AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER

Similar documents
AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS

2016 Local Roads Workshop Perpetual Pavement MICHIGAN RIDES ON US

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS

Pavement Materials, Design & Performance Overview

MODOT Alternate Pavement Approach. Dave Ahlvers NCAUPG Conference Overland Park, Kansas February 3, 2010

Perpetual Pavements. North Dakota Asphalt Conference Bismarck, ND April 6, 2010

Canadian Case Study for Perpetual Pavements Design

Quantifying the Benefits of Polymer Modified Asphalt

Asphalt Pavements The Best Value for Michigan Taxpayers

THINLAY ASPHALT FOR PAVEMENT PRESERVATION

Life Cycle Cost Analysis of Engineered Pavements

Perpetual Pavements. Perpetual Pavements Local Roads Workshop MICHIGAN RIDES ON US

Polymer Modified Asphalt Performance. Gary L. Fitts, P.E. Sr. Field Engineer Asphalt Institute

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS

MNDOT PAVEMENT DESIGN MANUAL

When it comes to the long-term price

CDOT s Life Cycle Cost Analysis

State Experiences with the MEPDG, LCCA, and Alternate Bids Indiana s Experience

2016 Local Roads Workshop PaveXpress Update MICHIGAN RIDES ON US

CONSTRUCTION CONFERENCE

FLEXIBLE PAVEMENT DESIGN WITH RAP MIXTURE

Life-Cycle Cost Analysis. Tashia J. Clemons Federal Highway Administration Office of Asset Management

Asphalt Institute National Asphalt Pavement Association State Asphalt Pavement Association Executives

A Contractor s Look at the Changing World of Asphalt Technology

Perpetual Pavements. Design and Construction Concepts

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

Annual Costs Any costs associated with the annual maintenance and repair of the facility.

Alternate Bid Pavement Type Selection OR

Introduction to PAVEXpress Pavement Design. December 6, 2018

Asphalt Pavement Mix Types

A Contractor s Look at the Changing World of Asphalt Technology

Life Cycle Cost Analysis for Pavements: Background & History

Carbon Footprint of HMA and PCC Pavements 1

NAPA ENGINEERING ACTIVITIES

Alternate Bids in Kentucky. Brian K. Wood, P.E. Assistant Executive Director Plantmix Asphalt Industry of Kentucky

LOW TEMPERATURE CRACKING

A Quick Overview of Best Practices in Pavement for Local Government

Investigating Life Cycle Cost Analysis to Identify a Sustainable Pavement Maintenance and Rehabilitation Strategy: A Case study on Ontario Highways

BUILDING A BETTER PERPETUAL PAVEMENT

ASPHALT: INNOVATION & SOLUTIONS. Bill Rosener Executive Vice President Asphalt Paving Association of Iowa

SHRP2 R21 Composite Pavement Systems Project Overview

GET IT RIGHT THE FIRST TIME:

Design of Concrete Overlays

Alternate Pavement Bidding

Impact of Subgrade Strength on HMA Section Thickness

Pavement Design. TTP Orientation Seminar 2011

UNIQUE PAVING MATERIALS. Cleveland, Ohio. Started in 1959 Unique is the oldest continuous cold mix producer in the USA.

COMPARISON OF TWO FDR ROAD PROJECTS USING EMC SQUARED STABILIZER WITH A MILL AND OVERLAY PROJECT Mescalero Apache Reservation

National Center for Asphalt Technology Test Track Update. Dr. David Timm, P.E. Wisconsin Asphalt Pavement Association Wednesday, November 29, 2017

Surface Requirements for Bituminous-Aggregate Combinations

Use of High Contents of Reclaimed Asphalt (RAP) in Hot Mix Asphalt (HMA) Pavements

ARRA Semi-Annual Meeting Minneapolis, MN October 16-19, 2017

Adjustments to Pavement Life-Cycle Cost Analysis Procedures

Recycled Concrete Aggregate Usage in the USA Industry and DOT Survey

PAVEMENT PRESERVATION A SOLUTION FOR SUSTAINABILITY

Thin Overlays for Pavement Preservation and Functional Rehabilitation

Perpetual Pavements. A Success Story. Le cas du Don Valley Parkway à Toronto. JOURNÉE DU BITUME mars 2004 Hôtel Delta à Trois-Rivières

