Bishunpur Small Hydro Power Project

Similar documents
Sugabandh Small Hydro Power Project

Thethaitangar Small Hydro Power Project

Torpa Small Hydro Power Project

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

JOURNAL OF INTERNATIONAL ACADEMIC RESEARCH FOR MULTIDISCIPLINARY Impact Factor 4.483, ISSN: , Volume 5, Issue 12, January 2018

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

PROJECT HISTORY. * Under Fiscal Incentives through promotion policies - 200MW

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Executive Summary of Bistan Lift IrrigationProject

Introduction. Forest Cover. Land Use Pattern Of The State. Recorded forest Area in Jharkhand (Area in km 2 )

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

CHAPTER 4 STUDY AREA DESCRIPTION

THE CONCEPT OF ORGANIC FARMING:

Upper Hasdeo Sub Watershed Status in hasdeo River Basin At Chhattisgarh, India

RL (+) 104m to RL (+) 108m. Ambient Temperature - 4 C to 42 C. Mostly Barren Land. Breakup of ownership:

BANGKET LENDANG N u s a T e n g g a r a B a r a t

K A H A Y A S u l a w e s i S e l a t a n

: Eastern Himalayan Region (II) as per Planning Commission(1989)

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

Water Management System A Case Study

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT

Head N E Ha

PRE FEASIBILITY REPORT

KEMBAR DAM N u s a T e n g g a r a B a r a t

Joint ICTP-IAEA Workshop on Sustainable Energy Development: Pathways and Strategies after Rio October 2012

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

Groundwater Flow Analysis Using Visual Modflow

Pre- Feasibility RepoRt

Delineation of Run of River Hydropower Potential of Karnali Basin- Nepal Using GIS and HEC-HMS

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT

Module 3. Lecture 6: Synthetic unit hydrograph

REMOTE SENSING AND GIS FOR INTEGRATED LAND MANAGEMENT: CASE OF INDIA

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

DETAILED NOTE ON PROJECT

Automated Unimpaired Hydrologic Metric Scaling for California Streams

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Project Interim Report

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution

EXISTING PROJECT FOR ORDINARY SAND MINING

Evaluating the use of DHI software MIKE Basin to optimize the water use in Malaprabha catchment area in Karnataka, India.

ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma Resident Engineer ASEB, E-8, Lajpat Nagar-II, New Delhi

10(a) Bridge and culvert design information

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution

Assessment of Meteorological Drought in Satna District, M.P., India

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

INTERNATIONAL JOURNAL OF GEOMATICS AND GEOSCIENCES Volume 1, No 4, 2011

PRE-FEASIBILITY REPORT

ASSESSMENT OF GROUNDWATER VULNERABILITY GIS BASED DRASTIC MODEL: A CASE STUDY OF SIPCOT- PERUNDURAI, ERODE

Identification of Potential Infiltration Zones through Overlay Analysis in GIS Environment Using Reservoir Frequencies, Spreads and Other Parameters

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

Theme 5: Small-scale Hydropower. By: Dr Khamphone Nanthavong Faculty of Engineering, National University of Laos

Rain harvesting and stream storage for supplementary irrigation to rain-fed paddy schemes: a case study of Selapon Paddy Scheme

PERFORMANCE EVALUATION OF GROUNDWATER RECHARGE STRUCTURES: AN APPLICATION OF WATER BALANCE ANALYSIS,

Impact Study of a check dam on Ground Water Recharge

Rejoining of Streams & Rainwater Harvesting in Javagal Hobli (A case Study)

Appendix E: Bridge Site Information Summary

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Distributed Hydrological Model For An Ungauged Subcatchment

PRE-FEASIBILITY REPORT

Keywords: Dark zone, Global warming, Rainfall harvesting, Rainfall fluctuation, Seasonal shift

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

Report on. Industrial Visit to. Reliance Thermal Power Plant, Dahanu

International Journal of Engineering and Techniques - Volume 4 Issue 1, Jan Feb 2018

Computing the Variation of Stream Flow in a Gauged Basin using Satellite Imagery with Regards To Change in Land Use Pattern

Importance of Small Hydro-Power in Developing Mountainous Country: A Case Study of Nepal Ram Hari Dhakal Civil / Hydropower Engineer, Vidhyut Utpadan

Estimation of Surface Runoff in the Man River Basin (MS)

Small Hydro based energy generation

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs

ABSTRACT. 150 microwatersheds.

