Laboratory Internal Audit Plan MAY 2017

Similar documents
Internal Auditing and Control of Nonconforming Work

Quality System Document

ADEM LTF Contractor QAPP Review Checklist

Laboratory Challenges with TNI Implementation and Laboratory Audits

Products & Services. Catalog

Medical Microbiology Laboratory. Quality Management for the. Roberta B. Carey, Ph.D., D(ABMM), CMQ/OE(ASQ)

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

Quality Management System

NQA-1 Graded Approach, 55-Gallon Drum Summary

MODULE 2A GENERAL MANAGEMENT SYSTEM REQUIREMENTS

Quality Management System

Quality Assurance Project Plans Requirements Review

EPA REGION 8 QA DOCUMENT REVIEW CROSSWALK Entity (grantee, contract, EPA AO, EPA Program, Other)

CLIA Challenges in Laboratory Consolidation

SECTION L QUALITY ASSURANCE. 1) designating and managing quality control functions, including:

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

CAP Regulatory Potpourri for Microbiologists. Christi Wojewoda, MD Director of Clinical Microbiology 2/2/19

National Shellfish Sanitation Program (NSSP) Guide for the Control of Molluscan Shellfish: 2017 Revision

Overview of Good Food Laboratory Practices

Technical Services Document #: TS-0007 Internal Audit Procedure Version #: 01

Project Proposal Form

Leveraging ISO s Quality Management System to Achieve 24/7 Inspection Readiness. Randy Querry Accreditation Manager Clinical

Medical Cannabis Laboratory Approval Program

QAM-Q-113 Responsibilities of the Laboratory Quality Assurance Officer

SQF 2000 Guidance. Guidance for Food Sector Category 4 Fresh Produce Pack House Operations. 1st Edition

NEW YORK STATE DEPARTMENT OF HEALTH CLINICAL LABORATORY EVALUATION PROGRAM. Crosswalk of Proposed Revision to General Systems Standards

Vendor Qualification Survey

I. Development, Submittal, and Acceptance of a Quality Management System

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

IQCP for the Akers Bio PIFA PlussPF4 Rapid Assay

Contracts, Subcontracts, Purchasing and the Laboratory

ASME NQA-1 Certification. Matthew Vazquez September 4, 2017

National Biomonitoring Plan

IQCP for the Akers Bio PIFA Heparin Platelet Factor 4 Rapid Assay

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM

A Small Laboratory s Experience

QMS CO-ORDINATOR & GENERAL PROCEDURES:-

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

May Quality Improvement Forum Call: Work Time Units

Procedure 14 Internal Audits

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Developing an Individualized Quality Control Plan (IQCP) For Cepheid s GeneXpert Diagnostic Systems

Quality Management. Carlos Bachier, MD

SUPPLIER QUALITY ASSESSMENT

Moving from ISO/TS 16949:2009 to IATF 16949:2016. Transition Guide

Definitions contained in the above mentioned document and industry regulations are applicable herein.

Basic Good Laboratory Practice. Christopher Jerome, B.Vet.Med., Ph.D

Quality Assurance QA STANDARD OPERATING PROCEDURE FOR FDA or Pharmaceutical Sponsored Audits

Lucia M. Berte Laboratories Made Better! P.C. Broomfield, Colorado, USA

STATIONARY SOURCE AUDIT SAMPLE PROGRAM [VOLUME 1, MODULE 2] GENERAL REQUIREMENTS FOR AN ACCREDITOR OF STATIONARY SOURCE AUDIT SAMPLE PROVIDERS

Self-Evaluation/Audit Checklist for Food Supplement Manufacturers

Audits must be conducted with due concern for employee safety and environmental protection.

