BRIGHTER SOLUTIONS FOR GREEN ENERGY KEYNOTE SPEECH BY:

Similar documents
Incorporating Renewable Energy in TNB s Future Generation Capacity Planning

AESIEAP CEO Conference 2013

Biomass and Energy A Perspective from Municipal Solid Waste (MSW)

1. INTRODUCTION. Name of Feed-in Approval Holder (FiAH) : Future Atlas Sdn Bhd (FASB)

Biomass Asia Conference, May G. Ilango Bharathi YTL SV Carbon Sdn. Bhd. Malaysia

FELDA PALM INDUSTRIES SDN. BHD

RENEWABLE ENERGY & FEED-IN TARIFF IN MALAYSIA. 16 th October Sustainable Energy Development Authority Malaysia (SEDA Malaysia)

Electricity from solar energy in Malaysia: Clean, renewable, and abundant energy source, so what s the problem?

INTERCONNECTION OF EMBEDDED GENERATION: THE MALAYSIAN EXPERIENCE

Malaysian Financial Mechanisms for Renewable Energy (RE) & Future Direction

CLICK HERE TO KNOW MORE

Updates on RE programme and efforts in Malaysia Azah Ahmad Sustainable Energy Development Authority Malaysia

ASEAN cogeneration experiences

Upgrading of Malaysian Biomass for Cofiring with Coal. Adlansyah Abd Rahman Centre for Renewable Energy, UNITEN

Outline 1 Introduction : Key Data of Malaysia 2 Energy Policies Electricity Sector in Malaysia Challenges in Meeting Future Energy Demand Mo

Key Statistical Data

SOLAR PV PROMOTION PROGRAM IN INDONESIA

Current Status & Prospects of PV Power Generation in Malaysia

RENEWABLE ENERGY POLICY OF BANGLADESH

Increase Type of Power Plant MW Percentage MW Percentage Percentage

Government Policy for Solar Irrigation Pumps in Bangladesh

SUSTAINABLE ENERGY DEVELOPMENT

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

Thahirah Syed Jalal. Pat Bodger

CURRENT STATUS ON CARBON CAPTURE AND STORAGE INITIATIVES IN MALAYSIA

About MPOCC MSPO Certification Scheme Progress of Work in MSPO Challenges Future Direction Conclusion. certifying Malaysian palm oil for the world

Power System Study for Renewable Energy Interconnection in Malaysia

ENERGY POLICY SHIFT AND KEY ENERGY PROJECTS TOWARDS SUSTAINABLE ENERGY FUTURE FOR MALAYSIA

Sharing Malaysia s experience in development of Renewable Energy

2008 CDM/JI Feasibility Study Report. Executive Summary

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8

5 th Energy Forum. Round Table Discussion Taking on Tomorrow s Energy Challenges Today. Tenaga Nasional Berhad. 3 September 2013

Feed-in Tariff Mechanism : Malaysia s Choice to Catalyst Renewable Energy Growth & Policy Updates on Solar PV

Current New & Renewable Energy Utilization in Chinese Taipei

Biomass and Decentralised Energy: Challenges and Benefits

BRIEF OUTLOOK ON MALAYSIAN ELECTRICITY SUPPLY INDUSTRY, TNB & MALAYSIA NATIONAL COMMITTEE OF CIGRE (MNC-CIGRE)

SUNSOURCE ENERGY SDN. BHD.

Incentives and Barriers for Decentralised Power Generation in Finland and in Thailand

An Outlook of Renewable Energy Development in Malaysia

Journey Started-Joint Research Collaboration ( Jan 2004-Dec 2006) FPI-UPM-KIT of Japan

Renewable Energy in Malaysia: Experience from Perlis

SECTOR ASSESSMENT (SUMMARY): ENERGY

Energy Status - Tanzania.

ENERGY SECTOR INTERVENTIONS

SRI LANKA ENERGY SUPPLY STATUS AND CROSS BORDER ENERGY TRADE ISSUES

Member State Perspectives

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

Selume proferre..! Investment Opportunities in Resource Management and Renewable Energy Projects in Sri Lanka

BIOGAS DEVELOPMENT IN THE MALAYSIAN PALM OIL INDUSTRY: STATUS, POTENTIAL & FUTURE PROSPECT

MINORITY SHAREHOLDER WATCHDOG GROUP (MSWG) 27 TH ANNUAL GENERAL MEETING. 18th December Prepared by: CoE Investor Relations

