IFC Issued for Construction Jul 30, 2013

Similar documents
FLOW DIAGRAMS & PIPING LISTS. Copyright 2007 Fluor Corporation. Lesson Objectives: Lesson Objectives. Flow Diagrams. Flow Diagrams

Fluor s Econamine FG Plus SM Technology

CO 2 CAPTURE FOR GAS PLANT. Robin Irons E.ON Innovation Centre, CCS Millbank, May 2013

Coker Safety and Reliability Lessons Learned

GENESEE GENERATING STATION UNITS 4 AND 5 WATER CONSUMPTION AND EFFLUENT DISCHARGE CHARACTERIZATION REPORT

McQuay. Air Cooled Condensing Unit. ALP Vintage D. Last Manufactured: Replacement Parts List No Revision E 09/2016

City of San Juan Bautista Well 6 Project ADDENDUM No. 1 July 6, 2018

SYNTHETIC NATURAL GAS PLANT. Philadelphia, PA

A new MAB-series solvent that can break ultimate energy goals of 1.9 GJ/t-CO2 and 190 kwh/t-co2

Holds a B. Sc. in Mechanical Power Engineering and has over 15 years hands-on experience working in operation, commissioning and start-up.

Energy Efficient. & Cost Saving. Continuous Boiler Blowdown Package Heat Recovery Systems. 20 Models from 1,200 pph to 50,000 pph Capacity

AP1000 European 21. Construction Verification Process Design Control Document

Caledonia Clean Energy Project Grangemouth

2/24/2011. Energy Efficiency. Fluid Sealing Association. The Beginning. Fluid Sealing Association

Boiler Energy Efficiency & Overview of Economizers

Appendix 8.5 Equipment Summary & Specification Sheets

ENGINEERING OF NUCLEAR REACTORS OPEN BOOK FINAL EXAM 3 HOURS

ENCON IN THERMAL SYSTEM

Introduction of energy savings by CO2 refrigeration systems in SM/CVS. Feb. 3 rd 2014 Panasonic Corporation Air-Conditioner Division Gaku Shimada

PRODUCT DESCRIPTION PARAMETERS

EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON-APPLICABILITY (NA).

Best Practises in Steam System

Thermal Distribution in District Energy and Cogeneration Systems

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017

P _扉_サイトグラス :14 PM ページ 1 Sight Glass 277 資料-00

Westinghouse AP1000 Nuclear Power Plant

DUKE UNIVERSITY CONSTRUCTION STANDARDS

Energy Conservation. Work Shop on Knowledge exchange Platform on Best practices in Iron & Steel Industry. By MCJ Energy Engineers Pvt Ltd

Optimization of an Existing Coal-fired Power Plant with CO 2 Capture

Troubleshooting Piping Systems

Steam Cooling Systems and Hybrid Cooling. Andrew G. Howell Xcel Energy

GS Quest CCS Project RAM Study Final Report

ATS Le Grandiose, Sector 150 Noida. Energy Conservation Building Code (ECBC) Compliance Report

CONSTRUCTION FOR THE VILLAGE ARTS FACTORY DORMITORY PHASE 2

Exploring inter-process heat integration opportunities for increased energy efficiency in industrial process clusters

Modular Oil & Gas Equipment Onshore & Offshore

Chevron Shell Suelopetrol Repsol

CO2 in Vending Machine

Maxi-Therm Since 2002, throughout North America, Maxi-Therm has been manufacturing innovative packaged solutions for informed specifiers.

Solvent Recovery Systems

Quest CO2 Capture Ratio Performance

R & R IDENTIFICATION CO.