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

Participatory risk assessment and monitoring

Module 2 Measurement and Processing of Hydrologic Data

MULTI-DIMENSIONAL FEASIBILITY ANALYSIS OF SMALL HYDROPOWER PROJECT IN INDIA: A CASE STUDY

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

HYDROLOGICAL INVESTIGATIONS AND ANALYSIS FOR HYDROPOWER PROJECTS

Agricultural Planning through Prediction of Rainfall Characteristics for Bilaspur Region of Chhattisgarh Plain in India

Tangible benefits of technological prospection and prefeasibility studies in SHP projects Ing. Sergio Armando Trelles Jasso

Flood Inundation Mapping of Tadi River

ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd.

INTERPRETING AND IMPLEMENTING THE SUSTAINABLE GROUNDWATER MANAGEMENT ACT. (Revised December, 2015)

Pre- FEASIBILITY REPORT

Flood Modelling and Water Harvesting Plan for Paravanar Basin

The Role and Opportunities Of Water Environment in the. Republic of the Union of Myanmar

Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit)

PRE-FEASIBILTY REPORT

SOIL MOISTURE CHARACTERISTICS IN UPPER PART OF HINDON RIVER CATCHMENT

Agricultural Productivity of the Baramati Tahsil, Pune District (Maharashtra).

Assessment of the Groundwater Quantity Resulting from Artificial Recharge by Ponds at Ban Nong Na, Phitsanulok Province, Thailand

Review of Hydrological Potential in Combined Gin and Nilwala River Basins of Sri Lanka

A COMPREHENSIVE STUDY OF CANAL BASED MINI HYDRO POWER PLANTS

Spatial Distribution of Fluoride Contamination in Groundwater Sources in Hard Rock Terrain, Parts of Dharmapuri District, Tamil Nadu, India

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

CATCHMENT AREA TREATMENT PLAN

Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh

Transcription:

1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall is 1400 mm. These geographical factors provide a number of Small Hydro Power (SHP) potential sites at waterfalls, rapids and meanders in the streams and rivers of Jharkhand. About 80% of villages in the Jharkhand are yet to see electrical power. It is prudential to harness the SHP potential sites for the electrification of its nearby villages. In view of above, Jharkhand Renewable Energy Development Agency (JREDA) has entrusted MECON LIMITED for preparation of (PFR) for development of Small Hydro Power (SHP) at 22 sites in Jharkhand. Bishunpur SHP site is one of 22 SHP sites, located in the western part of Jharkhand. It is situated in the Block Bishunpur of District Gumla. The Bishunpur SHP is proposed to utilize the flow of North Koel river near village Koenatoli. 1.2 Benefits of Small Hydro Power Harnessed energy has become a symbol of growth and instrument for development. Electric power particularly the small hydro power is a renewable, economically attractive, environment friendly, non-polluting and environmentally benign source of energy. Moreover, the Small Hydro Power is submergence free and has short gestation period. These benefits of SHP have now been sufficiently recognised. The need of the project comes from the benefits of SHP and utilization of resources.

1.3 Aim of report Development of small hydro projects requires many stages of technical and financial study to determine if a site is technically and economically feasible. The viability of project is very site specific. PFR is the first stage of work based on which Detailed Survey and Investigation (DSI) is recommended. The aim of the report is to examine the adequacy for proceeding to the next stage of work; Detailed Survey & Investigation. 1.4 Scope of report PFR covers the following activities. a) Topo sheet study for tentative planning of general layout of project, delineation of drainage area, and for obtaining idea on the access to site. b) Site visit for identification of location of the site, preliminary layout of SHP, preliminary assessment of head, duration of water availability in the stream, and electrification status of nearby villages. c) To examine the adequacy for proceeding to the next stage of development.

