Cable Jointing Manual. Jointing Procedures. Module 18. Concentric Cables

Similar documents
CONTENTS INSTRUCTIONS. UK POWER NETWORKS LV JOINTING MANUAL I Version Section Index I Page 1

ECS POT ENDING LV SWA SERVICE CABLES

1.2 REFERENCES.1 CSA C22.2 No.0.3, Test Methods for Electrical Wires and Cables.

RESIN FILLING TYPE JOINTING KITS FOR LOW VOLTAGE UNDERGROUND CABLES

0.6/1 kv LOW VOLTAGE CONTROL CABLES. Conductors. Insulation. Assembly. Standard Colour Code. Armour (Optional) Screening (Optional) Outer Sheath

Comparison of BS 5308, PAS 5308 and BS EN

TI 20 PVC TI 20 INSULATED TELEPHONE WIRE

Highly flexible, screened control cable with PVC insulation and PVC inner and outer sheath - certified

INFORMATION PROVIDED TO ASSIST THE TENDERER FOR THE SUPPLY OF:

Highly flexible, screened control cable with PVC core insulation and abrasion and oil resistant PUR sheath

Highly flexible, screened control cable with PVC insulation and PVC inner and outer sheath - certified

Separator, suitable tape between the braid and outer sheath

The Contractor shall furnish and install all shielded power cable suitable for use on this project.

TESTING PTE EARTHING

MATERIAL STANDARD FOR CABLES AND WIRES

Construction guideline

MEDIUM VOLTAGE XLPE INSULATED POWER CABLES [6.35/11kV Copper XLPE Three-Core HDPE Sheathed]

15~35KV Termination Kit

ELE-3COP-256 Title Hand Cable Laying.

CS-21 STREET STRUCTURES TABLE OF CONTENTS

COSVR256 HL53 04 Install lightning conductor systems

ALCO Cable Gland Tutorial

UNDERGROUND CABLE DISTRIBUTION UP TO AND INCLUDING 33kV AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD)

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

EXPLOSION-PROOF CABLE GLAND - Type ICG 623 Manual

ERROR PREVENTION WORK ZONE KIT

CONSULTATIONS TECHNICAL GUIDELINE. HVDC extruded cable

GUIDANCE FOR CUT OUT WORKS

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

MSME Testing Centre, 65/1, G. S. T. Road, Guindy, Chennai, Tamil Nadu. Discipline Electrical Testing Issue Date

TECHNICAL BULLETIN. Recommended Procedures For Splicing And Bonding Armored FuturePath

AMIGA. Installation Instructions

SECTION EARTHING AND EARTH FAULT PROTECTION

Accreditation No: LAB 041. Electrical Measurement & Test Laboratory (EMTL), PCSIR Labs. Complex, Lahore Pakistan.

Platinum Resistance Pt100 & Pt1000 Silicone Patch Sensors Element Encapsulated in A Silicone Rubber Patch with Self-Adhesive Aluminium Foil Backing

T/616/8697. CITB 256v1

Specification FOR. 12.7/22KV AL-CV/WS 12.7/22KV Aluminum Conductor XLPE Insulated Copper Wire Screened PVC Sheathed Power Cable.

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

Test Report No.: Page 2 of 35

*** Supercedes: BECO E and COM , , & ***

DIVISION 26 ELECTRICAL Electrical Power Conductors and Cables

L1-CHE-SPE-171 TECHNICAL SPECIFICATION FOR ELECTRIC CABLE

Pair Count Minimum Bend Radius Design Type Maximum Pulling Tension

DRAFT TANZANIA STANDARD. Part 7: Underground Power Cables for rated voltages 0.6kV/1kV (Um 1.2kV)

TOP CAP Snaps into bottom track Aluminum - trimmed to length. RAMPS Covered by carpet ABS plastic and MDF QUESTIONS? CALL US AT !

SCHEDULE ' A ' TECHNICAL SPECIFICATION FOR L.T.PVC POWER AND CONTROL CABLES FOR DISTRIBUTION NETWORK IN MAHARASHTRA

RG-59, RG-59+2DC, UTP CAT6, SFTP CAT6

Wire and Cable Heat-shrink Tubing Non-shrink Tubing Braided Sleeving Screening Braids Moulded Parts Terminals and Splices Wire and Cable Markers

Engineering Data for Copper and Aluminum Conductor Electrical Cables

40/69 kv to 127/220 kv XLPE

SECTION GROUNDING AND BONDING

Highly flexible control cable with PVC core insulation and PVC sheath - certified for North America

EXPRESS5800/1080Xd. Installation Procedures

Detailed Requirements Document (DRD) Level 3 OLE Context Core and Specialisms

New designed XLPE-insulated cables substituting paper-insulated pipe type cables

C&G 2382 BS7671: th Edition IEE Wiring Regulations. 25 Questions

SECTION A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013.

