PORT OF PORT HEDLAND - BULK PRODUCT MANAGEMENT PROCEDURE

Similar documents
PORT OF DAMPIER HANDLING OF GENERAL CARGO, GOODS AND EQUIPMENT PROCEDURE

EXCAVATION PROCEDURE

TO MEMBERS OF THE ASSOCIATION

Dust Management Procedure Environment

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

To the Members February 2011

Crushing and Screening Management Procedure Environment

Bulk Cargo Liquefaction

Iron Ore Fines. Contents. Problems with the Carriage of Iron Ore Fines LOSS PREVENTION BRIEFING FOR NORTH MEMBERS CARGO / MARCH 2017

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

2.19 FUMIGATION OF GRAIN VESSELS

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Airborne Pollutant Management Plan. November 2009

Supply Chain Safety Responsibility

GUIDELINES FOR PREPARING A CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN A334170

Contents Introduction Compliance Requirements 2

c: Don Labossiere/Tim PrawdziklPeter Crocker, Environmental Compliance and Enforcement Public Registries

A Guide for Exporters FOR THE EXPORT OF CONTAINERS AT PORT OF TOWNSVILLE

Conditions of Approval for the MDP for the brickworks at Perth Airport

SAMPLE. 11. To provide training on the hazards of silica and working safely in environments with silica exposure.

GUIDELINES FOR DEVELOPING AND APPROVING PROCEDURES FOR SAMPLING, TESTING AND CONTROLLING THE MOISTURE CONTENT FOR SOLID BULK CARGOES WHICH MAY LIQUEFY

Genetic Modification. University Health and Safety Policy. Version 1: September 2015 Author: Health & Safety Services 1

AMENDMENTS TO THE IMSBC CODE AND SUPPLEMENTS. New Individual Schedule for METAL SULPHIDE CONCENTRATES, SELF-HEATING, UN Submitted by Australia

SOUTH AFRICAN MARITIME SAFETY AUTHORITY SCHEDULE

Re: Indonesia and the Philippines Safe Carriage of Nickel Ore Cargoes

Animal Products Notice

IMSBC CODE GROUP A BULK CARGOES

PORT OF THURSDAY ISLAND PORT RULES

Understanding of Local Procurement for gaining accreditation

PORT OF THURSDAY ISLAND PORT RULES

Table OCO 8.1 Air Quality Management. Audit Check. Ref Subject Reference Control Activity Responsibility Timing Performance Measure

AIC International Trading & Shipping Module

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

Ground Disturbance Permit Procedure Environment

WIGGINS ISLAND COAL EXPORT TERMINAL

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Odour Management Plan. November 2009

Wastewater Management Procedure Environment

CCR RULE FUGITIVE DUST CONTROL PLAN

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

Public Comment Period. Consideration to Amend Permit No Direct Transfer Coal Facility May 4 19, 2015 Discussion Guide and Feedback Form

BHPBilliton Iron Ore Port Sweating the assets. September 2003

Manzanillo International Terminal 2016

BACKGROUND INFORMATION DOCUMENT

GOVERNMENT CLAMPDOWN ON MINING ACTIVITY AND HEAVY RAIN IN THE PHILIPPINES AFFECTING NICKEL ORE SHIPMENTS.

Policy Document. Contaminated Land Management Policy. Address. Online. Phone & Fax: Chelmsford Place Leeton NSW 2705

ONRSR Policy. Private Siding Registration

MARITIME AUTHORITY OF JAMAICA. DRAFT Guidelines on the Verification of Gross Mass of a Packed Export Container

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY. EudraLex. Volume 4

Asbestos Management Policy

Chapter VII. Chapter VII - Carriage of dangerous goods

DUST MANAGEMENT PLAN MILLER PAVING LIMITED BRAESIDE QUARRY. Prepared by: Church & Trought Inc. 885 Don Mills Road, Suite 106 Toronto Ontario M3C 1V9

APEC ENGINEER FRAMEWORK

Liquefaction of solid bulk cargoes. Gard Academy Summer Seminar 14 th June 2012 Mark Russell, Vice President Cargo Claims

L 360/64 Official Journal of the European Union

SUPPLIER QUALITY MANUAL

Maritime Rules Part 19: Maritime Transport Operator Certification and Responsibilities

Patrick Adelaide Stevedoring Wheat Demand Management Policy and Reference Pricing. January 2016

PORT OF MOURILYAN HARBOUR

Chemical Inhibitor Approval Scheme (CIAS) Audit Procedure

Weight Verification Amendments to SOLAS Chapter VI

February 21, Permit: APC-82/1209-CONSTRUCTION (Amendment 5) Petroleum Coke Storage and Handling Complex