Case Studies in Energy Efficiency and Water Conservation Projects

MEC-MOS-E-2004 Gas Turbine Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

26.36 Mass Transfer (Optimum Reflux Ratio)

NEBBinar: Managing Building Performance through Commissioning. March 28, 2013

Fluor's Econamine FG Plus SM Technology

Yemen LNG Operational feedbacks

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

Downsizing a Claus Sulfur Recovery Unit

Heavy Oil Controlled Document Corrosion Management Framework Project Document Title Document Number Document Revision Document Status Document Type

Available online at ScienceDirect. Energy Procedia 63 (2014 ) GHGT-12

Advanced Centrifugal Compression and Pumping for CO 2 Applications

Post Combustion CO 2 Capture Scale Up Study

Thermodynamic performance of IGCC with oxycombustion

COOLING COIL (35% ETHYLENE GLYCOL)

ChE 455 Fall 2001 Major 1. Ethylene Oxide Production

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

COKE-OVEN GAS PROCESSING EQUIPMENT

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi

UOP Selexol TM Technology Applications for CO 2 Capture

TOWNSHIP OF UPPER DEERFIELD

Existing Building Cx: Processes & Results A Cultural Journey. Barry Abramson Senior Vice President Servidyne

KEPCO KEPRI Kim eui hwan

CANSOLV SO2 Scrubbing System - 10 Years of Reliable Operation Integration with SRU Tail Gas Incineration

SOFCOM Mid Term Review

Best Practices in Energy Efficiency at ITC Limited - Paperboards & Specialty Papers Division

ACTEW Water. Work Instruction - Treatment Valves and Piping Systems Identification

AgriClean Mesophilic Digester and AgriJet Flush System

Dr. Nasr Professor in Chem. Eng. Member of Board of Director RIPI

Fossil Energy. Fossil Energy Technologies. Chapter 12, #1. Access (clean HH fuel) Coal. Air quality (outdoor)

UNIVERSITY OF ALABAMA AT BIRMINGHAM DEPARTMENT OF FACILITIES PLANNING

Advanced Sulfur Technologies for Mega Size Sulfur Complexes in Arid Environments. Presented by Thomas Chow

Problems at the Cumene Production Facility, Unit 800

GUJARAT STATE FERTILIZERS & CHEMICALS LTD.

Corrosion in GASCO Habshan CBA Units and its mitigation

System & Equipment Checkout Procedure Client Name Plant Location

TEK-B AR 3800E. Multivariable Pressure Transmitter. PRESSURE. Technology Solutions


HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares.

1. Project Definition. 2. Engineering Technical. 3. Engineering General. Project System Audit Bulk (Piping) Take-off

Synergies between process energy efficiency and relief loads

NWC District Energy Campus Energy - RFQ Supporting Documentation. April 25, 2018

18 th National Award for Excellence in Energy Management

PROCESS & PRODUCTION ENGINEERING DIRECTORY

Development of the First Combined Heat and Power plant in the Caribbean (CHP District Energy)

Power Plant Water Usage and Loss

Filtration for Oil and Gas

Fluid Mechanics, Heat Transfer, and Thermodynamics Fall Design Project. Production of Dimethyl Ether

Metropolitan Community College COURSE OUTLINE FORM

PI Heat and Thermodynamics - Course PI 25 CRITERION TEST. of each of the following a. it

Toxics Substance Reduction Plan Summary For. Particulate Matter (PM10) Particulate Matter (PM2.5) Grenville Castings 1 Conlon Drive Perth, ON K7H 3N1

TCN 02, Dated: WITH REFERENCE TO ABOVE FOLLOWING CHANGES MAY PLEASE BE NOTED AND COMPLIED WHILE SUBMITTING THE OFFER FOR THE SUBJECT JOB:

LANXESS CO 2 Capture plant

Bid Package 22A Plumbing Systems

Delayed Coker Blowdown System Water Reuse

Example Pressurized Water Reactor Defense-in-Depth Measures For GSI-191, PWR Sump Performance

BEYOND O&M. Shawn Maurer SEDAC Building Energy Specialist. Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign

PRICE BID SPECIFICATION

Transcription:

