Confidence in Carrapateena project grows

Similar documents
Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference. Andrew Cole Managing Director & CEO

Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer. M a y 2018

For personal use only

For personal use only

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015

SECOND QUARTER REPORT 15 JULY 2014

Carrapateena Pre-Feasibility Study

Carbine Tungsten Limited Mt Carbine Tungsten Project

A modern mining company

THIRD QUARTER REPORT 14 OCTOBER 2014

Nymagee Scoping Study

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

Second drill rig to accelerate major drilling program at Productora

For personal use only

Azure Minerals Ltd ASX Code:

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Financial results for the 6 months to 30 June 2008

5 th Asian Bauxite & Alumina Conference

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

For personal use only

For personal use only

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 JUNE 2016

Maiden Ore Reserve for Camel Creek JV

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 DECEMBER 2017

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics

Forward Looking Statement

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

Thalanga Operations Ore Reserve and Mineral Resource Statement

For personal use only

Low-cost, rich, DRC copper

Great Western Scoping Study Update & Onsite Gold Processing

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

Market Release Newcrest Mining 15 February 2016

EXCO S PROJECT PIPELINE

A G M P R E S E N T A T I O N O c t o b e r 2018

ASX QUARTERLY RELEASE

Hidden Valley PNG s Newest Mine Briefing for Analysts

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

September 2018 Quarterly Report Presentation and Webcast 25 October 2018

2019 First Quarter Report Presentation 1 2 A P R I L

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

CAPITAL DOWN AT TALA HAMZA

DALGARANGA PRE-FEASIBILITY UPDATE

For personal use only

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

2018 Fourth Quarter Report Presentation 2 4 J A N U A R Y

PRESENTATION MINING 2010 RESOURCES CONVENTION - BRISBANE

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES

ASX QUARTERLY RELEASE

FIRST GOLD ORE DISPATCHED FROM ULYSSES

Aeon Metals Limited HIGHLIGHTS

AVINO SILVER & GOLD MINES LTD.

OZ Minerals Update. Geoff Deans, Group Manager Social Performance. A modern mining company 29 AUGUST 2018

NEWS RELEASE Trading Symbol: TSX: SVM

Australia s leading explorer in Mexico

Provisional results for the year ended 30 June Thursday, 31 August 2006

SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED

QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

The Prominent Hill Mineral Resource and Ore Reserve Statements are appended to and form part of this Release.

ELEMENTOS. For personal use only. Asia Tin Summit 2017 Progressing the Development of the Cleveland Project. (ASX:ELT) September 2017

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

For personal use only

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA

PEGMONT PEA HIGHLIGHTS

ELEMENTOS LTD ASX:ELT summary

Gum Creek Gold Project Free Milling Scoping Study

Progress Update on the Lower Footwall Zone

EXCO S PROJECT PIPELINE. Unlocking the Value

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

CARRAPATEENA. Sub-Level Cave Pre-Feasibility Study. November 2016 EXECUTIVE SUMMARY

For personal use only REGIS RESOURCES LTD JUNE 2016 QUARTERLY REPORT & EXPLORATION UPDATE

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

ASX QUARTERLY RELEASE

TEMBANG PROJECT OPTIMISATION

AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 30 SEPTEMBER 2018

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2018

ASX QUARTERLY RELEASE

For personal use only

For personal use only

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

ALACER GOLD ANNOUNCES FOURTH QUARTER MINE PRODUCTION AND 2012 GUIDANCE

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

AMERICAS SILVER CORPORATION PROVIDES THIRD QUARTER PRODUCTION RESULTS AND SAN RAFAEL PROJECT UPDATE

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

121 MINING INVESTMENT CONFERENCE HONG KONG

PROMINENT HILL CONTAINED METAL PRODUCTION MARCH Q JUNE Q JUNE YTD 2015 TOTAL COPPER (TONNES) 31,160 32,991 64,151

Q Preliminary Production Results, 2018 Production Guidance and Mineral Reserve and Resource Update

For personal use only

March 2015 Quarterly Report

Transcription:

