PLANNING DECISION NOTICE

Similar documents
an Inspector appointed by the Secretary of State for Communities and Local Government

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

APPENDIX A: AT: CRICKLEWOOD SIDINGS, LAND REAR OF BRENT TERRACE (SOUTH) CRICKLEWOOD LONDON NW2 1BX DRAFT PLANNING CONDITIONS

an Inspector appointed by the Secretary of State for Communities and Local Government

Reference: 17/0150/HSE Received: 11th January 2017 Accepted: 11th January 2017 Ward: West Finchley Expiry 8th March 2017

30 Grimsdyke Crescent, Barnet, Herts, EN5 4AG

an Inspector appointed by the Secretary of State for Communities and Local Government

LOCAL MEMBER OBJECTION

LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989

Final Revisions: Reason: For the avoidance of doubt and in the interests of proper planning.

11 Middleton Road London NW11 7NR

Committee date 5 th September 2018 Application reference 18/00338/FULM Blueprint Commercial Centre Imperial Way

DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS OF THE 2012 DEEMED PLANNING PERMISSION (TRACK CHANGE)

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

13/01259/FULM Description of Development: Demolition of existing factory and erection of new building for warehousing/light industrial use Applicant:

Case Officer: Tony Wallace File No: CHE/15/00050/FUL Tel. No: Plot No: 2/ st June 2015 ITEM 1

Residential Development For Sale Cheltenham

87 Bridge Lane London NW11 0EE. Reference: 17/3752/FUL Received: 13th June 2017 Accepted: 14th June 2017 Ward: Golders Green Expiry 9th August 2017

17th OCTOBER 2017 PLANNING COMMITTEE. 5e 17/0877 Reg d: Expires: Ward: c. Number of Weeks on Cttee Day:

11 Rundell Crescent London NW4 3BS

Application Recommended for Approval Lanehead and Briercliffe Ward

Application Number: 12/00858/FUL Other Change of use from agricultural barn to dwelling

9.3.9 Industry uses code

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day:

This is a 'major' planning application and the Town Council has objected. DETERMINE RECOMMENDED Full Application - Granted

DEMOLITION OF EXISTING GARAGE AND CONSTRUCTION OF TWO STOREY SIDE AND REAR EXTENSION INCORPORATING A JULIET BALCONY AND CHIMNEY. PORCH TO FRONT.

Mid Suffolk District Council Planning Control Department 131 High Street Needham Market IP6 8DL

APPLICATION FOR PLANNING PERMISSION

47 Finchley Lane London NW4 1BY. Reference: 17/4134/FUL Received: 28th June 2017 Accepted: 7th July 2017 Ward: Hendon Expiry 1st September 2017

Town & Country Planning Act Notice of Planning Permission for Variation/Non-Compliance with a condition imposed on an earlier permission

FRINGE COMMERCIAL ZONE RULES

Report to: Development Management Section Head. Date of Committee: 10 th May 2017

Householder Alterations Local Development Order

The development to which this permission relates shall be begun within a period of three years from the date of this permission.

366 Watford Way London NW4 4XA. Reference: 18/0289/HSE Received: 15th January 2018 Accepted: 15th January 2018 Ward: Hendon Expiry 12th March 2018

UTT/17/3078/FUL (STANSTED ) (Referred to Committee by Cllr Sell. Reason: Due to traffic impact)

CA/15/01209/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2015 Ordnance Survey

Permitted Development for Householders: Guidance from Communities and Local Government. March 2010 Department for Communities and Local Government

Management Plan: Hazardous Materials Removal & Demolition

366 Watford Way London NW4 4XA. Reference: 18/0289/HSE Received: 15th January 2018 Accepted: 15th January 2018 Ward: Hendon Expiry 12th March 2018

Ibsa House, The Ridgeway, London, NW7 1RN

RECOMMENDED Outline Application - Approval recommended. That Planning Permission be granted subject to completing a S106 agreement the following:

