Copyright c 2009 Stanley B. Gershwin. All rights reserved. 2/30 People Philosophy Basic Issues Industry Needs Uncertainty, Variability, and Randomness

Similar documents
DESIGN AND OPERATION OF MANUFACTURING SYSTEMS is the name and focus of the research

Inventory and Variability

MIT Manufacturing Systems Analysis Lecture 1: Overview

MIT 2.853/2.854 Introduction to Manufacturing Systems. Multi-Stage Control and Scheduling. Lecturer: Stanley B. Gershwin

Multi-Stage Control and Scheduling

EasyChair Preprint. Economic Investigation in Variable Transfer Batch Size, in CONWIP Controlled Transfer Line

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION

Flexible Manufacturing systems. Lec 4. Dr. Mirza Jahanzaib

Ch 19 Flexible Manufacturing Systems

Bottleneck Detection of Manufacturing Systems Using Data Driven Method

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Dynamic Lead Time Based Control Point Policy for Multi Stage Manufacturing Systems

Planning. Dr. Richard Jerz rjerz.com

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Introduction to Transportation Systems

Introduction to Analytics Tools Data Models Problem solving with analytics

International Research Journal of Engineering and Technology (IRJET) e-issn: Volume: 03 Issue: 12 Dec p-issn:

Advanced skills in CPLEX-based network optimization in anylogistix

The Aspen Fidelis Reliability Difference: Minimize Risk, Maximize Profitability

Simulation-Aided Decision Making in Order-Driven, High-Variety Production

Challenges of Strategic Supply Chain Planning and Modeling

Simulation Using. ProModel. Dr. Charles Harrell. Professor, Brigham Young University, Provo, Utah. Dr. Biman K. Ghosh, Project Leader

Simulation of Lean Principles Impact in a Multi-Product Supply Chain

Agile at Mid-Scale. Al Shalloway. Introducing FLow for Enterprise Transformations (FLEX)

Curriculum Vitae Name Title Birth Date Gender Address Telephone Mobile Education Background Professional Experience

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Assessing Lean Systems Using Variability Mapping

This is a refereed journal and all articles are professionally screened and reviewed

CHAPTER 1 INTRODUCTION

Sparsity-Constrained Transportation Problem

ARC VIEW. TCS Seeks to Enable a Digital Integrated Business Planning Process. Keywords. Summary. From IBP to Digital IBP.

IMPROVING MANUFACTURING PROCESSES USING SIMULATION METHODS

A comparison between Lean and Visibility approach in supply chain planning

The Inventory Optimization Maturity Curve

Data Scientists in Software Teams: State of Art and Challenges [IEEE Transactions on Software Engineering, ICSE 2018 Journal First]

Utilizing Optimization Techniques to Enhance Cost and Schedule Risk Analysis

The Grey Clustering Analysis for Photovoltaic Equipment Importance Classification

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM

Guided Study Program in System Dynamics System Dynamics in Education Project System Dynamics Group MIT Sloan School of Management 1

Guided Study Program in System Dynamics System Dynamics in Education Project System Dynamics Group MIT Sloan School of Management 1

David Simchi-Levi M.I.T. November 2000

The Pharmaceutical Industry s Supply Chain Planning Reliability and Risk Management

Operations Research Models and Methods Paul A. Jensen and Jonathan F. Bard. Inventory Level. Figure 4. The inventory pattern eliminating uncertainty.

Proceedings of the 2015 Winter Simulation Conference L. Yilmaz, W. K. V. Chan, I. Moon, T. M. K. Roeder, C. Macal, and M. D. Rossetti, eds.

LEAN PRODUCTION SYSTEM

Model Question Paper with Solution

A DECISION TOOL FOR ASSEMBLY LINE BREAKDOWN ACTION. Roland Menassa

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras

Driving effective inventory management. Five key insights can increase visibility and reduce costs, all while setting appropriate service levels

Incorporating supply chain risk into a production planning process EXECUTIVE SUMMARY. Joshua Matthew Merrill. May 17, 2007

Manufacturing Systems Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

Abstract. 1 Introduction

ISE480 Sequencing and Scheduling

Decision Support and Business Intelligence Systems

Bill Drake March 14, 2013

Production error analysis for a line of manufacturing machines, variable structure control approach Starkov, K.; Pogromskiy, A.Y.; Rooda, J.E.