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

No.11, Tandis Street, Africa Blvd, Tehran, Iran, Postal Code: Tel: +98 (0) Fax: +98 (0)

Expert Group Meeting on Sustainable Application of Waste-to-Energy in Asian Region

Session IV: Access to Electricity Services in Rural Areas

Funded by: European Union

Energy in Kenya. Energy Scenarios Workshop July 24, 2013 Stanley Hotel

International Workshop: Future Perspective of Bioenergy Development in Asia

INTEGRATION OF RENEWABLE BASED GENERATION INTO SRI LANKAN GRID

UNOSD Expert Group Meeting Sustainable Application of Waste-to-Energy in Malaysia. Mohd Ali Hassan

ENERGY EFFICIENCY PROGRAMS IN MALAYSIA

TECHNOLOGY FACTSHEET SOLAR REFLECTOR CUM TRACKER TO ENHANCE ENERGY OUTPUT FROM SOLAR PV SYSTEMS 1

Policy Framework and the Promotion of Cogeneration in Malaysia

2016 HILTON HOTEL, KL

Renewable Energy Development in Sri Lanka Opportunities and Challenges. Ministry of Power and Energy Sri Lanka 01/12/2014 1

Sustainable Energy for All (SE4ALL) Action Agenda for Ghana. Presented By: Gifty Delali Tettey (Mrs.) Deputy Director Ministry of Power

IMPACT OF LNG AS ENERGY FUEL MIX FOR END USER

Feasibility study of integrated biogas and composting plant at community scale in Malaysia

Carl Bro Group HAMDAN MOKHTAR ENVIRONMENT AND BIOPROCESS TECHNOLOGY CENTRE SIRIM BERHAD

SECTOR ASSESSMENT (SUMMARY): ENERGY

Ontario s Renewable Energy Standard Offer Program. June 2008

Renewable Energy Act of 2008

Optimal Electricity Generation Mix with Carbon Dioxide Constraint

Development of a Macro-level Approach to Estimate Technical Losses in Malaysia Distribution Network

SECTOR ASSESSMENT (SUMMARY): POWER

Bringing electricity to the rural areas: Designing Laws and Policies that work

STUDY ON PRIVATE-INITIATIVE INFRASTRUCTURE PROJECTS IN DEVELOPING COUNTRIES IN FY2011

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

Workshop on photovoltaics, grid Integration and funding of the next wave of PV expansion in Cyprus, 13 December 2016.

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

PRESENTATION TO 7 th GERMANY- AFRICAN ENERGY SUMMIT APRIL 2013, GERMANY

Egyptian Renewable Energy plan

Can Connecticut Meet Renewable Portfolio Standards and Improve Air Quality, Increase Energy Reliability, and Strengthen the Economy?

Grid-Connected Renewable Energy

Utility Perspectives on Grid Connected Renewable Energy

SOLAR PV: POLICY, MARKET & INDUSTRY IN MALAYSIA

ASEAN Smart Grid Congress 2

Creating a shared value sustainable solutions for the industry, people & environment MSPO

SECTOR ASSESSMENT (SUMMARY): ENERGY (ELECTRICITY TRANSMISSION AND DISTRIBUTION)

ASEAN cogeneration experiences

14 TH to 18 th SEPTEMBER, 2015 ABIDJAN, CITE D IVOIRE

Risks And Opportunities For PacifiCorp State Level Findings:

RENEWABLE ENERGY IN GHANA: POLICY AND POTENTIAL

Terms of Reference. Development and Evaluation of Power and Heat Supply Options for Kosovo

Energy Trust of Oregon comments addressing the Senate Bill 978 process July 10, 2018

A GLOBAL PERSPECTIVE ON GROWING THE BIOECONOMY MALAYSIA; HUB FOR INDUSTRIAL BIOTECHNOLOGY LINKAGES ACROSS THE WORLD

Ministry of Industry and Trade General Directorate of Energy. Viet Nam s Power Development Plan

Rural Renewable Energy Development & Promotion Policies in China

The role of the NRA in the Energiewende

Renewable Energy Policies in Southeast Asia. Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018

Levelized Cost of New Generation Resources in the Annual Energy Outlook 2012

Transcription:

BRIGHTER SOLUTIONS FOR GREEN ENERGY KEYNOTE SPEECH BY: IR. MOHD AZHAR ABDUL RAHMAN MANAGING DIRECTOR TNB ENERGY SERVICES SDN. BHD. TENAGA NASIONAL BERHAD SEPTEMBER 2014