57 th Annual PAPA Conference Hershey, Pennsylvania. Dr. Randy West, P.E. Director / Research Professor

Caltrans Maintenance Technical Advisory Guide (MTAG)

Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies

Life-Cycle Cost Analysis

LONG-LIFE PAVEMENT PT-1 5 POINTS GOAL CREDIT REQUIREMENTS RELATED CREDITS SUSTAINABILITY COMPONENTS BENEFITS

NCAT Report REVIEW OF INITIAL SERVICE LIFE DETERMINATION IN LIFE CYCLE COST ANALYSIS (LCCA) PROCEDURES AND IN PRACTICE

New Composite Pavement Systems

Design and Rehabilitation Strategies for Sustainable Concrete Pavements

LONG TERM PAVEMENT PERFORMANCE PROGRAM DIRECTIVE. Program Area: General Operations Directive Number: GO-09. Date: September 14, 1998 Supersedes: S-2

Session 11: Strategy Selection 11.1

PRESENTATION OVERVIEW

Life Cycle Cost Analysis: Conventional Versus Asphalt-Rubber Pavements

Sustainability of Perpetual Pavement Designs: A Canadian Prospective

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS

THIN ASPHALT OVERLAYS FOR PAVEMENT PRESERVATION

THIN ASPHALT OVERLAYS FOR PAVEMENT PRESERVATION

Session TH83. Using In-Place Recycling Technologies to address the needs of the Owner Agencies FHWA and ARRA Advances 2014

Thinlay Asphalt for Pavement Preservation

Sustainable roads - Long-Life Asphalt Pavements Version for bankers

FHWA S MOVEMENT TOWARDS MORE SUSTAINABLE PAVEMENTS

APPLICATION OF MECHANISTIC-EMPIRICAL AND LIFE-CYCLE COST ANALYSES FOR OPTIMIZING FLEXIBLE PAVEMENT MAINTENANCE AND REHABILITATION

Cuyahoga County Constructs a Perpetual Pavement

ACKNOWLEDGMENT OF SPONSORSHIP

Surface Texture Issues Related to Concrete Pavements

Georgia DOT Micro-milling and Thin Overlay

Design Criteria and Testing for Cold In-Place Recycling. Todd Thomas Technical Services Engineer Colas Solutions, Inc.

Introduction to Asphalt Pavement Design and Specifications

LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENT Shiven Jiten Sompura 1 and Hakob Avetisyan, Ph.D. 2

Lecture 1. Mechanistic Empirical Pavement Design Guide (MEPDG): Overview MEPDG 1

Impacts of Pavement Preservation and Recycled Materials on Sustainability. Todd Thomas, P.E. Laboratory Director Colas Solutions, Inc.

COUNTY ROAD ASSOCIATION OF MICHIGAN

Federal Highway Administration Concrete Overlays Program. Sam Tyson, Office of Pavement Technology AASHTO Subcommittee on Construction August 2009

Specifying Asphalt Pavement the ODOT Way

FHWA Cooperative Agreement Subtask. Longitudinal Joints Intelligent Compaction

The Long Term Pavement Performance Program

MATERIALS DIVISION MEMORANDUM SIGNATURE:

Stone Matrix Asphalt and Perpetual Pavements

NCAT Report PAVEMENT ME DESIGN A SUMMARY OF LOCAL CALIBRATION EFFORTS FOR FLEXIBLE PAVEMENTS

National Concrete Conference. Structural Change, Impacts and Opportunities For Concrete Pavement

Incorporating Recycling into Pavement Design Where does it Fit?

