Document No.: INS Rev: B Origination Date: 10/30/2013

Similar documents
Supplier Quality Manual

CD Supplier Handbook. * Marine Canada Acquisition Limited Partnership DBA Teleflex Canada

Montaplast of North America, Inc.

Western Diversified Plastics, LLC. Supplier Requirements Manual

Global Supplier Standards Manual - Quality Standard

Adient Automotive Experience Global Supplier Standards Manual Chapter 4 Quality October, 2017

Supplier Quality Manual (QQS )

Supplier Quality Manual

Table of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A

Global Supplier Standards Manual- Supplier Quality September

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

SUPPLIER QUALITY MANUAL

Supplier Requirements Retail Information Svcs LLC Fastener Division

Supplier Quality Manual

Supplier Requirements Manual

Metric Manufacturing Supplier Manual

Supplier Quality Manual

Supplier Quality Requirements Manual

Supplier Quality Manual

Rev A. Vendor Compliance Manual

Supplier Material Delivery and Logistics Requirements

SUPPLIER MANUAL. Introduction

Supplier Audit Procedure /20/17

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

Supplier Audit Procedure /2/17

Supplier Requirements Manual

Metal Powder Products Company

SUPPLIER MANAGEMENT PROGRAM

Union Pacific Railroad. Supplier Excellence Manual. Contents

Supplier Quality Manual

SUPPLIER REQUIREMENTS MANUAL Revision 3. SUPPLIER REQUIREMENTS MANUAL Revision 3 GATES CORPORATION

Visteon Corporation. Customer Specific Requirements Fifth Edition. For Use with ISO/TS 16949:2009

SUPPLIER EXCELLENCE MANUAL

Supplier Requirement Manual. Preface

ELEMENTS OF MANUFACTURING BASICS

Supplier Quality Agreement

Production Control Requirements Section 13. Powers and Sons, LLC - Material Requirements

SUPPLIER QUALITY MANUAL

Document Routing/Approval Record

Bufab document Page 0/11 Date Version 1.1 BUFAB SUPPLIER MANUAL

Supplier Quality Manual

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page

VU Manufacturing Supplier Quality Manual

General Quality Assurance Procedure (QAP) QAP: 13.0 Subject: Control of Nonconforming Product Date: 11/21/13 Created By: Approved By: Rev: C

Supplier Quality System Requirements Manual

Tungsten Onboarding and Invoice Reference Guide

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

Program Invoices Contents

SUPPLIER MANUAL Quality Policy

Supplier Manual. June 5, 2015

Supplier Quality Manual CHASSIX Inc.

Revcor Supplier Quality Manual

SUPPLIER QUALITY MANUAL For ISO/TS16949:2009 (Level 1)

SUPPLIER QUALITY PROGRAM Procurement Standard

Daimler Trucks North America (DTNA)

Revision no: 01 Date: Global Supplier Quality Assurance Network

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

Supplier Policies & Procedures

Supplier Expectation Manual

Global Supplier Quality Manual. Revision 4

Activant Prelude. Entering Vendor Claims and Warranty Replacements

SUPPLIER QUALITY MANUAL

LUCY SWITCHGEAR FZE s TERMS AND CONDITIONS OF PURCHASE

SUPPLIER QUALITY MANUAL

Supplier Quality Manual CHASSIX Inc.

ALCO Plastics, Incorporated SUPPLIER QUALITY SYSTEM REQUIREMENTS MANUAL

Supplier Quality Expectations for 2011

Supplier Requirements Manual

Supplier Resource Guide

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

10/24/18. Printed document is uncontrolled after 10/24/2018, unless in a controlled book

TRICO PRODUCTS PUR-C-P106-A

SUPPLIER QUALITY MANUAL Control of Nonconforming Product

OPW Engineered Systems

BATES SUPPLIER MANUAL

Supplier Quality Requirements Manual

Supplier Quality Manual

Charleston Metals Products, Inc.

Training Guide. For Third Party Logistics Services for

Supplier handbook Solaris Bus & Coach S.A.