Jul 30, 013

Jul 30, 013

Jul 30, 013

Jul 30, 013

4 3 1 NOTES: 1. SEE RAWINGS 00.0000.000.041.007 THRU 016 FOR SYMBOL IENTIFICATION GENERAL NOTES & CONNECTION ETAILS.. ALL INSTRUMENT TAG NUMBERS ARE PREFIXE BY "46" UNLESS OTHERWISE STATE. 3. LOW POINTS AN RAINS REQUIRE ET AN INSULATION. CO RELIEF / VENT 1809 47.001 FROM 1ST STAGE C0 VENT COLLECTION HEAER 14"VA4700PJB(0.4) 3 FREE RAINING C C N/A CO VENT VENT GAS 4"VA47001PJB(0.4) 4"VA47001PJB(0.4) 1471 47.001 1474 FROM PV47001 FREE RAINING FREE RAINING TO S4603 46.06 CO 137 47.010 FROM 8TH STAGE C0 VENT COLLECTION HEAER 8"VA47009PJE(C) FREE RAINING FREE RAINING 3 8"VA47009PJE(C) VENT GAS 13011 TO S4603 46.06 ISSUE FOR CONSTRUCTION 01 Nov 01 B 1 10/1/1 ISSUE FOR CONSTRUCTION GB KB KH LMF EM 0 09/15/11 ISSUE FOR ESIGN GB KB KH LMF EM M G 07/11/11 ISSUE FOR PHA III F 04/0/11 ISSUE FOR ESTIMATE E 03/01/11 ISSUE FOR PHA II 01/10/11 ISSUE FOR CLIENT REVIEW C 1/0/10 ISSUE FOR INTERNAL REVIEW REV ISSUE ATE ESCRIPTION BY CK PRS CS PP MC APE PEM CLIENT APP 4 3 1 SCALE: NONE SHELL WG NO.: SHELL CANAA QUEST CCS PROJECT PIPING AN INSTRUMENT IAGRAM QUEST CCS PROJECT UNIT 46 REGENERATION/COMMON VENT GAS COLLECTION 46.0000.000.041.03 R REV. 1 A 46.03 FILE:\\F:\105\RAWINGS\CO\46\46.03.pid MOEL ATE:10/1/01 :4:19 PM BY:mak65766