IMPORT HEALTH STANDARD FOR SEA CONTAINERS FROM ALL COUNTRIES

Health & Safety Policy, Organisation and Arrangements

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Appendix B8 Construction Hazard and Risk Management Plan

DEPARTMENT OF TRANSPORT

DEPARTMENT OF TRANSPORT SCHEDULE

Procedure 14 Internal Audits

Quality and Environmental Business Process Manual

Table of Contents. Project Agreement Schedule 14

New Draft MO42 (Carriage, stowage and securing of cargoes and containers) open for consultation until 30 April 2016

HEALTH, SAFETY AND ENVIRONMENT MANAGEMENT SYSTEM

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Cargo Handling and Stowage

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Cargo Handling and Stowage

Ministerial Statement 958. Compliance Assessment Report. 1 January December 2018

Part 148. CAA Consolidation. 10 March Aircraft Manufacturing Organisations - Certification

Export Eligibility Requirements. Official Agrichemical Assurance Standard for Fresh Plant Products

ANNEX 5 DRAFT MSC CIRCULAR DUE DILIGENCE CHECKLIST IN IDENTIFYING PROVIDERS OF CTU-RELATED SERVICES

AUDIT & RISK MANAGEMENT COMMITTEE CHARTER

DEFENSE LOGISTICS AGENCY HEADQUARTERS 8725 JOHN J. KINGMAN ROAD FORT BELVOIR, VIRGINIA

Central Greenwaste and Firewood Monitoring Programme Biennial Report Technical Report

Intermaritime Certification Services (ICS) QUALITY MANAGEMENT SYSTEM INSTRUCTIVE FOR ISM-CODE

12. Environmental management

Maritime Rules Part 24D: Carriage of Cargoes Convention Containers

Memorandum of Understanding

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

SEALES ROAD HAULAGE LTD QUALITY PROTOCOL: PRODUCTION CONTROL SYSTEM OF FINE FILL MATERIAL & RECYCLED TYPE 1 803

Policy, Responsibilities & Procedures

Pollution Incident Response Management Plan - Summary. Medway Mine Medway

SENIOR PROJECT MANAGER

GENERAL PERMIT WMGR098 BENEFICIAL USE OF WASTE FOUNDRY SAND AND SAND SYSTEM DUSTS

COMPETITIVE ACCESS AND SERVICE ARRANGEMENTS OF CONTAINER MOVEMENTS: PORT BOTANY CASE

FARNCOMBE CONSTRUCTION. Health & Safety Policy, Organisation and Arrangements

LOOP LLC VESSEL LOADING SCHEDULING PROCEDURE. I. Nominations and Assignment of Arrival Windows; Load Contract

TruckSafe Operator Business Rules and Code of Conduct

SOLAS VGM FAQs Frequently asked questions about the new verified gross mass requirement from the Safety of Life at Sea convention

Asbestos Management System

CCR Fugitive Dust Control Plan

declare the amendment of the Compulsory Specification as set out in the

SECTION 28 Environment Management Strategies

Transcription:

TABLE OF CONTENTS 1. PURPOSE... 2 2. SCOPE... 2 3. RESPONSIBILITIES... 2 4. SPECIFICATION OF BULK MINERAL PRODUCTS... 3 4.1 PROVISION OF ONGOING INFORMATION...4 4.2 SAMPLING...5 4.3 PRODUCT DEM AND MOISTURE CONTENT...5 4.4 CHANGES IN PRODUCT SPECIFICATION...5 4.5 FOREIGN CONTAMINANTS...6 5. APPROVAL... 6 5.1 CONDITIONS OF APPROVAL...7 6. PROCESS OWNER... 7 APPENDIX A: DUST MANAGEMENT PLAN GUIDELINES... 8 Objective ID: A311134 Page 1 of 8

DOCUMENT AMENDMENT TABLE Version Prepared By Date Amendment 6 Landside Operations Manager & Commercial Trade Specialist 20/10/2017 Various updates in consultation with PPA s Health & Safety Manager, Environment & Heritage Manager 1. PURPOSE The purpose of this document is to obtain the chemical and physical properties of materials proposed to be exported via Pilbara Ports Authority, Port Hedland (PPA) owned and operated facilities. This will allow the operational, environmental, facility maintenance and health and safety risks / impacts of these products to be well understood and managed. 2. SCOPE This procedure applies to only those bulk mineral products transferred over PPA owned berths. This includes PPA s East Side Berths 1, 2 and 3 and the Utah Point Bulk Handling Facility. This procedure does not apply to third party owned infrastructure and facilities including BHPB Nelson Point and Finucane Island facilities, FMG Anderson Point facilities, Roy Hill Stanley Point facilities and Dampier Salt ship loader operations at Berth 3. 3. RESPONSIBILITIES The PPA Commercial Trade Manager (or his nominated delegate) shall: Act as the central point of contact for all new product requests. Coordinate the requirements of individual PPA departments. Disseminate and receive information from the customer. The GMO (or his nominated delegate) shall: Have powers of final approval for any bulk mineral product to be delivered/handled through PPA bulk loading facilities; Have the right to temporarily suspend the approval of any bulk mineral product handled through PPA bulk loading facilities; Recommend to the Board of Directors to rescind approval for any bulk mineral product handled through PPA bulk loading facilities; and, Objective ID: A311134 Page 2 of 8