YORKSHIRE DALES NATIONAL PARK AUTHORITY

Spectrum House Hillview Gardens London NW4 2JR

CONDITIONS & SECTION 106 AGREEMENT

PLANNING COMMITTEE REPORT

105/105A Ballards Lane London N3 1XY

CONSENT UNDER SECTION 36 OF THE ELECTRICITY ACT one or more heat recovery steam generators;

Domestic Enquiry Form

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

Draft Policy Review. Use of Shipping Containers

North York Moors National Park Authority. Director of Planning s Recommendation

Rear of 39 Somerset Road, Barnet, Herts, EN5 1RL. Final Revisions:

MAIN RESIDENTIAL ZONE RULES

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0067 Grid Ref:

SUBURBAN COMMERCIAL ZONE - RULES

MAIN INDUSTRIAL ZONE RULES

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps.

REFERENCE: F/03767/12 Received: 05 October 2012 Accepted: 05 October 2012 WARD(S): West Finchley Expiry: 30 November 2012.

Reference: 16/5632/FUL Received: 25th August 2016 Accepted: 8th September 2016 Ward: Totteridge Expiry 8th December 2016

ULDA Decision Notice

Description of Development: Extension at first and second floors to create additional retail floorspace (Class A1)

APPENDIX A LONDON BOROUGH OF BARNET

SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE APRIL 2011 APPLICATION FOR PLANNING PERMISSION

Policies Hastings Local Plan 2004:

5.9 MARAE DEVELOPMENT ZONE

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential

Report by the Executive Director of Community and Environmental Services

53 And The Market Place Falloden Way London NW11 6JT

4 Green Lane London NW4 2NN. Reference: 18/3509/FUL Received: 6th June 2018 Accepted: 11th June 2018 Ward: Hendon Expiry 6th August 2018

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies

25 May 2016 PLANNING COMMITTEE. 5a 15/0959 Reg d: Expires: Ward: KNA. 126, High Street, Knaphill, Woking, GU21 2QH

QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 BUSINESS MIXED USE

SCHEDULE 2 TO THE COMPREHENSIVE DEVELOPMENT ZONE THE SANDS TORQUAY RESIDENTIAL LAKES AND GOLF COURSE COMPREHENSIVE DEVELOPMENT PLAN

RURAL CONSERVATION ZONE

Application No: Location: Old Police Station, 37 Queen Street, Colchester, CO1 2PQ. Scale (approx): 1:1250

Motueka Aerodrome. Development Plan. March 2012 REVIEW SCHEDULE. Date Approved. Comments. Issue #

Winston House, 2 Dollis Park, London, N3 1HF & 4 Dollis Park, London N3 1HG & Regents Park Road, London, N3 1DH

10.1 OBJECTIVES. Note: Refer to Section 6 for Issues, Methods of Implementation, and Environmental Results Anticipated.

(DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION

Andrew McDonough. Town and Country Planning Act 1990 Planning Permission

Residential Development Site For Sale Cheltenham

Final Revisions: Change of use from A1 (Retail) to (Recording Studio).

LOCATION: Mowbray House, Edgware Way, Edgware, Middx, HA8 8DJ REFERENCE: H/01384/12 Received: 06 April 2012 Accepted: 10 July 2012 WARD(S):

20 MARCH 2018 PLANNING COMMITTEE. 5g 18/0104 Reg d: Expires: Ward: PY. 23 (LBC) Number of Weeks on Cttee Day:

This marked up copy of part 10a.12 shows the amendments resulting from the council s decision on submissions to part 10a.12 (decision report no.

Parish: Shenley Brook End & Tattenhoe PC

Woking Borough Council. Local Development Documents

IMPLEMENTATION GUIDELINE NO. 23

Stage 6 & 7 Design Guidelines

Planning Committee 24/06/2015 Schedule Item 07

Application for Planning Permission. Town and Country Planning Act 1990

06 February 2018 PLANNING COMMITTEE. 5a 17/0666 Reg d: Expires: Ward: SJS. Number of Weeks on Cttee Day: Minor dwellings - 13

CORK COUNTY COUNCIL. Reenrour West Bantry Co. Cork

Since September 2002 a motor vehicle repair garage has occupied Unit 1.