PETRI NET VERSUS QUEUING THEORY FOR EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS

Chapter 13. Lean and Sustainable Supply Chains

STATISTICAL TECHNIQUES. Data Analysis and Modelling

Tecnomatix Plant Simulation

Inventory Segmentation and Production Planning for Chemical Manufacturing

Index. buyer-supplier relationship (BSR), 47, , 132, 144 6, buying behaviour, 8,

Applying Industry 4.0 principles To Electronics Manufacturing with Valor

AN EXPERIMENTAL ANALYSIS OF ADVERTISING STRATEGIES

Contents PREFACE 1 INTRODUCTION The Role of Scheduling The Scheduling Function in an Enterprise Outline of the Book 6

COMPLEX DECISION MAKING IN THE FINANCIAL SERVICES SECTOR THE APPLICABILITY AND USAGE OF THE SYSTEM DYNAMICS METHOD

Sustainability Modeling

Contents 1 Introduction to Pricing

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Lean Supply Chain Planning: A Performance Evaluation through Simulation

Introduction to Management Science

VARIABILITY PROFESSOR DAVID GILLEN (UNIVERSITY OF BRITISH COLUMBIA) & PROFESSOR BENNY MANTIN (UNIVERSITY OF WATERLOO)

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample

PM B Task 5 Name : Page 1 Matr.-Nr. : PM II Task 1, 20 Points

Industrial & Sys Eng - INSY

IT 470a Six Sigma Chapter X

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

CHAPTER 2 LITERATURE REVIEW

Applying Industry 4.0 principles To Electronics Manufacturing with Valor

Analysis and Modelling of Flexible Manufacturing System

The entire presentation kit is having 2 main directories as below. Just in Time. 01 Introduction

Operations Research QM 350. Chapter 1 Introduction. Operations Research. University of Bahrain

PRINCIPLES OF LEAN MANUFACTURING. Purdue Manufacturing Extension Partnership (800)

Introducing Fast Flexible Flow at Hewlett-Packard

Models in Engineering Glossary

Introduction to RAM. What is RAM? Why choose RAM Analysis?

OPERATIONS RESEARCH Code: MB0048. Section-A

DRASTICALLY REDUCE TIME AND CREATE ACCURATE FORECASTS. Estimation addiction. New Product Investment. Reality Waste in Complexity

LEAN PRODUCTION AND AGILE MANUFACTURING NEW SYSTEMS OF DOING BUSINESS IN THE 21ST CENTURY

LEAN IN THE SOFTWARE TEST LAB

INCREASING AVAILABILITY OF PRODUCTION FLOW LINES THROUGH OPTIMAL BUFFER SIZING: A SIMULATIVE STUDY

Flow and Pull Systems

Dynamic Simulation and Supply Chain Management

one Introduction chapter Overview Chapter

Beginner Modeling Exercises Section 5 Mental Simulation of Combining Feedback in First-Order Systems

Agile & Lean / Kanban

University Question Paper Two Marks

Transcription:

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 1/30 Uncertainty, Variability, Randomness, and Manufacturing Systems Engineering Stanley B. Gershwin gershwin@mit.edu http://web.mit.edu/manuf-sys Massachusetts Institute of Technology April 23, 2009

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 2/30 People Philosophy Basic Issues Industry Needs Uncertainty, Variability, and Randomness Our Research Approach Previous Research Industry Collaboration Current Research Conclusion

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 3/30 People Stan Gershwin, Senior Research Scientist, M.E. Irvin Schick, Research Scientist, M.E. Chuan Shi and Fernando Tubilla, Ph.D. students, M.E. Firat Ileri and Kaan Karamanci, M.Eng. students, EECS Elisa Gebinnini, visiting Ph.D. student, Universitá Degli Studi Di Modena e Reggio Emilia (Unimore) Zheng Wang, Visiting Associate Professor in the MIT Engineering Systems Division; Associate Professor of the School of Automation, Southeast University, Nanjing, China