Have the right to request the proponents to remove any product from the facility, or to undertake additional product conditioning to ensure the product meets the required specification. PPA Staff shall: Ensure that they comply with the PPA Bulk Product Management Procedure and its requirements; Ensure they correctly follow all directions set out in the PPA Bulk Minerals Products Management procedure; and, Where required, to the best of their knowledge and ability, diligently fulfil responsibilities under the Bulk Product Management Procedure. 4. SPECIFICATION OF BULK MINERAL PRODUCTS Prior to the commencement of haulage of any bulk mineral product to PPA s bulk loading facilities or berths the GMO (or his delegate) must have in his possession a full detailed application form for the product being loaded (the Bulk Product Application Form) and which has been signed by the respective PPA Environmental, Operations, Safety, Maintenance and Commercial delegates. This information sheet includes all the details of the product being loaded including: Chemical make-up of the product including metal speciation and other chemicals present in the product (e.g. other chemicals that may have contaminated the product such as process solution). This must be submitted as a report from an independent and recognised analytical laboratory (NATA accreditation preferred) and be signed by a laboratory manager or equivalent Additional reports or information may be requested following the initial submission in order for PPA to adequately assess health, safety and environment (HSE) risks; Dust Extinction Moisture (DEM) level and Transportable Moisture Limit (TML). This must be submitted as a pdf report from an independent and recognised analytical laboratory and be signed by a laboratory manager or equivalent; Flow properties of the product in compliance with any requirements of Marine Order 34 (MO34) and the International Maritime Solid Bulk Cargoes (IMSBC) Code as determined by a recognised analytical laboratory (e.g. Jenike or Tunra Bulk Solids). Angle of repose and stowage factor of product Bulk density of product Particle Size Distribution (PSD); Objective ID: A311134 Page 3 of 8

Detailed health, safety and environmental risks of the product. The risk assessment must address: - potential short and long term health effects from in load, storage /stockpiling and out load of the product, and any potential manual intervention (e.g. cleaning up spilt product); - contaminants (e.g. airborne contaminants such as silica); - sources of emissions (for example, product transfer points, kiln stack, baghouses or discharge pipelines) including fugitive emissions (for example, noise, dust or odour); - types of emissions (physical, chemical, or biological); - volumes, concentrations and durations of emissions; and - proposed controls for mitigation of all identified risks. The risk assessment must be completed on PPA s Project Risk Assessment Tool. Relevant information to support the risk assessment findings must be attached (e.g. Respirable composition analysis report from an independent and recognised analytical laboratory when the chemical make-up of the product includes contaminates that may impact health); An attached Safety Data Sheet (SDS) that meets the National Code of Practice for the Preparation of Material Safety Data Sheets 2nd Edition [NOHSC:2011(2003)]; and, A product specific Dust Management Plan (DMP) in accordance with the Dust Management Plan Guidelines attached as Appendix A to this Procedure. For any new product being brought into the Port, this information must be provided at least three months prior to inloading, to allow PPA to make a thorough assessment of the product. 4.1 Provision of Ongoing Information To ensure that bulk products comply with the information provided, if necessary proponents will be required to submit to PPA the following information at a frequency to be determined by PPA: Daily tonnage reports of product transported to stockpile DEM and product moisture sample results (refer to section 4.3) The proponents are also required to submit to PPA a weekly forecast of haulage, including the source of the product. Objective ID: A311134 Page 4 of 8

