Secondary loop chilled water in super high-rise

Similar documents
Secondary loop chilled water in super high-rise

Online Optimal Control of The Central Chilling System in a Super High-Rise Commercial Building

Energy Performance Evaluation and Development of Control Strategies for the Air-conditioning System of a Building at Construction Stage

Varying Views. Variable-primary flow chilled-water systems are of. on Variable-Primary Flow WHAT IS VARIABLE-PRIMARY FLOW? >>>

Building Energy Saving through Life-Cycle Optimization, Commissioning and Diagnosis Experiences in International Commerce Center (ICC) of Hong Kong

Building Energy Saving through Optimization and Life-cycle Commissioning The Approach and Experiences in ICC

Online performance evaluation of alternative control strategies for building cooling water systems prior to in-situ implementation

Retrocommissioning Investigation Report

In typical commercial buildings, water-cooled chilled water plants use a signifi cant amount of energy.

Analysis of Complex Chilled Water Circuits Using Finite Element Based Modeling

Technical Report 2. Bellevue Ambulatory Care Pavilion New York, NY. Building and Plant Energy Analysis

Ground-Coupled Heat Pump And Energy Storage

IMPROVING CAMPUS CHILLED WATER SYSTEMS WITH INTELLIGENT CONTROL VALVES: A FIELD STUDY

Final Report for National Grid USA Service Company. Evaluation of 2003 Custom HVAC Installations Part II. September 27, 2005.

Optimizing Central Chilled Water Systems

Application of Near-Optimal Tower Control and Free Cooling on the Condenser Water Side for Optimization of Central Cooling Systems

THE GREAT CHILLED WATER DEBATE. Michael Dagher

Small Oil-Less Centrifugal Compressors: Bringing Energy Efficiency and Reduced Costs to Chiller Plants

Chilled Water Plant Design American Standard Inc.

Mechanical Project Proposal

Three Case Studies of the Application of Energy Systems Optimization Best Practices for Automatic Demand Response

COMPUTER SIMULATION AND EXPERIMENTAL VALIDATION OF A MODERN HOTEL ON BUILDING ENERGY CONSERVATION

A CONTROL SCHEME OF ENHANCED RELIABILITY FOR MULTIPLE CHILLER PLANTS USING MERGERD BUILDING COOLING LOAD MEASUREMENT

THE NEW WAY TO PROVIDE COMFORT IN 4 PIPES SYSTEMS APPLICATIONS

Retro-commissioning and on-going commissioning 23 November 2016

Optimized System for Your Bottom Line. Trane Training Class 1 Dec, 2017

Energy Efficiency Potential in Existing Building

SOLAR COOLING: STATE OF THE ART, TECHNICAL ANALYSIS AND FIRSTS APPLICATIONS

Research on Ground Source Heat Pump Design

Using Simulation Model to Reduce System Design Time and Cost

Chiller plant optimization

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68%

BUILDING FOR THE FUTURE

SorTech package solution description

Agenda. Understanding the three basic piping systems. Low DeltaT Syndrome causes, effects, and solutions Design & Control Considerations (VPF)

Enhanced Operation Strategies for Air Conditioning and Lighting Systems Toward Peak Power Reduction for an Office Building in Kuwait

SOLAR COOLING WITH SMALL SIZE CHILLER: STATE OF THE ART

ARE YOUR VARIABLE SPEED PUMPING APPLICATIONS DELIVERING THE PREDICTED SAVINGS? IMPROVING CONTROL TO MAXIMIZE RESULTS

SGM Engineering, Inc.

Oklahoma University Children s Medical Office Building

OPTIMIZATION OF ICE THERMAL STORAGE SYSTEM DESIGN FOR HVAC SYSTEMS

Chilled Water Energy Savings Study

Proceedings of BS2013: 13th Conference of International Building Performance Simulation Association, Chambéry, France, August 26-28

Italcementi Center for Research and Innovation

Outline Chilled Water T Study AHU Coil Overview Cooling Overview Test Setup Data Analysis Findings Summary

7 th NATIONAL CERTIFICATION EXAMINATION Nov FOR ENERGY MANAGERS & ENERGY AUDITORS

AE 481-COMPREHENSIVE SENIOR PROJECT I Building Mechanical & Energy Systems Option

This article does not examine economic payback; a detailed energy. analysis is the best method of comparing system options and their respective

An Integrated Solution for Commercial AC Chillers Using Variable Speed Scroll Compressors


University of Southern California Main Campus Plant Energy use reduction of 49% compared to previous plants and control strategies.