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 4/30 Philosophy Manufacturing systems can be understood like any complex engineered system, using predictive, quantitative methods. Engineers must have intuition about these systems in order to design and operate them most effectively. Such intuition can be developed by studying the elements of the system and their interactions. Using intuition and appropriate predictive, quantitative tools can have a big payoff.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 5/30 Basic Issues Frequent new product introductions. Short product lifetimes. Short process lifetimes. This leads to short factory lifetimes and frequent building and rebuilding of factories. There may be little time for improving the factory after it is built, and improving it after it starts operating is expensive; it must be built right.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 6/30 Industry Needs Tools to predict performance of proposed factory designs. Tools for optimal real-time management (ie, control or operation) of factories. Manufacturing Systems Engineers with intuition for factories as complex systems. Our goals: Development of predictive, quantitative, intuitive methods and tools for manufacturing systems design and operation; and education of Manufacturing Systems Engineers.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 7/30 Uncertainty, Variability, and Randomness Uncertainty: Variability: Incomplete knowledge. Change over time. Randomness: A specific kind of incomplete knowledge that can be quantified and for which there is a mathematical theory. Uncertainty, variability, and randomness are the enemies of manufacturing.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 8/30 Uncertainty, Variability, and Randomness Examples in the factory: machine failures quality failures human variability Examples in the economic environment: demand variations, changes in orders supplier unreliability changes in costs and prices

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 9/30 Uncertainty, Variability, and Randomness Therefore, factories should be designed and operated to minimize the creation, propagation, or amplification of uncertainty, variability, and randomness.

opyright c 2009 Stanley B. Gershwin. All rights reserved. 10/30 Our Research Approach 1. Identify an important systems issue by factory observation and discussion with practitioners. 2. Develop and analyze a simple analytical model. Find compromise between accuracy and ease of analysis. Test solution by comparison with with simulation. 3. Perform numerical experiments,... to develop intuition, to assess usefulness of the solution. 4. Test in factory. 5. Go to Step 2 if revision of the model is warranted. 6. Go to Step 1 to further understand the issue, or to look for other important issues.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 11/30 Our Research Approach Comparisons with Practice Qualitative methods, including Toyota Production System, lean, value stream mapping, etc., are useful, important managerial tools, but they are not predictive or quantitative. Computational methods, often use unrealistic models. Simulation is often excessively detailed, consequently slow to create and run and difficult to debug. It is also difficult to find accurate data for the parameters of the detailed models. Large-scale optimization, when used for scheduling, has the same difficulties as simulation. In addition, it is based on the assumption that the system is deterministic. It is re-run when random events occur, but that can lead to instability.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 12/30 Previous Research 1. Flow Line Analysis M 1 B 1 M 2 B 2 M 3 B 3 M 4 B 4 M 5 B 5 M 6 Machine Buffer Machines are unreliable. Buffers are finite. Issues: Machine failures propagate as disturbances when buffers become empty or full. Large buffers reduce propagation and increase production rate but increase inventory. System complexity makes performance prediction and analysis difficult.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 13/30 Previous Research 1. Flow Line Analysis Performance measures: averages and other statistics on Production rate Inventory Lead time System yield, and other quality-related measures Two-machine lines can be analyzed exactly, but a special approximation (decomposition) was developed for larger systems because of the size of the state space.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 14/30 Previous Research 1. Flow Line Analysis Five cases of two-machine lines: 0.92 200 M 1 B M 2 0.9 180 160 P 0.88 0.86 n 140 120 100 0.84 80 0.82 60 0.8 40 20 0.78 0 20 40 60 80 100 120 140 160 180 200 N Production rate vs Buffer space Average inventory vs Buffer space Small buffers can increase production rate with small inventory; large buffers provide little benefit at great cost. Appropriate buffer size depends on the amount of variability. 0 0 20 40 60 80 100 120 140 160 180 200 M 1, M 2 average uptimes: 100; M 2 average downtime: 10; M 1 average downtimes: 7.14, 8.33, 10, 12.5, 16.67. N

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 15/30 Previous Research 1. Flow Line Analysis Long Lines Decomposition Decomposition breaks up systems and then reunites them. Conceptually: put an observer in a buffer, and tell him that he is in the buffer of a two-machine line. Question: What would the observer see, and how can he be convinced he is in a two-machine line? Construct the two-machine line. Construct all the two-machine lines.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 16/30 Previous Research 1. Flow Line Analysis Quality and Quantity The Good state has high yield and the Bad state has low yield. The quality change is not visible until the first bad part reaches an inspection station. UP/Good UP/Bad DOWN