Supplier Quality System Survey

Strategies to Revise Quality Policy and Quality Objectives. Eileen Cortes February 22, 2017

QUALITY ASSURANCE/QUALITY CONTROL

IQCP Inspector Training Scenarios

CAPA Management: Best Practices and FDA QSR Mandate WHITE PAPER. ComplianceQuest In-Depth Analysis and Review

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

INTERNATIONAL STANDARD

ADVISORY CIRCULAR AC

This document is a preview generated by EVS

GENERIC CHECKLIST FOR GLP/GXP INSPECTIONS/AUDITS

Qualification of Highway Product Manufacturers Through the Use of NTPEP Audits

Good manufacturing practices

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE

Business Management System Manual

GUYANA NATIONAL BUREAU OF STANDARDS SCHEDULE OF TRAINING PROGRAMMES FOR MARCH TO DECEMBER 2018 Manufacturing and Service Organisations

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Marcia L. Zucker, Ph.D. ZIVD LLC

Judith Yost, MA, MT(ASCP) Director, Division of Laboratory Services. Laboratory Certification Intersection w/ Quality Management Systems

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Mark Citriglia Manager of Analytical Services Northeast Ohio Regional Sewer District

By Ginger Bailly 18 Feb For Official Use Only

IBS Electronics, Inc.

GxP Auditing, Remediation, and Staff Augmentation

QUALITY SYSTEMS INSPECTIONS TECHNIQUE

QUALITY AGREEMENT. The following Agreement has been concluded between

GxP Auditing, Remediation, and Quality System Resourcing

Certified Welding Fabricator (CWF) Program Information

Annex 4. Guidance on good manufacturing practices: inspection report. Background

ISO 9001:2015 Expectations

Lessons from Pharmaceutical Laboratory related FDA Warning Letters

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

CLIA Personnel & Competency Requirements

Meaningful Competency Assessment

SUPPLIER SURVEY FORM Instructions

GxP Auditing, Remediation, and Staff Augmentation

Qualification of Highway Product Manufacturers Through the Use of NTPEP Audits

Verification Auditing

AGSI Certification Pvt. Ltd. 208, Kartik Complex, New Link Road, Andheri (West), Mumbai

American Association for Laboratory Accreditation

UNCONTROLLED DOCUMENT WHEN PRINTED

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

IPD Quality Management System Supplier Questionnaire Instructions

Closing the Gap in Pre-analytical Specimen Quality

EPRI QUALITY PROGRAM MANUAL

Larry Strouse Railroad Safety Specialist (HM) Federal Railroad Administration

Moving to the AS9100:2016 series. Transition Guide

Transcription:

Laboratory Internal Audit Plan MAY 2017

Acknowledgements The following APHL workgroup members contributed to this document: Charlene Thomas, BS, MT(ASCP), manager, microbiologist, Alabama Bureau of Clinical Laboratories (workgroup lead) Lauren Farnsworth, MS, QA & Safety Program manager, Colorado Department of Public Health & Environment Steve Gradus, PhD, D(ABMM), CLIA director, City of Milwaukee Health Department Sheri Hearn, MPH, Quality Management officer, Oregon State Public Health Laboratory Lorelei Kurimski, MS, director, Office of Organizational Development, State Hygienic Laboratory at the University of Iowa Deborah Severson, BS MT(ASCP), director of Laboratory Services, Fairfax County Health Department Laboratory Bertina Su, MPH, senior specialist, Quality Systems, Association of Public Health Laboratories APHL Laboratory Internal Audit Plan 2

APHL Internal Laboratory Audit Plan A laboratory audit program is critical to ensuring the institution meets applicable requirements. Follow the guidelines below to develop appropriate documents/forms/statements for each heading of your internal audit plan. Add more headings as necessary. Purpose This section should describe the purpose of the internal audit including any defined goals. For example: To determine overall compliance with internal policy or regulatory requirements in preparation for an external audit To conduct a follow-up internal audit in response to a complaint, poor external inspection or a nonconforming event To ensure a new method is compliant with regulatory requirements To provide assurance to management that the management system is implemented as intended To serve training purposes, learn the requirements of accreditation bodies (standards) To improve processes To verify compliance with the requirements of the quality management system, including analytical methods, SOPs, the quality manual, ethics policies, data integrity, internal laboratory policies, and regulatory requirements such as AIHA-LAP, LLC, CLIA and TNI To compile the appropriate documentation to include: Auditor reviews of corrective actions Auditee/section response if necessary Final report reviewed by management Follow-up if needed Scope This section should describe the range of the audit. For example: Ensuring that appropriate test procedures, equipment, controls, calibrations methods are established Ensuring that appropriate laboratory tests are ordered Procuring test samples in an efficient and timely manner Producing accurate laboratory test results Disseminating laboratory test information to clients/providers in a timely manner Utilizing qualified laboratory personnel APHL Laboratory Internal Audit Plan 3