CONTENT BACKGROUND MALAYSIA S PERSPECTIVE - NATIONAL POLICY ON GREEN TECHNOLOGY TNB S PERSPECTIVE -RENEWABLE ENERGY & ENERGY EFFICIENCY CHALLENGES AND CONCLUSION 2

BACKGROUND 1. The world needs to reduce its dependency on fossil fuels (nonrenewable energy) as it is fast depleting and due to the harmful impact to the environment; 2. Sustainable energy and efficient utilization of energy is the focal attention in Malaysia: Renewable Energy (RE) was introduced as Fifth Fuel in the nation s energy supply mix. Establishment of National Green Technology Policy to ensure sustainable development and conserve the environment 10th Malaysia Plan (2011-2015) outlines the National RE Policy and Action Plan. Introduction of new rate for Feed-in-Tariff, revision 2014. 3. TNB is fully supportive of the need to strengthen the commitment and focus required to implement RE in Malaysia and aspires to become primary driver by the year 2015. 3

NATIONAL ENERGY POLICIES & DEVELOPMENT PLAN 8 th Malaysia Plan (2001-2005) RE as the fifth fuel Target: 5% RE in energy mix 9 th Malaysia Plan (2006-2010) Target: 300 MW grid-connected RE in Pen. Malaysia Target: 50 MW grid-connected RE in Sabah 10 th Malaysia Plan (2011-2015) New RE Policy and Action Plan Target: 985 MW of RE by 2015 (~5.5% of energy mix) Source: Ministry of Energy, Green Technology and Water, Energy Commission

NATIONAL ENERGY POLICIES & DEVELOPMENT PLAN National RE Policy & Action Plan Approved by Cabinet on 2 nd April 2010 Legal Instrument Implemented in Peninsular Malaysia since 1 st December 2011 with the enforcement of RE Act 2011 Implementation of FiT in Sabah & Labuan will be enforced in 2 nd quarter 2014. 5

RENEWABLE ENERGY PLANNING Year Biomass (MW) Biogas (MW) Mini Hydro (MW) Solar PV (MW) Solid Waste (MW) Total RE, Grid Connected (MW) 2011 110 20 60 9 20 219 2015 330 100 290 65 200 985 2020 800 240 490 190 360 2080 2025 1190 350 490 455 380 2865 2030 1340 410 490 1370 390 4000 Achievement so far, Year Biomass & Solid Waste (MW) Biogas (MW) Mini Hydro (MW) Solar PV (MW) Total RE, Grid Connected (MW) Sept 2014 52.30 11.74 11.70 123.39 199.13 1,479,602 tonnes Co2 reduction & 11,283 job opportunities created. 6

TENAGA NASIONAL BERHAD Statutory body established in 1949 responsible for the Generation, Transmission, and Distribution and Retail of electricity in Peninsular Malaysia and the state of Sabah Employee strength (TNB Group) as at August 31, 2013: 29,269 Number of customers (including SESB) as at August 31, 2013: 8.4 million Source: TNB Annual Report 2013

TNB FAMILY GENERATION ENERGY VENTURES * TNBES with many other support departments & units. TNB TRANSMISSION UNITEN & TNB RESEARCH DISTRIBUTION Our commitment towards environmental protection coordinated approach across the Organization

INDUSTRY OVERVIEW IN PENINSULAR MALAYSIA TNB Generation Division TNB (Thermal, Hydro) 9,110 1 MW KEV 2 2,420 MW IPPs (Thermal (Gas) and Coal) 10,287 MW TNB Transmission Division Total Overhead Lines Length 19,328 circuit-km Total Underground Cable Length 811 circuit-km Total Transformer Capacity 82,130 MVA Total Number of Substations - 391 TNB Distribution Division Co-generators (KLIA & KLCC) Bulk Suppliers (e.g. Bandar Utama, Sunway Pyramid, Genting Utilities, KL Sentral (Wirazone)) Customers (Total 8.4 million 3 ) Domestic 82.5% Commercial 16.4% Industrial 0.35% Public Lighting 0.7% Agriculture & mining <0.05% Notes: 1. Includes Janamanjung (100% TNB holding) 2. KEV (60% TNB holding) 3. As at 31 st Dec 2011 Generation Transmission Distribution & Retail Customers

RENEWABLE ENERGY Solar Biomass Biogas Mini Hydro

DRIVERS OF RE DEVELOPMENT Climate Change Energy Security RE Development Sustainability Rural Development

