Torpa Small Hydro Power Project

Similar documents
Bishunpur Small Hydro Power Project

Thethaitangar Small Hydro Power Project

Sugabandh Small Hydro Power Project

PROJECT HISTORY. * Under Fiscal Incentives through promotion policies - 200MW

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

K A H A Y A S u l a w e s i S e l a t a n

BANGKET LENDANG N u s a T e n g g a r a B a r a t

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

JOURNAL OF INTERNATIONAL ACADEMIC RESEARCH FOR MULTIDISCIPLINARY Impact Factor 4.483, ISSN: , Volume 5, Issue 12, January 2018

DETAILED NOTE ON PROJECT

KEMBAR DAM N u s a T e n g g a r a B a r a t

Executive Summary of Bistan Lift IrrigationProject

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

EXISTING PROJECT FOR ORDINARY SAND MINING

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Upper Hasdeo Sub Watershed Status in hasdeo River Basin At Chhattisgarh, India

Head N E Ha

CHAPTER 4 STUDY AREA DESCRIPTION

THE CONCEPT OF ORGANIC FARMING:

Joint ICTP-IAEA Workshop on Sustainable Energy Development: Pathways and Strategies after Rio October 2012

Kadamane Small Hydro Power Project Project Profile. Kadamane Small Hydro Power Project

Small Hydro based energy generation

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution

ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd.

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

SMALL HYDRO PROGRAMME IN INDIA

Delineation of Run of River Hydropower Potential of Karnali Basin- Nepal Using GIS and HEC-HMS

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma Resident Engineer ASEB, E-8, Lajpat Nagar-II, New Delhi

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

Theme 5: Small-scale Hydropower. By: Dr Khamphone Nanthavong Faculty of Engineering, National University of Laos

: Eastern Himalayan Region (II) as per Planning Commission(1989)

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs

The Role and Opportunities Of Water Environment in the. Republic of the Union of Myanmar

RL (+) 104m to RL (+) 108m. Ambient Temperature - 4 C to 42 C. Mostly Barren Land. Breakup of ownership:

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

SOIL MOISTURE CHARACTERISTICS IN UPPER PART OF HINDON RIVER CATCHMENT

Project Interim Report

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

Distributed Hydrological Model For An Ungauged Subcatchment

Participatory risk assessment and monitoring

Tangible benefits of technological prospection and prefeasibility studies in SHP projects Ing. Sergio Armando Trelles Jasso

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Module 3. Lecture 6: Synthetic unit hydrograph

PREFEASIBILITY REPORT

REMOTE SENSING AND GIS FOR INTEGRATED LAND MANAGEMENT: CASE OF INDIA

World Renewable Energy Technology Congress

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

Water Management System A Case Study

Impact Study of a check dam on Ground Water Recharge

CONTENTS. PogeNo. Chapter 10: Productivity Approaches. Chapter 11: Human Resources Development in Hydro Sector

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name

Rain harvesting and stream storage for supplementary irrigation to rain-fed paddy schemes: a case study of Selapon Paddy Scheme

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Rejoining of Streams & Rainwater Harvesting in Javagal Hobli (A case Study)

Pre- Feasibility RepoRt

PRE-FEASIBILTY REPORT

Pre- FEASIBILITY REPORT

Groundwater Flow Analysis Using Visual Modflow

Estimation of Surface Runoff in the Man River Basin (MS)

THE REPUBLIC OF THE GAMBIA Village Electrification Concept Adama Gassama

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

Flood Frequency Analysis of River Subernarekha, India, Using Gumbel s Extreme Value Distribution

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH

Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL:

HYDROLOGY - BASIC CONCEPTS

Estimating Hydropower Potential of an Ungauged Stream

Identification of Potential Infiltration Zones through Overlay Analysis in GIS Environment Using Reservoir Frequencies, Spreads and Other Parameters

A COMPREHENSIVE STUDY OF CANAL BASED MINI HYDRO POWER PLANTS

PRE-FEASIBILITY REPORT

Shree Swami Samarth Stone Crusher

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

3.5 Hydrology & Hydraulics

National Programme on Flood Prevention, Protection and Mitigation. INBO Conference, Sibiu, ROMANIA

GROUNDWATER POTENTIAL OF THE THIKA AREA, KENYA

Flood Modelling and Water Harvesting Plan for Paravanar Basin

PROPOSED TERM OF REFERENCE

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

Appendix E: Bridge Site Information Summary

Transcription:

1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall is 1400 mm. These geographical factors provide a number of Small Hydro Power (SHP) potential sites at rapids and waterfalls in the streams and rivers of Jharkhand. About 80% of villages in the Jharkhand are yet to see electrical power. It is prudential to harness the SHP potential sites for the electrification of its nearby villages. In view of above, Jharkhand Renewable Energy Development Agency (JREDA) has entrusted MECON LIMITED for preparation of (PFR) for development of Small Hydro Power (SHP) at 22 sites in Jharkhand. Torpa SHP site is one of 22 SHP sites, located in the south-western part of Jharkhand. It is situated in the Block Torpa of District Ranchi. The Torpa SHP is proposed to utilize Peruaghagh fall in Karo river. 1.2 Benefits of Small Hydro Power Harnessed energy has become a symbol of growth and instrument for development. Electric power particularly the small hydro power is a renewable, economically attractive, environment friendly, non-polluting and environmentally benign source of energy. Moreover, the Small Hydro Power is submergence free and has short gestation period. These benefits of SHP have now been sufficiently recognised. The need of the project comes from the benefits of SHP and utilization of resources.