Extensions to Domestic Dwellings

PART R3-L ZONE, LOW DENSITY MULTIPLE DWELLING DISTRICT

CONSENT UNDER SECTION 36 OF THE ELECTRICITY ACT 1989

Transcription:

] SPACEukONE Limited C/O Kember Loudon Williams LLP F.A.O. Martin Hull Ridgers Barn, Bunny Lane Eridge Tunbridge Wells Kent TN3 9HA 13 October 2017 PLANNING DECISION NOTICE APPLICANT: DEVELOPMENT TYPE: SPACEukONE Limited Minor Dwellings APPLICATION REFERENCE: 17/02720/FULL PROPOSAL: ADDRESS: Demolition of part of existing building; Erection of an apartment block extension, conversion of existing building to apartments, new access, landscaping and parking; Commercial unit on ground floor The Velo House, 5 St Johns Road, Royal Tunbridge Wells, Kent, TN4 9TN The Council hereby GRANTS permission/consent for the proposal referred to above subject to the following Condition(s): (1) The development hereby permitted shall be begun before the expiration of 3 years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. Tunbridge Wells Borough Council, Planning Services, Town Hall, Tunbridge Wells, Kent TN1 1RS - 01892 554604

(2) The development hereby permitted shall be carried out in accordance with the following approved plans: P 320 Rev B Proposed ground floor plan P 321 Rev B Proposed first and second floor plans P 322 Rev B Proposed Third floor and roof plan P 330 Proposed Plans area schedule P 470 Rev B Proposed Front and rear Elevations P 471 Rev B Proposed flank Elevations and Sections Reason: To clarify which plans have been approved. (3) Notwithstanding the details submitted written details including source/ manufacturer, and samples of bricks (with a sample to be provided on site), tiles, cladding and all roofing materials to be used externally shall be submitted to and approved in writing by the Local Planning Authority before the development is commenced and the development shall be carried out using the approved external materials. Reason: In the interests of visual amenity. (4) No development shall take place until detailed plans and information regarding the following aspects of the proposed development have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the approved details : Details relating to materials, including windows, window glazing and joinery details (including recess depths dimensions); The detailed design of any balcony structures, loggias, shared entrance doorways to flats and private doorway entrances to include materials, lighting, door, colour and canopy design; Details relating to materials to be used in the construction of all walls, fences or other means of enclosure, including parking forecourt gates; including capping details of any boundary wall; Details of external lighting. Reason: To ensure the built quality of the development (5) No development shall take place until details for the disposal of foul sewage and surface water have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: To avoid pollution of the surrounding area.

(6) Prior to the commencement of the development a Code of Construction Practice shall be submitted to and approval in writing by the Local Planning Authority. The construction of the development shall then be carried out in accordance with the approved Code of Construction Practice and BS5228 Noise Vibration and Control on Construction and Open Sites and the Control of dust from construction sites (BRE DTi Feb 2003).unless previously agreed in writing by the Local Planning Authority. The code shall include: - An indicative programme for carrying out the works - Measures to minimise the production of dust on the site(s) - Measures to minimise the noise (including vibration) generated by the construction process to include the careful selection of plant and machinery and use of noise mitigation barrier(s) - Maximum noise levels expected 1 metre from the affected façade of any residential unit adjacent to the site(s) - Design and provision of site hoardings - Management of traffic visiting the site(s) including temporary parking or holding areas - Provision of off road parking for all site operatives - Measures (including wheel wash) to prevent the transfer of mud and extraneous material onto the public highway - Measures to manage the production of waste and to maximise the re-use of materials - Measures to minimise the potential for pollution of groundwater and surface water - The location and design of site office(s) and storage compounds - The location of temporary vehicle access points to the site(s) during the construction works - The arrangements for public consultation and liaison during the construction works Reason: To protect the amenity of local residents and in the interests of highway safety. This is pre-commencement to ensure that the site set up is secured at an early stage to ensure highway safety and the amenity of local residents.