OUR EXPERIENCE IN RENEWABLE ENERGY PROJECTS Solar Biomass Biogas Mini-Hydro Potential ~6,500 MW (for 40% buildings) Yearly average irradiance 1,400 1,900 kwh/m 2 Status More than 5 MW REPPA, BELB AND Fit Projects Potential ~1,340 MW by 2030 Status Biomass Project, palm oil waste (EFB), other waste e.g. woodchips, paddy husks etc. Potential ~410 MW by 2028 Status Palm Oil Mill Effluent (POME), livestock, agro, industrial waste Potential ~490 MW by 2020 Status O&M 20 stations to date Run-of-river scheme with minimum impounding Renewable Energy is moving forward towards achieving the target of 5.5% by 2015

TRACK RECORD Major Projects / Services Description Scope No of projects/total capacity Building Integrated Photovoltaic (BIPV) at TNB Head Offices Bangsar & Dua Sentral Solar Hybrid System (Since 2001) Mini Hydro Stations (Since 2005) Power Quality, Energy Efficiency & Consultancy Design & Built Maintenance & Monitoring O&M Design & Built Maintenance & Monitoring O&M O&M Rehabilitation works PQ Monitoring System (PQMS) PQ Audit Energy Audit 2 Projects >70 Projects (>5,000 kw) 35 Stations PQMS for TNBD PQ Audit > 60 customers EE Audit > 10 13

SOLAR HYBRID PROJECT & BUILDING INTEGRATED PHOTOVOLTAIC (BIPV)

SOLAR HYBRID SYSTEM IN RURAL AREA Project in Kemar is equipped with solar generating capacity of 850kW and is part of the Rural Electrification Project (BELB) to indigenous settlements Supply electricity to approximately 3100 local residents as well as clinics, schools, houses of worship, police stations, kindergarten Kemar Project was fully commissioned by end of this month, October 2012. Special Features: 1. Optimum solution for alternative 24 hours electricity supply (or as required by customer) 2. Developed based on > 10years of track record, continuous R&D and first-hand experience in system design and O&M 3. Optimization in system O&M via remote monitoring facilities 4. Expandable system to meet future development and demand growth 5. Cost effective and competitive 15

BUILDING INTEGRATED PHOTOVOLTAIC (BIPV) This project is part of TNB s approach to prosper the growth of RE within our boundary. Space covered by solar car parks rooftop and office rooftop. Solar energy collected approximately 150kW. 16

AWARDS AND RECOGNITION FOR SOLAR PROJECTS Continuous improvement building trust and credibility Recognition by Ministry, State Government & Local Authorities Solar Hybrid Project Pulau Kapas, Terengganu (2 nd Runner-Up) Solar Hybrid Project Pulau Banggi, Sabah (1 st Runner-Up) Solar Hybrid Project Ladang Mutiara, Johor (2 nd Runner-Up) Solar Hybrid Project SK Telanok, Cameron Highland, Pahang (1st Runner-Up) 2009 2010 2011 2012 2014

BIOMASS PROJECT WITH FELDA PLANTATION INDUSTRY

FTJ BIOPOWER PROJECT TNB together with Felda Palm Industries is working on developing a biomass plant with 10MW capacity in vicinity of Jengka 9, Pahang Malaysia. A large capacity biomass power plant requires EFB supply from many palm oil mills. Most of palm mills location are scattered at far distances between them in the plantation. For a typical 10 MW net biomass power plant, it requires about 250,000 metric ton of EFB which involves about 5 to 7 palm oil mills to ensure sufficient supply through the project life. In process of project expansion to include 2MW biogas plant within site vicinity.

BIOGAS PROJECT WITH SIME DARBY PLANTATION

BIOGAS POWER GENERATION FROM POME TNB is working closely with Sime Darby Plantation, private miller in Malaysian to harness potential in utilizing residues from the palm oil mills. The palm oil mill effluent, POME will be used as fuel in the Anaerobic digestion process to produce biogas. Expected start of the project development with Sime Darby Plantation to develop biogas plant at two selected sites with capacity of 2MW each by early 2015.