1.3 Aim of report Development of small hydro projects requires many stages of technical and financial study to determine if a site is technically and economically feasible. The viability of project is very site specific. PFR is the first stage of work based on which Detailed Survey and Investigation (DSI) is recommended. The aim of the report is to examine the adequacy for proceeding to the next stage of work; Detailed Survey & Investigation. 1.4 Scope of report PFR covers the following activities. a) Topo sheet study for tentative planning of general layout of project, delineation of drainage area, and for obtaining idea on the access to site. b) Site visit for identification of location of the site, preliminary layout of SHP, preliminary assessment of head, duration of water availability in the stream and electrification status of nearby villages. c) To examine the adequacy for proceeding to the next stage of development.

2.0 INDEX MAP

3.0 GENERAL INFORMATION 3.1 Location of site The location of the site is shown in the Index Map. The details of location are as follows. a) Village (at power house): Bamnam b) Block: Torpa c) District: Ranchi d) State: Jharkhand e) Topo sheet No.: 73 F/1 f) Latitude: 22 15 N g) Longitude: 85 10 E 3.2 Access to site The access to Torpa SHP site from Ranchi is as follows. Approach Type of road Distance (approx) Ranchi Khunti State Highway 35 km Khunti Torpa State Highway 28 km Torpa Topkara Metalled road 6 km Topkara Lohajimi Motorable road 8 km Lohajimi Bridge over Motorable road 1.5 km Karo river Bridge over Diversion No road 1.5 km Karo river weir site Bridge over Power house Hilly footpath 4.5 km Karo river site The nearest railway station is at Pokla, which is about 26 km (with about 6 km of Jeepable kutcha road) away from Torpa town. However, the approach to the project site is convenient by road from Ranchi Railway Station, which is about 80 km from the project site. The nearest airport is also at Ranchi.

3.3 Electrification status of nearby villages There are about 30 villages within a radius of 5 km from the SHP site, having a total about 1500 houses. Presently these villages do not have access to electrical power. The nearest electrified village is at Topkara, which is about 15 km from the project site. The nearest grid is at Kamadara, which is about 42 km away from the project site. 3.4 Geology & Seismicity The site is located in Chotanagpur plateau, which is composed mainly of Archaic Gneiss and Granite rocks. The rocks are very old, hard and stable. Jharkhand has no moderate to large earthquakes in recent past, only small tremors have occurred in the region. According to the seismic hazard map of India updated by the Bureau of Indian Standards (BIS) in 2000, all of the southern districts of Jharkhand lie in Zone II.

4.0 HYDROLOGY 4.1 Stream / river The Torpa SHP will utilize the water from Karo river near Peruaghagh fall. a) Stream / river: Karo Nadi b) Source: Rain fed c) Catchment area: 980 sq km (approx) d) River basin: South Koel 4.2 Flow The daily flow data (Source: NHPC) of Karo river at a bridge (about 4 km from Torpa town on the road to Basia), which is about 20 km from the Peruaghagh fall, is available. Since, only few small streams join to Karo river within this 20 km stretch, these data hold good for the flow of Karo river near Peruaghagh fall. The average monthly flow (m 3 /s) has worked out from the daily flow data and is given in the table below. Average Monthly Flow (m 3 /s) of Karo river Month 1999 2000 2001 2002 January 12.03 Lean flow Lean flow February Lean flow Lean flow Lean flow March Lean flow Lean flow Lean flow April Lean flow Lean flow Lean flow May Lean flow Lean flow June 8.52 11.07 Lean flow July 62.75 39.75 88.18 August 83.08 11.07 43.25 September 95.99 73.17 24.74 October 29.64 40.28 21.83 November 16.06 Lean flow Lean flow December 12.84 Lean flow Lean flow Lean flow is 0.65 m 3 /s or less.

5.0 PRELIMINARY LAYOUT The preliminary layout is outlined below in the relevant portion of the Toposheet. During the site visit the head was measured as 80m and is indicated in the schematic sketch. Schematic sketch

6.0 POWER POTENTIAL 6.1 Power The flow for different exceedence times is estimated from the average flow data mentioned in para 4.2 of this report and given in column (2) of the table below. The net head is worked out as 76m, assuming the head loss of 5%, and is shown in column (3). Assuming the overall plant efficiency of 85%, the power potential is worked out and shown in column (4) of the following table. (1) (2) (3) (4) % Exceedence Time Flow (cumec) Net Head (m) Power Potential (kw) 8.33 88.25 76 55926 16.67 48.44 76 30697 25.00 39.08 76 24766 33.33 22.23 76 14087 41.67 11.02 76 6983 50.00 2.56 76 1622 58.33 2.35 76 1489 66.67 1.70 76 1077 75.00 0.36 76 228 83.33 0.26 76 165 91.67 0.16 76 101 100.00 0.06 76 38 6.2 Conclusion Keeping in mind that the streams / rivers in Jharkhand is rain fed, Torpa SHP site has a very good potential. Besides, supplying power to nearby 30 villages, it will strengthen the electrical grid. The project will go a long way in developing socio-economic condition of the people. Preliminarily the project seems feasible and is recommended for carrying out Detailed Survey and Investigation. The Torpa SHP will utilize a part of potential that is planned for Koel Karo Hydel Project. As such, Torpa SHP can only be considered in case Koel Karo Hydel Project is shelved.