7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics improved or in line with Scoping Study with capex of $980 million including contingency Estimated annual production rate lifts to 61,000 tonnes of copper and 63,000 ounces of gold. Projected Life of Mine revenue of $10.6 billion i & ii All-in sustaining cost over LOM circa US$0.92/lb Optionality to expand mining operations given resource prospects OZ Minerals has today released its Pre-Feasibility Study (PFS) for its proposed $980 million Carrapateena underground copper mine and Concentrate Treatment Plant project. Project metrics, including the estimated capex of $980 million including contingency, are in line with the Scoping Study. OZ Minerals CEO Andrew Cole commented: The Carrapateena PFS highlights that this project is competitive with, or better than, other global long-life copper assets at a similar stage of development. Today s study lifts the proposed annual production rate to 61,000 tonnes of copper and 63,000 ounces of gold with the mine operating 20-plus years at an estimated average production rate of four million tonnes per annum. The building of the Concentrate Treatment Plant (CTP) will allow us to add further value in delivering to our global customers a premium product with high copper content and low impurities. The regional infrastructure we intend to build to support the Carrapateena project will have the additional benefit of opening up new opportunities in what is a highly prospective region. This is not only the largest new mining project underway in Australia, it is also one that can be funded from our existing cash flows if we so wish. At current consensus pricing the project could also pay for itself within four years of commissioning. With the project s robust economics, lift in projected output and the lowering of production costs, our confidence in developing a world-class asset for shareholders and wider stakeholders grows by the day. OZ Minerals Limited ABN: 40 005 482 824 Level 1, 162 Greenhill Road, Parkside South Australia 5063 T: +61 8 8229 6066 F: +61 8 8229 6601 info@ozminerals.com www.ozminerals.com

Pre-Feasibility Study highlights: The executive summary of the PFS considers the development of the Carrapateena ore-body and builds upon an extensive bank of prior work. It concludes that development of the orebody is technically achievable and provides the business case for development. The study also sets out the execution strategy and associated risk and opportunity profile. Key production and financial highlights from the PFS include: A 4Mtpa sub-level cave mining operation. Average annual production of over 100,000 dry metric tonnes of copper concentrate post treatment in the CTP. Average annual production rate of 61,000 tonnes of copper and 63,000 ounces of gold at the proposed production rate. Mine life 20+ years from a plant operating at a production rate of 4 Mtpa. Estimated pre-production capital cost of $830 million, excluding CTP including owner s cost and contingency. Projected Net Cash Flow of $3.6 billion, including capital expenditure. Expected revenue over Life of Mine of $10.6 billion. A Net Present Value at 9.5% discount rate of approximately $820 million. Including a one-off deferred acquisition payment to RMG/Teck of US$50M, the NPV is $770 million. An IRR of circa 20%, both on a post-tax basis at copper/gold AUS consensus pricing. An average C1 cost of production of circa US$0.82/lb copper Life of Mine, including byproduct credits. In May 2016 the company estimated C1 costs of circa US$0.90/lb. Based on the PFS findings, the project will be able to produce a high quality copper-gold concentrate (grading between 30% - 40% copper) using conventional treatment on site. This will then undergo further processing at the offsite CTP to increase the grade to between 50% - 60%. With the successful completion of the PFS, the OZ Minerals Board have approved the project to progress to Feasibility Study. The CTP is undergoing a parallel study process which is expected to be released with the Feasibility Study. As previously announced, capitalisation of the project commenced on 1 July 2016. Capitalised expenditure for the project from 1 July 2016 to 31 March 2017 is forecast to be $84 million. This figure is included in the pre-production capital cost quoted above. The anticipated mine life of ~20 plus years will see approximately 20% of the estimated contained copper in the Carrapateena resource mined. There is optionality for the project scope to expand mining to more of the resource along with further exploration of the Khamsin and Fremantle Doctor tenements, which are located within 10km of Carrapateena. Mineral Resource, Ore Reserve and Feasibility Study: The PFS is based on a restatement of the 2015 Mineral Resource at a lower cut-off grade, reflecting the change from sub-level open stoping to sub-level caving. At a cut-off grade of $70/t, the restated Mineral Resource stands at 133Mt which includes 126Mt of Indicated Mineral Resources at 1.5% Cu and 0.6g/t Au and 7Mt of Inferred Mineral Resources at 1.0% Cu and 0.5g/t Au. Please refer to the 2015 Carrapateena Restated Mineral Resource Statement as at 17 October 2016. With the successful completion of the PFS, it is now possible to declare an Ore Reserve estimate for the Carrapateena project of 70Mt at 1.8% Cu and 0.7g/t Au. Full explanatory notes are available in the Carrapateena Ore Reserve statement as at 20 October 2016. Page 2 of 5 OZ Minerals ASX Release 07 November 2016

