Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802

Similar documents
Airport Master Plan Update (AMPU) Phase 2. Scope of Work

Raleigh Executive Jetport Master Plan Update SEPT 27, 2017

Master Plan Study Public Workshop #3. June 1-2, 2016

ORDINANCE NO INTRODUCED BY COUNCIL

Agency Scoping. May 31, :00 a.m. 1:00 p.m. Environmental Impact Statement Port Columbus International Airport

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING CONSULTING SERVICES MANCHESTER-BOSTON REGIONAL AIRPORT MANCHESTER, NH FY

Public Workshop #9. October 11, 2016

Defining & Completing the Planning Process

Request for Qualifications for Professional Services

Regional Transportation Studies Management Committee

Airport Master Plan Update June 14, 2017

SCOPE OF SERVICES FINAL. Airport Master Plan Update. Lehigh Valley International Airport. for the. Lehigh-Northampton Airport Authority

Update on the Draft EIR on the Proposed Airport Master Plan

CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES

PUBLIC INFORMATION MEETING SUMMARY

Burbank-Glendale-Pasadena Airport Authority

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #4 December 12, 2017

Federal Aviation Administration

7 PICKERING AIRPORT DRAFT PLAN

Sustainable Master Planning

MARIN COUNTY COMMUNITY DEVELOPMENT AGENCY ALEX HINDS, DIRECTOR

GRI Greenhouse Gas (GHG) Emissions Working Group

APPLICATION INFORMATION: 1. All five sections of the application must be completed.

Evaluation of Alternatives

Boston Overflight Noise Study. Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

Regional Transportation Studies Regional Council

REQUEST FOR PROPOSAL RFP: CVB CHUUK VISITOR BUREAU

LOWER LOS ANGELES RIVER REVITALIZATION PLAN (LLARRP) WORKING GROUP MEETING #5

7 Financial Analysis 49

Michael Baker International, Inc West Linebaugh Avenue Suite 240 Tampa, Florida Fax

Public Participation. Public Participation Plan and Schedule for the 10th Year Comprehensive Plan Update

Southern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015

CLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview

4 EXISTING AND FORECAST NOISE EXPOSURE MAPS

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California

WELCOME TO THE FEDERAL AVIATION ADMINSTRATION SCOPING MEETING

CLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview

General Session 2 Procurement Update. #AirportsTechnical

Chapter 5.0 Alternatives Analysis

Oakland International Airport-Materials Management Program (MMP) Updated November 2007

A Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports

Building an Enterprise GIS for SFO Then and Now

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

da WESTERN SYDNEY AIRPORT INDUSTRY INFORMATION SESSION 5 December 2017

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018

World Climate Research Programme JOINT SCIENTIFIC COMMITTEE (JSC) Thirty-ninth Session Nanjing, China, April 2018

NextGen Implementation Plan An Update

Technical, Engineering And Maintenance

SUSTAINABLE AIRPORT MASTER PLAN (SAMP) UPDATE

Environmental Clearance and Next Year s Grant. Los Angeles Airport District Office. Presented by: Brenda Pérez George Buley David Cushing

Chapter IV - Alternatives

Project Origination: Item Description (Origination) Comments (or reasons for NOT completing)

Section 26.45: Overall DBE Three-Year Project Goal Methodology. Name of Recipient: The City of Driggs, ID owner of the Driggs-Reed Memorial Airport

Getting Started and Participating in the Program

REQUEST FOR PROPOSALS

APPENDIX A TABLE OF CONTENTS

The existing land use surrounding North Perry Airport can be described as follows:

MEETING NOTES. Project: Ted Stevens Anchorage International Airport (ANC) Master Plan Update. Location: Coast International Inn, Anchorage

REQUEST FOR QUOTES: # LE

ILGS & LGSS. Department of General Service on behalf of Department of Revenue PA Lottery

EXHIBIT A SCOPE OF SERVICES FOR MODAL DEVELOPMENT (MD) SUPPORT - CONTINUING. Financial Project Nos