Proposal: Mechanical System Redesign

A Case Study of Control Problems and Resolutions in a High rise

i-chiller COMPACT 1 to 4 kw 0 C to 30 C ic03c to ic10c RELIABILITY:

District Cooling Sustainable Design. Presented by George Berbari CEO of DC PRO Engineering

Project Proposal Proposal for Investigation of Alternative Systems

Application of Steam Turbine Driven Chillers in CHP/DES System

Experiences from Geothermal Heat Pump Systems with Variable Flow Pumping

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.40

TGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series

Section A: CUSTOMER INFORMATION. Customer Name Electric Account Number Rate Application Number. Facility Address City State Zip Code

NATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS

The Milton S. Hershey Medical Center Academic Support Building. AE Senior Thesis Kari Anne Donovan Mechanical Option

Underf loor For Schools

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM

Project Case Study. Motor City DCP. Project: District Cooling Plant, Motor City Start Date: 2007 Completion Date: 2010

NORTH AMERICAN MONITORING OF A HOTEL WITH ROOM SIZE GSHPS

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Energy Management Workshop

Water-side Systems. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

New Suggestions for Centrifugal Chiller Technologies to Realize High Efficiency and High Functionality

D DAVID PUBLISHING. Optimizing Thermal Energy Storage Systems in the Hospitality Industry. 1. Introduction

VERIFICATION OF OPTIMUM OPERATION METHOD BY SIMULATION FOR THE HVAC SYSTEM WITH A THERMAL STORAGE TANK IN AN ACTUAL BUILDING

Condenser Water Heat Recovery"

Free Cooling Technology

Why use VSD in existing HVAC installations

Application of Variable Frequency Drives for Energy Savings

Year-round Energy Saving Potential for a Stratum Ventilated Subtropical Office. C.K. Lee Zhang Lin K.F. Fong

Intelligent System Design

Energy Efficiency in Building Active Design Part II

Innotech is a registered Trademark of Mass Electronics Pty Ltd Copyright 2013 Mass Electronics Pty Ltd

Persistence Tracking in a Retro-commissioning Program

Large University Central Chiller Plant Design Considerations

This paper will discuss applications of an ice slurry generator that has been in production since The

Energy Saving Report. Frigi-Tech Oil Additive. Application. In HKU Central Plant. Chiller No. 3

Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard

Application of solar cooling system in a campus library in Hainan, China

ASHRAE s LowDown Showdown

EMD SERONO RESEARCH CENTER EXISTING

Performance Mapping for Variable Ductless Heat Pump Systems in Heating, Cooling and Defrost Operation

Pressure Independent Valve Systems. ASHRAE Seminar College of the North Atlantic, Doha, Qatar 20 th April 2013

Chilled Water Plant Redesign

DOE Best Practice Software Tools. Joseph Chappell Adam Roget

Thermal Energy Storage

Managing. Delta T in Buildings

A NEW METHOD FOR THE OPTIMAL CHILLER SEQUENCING CONTROL

HVAC INTEGRATED CONTROL FOR ENERGY SAVING AND COMFORT ENHANCEMENT vahid Vakiloroaya

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load.