In December 2016 OZ Minerals will produce an updated Mineral Resource model based on the recently completed drilling program. This Mineral Resource model will form the basis of the Feasibility Study. The company expects to release the Carrapateena Feasibility Study in Q1 2017 after which the OZ Minerals Board expects to make a final commitment to the development of the Carrapateena project. Ends For further information, please contact: Investors Media Tom Dixon Chris Fogarty T 61 8299 6628 T 61 8 8229 6600 M 61 450 541 389 M 61 0420 928 824 Tom.Dixon@ozminerals.com Chris.Fogarty@ozminerals.com Forward Looking Statements Some statements in this announcement are forward-looking statements. Such statements include, but are not limited to, statements with regard to capacity, future production and grades, projections for sales growth, estimated revenues and reserves, targets for cost savings, the construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and debt levels, the outlook for minerals and metals prices, the outlook for economic recovery and trends in the trading environment and may be (but are not necessarily) identified by the use of phrases such as will, expect, anticipate, believe and envisage. By their nature, forward-looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside OZ Minerals control. Actual results and developments may differ materially from those expressed or implied in such statements because of a number of factors, including levels of demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in taxation or regulation. Given these risks and uncertainties, undue reliance should not be placed on forward-looking statements which speak only as at the date of this announcement. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, OZ Minerals does not undertake any obligation to publicly release any updates or revisions to any forward looking statements contained in this presentation, whether as a result of any change in OZ Mineral s expectations in relation to them, or any change in events, conditions or circumstances on which any such statement is based. i The Production Targets referred to in this ASX release are based on 91% Probable Ore Reserves and 9% Inferred Mineral Resources. The modifying factors used in the estimation of the Ore Reserve were also applied to the Inferred Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production targets will be realised. ii The material assumptions used in the estimation of the production targets and associated financial information are summarised in the table on Page 4. More detailed information on the material assumptions can be found in the Executive Summary of the Carrapateena Sub-Level Cave Pre-Feasibility Study, the Carrapateena Restated 2015 Mineral Resource Statement as at 17 October 2016 and the Carrapateena Ore Reserve Statement as at 20 October 2016 released on 7 November 2016. Page 3 of 5 OZ Minerals ASX Release 07 November 2016

Production Targets Material Assumptions Criteria Ore reserve / mineral resource estimate underpinning the production targets Cut-off parameters Commentary The production targets in this announcement are underpinned by the Ore Reserve estimate in the Carrapateena Ore Reserve Statement as at 20 October 2016 and the Mineral Resource estimate in the Restated 2015 Mineral Resource Statement as at 17 October 2016 (both released on the date of this announcement). These estimates were prepared by Competent Persons in accordance with the JORC Code 2012. The mining method selected for Carrapateena was determined to be sub-level caving (SLC) and the estimated production rate was 4.0 Mtpa. Expressed as a Net Smelter return (NSR) the break-even cut-off grade was estimated to be $51 per tonne of ore. The breakdown of this cost is shown in the table below. Activity Cost per tonne (AUD) Mining $24 Processing $16 Site Administration $4 Sustaining Capital $7 Total $51 Mining factors or assumptions The cut-off grade used in the estimation of the production target was $100 per tonne of ore. Previous studies by OZ Minerals determined that block caving, sub-level caving and sub-level open stoping methods were appropriate to the orebody geometry and expected ground conditions of the Carrapateena orebody. The Scoping Study conducted in 2016 (CHSS-8220- MAN-STU-0001) concluded that sub-level caving was the best mining method for Carrapateena. A review of the cavability of the overlying rocks was conducted by Power Geotechnical Pty Ltd. Using empirical data, the area of the cave footprint considered sufficient to ensure continuous caving was estimated and the mine designed accordingly. The use of empirical data is appropriate for a PFS but further study will be required to design the mine and engineer the rock mass to ensure that continuous caving will occur. Metallurgical factors or assumptions Power Geotechnical used proprietary software to model the SLC draw and the dilution entrained in the draw from outside the blasted area of the SLC. The cave draw modelling resulted in the recovery of 91% of blasted ore tonnes and 88% of the contained metal value. Approximately 13% dilution is included in the recovered ore tonnes. The dilution comes from the overlying rocks and from mineralised material surrounding the SLC shape. Given the potential of the overlying Woomera Shale to degrade into finer particles than other rock types, cave draw modelling assumed that the Woomera Shale had twice the probability of migrating into the caved mass than did the other diluting rock types. The metallurgical recoveries assumed are shown below. Metal Recovery % Copper 91 Gold 73 Silver 79 These recoveries include the small losses attributable to the Hydromet process. Infrastructure Costs Infrastructure sufficient for the operation of a 4 Mtpa mine and processing plant has been designed and costed in the PFS. It is believed that adequate water has been identified for the project but this remains to be confirmed. All costs used in the estimation of the production target and the associated financial information were estimated to a PFS level of accuracy. Page 4 of 5 OZ Minerals ASX Release 07 November 2016

Revenue factors Parameter Units LOM Copper US $ / lb 2.94 Gold US $ / oz 1281 Silver US $ / oz 19 Concentrate Load and Transport AU $ / t 92 Concentrate Sea Freight US $ / wmt 89 Copper Concentrate Smelting US $ / dmt 80 Copper Refining US $ / lb 0.08 Gold Refining US $ / oz 5.00 Silver Refining US $ / oz 0.50 Exchange Rate AUD / USD 0.75 Metal Grade in concentrate exceeds Payable portion 0 0.9675 35 0.97 Copper (%) 45 0.9725 50 0.975 0 0.93 5 0.95 Gold (g/t) 10 0.96 20 0.97 0 0 Silver (g/t) 30 0.9 Page 5 of 5 OZ Minerals ASX Release 07 November 2016