R.H. SHEPPARD CO., INC. HANOVER, PA QUALITY BY DESIGN SUPPLIER QUALITY MANUAL NINTH EDITION

Similar documents
Supplier Quality Manual (QQS )

Supplier Quality Standard

Progressive Metal Forming, inc Hall Road Hamburg, MI 48139

Supplier Quality System Requirements Manual

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by

SUPPLIER GUIDELINES MANUAL

Supplier Quality Requirements Manual

Metal Powder Products Company

SUPPLIER QUALITY MANUAL For ISO/TS16949:2009 (Level 1)

Western Diversified Plastics, LLC. Supplier Requirements Manual

SUPPLIER MANUAL SUPPLIER MANUAL

Supplier Quality Manual

Section Table of Contents Page Number

SUPPLIER QUALITY MANUAL

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

JSP Supplier Quality Assurance Manual

SUPPLIER QUALITY MANUAL

Supplier Quality Manual CHASSIX Inc.

Supplier Quality Manual CHASSIX Inc.

Supplier Requirements Manual

TRICO PRODUCTS PUR-C-P106-A

Vernay Quality System Supplier Quality Manual

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

Supplier Quality Systems Requirements Manual

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

Guideline for Suppliers: Initial Sampling

STANDARD. S P-O Svedlund UTDH Markku Backholm. SDT Eva Ivrell Hedensjö UTDH Iréne Klingberg

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities

Revcor Supplier Quality Manual

Supplier Requirement Manual. Preface

Supplier Quality Manual

Supplier Quality Manual

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP)

MERIT Customer Specific Requirements

Supplier Quality System Survey

Supplier Quality Assurance Manual

Blue Chip Engineered Products Supplier Quality Manual

IATF - International Automotive Task Force IATF 16949:2016 Frequently Asked Question (FAQ)

ALCO Plastics, Incorporated SUPPLIER QUALITY SYSTEM REQUIREMENTS MANUAL

Metric Manufacturing Supplier Manual

Visteon Corporation. Customer Specific Requirements Fifth Edition. For Use with ISO/TS 16949:2009

Supplier Quality Manual

VU Manufacturing Supplier Quality Manual

Supplier Quality Requirements FSQ01

CUSTOMER SPECIFIC REQUIREMENTS FOR ISO/TS APPLICABLE TO FIASA/POWERTRAIN SUPPLIERS

Supplier Quality Assurance Manual

Supplier Quality Requirements Guide

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

SUPPLIER QUALITY MANUAL

GENERAL QUALITY REQUIREMENTS

Its purpose is to define the approval process of new or revised parts, or parts resulting from new or significantly revised production methods.

Supplier Quality Manual

SUPPLIER QUALITY REQUIREMENTS MANUAL

Supplier Quality Manual

Global Supplier Quality Process Manual. Quality Processes for Suppliers to Merkle-Korff Industries. Abstract

Supplier Quality Expectations for 2011

Supplier. Quality. Manual

Global Supplier Quality Manual. Revision 4

Supplier Quality Requirements Manual

Table of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments

Supplier Quality Assurance Manual (SQAM)

DaimlerChrysler (Chrysler Group) Customer-Specific Requirements

SUPPLIER QUALITY MANUAL

Supplier Manual Rev /15

Global Supplier Development & Guidelines Manual

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5

PPAP Process Checklist \ Sign Off Sheet Instructions

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page

Customer Specific Requirements. For Use with ISO/TS16949 And ISO 9001

MANUAL SUPPLIER S QUALITY MANUAL

Supply Chain Supplier Quality Manual. Creation Date: 19 th September 2012 Last Updated: February 16, 2016 Revision Number: 03 Document Number: AQM005

SUPPLIER MANUAL Quality Policy

Suppliers Quality Assurance Manual

Customer Specific Requirements. For Use with ISO/TS16949 And ISO 9001

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A

Annex 1. Customer Specific Requirements For Use With ISO/TS16949

Table of Contents. 1 P age. Page

SUPPLIER QUALITY MANUAL

Montaplast of North America, Inc.