JANA LANDFILL PROJECT

BIOGAS PLANT FROM LANDFILL EFFLUENT The plant's developer was the Jana Landfill Sdn Bhd, a joint venture between TNB subsidiary TNB-ES and Worldwide Landfills Sdn Bhd, which is the company that operates the landfill. Located 40 kilometers outside of Malaysia's capital, Kuala Lumpur, the Jana landfill is one of the city's main municipal storage waste sites. The landfill's gas is being used to generate 2.096 megawatts of electricity began operation in February 2004

MINI HYDRO

HYDRO POWER It has four major advantages: it is renewable; it produces negligible amounts of greenhouse gases; it stores large amounts of electricity at low cost; and it can be adjusted to meet consumer demand. TNB operates three major schemes in the peninsular with an installed capacity of 1,911 MW Sungai Perak hydroelectric scheme Terengganu hydroelectric scheme Cameron Highlands hydroelectric scheme Maintain and operate Mini Hydro Stations all over peninsular Malaysia 1249 MW 400 MW 262 MW 10MW (20 Stations)

ENERGY EFFICIENCY

ENERGY EFFICIENCY To achieve an acceptable level of energy efficiency in buildings by taking the initiatives: Aircond Temperature keep at 24 Deg. C Change the bulb T8 to T5 type Promote and use more LED if possible To improve the energy utilization efficiency in the operation of existing buildings To promote EE design in any new buildings

ENERGY EFFICIENCY SERVICES ENGINEERING & CONSULTANCY Energy Efficiency Audit: Commercial buildings & TNB buildings Power Quality Services and Consultancy for TNB Prime Customers Power System Study for Distributed Generation interconnection Consultancy Works related to Interconnection & Renewable Energy TNBES offers customized services in energy efficiency, mitigate power quality problem and recommend solutions that translates into energy cost savings to the owner.

CHALLENGES & BENEFITS OF RENEWABLE ENERGY

CHALLENGES Reliability Transmission and Distribution Integrating Renewables On the Power Grid High Capital Cost

Reliability CHALLENGES Supply of electricity must be made available around the clock to provide power to consumers whenever they demand it. Solar - variable Not always available and require dispatchable back up generation such as Genset or hydropower. Biomass short of fuel supply Clustered location of POMs has better advantages to ensure sufficient supply within a certain radius. EFB Re-Processing Schedule - need to be timely.

CHALLENGES Transmission and Distribution Distance between power plant and local distribution substation (between 11 to 33kV) Transmission loss Cost for interconnection /km basis Local load (MW) demand Limiting factor of max. power plant size

CHALLENGES Integrating Renewables on the Power Grid Balance between demand and supply Ensure reliability System stability and safety

CHALLENGES High capital cost Cost of building renewable facilities has decreased over the years, yet some remains relatively costly Technology on learning curve Exclusivity of the design Construction cost has increased considerably due to raw materials price increase and other factors To help minimize the costs: Improvement in R&D needed Commercialization of these technologies

BENEFITS Benefits to Country and State Partially relieving the Government of the financial, administrative and risk burden associated with such an infrastructure project. Promoting competition in the electricity supply industry in order to improve efficiency and increase productivity. Stimulating private entrepreneurship and investment to accelerate economic growth. Technology transfer to local manufacturers on design and manufacture of power plant components, especially to local Bumiputera. Create permanent jobs. Create hundreds of temporary jobs during peak of construction. Substantial capital investments in the state. This will invariably promote economic activities and social benefits in the state through the multiplier effect. 35

BENEFITS Benefits to Country and State The power plant will support future generation mix and power demand EFB is viewed as the renewable energy source. CO2 emission could be reduced. This will open the possibility to sell Carbon Credit for better environmental condition as a whole. The abundant supply of a reliable stable source of electricity at Jengka 9, will draw industry and hence, revenues to Pahang and nearby areas. At least 30 per cent of the power project could be in local content. Develop and encourage the Bumiputera Vendor Programme formulated by PUNB and MOF for power plant components and thereby promoting SMI in accordance with the Government policy. 36

BENEFITS Benefits to TNB It will assist TNB in their continued efforts to reliably and economically supply long-term power to industries and other consumers. The biomass power plant will ensure compliance with the Government s Five Fuel Diversification Policy. It will allow reduction in TNB capital expenditures for power generation, Reduce dependency on fossil fuel and; Allowing TNB to focus even more on system transmission and distribution needs. Increase TNB s exposure in the Biomass Power Industry Reasonable rate of return Long-term secured revenue stream 37

WAY FORWARD TNB to be primary driver of Green Energy in Malaysia RE to be integrated in future generation capacity planning Continuous efforts for energy efficiency initiatives to existing power plants Intensify human capital development to support growth of green technology Continue to support REPPA through R&D initiatives and supervisory to further reduce the development costs

THANK YOU