Variable Frequency Drive Retrofit Opportunities. Michael Kuk CERx Solutions LLC

REPORT ON THE BENEFITS OF ICE- BASED THERMAL STORAGE FOR DISTRICT COOLING IN THE UAE MARKETS

Transcription:

University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 2008 Secondary loop chilled water in super high-rise Zhenjun Ma University of Wollongong, zhenjun@uow.edu.au Shengwei Wang The Hong Kong Polytechnic University W. K. Pau The Hong Kong Polytechnic University http://ro.uow.edu.au/engpapers/5413 Publication Details Ma, Z., Wang, S. & Pau, W. (2008). Secondary loop chilled water in super high-rise. ASHRAE Journal, 50 (5), 42-52. Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library: research-pubs@uow.edu.au

The following article was published in ASHRAE Journal, May 2008. Copyright 2008 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes only. This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE. Secondary Loop Chilled Water In Super High-Rise By Zhenjun Ma, Shengwei Wang, Ph.D., C.Eng., Member ASHRAE, and Waikeung Pau, C.Eng., Member ASHRAE This article presents the alternative design configurations for the secondary chilled water system in a super high-rise commercial building currently being constructed in Hong Kong. The original design configuration is evaluated and compared with an alternative design configuration concerning energy performance. Both configurations are implemented in this building to test and evaluate their operational performance. Building and System Description The building is a super high-rise building of approximately 1,608 ft (490 m) height (currently the tallest building in Hong Kong) and 3,455,215 ft 2 (321 000 m 2 ) of floor area. The building has a basement of four floors, a block building of six floors and a tower building of 98 floors. The basement is used mainly for parking. The block building from the ground floor to the fifth floor serves mainly as the commercial center including hotel ballrooms, shopping arcades, and arrival lobbies. The gross area is about 721,182 ft 2 (67 000 m 2 ). The tower building consists of 2,475,699 ft 2 (230 000 m 2 ) for commer- cial offices and a six-star hotel on the upper floors. Figure 1 shows the central chiller and secondary chilled water system in this building. Six identical high voltage (10,000 V) centrifugal chillers located on the sixth floor with the capacity of 2,056 ton (7,230 kw) each and the nominal power consumption of 361 ton (1,270 kw) each at full load are used to supply the chiller water. The rated chilled water supply and return temperatures at the design condition are 42 F and 51 F (5.5 C and 10.5 C), respectively, while the rated condenser water inlet and outlet temperatures at the design condition are 90 F and 99 F (32 C and 37 C), respectively. The rated COP of each chiller at the design condition is 5.70. Each chiller is associated with one constant condenser water pump and one constant primary chilled water pump. The water system is divided into four zones to avoid the chilled water pipelines and terminal units from suffering extremely high pressure, i.e., the highest static pressure of more than 4000 kpa (40 bar) and the designed working pressure of About the Authors Zhenjun Ma is a doctoral candidate. Shengwei Wang, Ph.D., C.Eng., is a professor in the Department of Building Services Engineering of The Hong Kong Polytechnic University, Hong Kong. Waikeung Pau, C.Eng. is a project manager at Sun Hung Kai Properties Limited, Hong Kong. 42 ASHRAE Journal ashrae.org May 2008