(7) No development shall commence until the following components of a scheme to deal with the risks associated with contamination of the site shall have been submitted to and approved, in writing, by the local planning authority: (1) A preliminary risk assessment which has identified: - all previous uses - potential contaminants associated with those uses - a conceptual model of the site indicating sources, pathways and receptors - potentially unacceptable risks arising from contamination at the site. (2) A site investigation, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site. (3) A remediation method statement (RMS) based on the site investigation results and the detailed risk assessment (2). This should give full details of the remediation measures required and how they are to be undertaken. The RMS should also include a verification plan to detail the data that will be collected in order to demonstrate that the works set out in the RMS are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action. (4) A Closure Report is submitted upon completion of the works. The closure report shall include full verification details as set out in 3. This should include details of any post remediation sampling and analysis, together with documentation certifying quantities and source/destination of any material brought onto or taken from the site. Any material brought onto the site shall be certified clean; Any changes to these components require the express consent of the local planning authority. The scheme shall thereafter be implemented as approved. Reason: The reason these details are required prior to commencement are to prevent harm to the environment and protect the health and safety of construction workers and future occupiers. (8) If during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until the developer has submitted a remediation strategy to the local planning authority detailing how this unsuspected contamination shall be dealt and obtained written approval from the local planning authority. The remediation strategy shall be implemented as approved. Reason: To prevent pollution of controlled waters and comply with the NPPF. (9) Prior to above ground works the details of a suitable ventilation system shall be submitted to and approved by the planning authority. This should include the facility for cooling and purge ventilation. The approved scheme shall be installed maintained and retained following approval. Reason: The reason these details are required prior to commencement are in order to protect the occupiers of the dwellings from adverse air quality conditions.

(10) The ceiling and floor that separated the residential and commercial unit shall resist the transmission of airborne sound such that the weighted standardised difference (DnT, W + Ctr) shall not be less than 53 decibels. The weighted standardized difference (DnT, W) a spectrum adaption term, Ctr, is quoted according to BS EN ISO 10140; 2011 Acoustics- Measurement of sound insulation in buildings and of building elements- Part 4: Field measurements of airborne sound insulation between rooms. Reason: To protect the residential amenity of the locality. (11) The rating level of noise emitted from the proposed plant and equipment to be installed on the site (determined using the guidance of BS 4142 : 2014 Rating for industrial noise affecting mixed residential and Industrial areas) shall be at least 5dB below the existing measured background noise level LA90, T. In exceptional circumstances, such as areas with a very low background or where assessment penalties total above 5, the applicants consultant should contact the Environmental Protection Team to agree a site specific target level. Reason: To protect the residential amenity of the locality. (12) The recommendations of Able Acoustics report reference P1229/02 dated August 2017, shall be implemented in full. The measures shall then be retained and maintained to protect residents from environmental noise. Reason: To protect the residential amenity of the locality. (13) Prior to the first operation of the premises, a scheme and maintenance schedule for the extraction and treatment of fumes and odours generated from cooking or any other activity undertaken on the premises, shall be submitted to and approved in writing by the Local Planning Authority. Any equipment, plant or process provided or undertaken in pursuance of this condition shall be installed prior to the first operation of the premises and these shall thereafter be operated and retained in compliance with the approved scheme. Reason: To prevent the transmission of odours into neighbouring properties to protect amenity. (14) Prior to the occupation of any of the units hereby approved, details of the provision of at least 1 'fast charge' electric vehicle-charging point, including a timescale for its provision, shall be submitted to, and approved in writing by, the Local Planning Authority. The charging points shall be provided in accordance with the approved details and in accordance with an agreed timescale and retained thereafter. Reason: To ensure a satisfactory standard of development which meets the needs of current and future generations. (15) Prior to commencement of above ground works, a scheme of mitigation measures for the control of air quality, to include Low Nox boilers, shall be submitted to and approved in writing by the Local Planning Authority. The agreed scheme shall be implemented prior to the first occupation of the building. Reason: To ensure a satisfactory standard of development which meets the needs of current and future generations.