CITY OF PALO ALTO. Citywide Travel Demand Model Project Scope of Services

# Members (Up to) Business/Industry 2 Home Builder/Developer 2 Environmental Interest 3 Academia 2. Stakeholder Group. Page 1 of 7

REQUEST FOR QUALIFICATIONS/EXPERIENCE STATEMENTS

Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment

Pomme de Terre One Watershed, One Plan Request for Proposal Responses DUE: May 19 th, 2017

Port of San Diego Climate Mitigation and Adaption Plan

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals

APPENDIX C: PUBLIC PARTICIPATION PLAN

1616 Airport Circle Hailey, ID

County of Santa Cruz

KANSAS CITY AVIATION DEPARTMENT. Chapter Five AIRPORT PLANS

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

8. CITY COUNCIL AGENDA

TWELFTH AIR NAVIGATION CONFERENCE

Dallas/Fort Worth International Airport Managing Data Management Systems & Integration

Workshop Objectives. Ken Goodrich, Research Engineer, NASA Langley. 2 nd On-Demand Mobility and Emerging Aviation Technologies Roadmapping Workshop

WINCHESTER FREDERICK COUNTY (WIN-FRED) METROPOLITAN PLANNING ORGANIZATION (MPO) PUBLIC INVOLVEMENT PLAN (PIP)

The Project Life Cycle

SOUTHWEST CHAPTER. Structural Engineers Association of Washington l. Structural Engineers Association of Washington SEAW LUNCH MEETING

Austin Straubel International Airport Development Committee Study & Findings Report. Background and Introduction:

Review and discuss overall format and organization of the General Plan Update products;

Community Participation Plan. Comprehensive Master Plan City of Cartersville, Georgia

REQUEST FOR PROPOSALS

a g e n d a ACI-NA/ACC Airport NEPA & Planning Workshop November 29-December 1, 2017 RITZ CARLTON Pentagon City Arlington, Virginia

Root River One Watershed, One Plan Request for Proposals Proposals DUE: Wednesday, December 3, 2014, 4:00 PM

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

2015 AIM Infrastructure And Quality Assurance People, Organization and Projects

Consortia Report on Governance Compliance of Rules and Procedures

June 20, 2016 REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT

Shutdown Requests. Gian Catano Contract Administrator December 17, 2014

COMMUNITY ENGAGEMENT Resource Guide

Click to edit Master subtitle style

WISCONSIN DOT PUTTING RESEARCH TO WORK

Step 2: Analyze Stakeholders/Drivers and Define the Target Business Strategy

Manhattan Regional Airport Draft Environmental Assessment. Table of Contents

East Central Florida Corridor Evaluation Study Project Advisory Group Meeting #1 June 9, 2016 Meeting Summary

REQUEST FOR PROPOSALS High Demand Career Initiative Planning and Technical Assistance

Transcription:

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Kickoff Meeting #1 DATE: August 22, 2016 On behalf of the Pangborn Memorial Airport, I would like to invite you to serve as a member of the Planning Advisory Committee (PAC) for the Airport Master Plan Update (Plan). The Plan is a 20-year analysis of future Airport facility needs. It will address how our community s growth and aviation trends influence Airport usage and recommended improvements. The result is a capital development plan and set of drawings that will be used to strategically guide future Airport development and funding. The FAA requires that airports like ours do a Plan about every ten years, having funded 90 percent of our Plan s cost. As Airport Director, I will assist with coordinating between the PAC and the consultant team, led by Mitchell Hooper with Mead & Hunt, and also including EnviroIssues for public outreach and RH2 for local civil engineering support. As a PAC member, you will be asked to attend project meetings and provide review and input on working paper materials. Your involvement is important to ensuring that the Plan reflects our region s growth. The first PAC meeting is Wednesday, August 31, 2016, from 11:00 am to 1:00 p.m. at the Confluence Technology Center (285 Technology Center Way, Wenatchee). Lunch will be provided. This meeting will serve to familiarize PAC members with the Plan process and timeline, define PAC roles and responsibilities, and most importantly, seek initial PAC input regarding Plan study objectives. A PAC meeting agenda and materials are enclosed. I hope that you will join us in this important effort. At your earliest convenience, please confirm your availability to serve on the PAC, and feel free to contact me at 509-884-2494 Ext. 6 or trent.moyers@pangbornairport.com if you have any questions. Sincerely, Trent Moyers Airport Director Pangborn Memorial Airport Pangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802 Phone: 509.884.2494 ext. 6 I Fax: 509.884.0113 I www.flywenatchee.com I www.pangbornairport.com