STANDARD. Date SP Jan F Visscher UTMS Michaela Bundschuh

Works Standard. PPAP - Production Part Approval Process

ConMet Supplier Quality Manual

SUPPLIERS MANUAL. Revision: Copyright Interconnect Product Assembly AS Printed NB! Paper copies are uncontrolled documents

Supplier Quality Manual

SUPPLIER QUALITY ASSESSMENT

Consolidated Metco, Inc. Supplier Quality Manual

MANUAL SUPPLIER S QUALITY MANUAL

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

10/24/18. Printed document is uncontrolled after 10/24/2018, unless in a controlled book

Supplier Quality Requirements Manual

Prepared by: Checked by: Released by: Department LOQL Wagner LO-E Doelker LOQL Nuding Date Signature

Torque Transfer Solutions

CUSTOMER SPECIFIC REQUIREMENTS RELATED TO ISO/TS APPLIED TO FIASA/Powertrain SUPLLIERS

LOTUS SUPPLIER HANDBOOK rev14 09/05/2018. Supplier Handbook

SUPPLIER QUALITY MANUAL

Charleston Metals Products, Inc.

PURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

ISO/TS16949:2002 The Automotive Quality Management Business System

Transcription:

R.H. SHEPPARD CO., INC. HANOVER, PA. 17331 QUALITY BY DESIGN NINTH EDITION

TABLE OF CONTENTS TITLE PAGE 1. SUPPLIER QUALITY SYSTEM REQUIREMENTS 1 2. PURCHASE ORDERS, SPECIFICATIONS AND PRINTS 1 3. REQUESTS FOR PRINT CHANGES 1 4. REQUESTS FOR DEVIATIONS FROM PRINTS 2 5. PACKAGING 2 6. ON TIME DELIVERIES 3 7. PPAP REQUIREMENTS 3 & 4 8. MATERIAL COMPLAINT NOTICES (MCN) 5 8.1 MCN ISSUE 5 8.2 CORRECTIVE ACTION RESPONSE NOT REQUIRED 5 8.2 CORRECTIVE ACTION RESPONSE REQUIRED 5 8.3 SECOND NOTICE MCN 5 SAMPLE MCN S 6 & 7 Rev. 9, PAGE i

1. SUPPLIER S QUALITY SYSTEM REQUIREMENTS The minimum quality system required to do business with the R. H. Sheppard Company is ISO 9001:2008. Proof of certification to this standard must be available upon request. All ISO9001 certified suppliers are required to develop their quality systems to conform to the ISO/TS 16949 standard utilizing the AIAG standards listed below. These standards are necessary to provide the R.H. Sheppard Company with well documented PPAP s as required and assure the appropriate controls are in place. FMEA - Potential Failure Mode & Effects Analysis (Design & Process) MSA - Measurement Systems Analysis PPAP - Production Part Approval Process SPC - Statistical Process Control APQP - Advanced Product Quality Planning & Control Plan Current revisions of these manuals can be obtained from the Automotive Industry Action Group @ www.aiag.org. 2. PURCHASE ORDERS, SPECIFICATIONS AND PRINTS All confirmed purchase orders will be sent to the supplier with copies of the latest revisions of the applicable Sheppard prints, or Part Identification Sheets and specifications. The supplier should discard any previous revisions of these documents and use those provided with the Sheppard Purchase Order. 3. REQUESTS FOR PRINT CHANGES If it is determined by the supplier that a dimension or other print specification require changes, the supplier shall contact the Sheppard Purchasing Manager via e-mail and request a print change. The supplier shall provide all necessary details of the requested change to the Purchasing Department. Following RHSCo. review of the request, the Purchasing Department will inform the supplier of the decision in writing via e-mail. Rev. 9, Page 1 of 7

4. REQUEST FOR DEVIATION FROM PRINT (Prior to, During or Following Manufacturing) The supplier shall contact the Sheppard Purchasing Department via e-mail if a problem is discovered in complying with any print requirement and report the following information as a minimum: 1. Sheppard Part Number; 2. Sheppard Purchase Order Number; 3. Description of the problem; 4. Quantity of the parts involved; 5. Duration of this condition; 6. The proposed corrective action for preventing future occurrences of the reported condition. This information will be reviewed by Sheppard Purchasing, Quality and Engineering, as necessary. Following review, the supplier will be contacted by the Purchasing Department on the acceptance or rejection of the deviation request in writing via e- mail. 5. PACKAGING Unless otherwise stated in the Sheppard purchase order, all parts and material shall be packaged for shipment in accordance with the supplier s standard packaging procedures. The methods and materials used in packaging shall assure adequate protection against damage during handling and delivery. Rev. 9, Page 2 of 7

