FIAT GROUP AUTOMOBILES and FIAT POWERTRAIN TECHNOLOGIES CUSTOMER-SPECIFIC REQUIREMENTS. for use with ISO/TS 16949:2009

Similar documents
Global Supplier Manual Appendix U FCA EMEA Customer Specific Requirements for Suppliers. October 26, 2017

FCA (EMEA/LATAM Regions)

CUSTOMER SPECIFIC REQUIREMENTS FOR ISO/TS APPLICABLE TO FIASA/POWERTRAIN SUPPLIERS

CUSTOMER SPECIFIC REQUIREMENTS RELATED TO ISO/TS APPLIED TO FIASA/Powertrain SUPLLIERS

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

NEW BUSINESS HOLD. (Ex-standard FGA 07172)

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Supplier Quality Manual (QQS )

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page

Supplier Quality System Survey

Automotive Components Holdings, LLC. Customer Specific Requirements (CSR)

Awareness Session for Transition to IATF 16949:2016

Supplier Quality System Requirements Manual

Visteon Corporation. Customer Specific Requirements Fifth Edition. For Use with ISO/TS 16949:2009

MERIT Customer Specific Requirements

Delphi Technologies Customer Specific Requirements. For Use with ISO 9001:2015 and IATF16949:2016

Global Supplier Scorecard Quality Bid List rules 2017

Groupe PSA. Customer-Specific Requirements for use with IATF 16949

Global Supplier Quality Process Manual. Quality Processes for Suppliers to Merkle-Korff Industries. Abstract

Ege Fren SUPPLIER MANUAL D017

Cargotec Supplier Requirements

Annex 1. Customer Specific Requirements For Use With ISO/TS16949

Comparison of Requirements ISO/TS vs. AS9100 and ISO 13485

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

SUPPLIER QUALITY PROGRAM Procurement Standard

Supplier Quality Requirements Manual

STANDARD. S P-O Svedlund UTDH Markku Backholm. SDT Eva Ivrell Hedensjö UTDH Iréne Klingberg

Supplier Quality Manual

Supplier Quality Manual CHASSIX Inc.

PSA Group Customer-Specific Requirements for use with ISO/TS 16949:2009

Supplier Quality Manual CHASSIX Inc.

QMS Qualitäts-Management-Systeme. Key Points Regarding ISO/ TS 16949: 2009 If you have further questions let us know. We are ready to help.

ISO/TS TECHNICAL SPECIFICATION

PRINTED COPY IS NOT CONTROLLED

SUPPLIER QUALITY MANUAL

Dayco Suppliers Management WebSite Manual (for supplier) Rel

Supplier Quality Manual

GENERAL SUPPLIER GUIDELINE DATE: OCTOBER 2013

RENAULT GROUPE Customer-Specific Requirements for use with IATF st Edition version 2016

ISO/TS TECHNICAL SPECIFICATION

Supplier Quality Manual

Policy X Procedure Work Instruction Revision: 4 Title: Responsible Dept: Supplier Quality Systems Audit REVISIONS

Blue Chip Engineered Products Supplier Quality Manual

Vendor Qualification Survey

SUPPLIER QUALITY MANUAL

MT342-15/E. Электрогидравлика. Suppliers. Quality manual

Aptiv Customer Specific Requirements. For Use with ISO 9001:2015 and IATF16949:2016

Supplier Requirements Manual

CD Supplier Handbook. * Marine Canada Acquisition Limited Partnership DBA Teleflex Canada

QUALITY MANUAL QM0492 ISO SUPPLEMENT III

Annex 1. Customer Specific Requirements For Use With ISO/TS16949

Section Table of Contents Page Number

DaimlerChrysler (Chrysler Group) Customer-Specific Requirements

SUPPLIER QUALITY MANUAL

TRICO PRODUCTS PUR-C-P106-A

SUPPLIER MANUAL Quality Policy

JDI Quality Assurance Guideline

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

PSA Group. Customer-Specific Requirements for use with IATF 16949

Supplier Manual Rev /15

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities

Supplier Quality Manual. Autoneum Group Supplier Quality Manual

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

Customer Specific Requirements. For Use with ISO/TS16949 And ISO 9001

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by

Transitioning from ISO/TS 16949:2009 to IATF 16949:2016 Presented by Brandon Kerkstra Revision: 10/24/2016

Automotive QMS Update IATF 16949:2016 September 2016

Automotive QMS Update IATF 16949:2016. September 2016

Supplier Quality Advanced Controls Program

QUALITY AGREEMENT QUALITY AGREEMENT. and. MAGNETI MARELLI S.p.A., also on behalf of its affiliates and subsidiaries

Supplier Expectation Manual

NQA-1 Graded Approach, 55-Gallon Drum Summary

QUALITY MANAGEMENT SYSTEM DOCUMENT

QUALITY MANAGEMENT SYSTEM DOCUMENT

SUPPLIER QUALITY SYSTEM SURVEY

VU Manufacturing Supplier Quality Manual

Everest Engineering Works ISO REVISION DATE ISSUE

Supplier Questionnaire and On-site Supplier Evaluation

General Motors Global Purchasing and Supply Chain Global Supplier Quality

OPW Engineered Systems

Supplier Quality Manual

Supplier Quality Manual

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP)

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Production Part Approval Process Supplier Information. - Version 1.0

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

List of Documented Information (Document & Records)