Jul 30, 013

Jul 30, 013

Jul 30, 013

Jul 30, 013

ISSUE FOR CONSTRUCTION 09 Sep 013

ISSUE FOR CONSTRUCTION 09 Sep 013

ISSUE FOR CONSTRUCTION 09 Sep 013

4 3 1 NOTES: 1. SEE RAWING 00.000.000.041.007 THROUGH 016 FOR SYMBOL IENTIFICATION. GENERAL NOTES & CONNECTION ETAILS.. SEAL FLUSH TAKEOFF POINTS TO BE AT A HIGHER ELEVATION THAN THE PUMP SEAL GLAN TO ENSURE AEQUATE SELFVENTING OF MECHANICAL SEALS. 3. INSULATION AN TRACING IN FLUOR SCOPE 3 1/" FO (1) PLUGGE VENT SEAL GLAN PLUGGE QUENCH 1/" FO () PLUGGE RAIN 3 3 V FO 1/" SEAL GLAN SEAL PLAN: 14 RECIRCULATION FROM PUMP ISCHARGE THROUGH PUMP SEAL CHAMBER THROUGH A FLOW CONTROL ORIFICE AN BACK TO THE PUMP SUCTION SEAL PLAN: 13 RECIRCULATION THROUGH PUMP SEAL CHAMBER THROUGH A FLOW CONTROL ORIFICE AN BACK TO THE PUMP SUCTION EQUIPMENT # SERVICE PROCESS P&I # FO (1) INSTRUMENTS FO () PUMP TRIM # PROCESS LINE # EQUIPMENT # SERVICE PROCESS P&I # INSTRUMENTS FO PUMP TRIM # PROCESS LINE # P4604 AMINE REINVENTORY PUMP 46.01 FO4681 FO468 PT46009AB P46086AB P4609A WATER MAKEUP PUMP 46.0 FO461 PT46014SAG SC46018SAG P4605 AMINE MAKEUP PUMP 46.01 FO4691 FO469 PT46010AB P46087AB P4609B WATER MAKEUP PUMP 46.0 FO46151 PT46015SAG SC46019SAG C C FO 3 E4609X VENOR "x FLUOR "x TW BACK FLUSH V CSO 46.05 CWS 1401 46.05 CWR 140 TO PROCESS RAWING P&I NO. 1/" TUBING 1/" FLUOR VENOR 3 PLUGGE VENT SEAL GLAN PLUGGE QUENCH PLUGGE RAIN V Jul 30, 013 B SEAL PLAN: 13/61 RECIRCULATION THROUGH PUMP SEAL CHAMBER THROUGH A FLOW CONTROL ORIFICE AN BACK TO THE PUMP SUCTION PUMP GEARBOX OIL COOLING 1 07/08/13 0/05/13 ISSUE FOR CONSTRUCTION ISSUE FOR CONSTRUCTION GB GB KB KB KH KH SL SL BB EM EQUIPMENT # SERVICE PROCESS P&I # INSTRUMENTS FO PUMP TRIM # PROCESS LINE # EQUIPMENT # SERVICE PROCESS P&I # INSTRUMENTS TW CWS LINE NUMBERS CWR OIL COOLER TAG # REV ISSUE ATE ESCRIPTION BY CK PRS CS PP MC APE PEM CLIENT APP P4603A P4603B P4608A P4608B P4610A P4610B STRIPPER REFLUX PUMP STRIPPER REFLUX PUMP RECOVERE CLEAN CONENSATE PUMP RECOVERE CLEAN CONENSATE PUMP EMIN WATER SUPPLY PUMP EMIN WATER SUPPLY PUMP 46.006 46.006 46.01 46.01 46.03 46.03 FO4661 FO4671 FO46171 FO46181 FO46301 FO46311 PT46001PJB(0.4) PT4600PJB(0.4) PT4601SAB PT46013SAB PT46016UJB(0.4) PT46017UJB(0.4) P460PJB(0.4) P4603PJB(0.4) SC46003SAB SC46004SAB WI4600UJB(0.4) WI46003UJB(0.4) P4609A P4609B WATER MAKEUP PUMP WATER MAKEUP PUMP 4 3 1 46.0 46.0 TW461 TW46151 "CWS4604UAB "CWS46043UAB "CWR4605UAB "CWR4606UAB E4609A E4609B SCALE: NONE SHELL WG NO.: SHELL CANAA QUEST CCS PROJECT PIPING AN INSTRUMENT IAGRAM QUEST CCS PROJECT UNIT 46 REGENERATION/COMMON OH3 PUMPS SEAL PLAN & OIL COOLING ETAILS 46.0000.000.041.049 R REV. A 46.049 FILE:\\F:\105\RAWINGS\CO\46\46.049.pid MOEL ATE:7/15/013 :5:53 PM BY:bes9451