A A Secondary Water Circuit for Zone 1 C From Office Floors (79-98) To Office Floors (79-98) B Secondary Water Circuit for Zone 2 SCHWP-78-01 to 03 From Podium and Basement To Podium and Basement SCHWP-06-10 to 12 C Secondary Water Circuit for Zones 3 & 4 D Primary Water Circuit E Chiller Circuit F Cooling Water Circuit PCHWP-78-01 PCHWP-78-02 PCHWP-78-03 HX-78 HX-78 HX-78 SCHWP-42-04 to 06 From Office Floors (43-77) To Office Floors (43-77) SCHWP-42-01 to 03 HX-06 HX-06 SCHWP-06-01 to 02 B From Office Floors (7-41) To Office Floors (7-41) SCHWP-06-03 to 05 PCHWP-42-01 PCHWP-42-02 PCHWP-42-03 PCHWP-42-04 PCHWP-42-05 PCHWP-42-06 PCHWP-42-07 HX-42 HX-42 HX-42 HX-42 HX-42 HX-42 HX-42 SCHWP-06-06 to 09 D PCHWP-06-01 PCHWP-06-02 PCHWP-06-03 PCHWP-06-04 PCHWP-06-05 PCHWP-06-06 E Evaporator Evaporator Evaporator Evaporator Evaporator WCC-06a-01 WCC-06a-02 WCC-06a-03 WCC-06a-04 WCC-06a-05 (7230 kw) (7230 kw) (7230 kw) (7230 kw) (7230 kw) Condenser Condenser Condenser Condenser Condenser Evaporator WCC-06a-06 (7230 kw) Condenser F CDWP-06-01 CDWP-06-02 CDWP-06-03 CDWP-06-04 CDWP-06-05 CDWP-06-06 From Cooling Towers To Cooling Towers Figure 1: Schematics of the chiller and secondary chilled water systems. nearly 6000 kpa (60 bar). The actual designed water working pressure for Zone 1 is 1600 kpa (16 bar), while the designed water working pressures for the other three zones are 2000 kpa (20 bar), respectively. Zone 2 (seventh through the 41 st floor), indicated as B in Figure 1, is supplied with the secondary chilled water directly. For the other three zones, the heat exchangers are used to transfer the cooling energy from low zones to high zones to avoid the high water static pressure. Zone 1 (all floors below the sixth floor) indicated as A in Figure 1, is supplied with the secondary chilled water through the heat exchangers located on the sixth floor, while the chilled water from chillers serves as the cooling source of the heat exchangers. Zone 3 (43 rd through 77 th floor) and Zone 4 (79 th through 98 th floor), indicated as C in Figure 1, are supplied with the secondary chilled water through the first stage heat exchangers (HX-42 in Figure 1) located on the 42 nd floor. Some of the chilled water after the first stage heat exchangers is delivered to Zone 3 by the secondary chilled water pumps (SCHWP-42-01 to 03) located on the 42 nd floor. Some water is delivered to the second stage heat exchangers (HX-78 in Figure 1) located on the 78 th floor by the secondary chilled water pumps (SCHWP-42-04 to 06) located on the 42 nd floor. The water system after the second stage heat exchangers is the conventional primary-secondary chilled water system. Zones 3 and 4 represent about 51% of the total cooling load of this building. All primary chilled water pumps in Zones 3 and 4 are constant speed pumps, while all secondary chilled water pumps are variable speed pumps. The major specification of all pumps in Zones 3 and 4 at the design condition is summarized in Table 1. The total design power load of all pumps in Zones 3 and 4 is 389 ton (1369.4 kw), while the total design power load of all constant speed pumps in Zones 3 and 4 is 120 ton (421.2 kw). The constant primary pumps makeup 30.76% of the total pump power in Zones 3 and 4 at the design condition. The Original Design Configuration In the original design, the configuration of water systems after the first and second stage heat exchangers in Zones 3 and 4 is the primary-secondary pumping paradigm. Each primary chilled water pump is dedicated to each heat exchanger to provide a relatively constant water flow rate, while the water flow rate in the secondary chilled water system varies to meet the indoor cooling load requirements. Under part load, especially May 2008 ASHRAE Journal 43