(16) Not withstanding the details submitted, no above ground works shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority and these works shall be carried out as approved. These details shall include means of enclosure/boundary treatment; the surfacing of vehicle and pedestrian access, circulation and parking areas; other hard surfacing materials; and structures as well as schedules of plants and should specify the type of material in which planting will take place and the depth of that material. The submitted details shall also include the identification of all trees and shrubs which are to be retained and detail the measures for protection, to accord with the current British Standard BS 5837. Reason: In order to protect and enhance the amenity of the area. (17) All planting, seeding or turfing comprised in the approved details of the landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development which ever is sooner and any trees or plants (including trees and plants shown to be retained) which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species, unless the Local Planning Authority gives written consent to any variation. Reason: Pursuant to Section 197 of the Town and Country Planning Act 1990 and to protect and enhance the appearance and character of the site and locality. (18) Prior to the commencement of above ground construction works, details of the finished ground floor levels, shown in relation to the existing and proposed site levels as well as eaves and ridge heights of neighbouring buildings, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be constructed in accordance with the approved details. Reason: To ensure a satisfactory appearance on completion of the development. (19) The area shown on the approved site layout plan as vehicle parking and turning shall be provided, surfaced and drained in accordance with details submitted to and approved in writing by the Local Planning Authority before the buildings they serve are occupied, and shall be retained for the use of the occupiers of, and visitors to, the development in accordance with the details approved in the preceding planning condition, and no permanent development, whether or not permitted by the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order), shall be carried out on that area of land so shown or in such a position as to preclude vehicular access to this reserved parking space. Reason: Development without provision of adequate accommodation for the parking and turning of vehicles is likely to lead to parking inconvenient to other road users.

(20) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order with or without modification), no gates, walls, fences or other means of enclosure shall be erected within the application site area. Reason: In the interests of highway safety. (21) Prior to the commencement of above ground works, details of the proposed vehicular crossing over St. Johns Road shall be submitted to and approved in writing by the Local Planning Authority, and the work shall be carried out in accordance with the approved details. Reason: In the interests of highway safety and to ensure a satisfactory appearance on completion of the development. (22) Prior to first occupation 1.0m x 1.0m x 45 degree pedestrian visibility splays shall be provided within the curtilage of the site and either side of each access way and anything greater in height than 0.6m above the height of the adjoining highway shall be permanently removed. The splays shall be maintained thereafter. Reason: In the interests of highway safety, pedestrian and vehicular. (23) A minimum headroom of 3.8m shall be retained throughout the car park. Reason: In the interests of highway safety. (24) The night safe deposit box shall be retained and maintained in its current position. Reason: In the interest of the historic environment and visual amenity. (25) Before the occupation of any part of the building, details of the balconies to be installed to all amenity areas, shall be submitted to and approved in writing, to include, screening panels to be installed to a height of 1.8m from the terrace or balcony, to be of obscured glass at least to the equivalent level of Pilkington level 3. The balconies shall be installed and maintained thereafter, in accordance with the approved details. Reason: To protect the residential amenity of the locality. (26) The commercial unit hereby approved shall only be occupied for A1 or B1 purposes and for no other use. Reason: In the interests of amenity.