AGENDA PAC KICKOFF MEETING #1 Meeting Tasks and Timeline [2 Hours]: I. Introductions (Points-of-Contact, PAC Contact Information) [10 Minutes] II. III. IV. Plan Overview, Focus Items, Deliverables, and Schedule [30 Minutes] Planning Advisory Committee (PAC) Role & Responsibilities [20 Minutes] Review Draft Inventory Narrative Chapter / User Survey [30 Minutes] V. Airport SWOT Analysis [25 Minutes] VI. Next Steps [5 Minutes] Open Discussion Meeting Handouts: Meeting Agenda Draft EAT Airport User Survey Questionnaire SWOT Analysis Materials Note: Meeting presentation and handout materials will be posted on Airport website Thank You for Attending Page 2 of 13 9/2/2016

PLAN KEY FOCUS AREAS EAT Master Plan Items to be addressed as part of this Plan, those highlighted pertain to PAC action items: General: Prepare Airport Master Plan Update Report Update Airport Layout Plan (ALP) drawings per FAA checklist standards (SOP 2.00) Update Exhibit A Property Map per FAA checklist standards (SOP 3.00) Reflect current facility and infrastructure conditions, and recommended facilities Collect and submit aeronautical survey data to Airport s GIS (AGIS) Obtain updated wind data observations Airport stakeholder and public involvement program insights Airfield and Airspace: Depict Runway End 12 extension features o Airfield: runway, taxiway, lighting, and navigational aids o Roadway: New roadway re-alignment system o Property: Airport ownership boundary and interests Crosswind runway feasibility Determine taxiway system compliance with FAA geometry standards Determine disposition of existing closed taxiway segments Identify future taxiway system requirements and layouts Depict location of navigational aid equipment Update airspace obstruction data and penetrations/mitigation for future conditions Reflect current and future instrument approach procedure/minimum standards Depict existing and future storm drainage features Terminal/Landside: Depict planned building improvements (expansion, modification, removal, and relocation) Determine future facility requirements and improvements: o Passenger terminal building o Apron and de-icing o Auto parking and circulation o General aviation hangars Airport business/industrial space allocation, infrastructure, and ground access Other: Update depiction of current on-airport and off-airport land uses Depict future Airport Operating Area (AOA) Update Airport noise contour Identify future non-obligated Airport property Update existing Airport property ownership interests and future planned land acquisition Page 3 of 13 9/2/2016

PROJECT SCHEDULE (PAC MILESTONE EVENTS) Plan Milestones 1 Develop Working Paper #1: Airport Inventory and Environmental Chapter 2 PAC Meeting #1: Kickoff & Review Draft Inventory/Environmental Chapter/SWOT 3 Develop Working Paper #2: Airport Activity Forecast Chapter Plan Timeline (Estimated) July 2016 August 30, 2016 August October, 2016 4 PAC Meeting #2: Review Final Inventory / Forecast October November, 2016 5 Develop Working Paper #3: Facility Requirements & Initial Airport Alternatives September November 2016 6 PAC Meeting #3 / Public Outreach #1 January 2017 7 Finalize Working Paper #3: Refine Airport Alternatives November 2016 February 2017 8 PAC Meeting #4: Final Airport Alternatives March 2017 9 Develop Working Paper #4: Capital Improvement Plan and Financial Feasibility February May 2017 10 PAC Meeting #5 / Public Outreach #2 May 2017 11 Sponsor Adoption of Final Master Plan / Drawings June - August 2017 Note: Port presentations and briefings expected to coincide with PAC meetings dates. Page 4 of 13 9/2/2016