Pumps Number * Flow (L/s) Head (m) under light load, these primary chilled water pumps contribute a large portion of the total energy used in Zones 3 and 4. In the conventional primary-secondary chilled water systems, the primary chilled water pumps are piped and dedicated to each chiller to provide a constant water flow rate in the evaporators, achieving more reliable control and avoiding the freezing and rupturing of tubes in the evaporators. For the heat exchangers in Zones 3 and 4, the major function of these primary chilled water pumps is to provide the circulation force to chilled water to overcome the pressure drops. Since both sides of heat exchangers are chilled water and the water temperatures are normally higher than 41 F (5 C) for this project, there is no problem of freezing and rupturing occurring in the heat exchanger tubes. To reduce the installation cost and space requirements as well as to enhance the system energy efficiency, these primary chilled water pumps can be eliminated from the original design and the variable primary water system can be designed for Zones 3 and 4. The Alternative Design Configuration Although variable primary chilled water systems have been addressed and promoted in a number of studies, 1,2,5,7 9 primary-secondary chilled water systems are still used in many projects. These systems are simple, and personnel are familiar and experienced with them. 3 Also, there is a concern that the controls intended to prevent freezing and rupturing from occurring in chiller evaporators may cause nuisance shutdowns of chillers as a result of too-rapid decreases in chilled water flow. In the alternative design, the configuration of the Efficiency (%) Pow (kw) Pow tot (kw) SCHWP-06-06 to 09 3 (1) 345 30.3 84.2 122 366 PCHWP-42-01 to 07 7 (1) 149 26.0 84.9 44.7 312.9 SCHWP-42-01 to 03 2 (1) 294 36.5 87.8 120 240 SCHWP-42-04 to 06 2 (1) 227 26.2 84.3 69.1 138.2 PCHWP-78-01 to 03 3 (1) 151 20.6 84.3 36.1 108.3 SCHWP-78-01 to 03 2 (1) 227 39.2 85.8 102 204 Total design power of all pumps in Zone 3 and Zone 4 1369.4 (kw) Total design power of primary pumps in Zone 3 and Zone 4 421.2 (kw) (30.76%) * Value in parentheses indicates number of standby pumps. Pow tot in each row does not include the power of standby pumps. Table 1: Major specifications of all pumps in Zones 3 and 4. HX-42 SCHWP-78-01 to 03 HX-78 SCHWP-42-04 to 06 From Zones 3 & 4 From Office Floors (79-98) To Office Floors (79-98) HX-42 HX-42 HX-42 HX-42 HX-42 HX-42 SCHWP-06-06 to 09 From Office Floors (43-77) To Office Floors (43-77) Figure 2: Water systems in Zones 3 and 4 using the alternative design configuration. primary-secondary chilled water system associated with the chillers keeps them unchanged, while the configurations of the water systems after the first and second stage heat exchangers in Zones 3 and 4 are designed as the variable primary chilled water systems. Figure 2 shows the water systems in Zones 3 and 4 using the alternative design. In this design, the primary chilled water pumps after the first and second stage heat exchangers and their associated fittings in the original design are elimi- nated, and the secondary chilled water pumps in the original design are functioned as the variable primary pumps. The bypass line between the primary water loop and the second- 44 ASHRAE Journal ashrae.org May 2008 HX-78 HX-78 To Zone 3 & Zone 4 Pressure Limiting Valve SCHWP-42-01 to 03

Advertisement formerly in this space.

ary water loop in the original design is eliminated as well. In the alternative design, a bypass line is located near the pumps, as shown in Figure 2, to limit the maximum pressure head on the water distribution system. A pressure limiting valve is installed on each bypass line. When the pressure difference between the two points is more than a predetermined pressure difference, the pressure limiting valve will be activated. Otherwise, the valve is closed. Compared to the original design, this alternative design From Coils To Coils Temperature Setpoint has several distinct advantages. The installation cost and space requirements are reduced significantly due to the elimination of the primary water pumps after the first and second stage heat exchangers and their associated fittings. The system energy performance is improved since the parasitic power of these primary constant chilled water pumps is eliminated. The energy T Temperature Controller HX-78 HX-78 HX-78 Water Flow Setpoint Figure 3: The speed control logic for pumps of SCHWP-42-04 to 06. Water Flow Controller From Cooling Source To Cooling Source performance associated with this alternative design is evaluated and compared with the original design in the next section. Energy Performance Evaluation Since the building is still at the construction stage, the hourly based annual building cooling load profiles of this building M Advertisement formerly in this space. Advertisement formerly in this space. 46 ASHRAE Journal May 2008

Advertisement formerly in this space.

Advertisement formerly in this space.