4.2 Sampling To ensure consistency of product with the information provided and to ensure that risks are adequately understood, PPA may, from time to time, take random samples of bulk material. Samples will be sent to a NATA accredited laboratory and tested for: Chemical make-up DEM Moisture content Particle size The results of the laboratory analysis will be compared against the data supplied by the proponent to ensure that the product complies with the information provided. If the laboratory analysis identified inconstancies with the supplied product information, the proponent will be notified immediately. The risk assessment will be reviewed and any further controls necessary will be the responsibility of the proponent. If continual breaches are detected then further action may be taken to address the breaches. PPA may also monitor moisture content via analysers at any point in the conveyor system. 4.3 Product DEM and Moisture Content Proponents must provide to PPA an independent third party laboratory report (eg. Tunra or similar) stating the DEM for each product type transported to PPA s facilities. Products transported to Utah Point require the DEM report to be updated annually and provided to PPA. Proponents must undertake appropriate product conditioning and monitoring at the mine site to ensure that all product delivered to PPA has a moisture content at or above its DEM. Proponents are required to submit moisture content results of samples of all product types transported to PPA s facilities. Results must be provided in a format and at a frequency approved by PPA. The Certificate of Analysis showing average moisture content must be provided to PPA for product shipments departing Utah Point. 4.4 Changes in Product Specification If the proponent suspects that products may be changing in chemical or physical composition then they must notify PPA immediately of the change. The proponent will be responsible for undertaking and submitting to PPA a risk assessment of the change to Objective ID: A311134 Page 5 of 8

ensure that there a no new risks posed by the changed product specifications. Otherwise the proponent may make changes to the detailed HSE risks of the product, the MSDS or the DMP to improve the management of the product. Any changes to these documents must be approved by PPA. 4.5 Foreign Contaminants Systems are to be implemented at the mine site to ensure that foreign contaminants are not present in the product when it is received at the PPA facilities. PPA out-loading systems are equipped with metal detectors and any foreign metal or contaminant detection will result in the offending object being removed from the conveyor in accordance with the PPA Isolation Procedure. Any subsequent delays will be included within the gross loading rate calculations for the particular vessel and may reduce the applicable loading window accordingly. Continued or extreme detections of any kind (whether by number of events or potential severity) may result in the PPA requiring:- 1) Additional screening of the product; 2) Manual intervention for detection in the stockyard; and/or 3) Removal of the contaminated product from site. 5. APPROVAL Any new bulk product proposed to be handled through PPA bulk loading facilities must be approved by the GMO following consultation with the following persons: Environment and Heritage Manager assess the risks of impact to the environment, public health and amenity; Health and Safety Manager assess the risks of impacts to safety and human health; Marine Operations Manager assess the risks of impacts to ship safety; Landside Operations Manager assess the risks of impacts to landside operations and mine site requirements; Maintenance Manager assess the risks of impacts to ship loader infrastructure; and Commercial Trade Manager assess potential impacts on existing and proposed PPA commercial agreements. In most instances, any new product will undergo a trial period over which the suitability of the product will be assessed to determine whether it is acceptable to PPA. If the trial period demonstrates that the product has significant risks, the GMO will either extend the trial period Objective ID: A311134 Page 6 of 8

so that a more thorough assessment can be undertaken or remove the approval for the product. Further to the above, PPA reserves the right to undertake an on-site inspection of any material prior to it being transported to port facilities. Upon inspection, PPA may request changes to product conditioning if the product is determined to be unsuitable for the port facilities. These changes are to be adhered to otherwise approval for product export will be withdrawn. The GMO may waive the requirement for any or all of the specification data if satisfied on inspection that the material and volume pose a low risk. Approval to commence haulage of any new product will be confirmed in writing by the GMO. 5.1 Conditions of Approval PPA may enforce conditions on the approval of bulk material to be handled through the port. This may include, but is not limited to: Minimum gross loading rate that must be achieved and the applicable operational window for loading the product onto any vessel. Road sweeping requirements. Cleaning requirements (e.g. additional resources required). Additional dust control requirements. Removal of spilt product. Vacuum truck(s) requirements. Additional personnel and equipment. Management of cleaning waste. Contractual agreements (or variations to existing agreements) being entered into by the proponent. Additional controls may be specified if the impacts of the product are difficult to manage. The cost of any conditions imposed by PPA will be met by the proponent. 6. PROCESS OWNER The Landside Operations Manager has overall responsibility for this procedure. Date approved: 20 October 2017 Review date: 20 October 2018 Version: 6 Approved by: General Manager Operations Objective ID: A311134 Page 7 of 8

APPENDIX A: DUST MANAGEMENT PLAN GUIDELINES The Dust Management Plan is to address the following but is not limited to: Introduction background and scope of the document. Project overview mine site details, handling and transport details, product information. Dust Management Objectives based on a risk assessment, identify likely dust sources, targets to be met, and how the dust sources will be managed. Specifically focus on: product conditioning processes at mine site; truck movements; condition of product on delivery; inloading; stockpile management; and outloading. Contingency measures (could be included in the above). Roles, responsibilities and contacts. Monitoring outline of the sampling program undertaken to determine product moisture content at the mine site. Reporting frequency of reporting to PPA, incident reporting. Review and audit. A Dust Management Plan is required for each product to be hauled through PPA multi-user facilities. Objective ID: A311134 Page 8 of 8