PLANNING ADVISORY COMMITTEE (PAC) ROLE MASTER PLAN OVERVIEW The Pangborn Airport Master Plan is being conducted to assess and document the 20-year improvements essential to meeting existing and future Airport demands. It serves as a roadmap for guiding the orderly development of Airport facility, equipment, and service needs. The Plan results in a year-by-year Capital Improvement Plan (CIP) and record drawing set of Airport Layout Plan (ALP) sheets documenting future improvements. The Plan centers on the following: Identify Airport facilities needed to meet aviation demand and services Compliance with FAA standards and assurances Landside and business park development needs Future Airport land uses and property interests Airport capital project priorities, costs, and potential funding sources PAC MISSION & PURPOSE PAC Mission Statement: Provide internal and external perspectives and advise on the Airport s recommended planning course-of- action. The Airport Director has assembled a Planning Advisory Committee (PAC) to serve specifically for the Pangborn Memorial Airport Master Plan project. The PAC is one component of the Plan s public involvement and outreach effort, which is structured to actively encourage public participation. The PAC serves as a standing technical advisory group comprised of stakeholders having various aviation and community perspectives. As a strategic planning process responsive to community factors, PAC input is used to guide Airport Master Plan recommendations throughout the approximate 12 to 16- month Plan process. PAC COMPOSITION The PAC is comprised of individuals with diverse professional backgrounds and interest in airport and community development. PAC members bring various aviation and non-aviation perspectives to the Plan process for the purpose of forming a well-rounded consensus on key Plan focus items. PAC participation allows for focused and diverse input by key Airport stakeholders, interested constituents, and representatives of the general public. Page 5 of 13 9/2/2016

PAC TASKS The PAC serves in an advisory capacity and is collectively responsible for evaluating and providing feedback on Plan documents. The PAC will review study materials, comment on project findings, and encourage community awareness and understanding of Plan recommendations. PAC feedback will be incorporated into the final Airport Master Plan as appropriate, following review and discussion. PAC members have the following responsibilities: Identify SWOT factors per airport and community interests Review interim reports and study documents Provide feedback and insight on Plan recommendations Recommend a 'preferred' master plan course-of-action Give feedback on the strategy to inform and engage the general public Attend scheduled PAC scheduled meetings (5) Attend and promote awareness of public open-house meetings (2) Adhere to PAC meeting ground rules (provided at Meeting #1) PAC PARTICIPATION & MEETINGS The PAC offers participation at key decision-points, to coincide with PAC meetings held at key Plan milestones. PAC meetings will be held to present study findings, discuss recommendations, and solicit feedback. Meeting and presentation deliverables will be provided for review no later than one calendar week (seven days) prior to scheduled PAC meetings, and will be distributed to PAC members in electronic format via email or file transfer site, as a means to minimize paper iterations. The Consultant will prepare a presentation covering the highlights of the deliverables, and opportunities for PAC input. The proposed PAC meetings and content are indicated below; meeting content may be modified as the Master Plan process progresses. Page 6 of 13 9/2/2016

The following are anticipated PAC meetings, expected timeframe, and proposed discussion topics: PAC Meeting #1: Project Kickoff August 31, 2016 What is this project about, and what are the expected outcomes? What and where are project resources? What are the Airport s virtues? PAC Meeting #2: Airport Inventory and Aviation Activity Forecasts (Anticipated: October - November 2016) What exists at the Airport today? What are existing Airport conditions, and deficiencies? What might future Airport users and activity look like? PAC Meeting #3: Facility Requirements and Initial Airport Alternatives (Anticipated: January 2017) How large should future facilities be? What do future users need that we do not have, or need to replace? What might future users look like? PAC Meeting #4: Final Alternatives, Improvement Plan, and Financial Feasibility (Anticipated: March 2017) Where should we develop? What are the benefits and drawbacks to development? How much do the improvements cost? How do we pay for them? PAC Meeting #5: Final Draft Deliverable (Anticipated: May 2017) What is the final plan deliverable? How do we support Airport recommendations? Page 7 of 13 9/2/2016