were calculated using EnergyPlus 4 based on the design data and hourly based weather data of the typical year in Hong Kong. To predict the power consumption of variable speed pumps under various operating conditions, proper pump models are required. The pump models used in this study were comprised of polynomials representing head versus flow and speed, efficiency versus flow and speed, motor efficiency versus the fraction of the nameplate brake horsepower, and VSD (variable speed driver) efficiency versus the fraction of the nominal speed. The head and efficiency characteristics are based on the manufacturers data at full speed operation and extended to variable speed operation using pump affinity laws. 5 To evaluate energy performance of the original design and alternative design, a set of control strategies are required to control the operation of these pumps. In this article, simple control strategies are used and are presented briefly. The speed of the pumps distributing water to cooling coils (i.e., pumps of SCHWP-42-01 to 03 in Zone 3 and pumps of SCHWP-78-01 to 03 in Zone 4) is controlled to maintain the differential pressure at a remote location in the system at a setpoint determined to be sufficient to deliver the required chilled water flowing through all cooing coils. The speed of the pumps distributing water to heat exchangers, i.e., pumps of SCHWP-42-04 to 06, is controlled using a cascade controller, as shown in Figure 3. This cascade controller uses the outlet water temperature at the secondary side of heat exchangers to determine the required water flow rate with respect to the temperature setpoint and the required water flow rate is then compared with the measured water flow rate to carry out the pump speed control. In this controller, a predetermined function is embedded to set the setpoints of the outlet water temperature at the secondary side and the water temperature at the primary side of heat exchangers with proper difference, allowing the water flow rates at both sides to remain roughly the same as needed for proper control of the system. The same control logic also is used for the pumps of SCHWP-06-06 to 09 for the same purpose. The heat exchangers and pumps are sequenced based on the water flow limits for each. Another heat exchanger is put into operation when the water flow rate of each operating heat exchanger exceeds its design water flow rate. One of the operating heat exchangers will be switched off when the water flow rate in the system is less than the total design water flow rate of (N-1) heat exchangers (the current operating number of heat exchangers is N). Another pump is put into operation when the water flow rate of each operating pump exceeds its design value. One of the operating pumps will be shut down when the water flow rate in the system is less than the total design water flow rate of (N-1) pumps (the current operating number of pumps is N). A dead band is used in the sequence controllers of the heat exchangers and pumps for staging and destaging a heat exchanger and a pump to avoid their frequent cycling on and off. In the original design, the operation of each primary chilled water pump in Zones 3 and 4 is dedicated to the operation of the associated heat exchanger that it serves. Since the setpoint, Advertisement formerly in this space. May 2008 ASHRAE Journal 49

Pump Power Original Design (kwh) Alternative Design (kwh) Savings (kwh) Savings (%) Annual 2,760,758.4 1,726,163.5 1,034,594.9 37.48 Spring day 8,587.7 5,392.7 3,195.0 37.20 Mild-Summer Day 10,505.8 6,490.4 4,015.4 38.22 Sunny-Summer Day 12,894.5 8,212.8 4,681.7 36.31 Table 2: Comparison of annual and daily power consumption of all pumps in Zones 3 and 4 under different design configurations. including the differential pressure setpoint and the temperature setpoint, of each local controller significantly affects the system energy consumption, the same setpoints were used during the evaluation of energy performance of both design configurations. Most of the control and operation strategies used in this study are conventional and not the optimal strategies to be used in practice. Based on the previous pump models and control strategies, the energy performance of both design configurations was evaluated on the virtual building system, including the cool- ing plant and air-conditioning systems that were constructed, particularly for the super high-rise building. 6 Using the simulated hourly based annual building cooling loads and the hourly based weather data of the typical year in Hong Kong, the annual power consumptions of the pumps in Zones 3 and 4 under two different design configurations were evaluated. Table 2 gives the results. The annual power consumptions of pumps in Zones 3 and 4 using the original design configuration and the alternative design configuration were 2,760,758.4 kwh and 1,726,163.5 kwh, respectively. Compared to the original design configuration, the annual energy savings using this alternative design configuration was about 1,034,595 kwh, which contributes about 2% in savings of the annual total energy consumption of the overall air-conditioning system (including all pumps, chillers, cooling tower fans, AHU fans, and PAU fans) of this building. Three typical days, which represent the typical operation conditions of the air-conditioning system in the spring, mild-summer, and sunny-summer, respectively, were selected to demonstrate more details of energy-saving potentials using the alternative design configuration. The building cooling loads are varied from 796 ton to 7,535 ton (2,800 kw to 26,500 kw), from 1,308 ton Advertisement formerly in this space. Advertisement formerly in this space. 50 ASHRAE Journal May 2008

Advertisement formerly in this space.