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 17/30 Previous Research 1. Flow Line Analysis M 1 B M 2 Effective Production Rate 0.4 0.395 0.39 0.385 0.38 0.375 0.37 0 5 10 15 20 25 30 35 40 45 50 Buffer Size Two-machine line where the first machine has quality issues and the inspection is located at the second machine. The shape of the graph depends on machine parameters: MTTFs, MTTRs, mean time until quality change, mean time to detect quality change.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 18/30 Previous Research 1. Flow Line Analysis Other Extensions Assembly/disassembly systems. Systems with closed loop flow of pallets, fixtures, or kanbans. B k M 1 B 1 M 2 B 2 M k-1 B k-1 M k Line design: minimal buffer space to achieve production rate target. Systems with complex machines, including multiple failure modes, general up- and down-time distributions, batches, etc.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 19/30 Previous Research 1. Flow Line Analysis Accomplishments: Fast analytical tools for... performance evaluation of long flow lines, assembly/disassembly systems, systems with pallets, systems with various control policies; optimal allocation of buffer space; evaluating the interaction between buffer space and system yield.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 20/30 Previous Research 2. Real-time scheduling Derived the hedging point policy and extensions, to determine inventory targets to compensate for machine failures and inventory and backlog costs. Evaluated various policies by decomposition, including kanban, CONWIP, etc. Established relationships among time-based, surplus-based, and token-based policies.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 21/30 Previous Research Industry Collaboration HP (benefit in hundreds of millions of dollars) GM Peugeot... and many others Subjects: line design, performance evaluation, system quality analysis, material flow control,...

Current Research 1. Flow-Line Analysis Consider a k-machine line. Processes and machines have already been selected, and now we must design the in-process inventory space. Let N = (N 1,..., N k 1 ), the vector of buffer sizes, the decision variables P(N) = production rate, parts/time unit ˆP = required production rate, parts/time unit A = profit coefficient, $/part n i (N) = average inventory of buffer i, i =1,, k 1 b i = buffer cost coefficient, $/part/time unit c i = inventory cost coefficient, $/part/time unit Copyright c 2009 Stanley B. Gershwin. All rights reserved. 22/30

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 23/30 Current Research 1. Flow-Line Analysis We are extending our buffer space design optimization methods to problems of the form k 1 k 1 max J(N) = AP(N) b i N i c i n i (N) s.t. P(N) ˆP, i=1 i=1 N i N min, i =1,, k 1.

Current Research 1. Flow-Line Analysis Optimization of a three-machine line. profit curve (P < P) profit curve (P > P) J(N) N 1 N 2 Copyright c 2009 Stanley B. Gershwin. All rights reserved. 24/30

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 25/30 Current Research 1. Flow-Line Analysis New feature: The objective includes the inventory cost and there is a production rate constraint. Difficulty: Both the objective and the constraint are non-linear. Earlier methods are not applicable. We developed a very simple (but very fast and effective) algorithm. We are currently extending this to the optimization of loop systems, which will allow us to optimize CONWIP control. See Chuan Shi s poster!!

Current Research 2. Real-time scheduling Real-Time Setup Scheduling Problem: Setups take up a resource s time. The more frequently setups are done, the less capacity is available for production. Production rate goes down. However, the less frequently setups are done, the more inventory is produced. Production lead time goes up. Setups are often scheduled using large-scale deterministic mixed integer optimization techniques. However, this is computation-intensive, and when unpredictable or random events occur, the scheduled must be adjusted by recalculation or by manual adjustment. This can be time-consuming and can lead to instability. Copyright c 2009 Stanley B. Gershwin. All rights reserved. 26/30

Current Research 2. Real-time scheduling Proposed solution: the Hedging Zone Policy This is an extension of the Hedging Point Policy for systems with no setup costs. It is a heuristic feedback control law which is designed to respond to random events gracefully. Copyright c 2009 Stanley B. Gershwin. All rights reserved. 27/30

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 28/30 Current Research 2. Real-time scheduling Hedging Zone Policy Rank order the parts. Select upper and lower hedging limits for each part type. When the part that is currently being produced reaches its upper limit, switch to the highest ranking part that is below its lower limit.

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 29/30 Current Research 2. Real-time scheduling If the limits are too far apart, inventories are very large. If the limits are too close together, some part types are never made. We are developing methods for selecting good bounds. We are performing extensive simulation experiments. See Fernando Tubilla s poster!!

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 30/30 Conclusion There are many problems to be solved that are both interesting and of practical economic importance. We are always looking for opportunities to study factories and work with industry.