PROJECT TEAM CONTACTS: PROJECT TEAM CONTACTS: 1. Airport Mr. Trent Moyers, Airport Director Pangborn Memorial Airport Phone: 509.884.2494, Ext. 6 Fax: 509.884.0113 Email: trent.moyers@pangbornairport.com 2. Consultant Team (Technical Planning): Mr. Jeff Smith, Technical Project Manager Consultant Firm: Mead & Hunt Phone: 971.247.9001 Email: jeff.smith@meadhunt.com 3. Consultant Team (PAC Participation) Justin McCaffree, Associate Consultant Firm: EnviroIssues Phone: 206.922.6249 Email: jmccaffree@enviroissues.com Page 8 of 13 9/2/2016

PAC MEMBERS, AFFILIATIONS, AND CONTACT INFORMATION: Name Affiliation Email Phone Ms. Lisa Parks Mr. Mark Kulaas Mr. Steve King Ms. Shiloh Schauer Ms. Lori Barnett Mr. Rafael Aguilar Mr. Todd Fryhover Mr. Jon devaney Executive Director, Port of Douglas County Land Services Director, Douglas County Community and Economic and Development Director, City of Wenatchee Executive Director, Wenatchee Valley Chamber of Commerce Community Development Director, City of East Wenatchee President, Hispanic Chamber of Commerce President, Washington Apple Commission President, Washington State Tree Fruit Association lisa@portofdouglas.org (509) 884-4700 mkulaas@co.douglas.wa.us / sneuenschwander@co.dougl as.wa.us (509) 884-7173 sking@wenatcheewa.gov (509) 888-3203 shiloh@wenatchee.org (509) 662-2116 lbarnett@eastwenatchee.com (509) 884-5396 Ext. 112 laperaradiotv@gmail.com (509) 393-6868 todd.fryhover@waapple.org (509) 663-9600 jon@wstfa.org (509) 452-8555 Mr. Mike Montgomery Alpine Aviation alpineaviation@gmail.com (509) 886-5554 Mr. Tyson McInnis Stemlit Growers tyson.mcinnis@stemlit.com (509) 663-1451 Mr. Dale Deveraux Selland Construction daled@sellandconstruction.c om (509) 670-2358 Mr. Jack Snyder C & O Nursery Co. jack@c-onursery.com (509) 669-5600 Page 9 of 13 9/2/2016

PAC MEMBER CONTACT INFORMATION & AVAILABILITY PAC MEMBERS TO COMPLETE AND SUBMIT AT MEETING Name: Mailing Address: Phone: Email: Preferred Meeting Days / Times: Monday: Morning Afternoon Tuesday: Morning Afternoon Wednesday: Morning Afternoon Thursday: Morning Afternoon Friday: Morning Afternoon Special Contact Instructions: Page 10 of 13 9/2/2016

SWOT ANALYSIS MATERIALS PAC MEMBERS TO REVIEW PRIOR TO MEETING SWOT stands for Strengths (S), Weaknesses (W), Opportunities (O), and Threats (T), a process for identifying factors important to the Plan, and for synchronizing the Airport's merits relative to internal and external influences. The SWOT input is compiled from PAC input. The SWOT outcomes are used to legitimize study objectives, pragmatically assess study recommendations, and guide the Plan s overall developmental policy. The following shows the SWOT table, in which PAC input will be solicited during PAC Meeting #1. SWOT TABLE Helpful Harmful Positive To Achieving the Objective Negative To Achieving the Objective Internal Origin Attributes Within Airport Influence Strengths Weaknesses External Origin Attributes Beyond Airport Influence Opportunities Threats Strengths: Weaknesses: Opportunities: Threats: Advantageous quality. Disadvantage or deteriorating influence. Controlled potential benefit to exploit or capitalize. Uncontrollable potential vulnerability, risk, or detriment. Page 11 of 13 9/2/2016

SWOT RESPONSES PAC MEMBERS TO COMPLETE AND SUBMIT DURING MEETING Strengths: 1. 2. 3. Weakness: 1. 2. 3. Opportunities: 1. 2. 3. Threats: 1. 2. 3. Page 12 of 13 9/2/2016

ADDITIONAL SWOT NOTES/REMARKS: Page 13 of 13 9/2/2016