Probabilistic Life Cycle Cost Analysis FHWA Demonstration Project DP 115

CHAPTER 11 PAVEMENT TYPE DETERMINATION

Transcription:

AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER

LIFE-CYCLE COST ANALYSIS: A POSITION PAPER Introduction Many agencies are turning to life-cycle cost analysis (LCCA) as a means of evaluating the long-term economic viability of pavement designs. As such, it is important for each agency to conduct a realistic assessment of pavement economics in order to provide objective input into the life-cycle cost analysis. The determination of life-cycle costs of alternative pavement types is an important part of a rational means for decision making. An appropriate and non-biased method for life-cycle cost analysis is articulated by the Federal Highway Administration (FHWA) in Demonstration Project No. 115 (FHWA, 1998). It uses the net present value (NPV) approach of determining the costs of several alternatives. The Asphalt Pavement Alliance has developed software capable of performing life-cycle cost analysis using the FHWA procedure. This software can be downloaded for free from http://www.asphaltroads.org/why-asphalt/ economics.html. Net Present Value Method A simplified sketch of how the net present value method of life cycle cost analysis works is shown in Figure 1. The initial cost, the rehabilitation costs, and the salvage value are all considered according to what their values would be in terms of the present value of money. Then a discount rate factor is applied to account for the time value of money, and the future rehabilitation costs and salvage value are discounted back to the present. This simply means that dollars in the present are presumed to be worth more than dollars in the future. The life-cycle cost is then the sum of the initial costs and discounted future costs and salvage value. FIGURE 1: SKETCH OF NET PRESENT VALUE APPROACH TO LIFE-CYCLE COST ANALYSIS. Initial Construction Cost Rehabilitation Time Salvage In determining the life-cycle cost of a pavement, it is important to include only those costs which pertain to the pavement. In other words, common costs such as striping, sod, guardrails, etc. should not be included unless the difference in pavement type causes a cost differential in these items.» INITIAL COST The basis for cost of the initial construction should be unit prices from bid records of projects constructed over the last two or three years, and only representative prices should be included. For example, very small projects or projects where paving is only a minor component of the total cost may cause unit prices to be skewed. It is realistic to consider the initial cost both by itself and as part of the life-cycle cost analysis. This recognizes that the agency is constrained by an annual budget, and needs to examine the short-term ramifications of expenditures as well as the long-term impact of pavement type decisions.» PREDICTED PERFORMANCE LIFE It is important that the agency refer to its past experiences with different pavement types. 2

It is recommended that at least two categories of asphalt pavements be used: pavement less than eight inches thick over granular base and pavement greater than eight inches. It is important to document the performance from the time of original construction or reconstruction until the next reconstruction. In other words, a simple overlay or mill and fill are rehabilitation activities and do not constitute the end of the pavement life. The analysis period should be long enough to capture major rehabilitation or reconstruction activities for all pavement options. When the Perpetual Pavement concept is used, reconstruction occurs well outside the normal analysis period of 30 to 50 years. The Asphalt Pavement Alliance recommends that the analysis period be no less than 40 years and that it include at least one rehabilitation activity for each pavement option (APA, 2010). This complies with the FHWA-recommended minimum of 35 years. It is very important that the predicted timing and extent of the first rehabilitation be based upon actual construction and pavement management data rather than memory or judgment. Information collected from all 50 state highway agencies shows that the most frequently occurring performance period used between initial construction and first overlay is 20 years, while the average for this same interval was 15.7 years (APA, 2010). The same information from 50 states showed the average performance period used between first and second overlay was another 12.0 years, so the average time from initial construction to second overlay is 27.7 years. These figures correspond well with an FHWA study of asphalt overlay performance from the Long-Term Pavement Performance study which showed that most overlays lasted for over 15 years and many lasted for more than 20 years before significant distress was noted (FHWA, 2000). The above data and policies reflect averages, and, in some cases, engineering judgment, rather than data collected over a number of decades and rehabilitation practices in different jurisdictions. They do not account for recent improvements in the selection of materials, mix design procedures, and pavement design methods. The implementation of Superpave occurred in the mid-1990s, and SMA was adopted by a number of agencies throughout the 1990s, so the impacts of these improvements on performance have not been fully realized. Such improvements come at higher costs for materials, so it is logical to give some conservative credit for performance although it may not be completely documented. One approach, suggested by Von Quintus (2009), is to use a technique known as survival analysis to extrapolate the performance of newer technologies.» MAINTENANCE COSTS Maintenance costs are frequently difficult to define because of either a lack of record keeping or accounting that does not appropriately discriminate between different types of maintenance activities. Maintenance costs in a life-cycle cost analysis usually have minimal impact when compared to the initial and first rehabilitation costs. If maintenance costs are used within an LCCA procedure, then historical documentation of actual pavement activities and expenditures should be used. As with rehabilitation, unrealistically frequent or inappropriate maintenance activities can artificially increase life-cycle cost.» SALVAGE VALUE Because some or all of the pavement structure continues to serve its purposes beyond the analysis period, it is important to account for its condition at the end of the analysis period. Salvage value is typically the term used in life-cycle cost analysis, but FHWA chooses to use the term remaining service life (RSL) value to distinguish the idea that the pavement will continue to serve beyond the end of the analysis period. Another method used is to consider the salvage value as some percentage of the initial pavement construction cost. 3