6. ON TIME DELIVERIES The R. H. Sheppard Co., requires 95 percent on time delivery performance from its suppliers. If the required delivery of parts as stated on the Sheppard Purchase Order cannot be met, the supplier shall immediately contact the Sheppard Purchasing Department to determine if the delay would have a negative affect on our production. The R. H. Sheppard Co., would be subject to very severe penalties from our customers if we caused delays or stoppages on any of our customers production lines due to poor delivery performance. The R. H. Sheppard Co., reserves the right to assess suppliers penalties and/or recoup related costs if a supplier causes a delay or stoppage on an assembly line. 7. PPAP REQUIREMENTS The below guide describes when a PPAP will be required and what level of PPAP should be performed, we have identified various conditions where a PPAP will be required, however, should you have a question on a different situation please contact R.H. Sheppard Purchasing or Quality Department for further direction. 7.1 No PPAP: This MAY be allowed for commercially available product from a catalog, must be approved by quality. 7.2 Level 1 PPAP: Is required when purchasing commercially available product. A PSW/Dimensional layout is required. 7.3 Level 1 PPAP: New Tooling (dies) a Level 1 PPAP along with a PSW and full dimensional layout is required. 7.4 Level 3 PPAP: MATERIAL CHANGES, all material changes must be submitted to Purchasing to receive authorization from Product Engineering to make parts and proceed with testing. A Level 3 PPAP is required and there is a 300 piece minimum PPAP run unless otherwise approved by Quality. Level 3 PPAP is required as defined by the AIAG Manual. Rev. 9, Page 3 of 7

7.5 Level 3 PPAP: Required for any parts manufactured to a RH Sheppard print/design. There is a 300 piece minimum PPAP run unless otherwise approved by Quality. Level 3 PPAP is required as defined by the AIAG Manual. 7.6 Level 3 PPAP: MOVING TO A NEW SUPPLIER required for any parts manufactured to a RH Sheppard print/design. A Level 3 PPAP is required as defined by the AIAG Manual. 7.7 Level 1 PPAP: FAMILY OF PARTS, when a part has a Level 3 PPAP performed and there are subsequent like parts, a Level 1 PPAP and PSW with dimensional layout is acceptable for any additional parts in that family. 7.8 Level 3 PPAP: MAKING ANY PROCESS/PLANT MOVES CHANGES required for any parts manufactured to a RH Sheppard print/design. There is a 300 piece minimum PPAP run unless otherwise approved by Quality. Level 3 PPAP is required as defined by the AIAG Manual. All procedures will work in conjunction with the AIAG PPAP Manual. Copies of this manual may be obtained by visiting: https://www.aiag.org/products/products-list/product-details?productcode=ppap-4 Rev. 9, Page 4 of 7

8. MATERIAL COMPLAINT NOTICE (MCN) PROCEDURE 8.1 MCN ISSUE A Material Complaint Notice (MCN) will be issued to the supplier for any discrepant shipment received at R. H. Sheppard. The Responsibility Description section of the MCN will contain instructions stating whether or not written corrective action is required. 8.2 CORRECTIVE ACTION RESPONSE NOT REQUIRED On the issued MCN if under responsibility a #2 is present, no corrective action response is required. It is recommended that the supplier investigate the reported condition(s) and implement necessary changes. 8.2 CORRECTIVE ACTION RESPONSE REQUIRED On the issued MCN if under responsibility a #1 is present, a corrective action response is required. A corrective action report, utilizing the 8D format, shall be completed by the supplier. This corrective action report shall contain as a minimum information on the following: The immediate containment action taken The root cause The proposed corrective action plan The implementation date of the permanent corrective action The verification of Corrective Action take for effectiveness The supplier shall submit the completed MCN response to the Sheppard Purchasing Department within 30 calendar days of receipt. Additional information concerning 8D response, Corrective Action format may be obtained from the American Society for Quality @ www.asq.org. 8.3 SECOND MCN NOTICE If the initial corrective action response is not received at R. H. Sheppard within the required time, a Second Notice MCN will be issued. Included on the front page of the MCN will be a reminder note stating that the written corrective action report is overdue. A 30 calendar day response time from the day of receipt will be required on this notice. A LACK OF RESPONSE WILL HAVE A NEGATIVE EFFECT ON SUPPLIER RATINGS AND FUTURE BUSINESS WITH R.H. SHEPPARD. Rev. 9, Page 5 of 7

SAMPLE MATERIAL COMPLAINT NOTICE Requiring CAR: R. H. SHEPPARD CO., INC. Rev. 9, Page 6 of 7

SAMPLE MATERIAL COMPLAINT NOTICE Not Requiring CAR R. H. SHEPPARD CO., INC. Rev. 9, Page 7 of 7