the permitting process to foster economic development Ensure trucking companies have confidence in receiving a permit in a timely manner

High-Level Needs Innovative and Modern design Account for the Commercial Trucking Interests Provide permit within minutes rather than days Reduce dun-permitted travel Reduced idle time Fully accessible via the internet Automate permit issuance for standard OS/OW moves Automate the routing to account for road and bridge constraints Live Load Analysis of bridge structures Utilize existing GIS, LRS, Roadway, and Bridge data Timely turnaround of permit requests Account for real-time roadway restrictions

Project Approach 2009 ODOT and ODPS issued an RFP for an Automated OS/OW Solution for Permitting and Routing Key Stakeholder: Legislature, DOT, DPS, Commercial Trucking Industry, Vendors and the general public Intergraph / Cambridge team selected to deliver the solution Intergraph Leader in GeoSpatial Technologies Leader in Routing Technology Cambridge Systematics Industry leader in freight operations and commercial trucking policies Leader in truck permitting

Expected Benefits Keep pace with increase in demand for OS/OW permits Preserve the state s roadway infrastructure Ensure public safety Improve customer service Reduced permit turnaround time Streamline permit issuance process Log the permitted route for monitoring and analysis of: Movement of OS/OW traffic over the state s highways Impact of these movements on the state s structures Reduced human errors Robust and more accurate reporting Reduced training time for permit staff Accurate tracking of financials

OKiePROS Oklahoma Permitting and Routing Optimization System

Four Primary Solution Components Permitting Web interface for entering permit request Routing Web interface for analyzing route Restriction Management Web interface for managing roadway and bridge restrictions Solution Architecture Centralized solution database in Oracle Cambridge Permit cs For Permitting Intergraph s Routing Web Service NAVTEQ Routing Network Data Oklahoma DOT bridge and roadway data

Permitting Support on-line application submission and retrieval of permits Screen incoming permit applications Manage workflow across different sections within the agency (Permits, Bridge Evaluation, etc.) Handles a variety of payment methods Customer can print approved permit and associated documents Accessible to roadside enforcement personnel

Routing Roadway and bridge data for network constraints Create detailed driving directions Ability to Save and recall commonly used routes for later use Integrate with bridge analysis software (VIRTIS) Place on hold a route request for review by engineering or permitting Ability to capture notes or instructions to the carrier (i.e. Drive 10 MPH in the left lane between points A and B) Ability to produce robust administrative and operational reports

Restriction Management Map Based Restriction Management Temporal management for restrictions Override existing roadway and bridge constraints On-the-fly entry of temporary restrictions (network constraints) Crash event Construction projects (lane closure, reduction in roadway capacity) Road segment closure Bridge postings or vertical / horizontal clearances Entry of route notifications such as traffic delays. Identify active permits affected by temporary restrictions

Development Plan Test Test Develop Test Deployment Develop Deployment Develop Deployment Design Design Design Project Kickoff Action: Initial Requirements and Gap/Fit Analysis Result: Initial High Level Requirements, Initial Functionality for Review Iterations 1...N Action: Joint Application Development (JAD) Sessions Result: Incremental Delivery and Evolution of Functionality and Documentation Implementation Action: Final Installation Result: System Operational Requirements, Design and Use Documentation Complete

Automated Routing

Automated Routing Origin Vehicle Height=14'-6" Width = 19' Vertical=14' Roadway Width=18' Update the Permit with A Map & Driving Directions Automated Routing Application Creates The Safe Route 1. Road Network 2. Apply Roadway Restriction 3. Enter Vehicle and Load Information 4. Enter Origin and Destination 5. Submit Route Request Destination

Automated Permitting and Routing for Oversized and Overweight Vehicles

Requestor Information Permit Type Permit Information Vehicle Information Weight Information Dimension Information Route Information Route Calculation Shortest Valid Route O Get Route using: Interstates and States only Request Submittal 1 D

Find Location Locate by County Route Postmile County: Muskogee Route: 16 Milepost: 68 Find Locate by County Intersection County: Muskogee Route1: 16 Route2: 251A Find Edge Maintenance Turn Maintenance Temporary Closures Test Network Submit Edits

Find Location Edge Maintenance Select a route segment (edge) in the Map view to edit its properties. Click Done when finished editing this edge. Average Speed: 50 OneWay: Both One way-incr. ways One way-incr. # of Lanes: 4One way-decr. Min Lane Width: 11 Max Allow Weight: 16 Max Allow Height: 16 Max Allow Length: 16 Done Turn Maintenance Temporary Closures Test Network Submit Edits

Find Location Edge Maintenance Turn Maintenance Select the 2 edges that define the turn. Click Done when finished editing this turn. Restricted: Allowed Max Turn Radius: 90 ft. Restriction Type: Permanent Temporary From: To: Done Temporary Closures Test Network Submit Edits

Find Location Edge Maintenance Turn Maintenance Temporary Closures Click the From and To points for the closure. Type: Maintenance Curb to curb width: 48 ft. Restriction Dates: From: 8/3/09 To: 8/6/09 Done Test Network Submit Edits

Turn Maintenance Temporary Closures Test Network Test vehicle: Super-load Select a predefined route 2 Category: Test Routes Route: I35 I44 Select route points using the map Add Click on the Add button, then select a location by clicking on the map Select route points by description Key in a street address, intersection, or business name and then click on the Add button Add SR 16 @62.1 SR 16 @70.2 Get Route Submit Edits using: Interstates and States only 1

Find Location Edge Maintenance Turn Maintenance Temporary Closures Test Network Your edits have been posted successfully. Submit Edits Select which edits to accept and then click Submit or click Discard to delete all edits. Location SR 16 (65.5-71.1) SR 16 (66.5-68.9) Edit Type 2 way to 1 way-incr Temporary lane closure Accept Submit Discard

Project Status Iterative project delivery methodology Iteration 2 Delivered Basic Permitting Application form complete Some business rules and data constraints accounted for Initial administrative functions Customer Account Management User Management Basic Routing (Point to Point) Iteration 3 Planned for May Further enhanced functionality Project completion scheduled for April 2011

Thank You! Questions?