to 8,985 ton (4,600 kw to 31,600 kw), 1400 and from 1,507 ton to 10,805 ton (5,300 kw to 38,000 kw) in the selected typical 1200 spring day, mild-summer day, and sunnysummer day, respectively. Compared to 1000 the original design, the alternative design can save about 3,195.0 kwh (37.20%), 800 4,015.4 kwh (38.22%) and 4,681.7 kwh (36.31%) in the typical spring day, 600 mild-summer day and sunny-summer day, respectively. The hourly based pump 400 power consumptions under two different design configurations in the typical 200 sunny-summer day are also showed in Figure 4. At part load, the contribution of the parasitic power of the primary pumps in the original design to the total power consumption of the pumps in Zones 3 and 4 would be more significant. The hourly based pump power consumption of the original design is always significantly higher than that of the alternative design. These preliminary results illustrate that this alternative design can provide sig- nificant energy savings in this building as compared to the original design. The power consumptions presented throughout this article includes the power consumptions of all pumps in Zones 3 and 4 only. The practical installation of the chilled water pumping systems can operate under these two design configurations because the alternative design was proposed at the construction stage. One standby primary chilled water pump at each primary set is eliminated and the associated pipeline is replaced by a bypass line, allowing the chilled water system to operate without using the constant primary pumps. When the manual valves installed on these bypass lines are shut off, the chilled water system can operate according to the original design configuration. The secondary chilled water pumps in the original design can provide sufficient pump head to handle the pressure losses previously handled by the primary pumps since the secondary chilled water pumps in the original design are oversized. Conclusions An alternative design configuration for the secondary chilled water system of a super high-rise building is presented in this article and implemented in the building to achieve more energy savings. The preliminary energy performance evaluation results show that a significant amount of pump energy can be saved when using this alternative design. Compared to the original primary-secondary design configuration, the annual energy savings using this alternative design configuration for this building is about 1,034,594 kwh. Both alternative design configurations are implemented in the super high-rise building. Their operational performance, implementation issues, and control issues, as well as their comparisons in practical application, will be reported in the near future. Pump Power (kw) Original Design Alternative Design 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (h) Figure 4: Comparison of hourly based pump power consumptions between two design configurations in the typical sunny-summer day. Acknowledgments The work presented in this article is financially supported by a grant (5283/05E) of the Research Grant Council (RGC) of the Hong Kong SAR and the support of Sun Hung Kai Properties Limited. References 1. Kirsner, W. 1996. Demise of the primary-secondary pumping paradigm for chilled water plant design. HPAC Engineering 68(11):73 78. 2. Hartman, T.B. 1996. Design issues of variable chilled-water flow through chillers. ASHRAE Transactions 102(2):679 83. 3. Severini, S.C. 2004. Making them work: Primary-secondary chilled water systems. ASHRAE Journal 46(7):27 33. 4. EnergyPlus. 2005. www.eere.energy.gov/buildings/energyplus/. 5. Bahnfleth, W., and E. Peyer. 2001. Comparative analysis of variable and constant primary-flow chilled-water-plant performance. HPAC Engineering 73(4):41 50. 6. Wang, S.W., X.H. Xu, and Z.J. Ma. 2006. Report on the energy performance evaluation of International Commerce Center (ICC) A study sponsored by Sun Hung Kai (SHK). Department of Building Services Engineering, The Hong Kong Polytechnic University. 7. Bahnfleth, W. and E. Peyer. 2006. Energy use and economic comparison of chilled water pumping alternatives. ASHRAE Transactions 112(2):198 208. 8. Bahnfleth, W. and E. Peyer. 2004. Varying views on variable flow chilled water systems. HPAC Engineering 76(3):S5 S9. 9. Bahnfleth, W. and E. Peyer. 2004. Variable primary flow chilled water systems: Potential benefits and application issues. ARTI-21CR/611-20070-01. Final report (two volumes) to Air- Conditioning and Refrigeration Technology Institute. http:// tinyurl.com/33dgk8 (or http://www.arti-research.org/research/ completed/finalreports/20070-final1.pdf). http://tinyurl.com/2r44ce (or http://www.arti-research.org/research/completed/finalreports/ 20070-final2.pdf). 52 ASHRAE Journal ashrae.org May 2008