» DISCOUNT RATE The selection of a discount rate in life-cycle costing can be contentious because there is a great deal of uncertainty associated with future interest rates and inflation. An unreasonably low or negative discount rate essentially means that it would not matter financially if a project were to be constructed today or 10 years from now. This would overemphasize the influence of uncertain future costs. Too high a discount rate would overemphasize the importance of the initial cost. The Mechanistic- Empirical Design Guide (MEPDG) from the American Association of State Highway and Transportation Officials recommends establishing the discount rate according to that set by the federal Office of Management and Budget Circular A-94 which is updated annually. This circular may be accessed through this web site: http://www.whitehouse. gov/omb/circulars_a094/. Based upon a survey of states (APA, 2010), an average discount rate of 3.7 percent is used in the U.S. with a range between 2.3 and 6.0 percent. It is interesting to note that 23 states have chosen to use a discount rate of 4 percent when performing life-cycle cost analysis. Summary Life-cycle cost analysis is a tool that can help evaluate the long-term benefit of structures. However, it must be correctly used and the data used in conducting LCCA must be derived from existing records that accurately reflect the expectations for the initial cost, rehabilitation timing and costs, salvage value, and discount rate. Some of these data exist in readily retrievable and usable form while others will require that an agency examine its own documented experience. It should also be remembered that the life-cycle cost analysis is only a tool, and its results do not constitute a decision. The decision for selecting a particular type of pavement should also consider factors not incorporated in the life-cycle cost analysis. References - APA. 2010. Pavement Type Selection. IM-45. Asphalt Pavement Alliance. Lanham, MD. - Federal Highway Administration. 1998. Life Cycle Cost Analysis in Pavement Design, Report No. FHWA-SA-98-079, Federal Highway Administration, Washington, D.C. - Federal Highway Administration. 2000. Performance Trends of Rehabilitated AC Pavements, Tech Brief No. FHWA-RD-00-165, Federal Highway Administration, Washington, D.C. - Von Quintus, H. 2009. Performance Characteristics of the Ideal Asphalt Pavement. Jn. Assn. Asphalt Paving Technologists. Association of Asphalt Paving Technologists. White Bear Lake, MN. pp. 941-968. 4

Appendix Life-cycle Cost Analysis Synopsis Talking Points - Life-cycle cost analysis (LCCA) is an important tool for use in decision making for large highway projects, although factors other than economics should also be considered. - Only those cost factors affecting pavement should enter into LCCA performed to select a pavement type selection. - Initial costs should be based on bid records over the last two or three years. - Predicted pavement performance should be based upon actual data analyzed to reflect time to rehabilitation and reconstruction. - Maintenance costs are usually difficult to determine and have a negligible effect on the outcome of LCCA. - Salvage value is most often determined by the remaining service life at the end of the LCCA analysis period. - The discount rate reflects the time value of money and thus should be considered over a long history of 30 years which ensures that fluctuations over a short period do not bias it. The Office of Management and Budget maintains information on the discount rate over long periods and should be the source of data used. - Other advantages of asphalt pavements include: - Sustainability They are 100 percent recyclable. - Perpetual Pavement design will result in reduced consumption of materials and less traffic congestion. - Low noise Using a small aggregate size or open-graded friction course will reduce noise levels in sensitive areas. - Safety Using open-graded friction course asphalt mixtures has proven to reduce wet-weather accidents and save lives. For More Information, Contact Us» Asphalt Pavement Alliance 5100 Forbes Boulevard 2nd Floor Lanham, MD 20706 877.272.0077 Voice 301.731.4621 Fax www.asphaltroads.org - Asphalt pavements are more economical to build and maintain as shown in studies in Colorado, Kansas, and Ohio. IM-53 SEPT 2011