ISSUE FOR CONSTRUCTION 09 Sep 013

ISSUE FOR CONSTRUCTION 09 Sep 013

ISSUE FOR CONSTRUCTION 09 Sep 013

ISSUE FOR CONSTRUCTION 09 Sep 013

1. SEE RAWINGS 00.0000.000.041.007 THRU 016 FOR SYMBOL IENTIFICATION GENERAL NOTES & CONNECTION ETAILS. 85.17 EMIN WATER FROM HEAER WASTE WATER TO WWTP 71 85.17 85.17 85.17 85.17 INSTRUMENT AIR FROM HEAER UTILITY AIR FROM HEAER LP STEAM FROM HEAER LOW TEMP HP STEAM 85.17 HOT EMIN WATER TO V510 85.17 LEAN AMINE TO V44118 FROM HEAER 85.17 RICH AMINE FROM V44118 85.17 85.17 85.17 85.17 NITROGEN FROM HEAER LP CONENSATE FROM HEAER TRAPS RECOVERE CLEAN CONENSATE TO TK5101 UTILITY WATER FROM HEAER 85.17. ALL INSTRUMENT TAG NUMBERS ARE PREFIXE BY "46" UNLESS OTHERWISE NOTE. 3. CONNECTION FOR UTILITY WATER TO QUENCH POC IF REQUIRE BY WWTU. 4. CONNECTION FOR TEMPORARY SUPPLY. 5. LOCALIZE EGASSING OF CO MAY OCCUR AT RESTRICTIONS, BENS, TEES, ETC. RESULTING IN LOCALIZE TWOPHASE FLOW AN VIBRATION. TWO PHASE FLOW 85 85 46 46 RS RS RS RS RS RS RS 85 46 "SCL46009SAB "x T SAB "x NA T 46 4"WP4600PJB(0.4) 3"AI46001ULB "WU46001UAB "AU46001ULB 10"SL4601SAB 36"SL46001SAB "SS48001SAG 6"SC46008SAB 6"WI46007UJB(0.4) 10"P4600JE(0.4) TWO PHASE FLOW 1460 1458 46.030 46.030 NITROGEN TO ISTRIBUTION UTILITY AIR TO ISTRIBUTION 1459 46.037 INSTRUMENT AIR TO ISTRIBUTION 1614 1686 WASTE WATER 46.07 FROM P4603A/B / P4607 46.001 RICH AMINE TO E460A/B 1470 H 46.031 1615 1681 UTILITY WATER TO ISTRIBUTION RECOVERE CLEAN CONENSATE FROM P4608A/B HOT EMIN WATER FROM E4606A/B LEAN AMINE 1 46.07 46.00 46.011 FROM P460A/B/C TO P4610A/B RS EMIN WATER 1137 46.03 "SCL46009SAB 4 3 1 5 "GI868ULB 4"WP834PJB(0.4) 3"AI851ULB "WU841UAB "AU85148ULB 36"SL85145SAB "SS858SAG "SCL801SAB 6"SC8510SAB 6"WI803UJB(0.4) 10"P85156JE(0.4) 14"P85155AG H N/A SAG 18" GI869ULB SL4603SAB "x " " " 4 4 4 85 46 85 48 85 6"WI46001UJB(0.4) REV ISSUE ESCRIPTION BY CK PRS CS PP MC APE PEM ATE 5 SHELL CANAA "GI46001ULB 14"P46081AG 4 3 1 SCALE: NONE SHELL WG NO.: REV. C B A 6"WI80UJB(0.4) C NOTES: QUEST CCS PROJECT R PIPING AN INSTRUMENT IAGRAM QUEST CCS PROJECT CLIENT APP 63 SS864SAG H 46.09 LP STEAM 14048 TO ISTRIBUTION 46.09 LP CONENSATE 14049 TO V4607 " AU85149ULB US46019 US46019 US46019 WU84UAB "x 3 07/08/13 ISSUE FOR CONSTRUCTION GB KB KH SL BB 1 09/8/1 ISSUE FOR CONSTRUCTION GB KB KH LMF EM 0 G 09/15/11 07/11/11 ISSUE FOR ESIGN ISSUE FOR PHA III GB KB KH LMF EM F 04/0/11 ISSUE FOR ESTIMATE E 03/01/11 ISSUE FOR PHA II 01/10/11 ISSUE FOR CLIENT REVIEW 63 H TWO PHASE FLOW M 46.101 FILE:\\F:\105\RAWINGS\CO\46\46.101.pid MOEL ATE:7/18/013 1:17:56 PM BY:bes9451 SCL46008SAB FI 094 "x FT 094 "x H H H 46.003 LP STEAM 14104 TO ISTRIBUTION LOW TEMP HP STEAM 48.00 1545 TO E480 UNIT 46 REGENERATION/COMMON NORTH BATTERY LIMITS 46.0000.000.041.101 Jul 30, 013 6"WI46001UJB(0.4)