Informative(s): (1) The applicant's attention is drawn to the comments of Scotia Gas Networks. (2) As the development involves demolition and / or construction, the applicant is advised to refer to the Mid Kent Environmental Code of Development Practice. Broad compliance with this document is expected. (3) A formal application for connection to the public sewerage system is required in order to service this development. To initiate a sewer capacity check to identify the appropriate connection point for the development, please contact Southern Water, Sparrowgrove House Sparrowgrove, Otterbourne, Hampshire SO21 2SW (Tel:0330 303 0119) or www.southernwater.co.uk. (4) The applicant is advise to HSE Publication HSG47 "Avoiding Danger from Underground Services" (5) It is the responsibility of the applicant to ensure, before the development hereby approved is commenced, that all necessary highway approvals and consents where required are obtained and that the limits of highway boundary are clearly established in order to avoid any enforcement action being taken by the Highway Authority. (6) Across the county there are pieces of land next to private homes and gardens that do not look like roads or pavements but are actually part of the road. This is called 'highway land'. Some of this land is owned by The Kent County Council (KCC) whilst some are owned by third party owners. Irrespective of the ownership, this land may have 'highway rights' over the topsoil. Information about how to clarify the highway boundary can be found at http://www.kent.gov.uk/roads-and-travel/what-we-look-after/highway-land (7) The applicant must also ensure that the details shown on the approved plans agree in every aspect with those approved under such legislation and common law. It is therefore important for the applicant to contact KCC Highways and Transportation to progress this aspect of the works prior to commencement on site. (8) The applicant is advised that works to the highway require separate consent of the highway authority prior to the commencement of works on site. The works will require a S278/38 agreement and you are advised to contact the Agreements Engineer nicola.corrigan@kent.gov.uk

The Council's approach to this application: In accordance with the paragraphs 186 and 187 of the National Planning Policy Framework (NPPF), the Council takes a positive and proactive approach to development proposals, focused on solutions. We work with applicants/agents in a positive and proactive manner by: Offering pre-application advice. Where possible, suggesting solutions to secure a successful outcome. As appropriate, updating applicants/agents of any issues that may arise in the processing of their application. In this instance: The application was determined based on the information supplied and without delay. IMPORTANT: YOUR ATTENTION IS DRAWN TO THE ATTACHED NOTES

NOTIFICATION TO APPLICANT FOLLOWING REFUSAL OF CONSENT OR GRANT OF CONSENT SUBJECT TO CONDITIONS Appeals to the Secretary of State If you are aggrieved by the decision of your local planning authority (LPA) to refuse permission for the proposed development, or to grant it subject to Conditions, then you can appeal to the Secretary of State (SoS) under the Town and Country Planning Act 1990, the Planning (Listed Buildings and Conservation Areas) Act 1990 or Control of Advertisements Regulations1989. Please see Development Type on page 1 of the decision notice to identify which type of appeal is relevant for the following: If this is a decision to refuse planning permission for a Householder application or a Minor Commercial application and you want to appeal the decision, or any of the conditions imposed, then you must do so within 12 weeks of the date of this notice. In all other cases, you will need to submit your appeal against the decision, or any of the conditions imposed, within 6 months of the date of this notice. For applications relating to Enforcement Notices: If this is a decision on a planning application relating to the same or substantially the same land and development as is already the subject of an enforcement notice and if you want to appeal against the decision on your application, then you must do so within 28 days of the date of this notice. If an enforcement notice is subsequently served and relates to the same or substantially the same land and development and if you want to appeal against the decision on your application, then you must do so within 28 days of the date of service of the enforcement notice, or within 6 months [12 weeks in the case of a householder or minor commercial application decision] of the date of this notice, whichever period expires earlier. Appeals must be made using a form which you can get from The Planning Inspectorate, Room 3/13, Temple Quay House, 2 The Square, Temple Quay, Bristol BS1 6PN or online at www.planningportal.gov.uk/pcs. The SoS can allow a longer period for giving notice of an appeal but will not normally be prepared to use this power unless there are special circumstances which excuse the delay in giving notice of appeal. The SoS need not consider an appeal if it seems to the SoS that the LPA could not have granted advertisement consent for the proposed development or could not have granted it without the conditions they imposed, having regard to the statutory requirements, to the provisions of any development order and to any directions given under a development order.