SEMPEO SQA Unit Code H Assembling mechanical components

Rayfit The advanced heat-shrinkable joint sleeve for medium voltage joints up to 36 kv NEW ENERGY DIVISION

Specification for UDC Electrical Testing

WSD 1800 Issue C Rated Ford Automotive Sensor Cable Specification

CHAPTER 13 GROUNDING AND BONDING

SECTION GROUNDING AND BONDING

SECTION WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring.

WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring.

Ceramic Ceramic No. of Lead/Wire Lead Allied RS order Dia Ø Length Wires Type Length Code code

U.V resistance UL Sunlight Resistance. Flame retardant IEC

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

MESH FLOOR HEATING SYSTEMS INSTALLATION INSTRUCTIONS


EHV XLPE CABLES CDCC LINE

Assembling, Wiring and Testing Electrical Panels/Components Mounted in Enclosures H/508/5093 QU Restricted

CONTENTS. B. System Design and Performance Requirements

SECTION GROUNDING

Aluminum Wiring. Facts and Figures

PILC Replacement: Getting the Lead Out

CABLE TERMINALS CABLE TERMINALS

Fixings, bonds and clamps

EO - Continuous Improvement and Asset Development

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

Producing mechanical assemblies

NPS/002/018 Technical Specification for Pilot, Control and Telephone Cables

DATA SHEET Single Core 2HR Fire Rated Cable

NPS/002/018 Technical Specification for Pilot, Control and Telephone Cables

TECHNICAL SPECIFICATION FOR 1.1KV XLPE POWER CABLE SECTION-1

EI INSTALLATION OF UNDERGROUND CABLES - LV TO 132KV

XLPE MATERIAL NATIONAL CABLES INDUSTRY XLPE INSULATED MEDIUM VOLTAGE CABLES

Thermonet. Installation Guide NEW! Your step-by-step guide to the perfect installation. now with self adhesive mesh

TECHNICAL SPECIFICATION FOR L. T. XLPE POWER CABLE

New Whole-Current-Metered Connections up to 60kVA

STANDARD TECHNIQUE: OH4K/1

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

MANUFACTURER'S QUALITY ASSURANCE PLAN (QAP - Instrumentation cables)

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SYRIAN ARAB REPUBLIC MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION The ELECTRICITY (PEDE) TENDER DOCUMENTS FOR

SECTION HEAT TRACING FOR PLUMBING PIPING

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

Index. P. 02 Your expertise and ours combined P. 02 Analysis of your application P. 02 Prototypes and pilot series

Transcription:

Cable Jointing Manual Jointing Procedures Module 18 Concentric Cables Version: 1.0 Date of Issue: June 2008 Author: Richard Summers Job Title: Cables Specialist Approver: Keith Nutter Job Title: Network Standards Manager Review Date: June 2013

Revision Log Version: 1.0 Prepared by: Richard Summers Date: June 2008 New Combined Module. Changes made Replaces Cable Jointing Instructions and Procedures in Central Networks West Underground Cable Jointing Manual:- CJI 11.40; CJI 11.41; CJP390; CJP391; CJP392; CJP393; CJP530. Version: 1.0 Date of Issue: June 2008 Page 2 of 9

CONTENTS 1. CABLE DESCRIPTIONS AND TERMINOLOGY 4 2. GENERAL 4 3. REMOVING THE ARMOURS, LEAD SHEATH, BELT PAPERS AND OPENING CONCENTRIC NEUTRALS 5 4. ISOLATION 6 5. REMOVING THE INNER BELT PAPERS 6 6. CONNECTING ONTO THE PHASES OF SINGLE, TWIN AND THREE PHASE CONCENTRIC 6 7. CONNECTING ONTO THE PHASES OF TRIPLE CONCENTRIC WHEN THE OUTER CONCENTRIC LAYER IS THE NEUTRAL 7 8. CONNECTING ONTO TRIPLE CONCENTRIC WHEN THE OUTER CONCENTRIC LAYERS ARE PHASE CONDUCTORS. 8 Version: 1.0 Date of Issue: June 2008 Page 3 of 9