Activities to Be Audited This section should define the activities to be audited. For example: Preanalytical Review of: Temperature logs Sample receipt logs Sample rejection logs Sample quality logs Policies and procedures for: Sample or patient identification verification Sample collection, handling, and transportation Sample receipt, preparation, and storage Sample acceptance and rejection criteria Chain of custody Data entry and review Postanalytical Review of: Non-conforming events/corrective actions Report completeness Turn-around-time Corrected reports Policies and procedures for: Result release Report preparation and delivery Sample archiving and management Sample storage and disposal requirements Demographic and results corrections (corrected reports) Analytical Review of: Temperature logs Review of instrument runs Reagent and standard logs Instrument/equipment maintenance logs Proficiency tests Failed runs Policies and procedures for: Testing and examinations Results review and follow-up Critical values Method verification and validation Quality control requirements; type, frequency, and corrective action for out of range QC Calibration and calibration verification APHL Laboratory Internal Audit Plan 4

Reference Requirements This section should reference documents/regulations pertinent to the performance of the laboratory test. For example: Clinical Laboratory Improvement Amendments of 1988. 42 CFR Parts 493. EPA Manual for the Certification of Laboratories Analyzing Drinking Water Criteria and Procedures Quality Assurance Fifth Edition ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories, Second edition 2005-05-15 APHL Laboratory Internal Audit Plan 5

Assigned Auditors(s) This section should establish the general qualifications, responsibilities, training and continuing education of the auditors. For example: Personnel are trained and qualified Personnel are independent of the activity to be audited. Training Internal training provided by quality managers or a designated quality group External training available through accrediting bodies such as A2LA Resources available on web (be sure these are from qualified organizations) Training certificates maintained in auditors training files Auditor responsibilities Reviews prior documents and audit reports Performs the audit Asks objective questions (e.g., What is your process? ) Reviews documents and records Seeks lead auditor help when necessary Completes audit form and summary Reviews non-conformances with management Submits review documentation to lead auditor for review Attends meetings Discusses findings and answers questions Lead auditor responsibilities (usually the quality manager) Plans and schedules Forms the team Provides documents and reviews with team Assigns standards segments to team Assists with the audit Reviews the audit Discusses obstacles and challenges with leadership Helps with audit report Manages meetings APHL Laboratory Internal Audit Plan 6

Schedule This section should give an overview of the timetable for the audits. An internal audit is a formal laboratory activity that must be performed in accordance with a documented procedure and on a regular schedule. Laboratories may choose to conduct a full laboratory audit annually or biannually, or to audit parts of their system every month. Generally it is recommended that a laboratory audit every part of its management system, including its testing and/or calibration activities, at least once every twelve months. Steps may include: Determine and document with a planning calendar regulators inspection cycles, e.g., biennial CLIA inspections. Plan off year internal inspections in preparation for regulators inspections. At a minimum, allow 3-6 months lead time for internal inspection prior to official inspection. Develop a pre-determined plan for walk-through inspections by supervisors/management using checklists. Use regulators checklists if available. Throughout the year, plan regular (e.g., monthly, quarterly, etc.) inspections of the laboratory. Depending on the size and complexity of the facility, this could be by section, workbench or the entire laboratory. Sampling Plan This section should cover activities required to complete the laboratory test. Horizontal audits usually capture processes from beginning to end (e.g., a training program). Vertical audits usually provide a deep look into a specific process (e.g., sample receipt acceptability and rejection). For example: Sample tracking (Horizontal) Nonconformance program (Horizontal) Sample receipt and login (Vertical) Turnaround time (Vertical) APHL Laboratory Internal Audit Plan 7