Supplier Quality Manual

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

PROFESSIONAL SUITESOLUTIONS

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual

Exhibit E LeanSight SLA. LeanSight SERVICE LEVEL AGREEMENT (SLA)

ERS Guide for Suppliers

COMPANY NAME HERE PROCUREMENT CARD POLICIES AND PROCEDURES TARGETED USAGE AND EXCLUSIONS

Supplier Quality Assurance Manual

CMCO SUPPLIER REQUIREMENTS

Blue Telecom is compliant with the Telecommunications Consumer Protection Code (C628:2012), which applies if you meet one of the criteria below.

SUPPLIER QUALITY REQUIREMENTS MANUAL

Taulia efile Program. Supplier User Guide. Company sensitive. For official use only.

Invoice Collaboration with SNC Supplier

SUPPLIER QUALITY MANUAL

Supplier Quality Manual. Autoneum Group Supplier Quality Manual

Transcription:

1.0 Purpose This instruction is to describe the process for Cost of Poor Quality (COPQ) calculation, along with process for Cost Recovery with supplier caused problems. This applies to all purchased materials, parts & services supplied to Fram Group operations worldwide, but is not applicable to intra-company suppliers. 2.0 Definitions CAR Correction Action Report (and Resolution) COPQ Cost of Poor Quality CRN Cost Recovery Notification (debit Memo) NCM Non-conformance Material Notification SQ Supplier Quality DM Debit Memo used to debit a supplier SQM Supplier Quality Manager 3.0 Reference Documents P-85-02 Corrective and Preventative Action 4.0 Procedure All unanticipated costs that are incurred by Fram Group businesses will be documented and charged back to the supplier who is responsible for their occurrence. Dollar values used throughout this process shall be of the same national currency as the purchased materials, parts and/or services supplied. This process is outlined as follows: Page 1 of 5

Identify Potential Issue R - Prod Eval/Plant Quality Determine Fault R Prod Eval/ Plant Quality Advise Supplier of Issue via Rejection Notice R Prod Eval/ Plant Quality Cc: Sourcing Mgr/ SQM Notify Supplier of Potential Chargeback with notification of 14 day review time Document Costs Associated with Issue and Log in SQ SharePoint R Prod Eval/SQM/ Plant Quality Review Value of Chargeback R Prod Eval/Plant Quality Value is < $10,000 Value is > $10,000 Send Chargeback to Buyer R Prod Eval/ Plant Quality Send to Buyer and Commodity Manager/Director if approved R Sourcing Mgr COPQ form sent to supplier with notification of 7 day dispute time R Buyer Cc: Prod Eval, SQM, Sourcing Mgr, Plant Qlty Supplier Disputes Charges R - Supplier N Y Send Debit Memo to Finance for debit R Buyer Resolve Dispute and escalate if needed for a closure within 30 days R Buyer/Sourcing Mgr/ SQM/ Plant Qlty/ Prod Eval Finance Send DM confirmation to originator, supplier and buyer R AP Cc: Prod Eval/ Plant Qlty, Sourcing Mgr, SQM Originator updates metrics file for reporting R- Prod Eval/ Plant Qlty End 4.1. General Recovery Rules Cost of Recovery requires a NCM report and/or CAR issued to the supplier prior to a CRN request. This notification must state that a cost recovery is being processed and who at the supplier has been notified about the cost recovery. However, there may be exceptions where the CRN may be issued without NCM or CAR, such as: PPAP approval failure Supplier Quality failure requiring Fram Group personnel presence at Customer and/or Supplier location. Page 2 of 5

The manufacturing plant or designated company representative will track, collect, record and document supplier related incidents (or manage for sub-contracted third-party to do so). Depending on the amount of chargeback, an internal escalation must occur. Chargeback s less than $1k can be sent directly to supplier Items greater than $10k must be sent to buyer and Sourcing Manager/director for approval. 4.2. Accept/Reject Recovery Costs Supplier Accepts Cost Recovery Amount or no response from supplier: If after 7 calendar days from the date of the cost recovery notification, the supplier has accepted the CAR cost recovery amount or has not answered the CRN, a debit memo request will be sent to accounting (a copy also to the buyer) by the manufacturing location, to request that accounting bill the supplier for the amount listed in the cost recovery. Supplier Does Not Accept Cost Recover Amount: When a supplier receives a cost recovery request and indicates that he/she feels it is not accurate, the appeals/negotiation process begins. During the first 14 calendar days the supplier must initiate communication with the issuing person or manufacturing location regarding the charges. The supplier should provide as much detail as possible to support the contention that the charge is inaccurate. If the issuing location and the supplier agree on a negotiated cost, that amount will be indicated in the revised cost recovery and will be forwarded to the financial department for debit to the Supplier (a copy also to be sent to the buyer). If no agreement is reached between the supplier and the plant location at the end of the first 14-calendar day period, the company representative must forward all details to the Buyer so they can negotiate and resolve the cost recovery. The buyer needs to attempt to resolve the cost recovery as soon as possible, but within 30 calendar days from the date of receiving the cost recovery and the supporting documentation. If the buyer cannot resolve this issue within the 30 days timeframe, the buyer should involve the Sourcing manager. The Sourcing manager may involve the Supply Base director when additional leverage is required. When a cost recovery has gone to this step, the cost recovery spreadsheet will indicate this escalation, and require the buyer to forecast a final resolution date. Page 3 of 5