2.0 INDEX MAP

3.0 GENERAL INFORMATION 3.1 Location of site The location of the site is shown in the Index Map. The details of location are as follows. a) Village: Koenatoli b) Block: Bishunpur c) District: Gumla d) State: Jharkhand e) Topo sheet No.: 73 A/7 f) Latitude: 23 20 56 N g) Longitude: 84 21 57 E 3.2 Access to site The access to Bishunpur SHP site from Bishunpur is highlighted in the Index Map. The access to Bishunpur from the State capital, District HQ and the nearest Railway Station are as follows. Origin Ranchi (State Capital) Lohardaga Gumla (District HQ) Place Destination Lohardaga (Nearest Rly Stn) Bishunpur (Block HQ) Type of approach National Highway (NH 75) State Highway Distance (approx) 75 km 50 km Bishunpur State Highway 50 km The nearest railway station Lohardaga is in Ranchi Lohardaga section of South Eastern Railway. The nearest airport is at Ranchi. 3.3 Electrification status of nearby villages There are about 16 villages having about 800 houses nearby the SHP site, which do not have access to electrical power.

3.4 Geology & Seismicity The site is located in Chotanagpur plateau, which is composed mainly of Archaic Gneiss and Granite rocks. The rocks are very old, hard and stable. Jharkhand has no moderate to large earthquakes in recent past, only small tremors have occurred in the region. According to the seismic hazard map of India updated by the Bureau of Indian Standards (BIS) in 2000, all of the southern districts of Jharkhand lie in Zone II.

4.0 HYDROLOGY 4.1 River / Stream The Bishunpur SHP will utilize the water from North Koel river near village Koenatoli. a) Stream / river: North Koel b) Source: Rain fed c) Catchment area: 375 sq km (approx) d) River basin: North Koel 4.2 Catchment area The catchment area is delineated on the topo sheet as shown below.

4.3 Rainfall The monthly rainfall (mm) of Bishunpur is given in the table below. Monthly Rainfall (mm) of Bishunpur Month 2000 2001 2002 2003 January 29 14 15 29 February 13 14 15 15 March 38 0 0 12 April 10 11 0 2 May 11 9 0 15 June 238 245 248 259 July 343 381 336 346 August 216 222 253 249 September 218 226 216 217 October 29 30 38 33 November 5 6 3 4 December 1 3 4 3 Total 1151 1160 1128 1183 4.4 Flow The Bishunpur SHP site was visited during the 4 th week of November 2004, and the flow of North Koel river near village Koenatoli was measured as 1.606 m 3 /s. As understood from local people and seen from the rainfall data, the river is perennial, though there is lean flow only during summer season. The flow data of North Koel river near village Koenatoli are not available. However, the following two bases are available to estimate the flow-duration.

a) Mean flow with catchment area of 22 streams scattered over Chhotanagpur plateau area in Jharkhand. b) Model of flow-duration, based on data of 22 streams scattered over Chhotanagpur plateau area in Jharkhand. The flow-duration of North Koel river near village Koenatoli has been estimated on above two bases and shown in the table below. Flow-duration of North Koel river near village Koenatoli Exceedence Time (%) Flow (m 3 /s) 25 4.417 50 1.624 60 1.182 75 0.734 80 0.618 90 0.404 It has found that the flow measured (1.606 m 3 /s) is close to the flow of exceedence time 50%, which indicates the correctness of flow-duration.

5.0 PRELIMINARY LAYOUT The preliminary layout is outlined below in the relevant portion of the Toposheet. During the site visit the head was measured as 15m and is indicated in the schematic sketch. Schematic sketch

6.0 POWER POTENTIAL 6.1 Power The flow for different exceedence times is given in column (2) of the table below. The net head is worked out as 14.25m, assuming the head loss of 5%, and is shown in column (3). Assuming the overall plant efficiency of 85%, the power potential is worked out and shown in column (4) of the following table. (1) (2) (3) (4) % Exceedence Time Flow (cumec) Net Head (m) Power Potential (kw) 25 4.417 14.25 525 50 1.624 14.25 193 60 1.182 14.25 141 75 0.734 14.25 87 80 0.618 14.25 73 90 0.404 14.25 48 6.2 Conclusion The SHP site preliminarily seems to have small potential, but seeing the nature of rainfall and availability of water in the river almost through out the year, with a little storage the power potential can be increased. Also exact availability of water for power generation over different periods of a year will be measured during Detailed Survey and Investigation (DSI). Further in view of non-availability of electrical power to villages nearby the site, whatever potential is available, is needed to be harnessed. Therefore, it is recommended to carry out the next stage of development of The SHP, namely; Detailed Survey and Investigation (DSI).