1. Cable Descriptions and Terminology Concentric cables come in several forms; these descriptions are to provide a Company wide standard. The annotations found on Company drawings may not reflect these descriptions as local terminology may vary. Single Concentric Single phase core with a concentric neutral made up of either copper strands or tapes Twin Concentric Two phase core conductors with a concentric neutral made up of either copper strands or tapes. Three Phase Concentric Three phase core conductors with a concentric neutral made up of either copper strands or tapes (not to be confused with triple concentric, HV Calendar-Waters cable or HV cables with Board of Trade tapes). Triple Concentric One central phase core, one concentric phase and a concentric neutral. The concentric layers are made up of either copper strands or tapes (Two phase cable) HV Board of Trade Bare copper tapes directly below the lead sheath HV Calendar-Waters Belt papers under the lead sheath below which are copper tapes that are individually insulated from each other using papers or cotton fabric tape. 2. General Twin / Single Phase Concentric When cutting a Single Phase Concentric core always check by removing papers that the cable is single phase. Some Twin Concentric cables have phase conductors that are semicircular and held together with belt papers these look identical to single phase core insulation and if cut together will result in a phase to phase short circuit. Always use live working techniques and PPE - even if the cable is isolated. If you are unsure stop and get assistance from your supervisor. Version: 1.0 Date of Issue: June 2008 Page 4 of 9

3. Removing the Armours, Lead Sheath, Belt Papers and Opening Concentric Neutrals Remove armours and bedding, fit earth bond and remove the lead sheath in accordance with Module 1and 2). Wearing insulated gloves remove the belt paper one at a time until the concentric wires / tapes are exposed. Test these conductors to ensure that they are not live. If the concentric wires / tapes are found to be live go to paragraph 8. Lay the braid over the wires / tapes and secure in position with roll springs as shown in the photo. Twist the spring to tighten using hand pressure Lift the wires / tapes using a small cable wedge and cut strand at a time using side cutters. Do not damage the underlying belt papers. Form the wires / tapes into a conductor and apply a tape binder to terminate the next layer of belt papers against. Tape Binders Connect the neutral / earth of the service cable and the wires / tapes of the main into the extended connector. Make the earth connections onto the lead sheath in accordance with Module 6 and bond the lead sheath to the service slides of the connector using 50mm earth wire. Remove the temporary neutral bond and braid. Version: 1.0 Date of Issue: June 2008 Page 5 of 9

4. Isolation At this point if it is known that the cable been worked on is Triple Concentric it must be isolated. Single, Twin and Three Phase Concentric can be jointed live. 5. Removing the Inner Belt Papers As there is often confusion with the terminology on our network drawings there is always a possibility that Triple Concentric may be incorrectly labelled as Single, Twin or Three Phase Concentric, for this reason the following method must be used to remove the inner layers of belt papers 1. Fully shroud all exposed neutral, earths and lead sheaths 2. Using a plastic hack knife scrape and unwrap one layer of paper at a time until the belts are removed. 3. If copper wires / tapes start to become visible stop and isolate the cable. 6. Connecting onto the Phases of Single, Twin and Three Phase Concentric Once the core insulation has been exposed the cable can be jointed as standard PILC cable, using mechanical connectors (Module 6) Version: 1.0 Date of Issue: June 2008 Page 6 of 9

7. Connecting onto the Phases of Triple Concentric When the outer concentric layer is the Neutral Having tested to prove that the concentric phase is not live the wires / tapes can be lifted with a small wedge and cut using side cutters. No damage should be done to the core insulation below. The strands are then formed into a core, insulated with 6 layers of non-adhesive tape and jointed back together using an extended connector. The phase of the service is then connected via the service slide. SHROUDING OMITTED FOR CLARITY Apply an insulation wrap over the phase connector and secure using cable ties. The cable can now be reenergised and the cut-out tested (Module 12). Once tested the outer joint box can be fitted (Module 8) Version: 1.0 Date of Issue: June 2008 Page 7 of 9

8. Connecting onto Triple Concentric When the outer concentric layers are Phase conductors When it is discovered that the outer concentric layer is live the cable must be isolated and all exposed earth conductor must then be shrouded. The concentric phase can be lifted with a wedge, cut with side cutters, formed into a core and be insulated with 6 layers of non adhesive tape. End caps must then be fitted. The next layer of wires / tapes can then be exposed and formed in a similar way. With the concentric conductors fully shrouded and fitted with end caps, the centre core can be exposed. The cable can now be re-energised and tested to identify the neutral conductor. Once the neutral has been identified the cable must be isolated before any connections are made. The neutral connection is then made (module 6) and bonded to the lead sheath. All neutral earth metalwork must be re-shrouded before any of the phases are exposed. The phase connections can then be made using extended connectors and service slides. Once made and insulated with wraps the temporary shrouding can be removed from the neutral / earth. SHROUDING AND END CAPS OMITTED FOR CLARITY SHROUDING OMITTED FOR CLARITY Version: 1.0 Date of Issue: June 2008 Page 8 of 9

Before fitting the outer box (Module 8) the cable must be reenergised to allow the cut-out to be tested (Module 12) Where the inner concentric layer is identified as the neutral the connections can be made in a similar way as Paragraph 7, however all jointing must be carried out under isolation with the cable treated as live. Version: 1.0 Date of Issue: June 2008 Page 9 of 9