Report of Findings (Nonconforming Activities/Actions) This section should explain how nonconforming events are documented, including follow-up actions. For example: Some checklists are available through regulatory bodies for use in internal audits and reports Verbal Begin with what was positive in the audit Cite the standard used to identify any non-conformances (regulation/accreditation, method, policy, procedure, checklist, etc.) Identify any actions required (immediate correction, timeline for corrective action or recommendation) Written Report (generally provided within 2 weeks of audit) Capture individuals interviewed Provide checklist with findings (include dates of audit) Begin with what was positive in the audit Provide summary of findings (mention documents, records, equipment, etc.) Cite the standard used to identify any non-conformances (regulation/accreditation, method, policy, procedure, checklist, etc.) Identify any action required (immediate correction, timeline for corrective action or recommendation) Submit overall conclusions and recommendations Examples of terminology to use There is no evidence There is insufficient evidence Current practice does not reflect Current documentation Not all The procedure for is not fully implemented APHL Laboratory Internal Audit Plan 8

Report of Findings (Nonconforming Activities/Actions) Reports go to section audited (supervisor and/or section manager) with a copy to management Auditee responds to audit with any required corrective actions Response and/or results of root cause analysis with a statement of action: Detail any corrections made while identifying the underlying cause. Include a statement of the corrective action for each nonconformity/deficiency. Perform a root cause analysis of the problem or use another form of analysis such as Define, Analyze, Resolution, Action(s) taken, also known as The Five Whys; cause mapping; fishbone diagrams; or Plan, Do, Check, Act (PDCA) Proof of commitment: Indicate changes in documentation. If there was a written procedure that was not being followed, then provide other evidence (e.g., document name and section if updated) Objective evidence of compliance: Provide copies of laboratory records demonstrating compliance or provide a timeline/deadline of when the compliance will be achieved. Auditor reviews corrective actions and responds Auditee/section responds if necessary Final report reviewed by management Follow-up if needed Quality Function Approval and Date This section should include the signatures/dates of the management staff accountable for the audit findings. It is recommended that nonconformances and corrective actions be shared with all staff in the relevant laboratory section. Effectiveness of Actions (taken over time) This section should describe the effectiveness of actions taken over time in response to identified internal audit nonconformance(s). The specific nonconforming activities determine whether immediate actions, corrective actions or both are executed. For example: Review immediate correction for effectiveness. This may include reviewing specific logs (after a period of time determined by the remediation plan) to ensure nonconformances are appropriately documented. Review corrective actions for effectiveness. This may include updating an SOP, retraining and monitoring periodically over a longer period of time (typically 3 months to 1 year). Documentation of findings from the review(s) should indicate whether the actions taken were effective. If so, the results should be shared with staff and acknowledgements signed by appropriate management. If the results were not effective, a root cause analysis should be performed if not completed already, and further corrective actions identified, with a new plan and another review for follow-up effectiveness. APHL Laboratory Internal Audit Plan 9

Tracking/ Monitoring This section should describe the process for correction of a documented nonconformance activity. For example: Non-conformance/deficiencies should be documented and tracked by management or delegated to staff as appropriate. Assessments are written whenever an audit finds a non-conformance/deficiency Assessments include timelines for expected action Assessments should be documented using an assessment tool such as a root cause analysis form Non-conformance/deficiencies should be monitored for trends over time APHL Laboratory Internal Audit Plan 10

Association of Public Health Laboratories The Association of Public Health Laboratories (APHL) works to strengthen laboratory systems serving the public s health in the US and globally. APHL s member laboratories protect the public s health by monitoring and detecting infectious and foodborne diseases, environmental contaminants, terrorist agents, genetic disorders in newborns and other diverse health threats. This project was 100% funded with federal funds from a federal program of $459,900. This publication was supported by Cooperative Agreement # NU60OE000103 funded by the Centers for Disease Control and Prevention. Its contents are solely the responsibility of the authors and do not necessarily represent the official views of CDC or the Department of Health and Human Services. 8515 Georgia Avenue, Suite 700 Silver Spring, MD 20910 Phone: 240.485.2745 Fax: 240.485.2700 Web: www.aphl.org Copyright 2017, Association of Public Health Laboratories. All Rights Reserved.