When the cost recovery negotiation is complete, at whatever level, the final outcome must be sent to financial for issuing the debit-/credit-note, to the supplier and to the originator of the chargeback to document the resolution in the tracking spreadsheet. 4.3. When to Document Costs The inability of a supplier to meet expectations can cause Fram Group to incur unanticipated costs during several phases of the process. The following table outlines typical events where costs can be incurred. When any of these events occur, Fram Group personnel should begin to document the costs. This includes the following items (but not limited to): New Product Launch Any costs incurred as a result of a supplier failing at PPAP Submission, Run@Rate, Process Readiness, etc. Manufacturing Process Delivery Warranty Customer Issue Lots rejected at Receiving Inspection Downtime Sorting/Rework Overtime Line speed Reduction Additional manpower Line changes due to material availability Equipment breakage Additional outside processing or inspection Tooling and fixturing for rework Premium costs paid to support production Material and Process Value Added losses Fram Group personnel traveling to support problem resolution at supplier Any costs incurred as a result of supplier late delivery (i.e. premium freight inbound or outbound or any penalties) Part identification and labeling Shipping document errors Warranty claims Recalls Rework at premises Replacement of material at Charges from Internal containment to prevent quality issues at Customer such as quarantine, added inspection, certification of product, etc. 4.4. Table of Invoicing Rule (Costs in USD) ADMIN. FEE NCM Notification (with or without CAR) Warranty Admin Fee MANAGEMENT FEE* OE Customer Incident due to Vendor (CIV) $5,000 CONTAINMENT Material Sorting, Rework managed by Fram Group $75/hr Local Third-party or company personnel DEFECTIVE MATERIAL Returned or Scrapped Parts (without relevant Page 4 of 5

MATERIAL & PROCESS VALUE ADD LOSS MAJOR PROBLEM MANAGEMENT ACTIVITIES NEW PRODUCT LAUNCH MANAGEMENT WARRANTY DELIVERY debit note from Finance) Material scrapped caused by component failure including process cost All involved Fram Group Personnel Costs including Travel & Expenses All involved Fram Group Personnel Costs including Travel & Expenses in case of a PPAP Submission Failure due to Supplier Fram Group Warranty Costs including all costs recharged by Customers Labeling issue or Shipping Notice Error Premium Freight costs due to Supplier Production Loss OTHER COSTS Other Costs due to Supplier * Management Fee relating to Customer Incident due to Vendor shall be raised internally and agreed upon by the Buyer and Commodity Manager prior to approaching vendor. All incidents will automatically generate an administrative charge consisting of a fixed rate, as mentioned in table above. NCM: the Fram Group organization shall raise one Non-Conforming Material Notification only for each rejected batch whether there is one or more defective parts in this batch. The issuing location does NOT have to designate a problem as a Major Disruption in order to recover incurred costs due to a non-conformance or discrepancy. If a plant has several assembly lines (such as a components operation) and one of the lines or operations experiences a part shortage and continues to build product, the cost recovery should detail man-hours lost to calculate charges. The number of units impacted shall be recorded on the cost recovery. In ALL cases, these charges must have complete supporting documentation. Revision History Log Revision Change Description Author Approval Date - Release JP Sre 10/30/2013 A Document format changes consistent with QMS documents in use Sre Sre 07/07/2014 in FRAM Filtration Master Control system. Corrected misc typos. B Reformat for Fram Group update flow chart with responsibilities Pkw/gr/dl pkw 5/09/17 Page 5 of 5