Supplier Requirement Manual. Preface

Supplier Requirements Manual

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

Quality management systems

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

SUPPLIER QUALITY REQUIREMENTS MANUAL

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

Quality Manual Template ISO 9001:2015 Quality Management System

Transcription:

Date: 03/02/2011 Revision 02 Page 1 of 10 FIAT GROUP AUTOMOBILES and FIAT POWERTRAIN TECHNOLOGIES CUSTOMER-SPECIFIC REQUIREMENTS for use with :2009 Revision 02 February 3 rd, 2011

Date: 03/02/2011 Revision 02 Page 2 of 10 Table of Contents Scope of the Document...3 Section A General Procedures...3 Section B Connection between FGA/FPT Customer-Specifics and ISO/TS16949...4 FGA/FPT Customer-Specific Requirements added to ISO/TS16949...5 1. Customer Representative (Ref. 5.5.2.1)...5 2. Report characteristics related documentation (Ref. 7.2.1.1)...5 3. IMDS (Ref. 7.2.1 Point C and Procurement Specific 9.01107)...5 3.1. FGA...5 3.2. FPT...6 4. Special Characteristics (Ref. 7.3.2.3)...6 4.1. FGA...6 4.2. FPT...6 5. Periodic layout inspection and functional testing (Ref. ISO/ITS 16949 8.2.4.1)...7 6. Prototype Programme (Ref., 7.3.6.2)...7 7. Field Management (Ref. 8.5.2.4)...7 8. Organizations Performance Analysis (Ref. 5.6) and Review Output (Ref. 6.2.2.3)...7 9. Product approval process (Ref. 7.3.6.3)...8 9.1. FGA...8 9.2. FPT...8 10. On Job Training (Ref. 6.2.2.3)...8 11. Personnel Safety (Ref. 6.4.1)...8 12. Incoming Material Quality (Ref. 7.4.3.1)...8 13. Customer Owned Production Tooling (Ref. 7.5.4.1)...8 14. Supplier Status Special Notifications (, item 8.2.1.1)...8 15. Customer specifics clarification...9 16. Annexes...9 16.1. Annex 1: Program Review;...9 16.2. Annex 2: PCPA;...9 16.3. Annex 3: 1DP One Day Production....9 17. Revision History...9

Date: 03/02/2011 Revision 02 Page 3 of 10 Scope of the Document This document defines Customer Specifics of both Fiat Group Automobiles (FGA) and Fiat Powertrain Technologies (FPT) in order to complete the :2009 Quality System Requirements, and relates them with the technical documentation already used in the relation between FGA or FPT and the Organizations (Drawings, Norms, Procurement Specification, Request For Quotation and other documentation). In this document, the terms Organization and Supplier are interchangeable, both representing the company (or site) being registered to. Every Nation where FGA and FPT have productive plants can add local supplements to these Customer-Specifics (see Local Addenda) Section A General Procedures The Customer-Specifics complement the already used general procedures that rule the supply relation between FGA, FPT and the Organizations. The fundamental procedures are the following: # PROCEDURE DESCRIPTION FGA SPECIFICATION NR. 1 Fiat Auto S.p.A. - General Purchasing Conditions 9.01100 2 Quality Of Supplies 9.01102 FPT.9.01102 3 Supply Material Certification Quality Document CQC - Product Quality And Conformity Certificate 4 Use Provisions For The I.M.D.S. (International Material Data System) System 5 Qualification Of Production Parts Components (Buy) FPT 9.01103 FPT.9.01103 9.01107 07740 FPT.IFP059 6 Program Review Procedure FGP-Procedure 13 7 PCPA (Process Control Plan Audit) and PSA FGP-Procedure 14 (Potential Supplier Assessment) 8 1DP One Day Production Procedure FGP-Procedure 15 9 Management of Variances (Buy Components) 08090 FPT.IFP059 10 Reinforced Control Plan 07171 FPT.MAP048 11 Quality Monitoring Of Direct Materials Supplies At 08018 Manufacturing Factories And Spare Parts Storehouses 12 CSL Business Hold FGP-Procedure 16 Remarks: FGP: Fiat Group Purchasing; FPT: Fiat Powertrain Technologies. These documents can be reviewed, after Customer authorization, in the website https://norme.orange.fiat.it

Date: 03/02/2011 Revision 02 Page 4 of 10 Section B Connection between FGA/FPT Customer-Specifics and ISO/TS16949 ISO/TS 16949:2009 DESCRIPTION CUSTOMER-SPECIFICS FGA 4.2.4.1 Records Retention 9.01102 FPT.9.01102 7.1 Planning of Product Realization FGP-Procedure 13 7.1.1 Planning of Product Realization Supplemental 7.1.2 Acceptance Criteria 7.1.3 Confidentiality 7.1.4 Change Control 7.2.1 Determination of Requirements related to the Product 7.3.2.3 Special Characteristics 9.01102 9.01102/10 9.01102 9.01100 FGP-Procedure 23 Attachment 03 (Confidentiality Agreement) 08090 07740 9.01102 FGP-Procedure 01 Attachment 06 Request For Quotation (RFQ) and Statement Of Requirements (SOR) 9.01102 9.01102/10 9.01120 Timing Chart FPT FPT.9.01102 FPT.IFP053 FPT.9.01102 9.01100 FGP-Procedure 23 Attachment 03 (Confidentiality Agreement) FPT.IFP059 FPT.9.01102 FGP-Procedure 01 Attachment 06 Request For Quotation (RFQ) and Statement Of Requirements (SOR) FPT.9.01102 FPT.IFP053 7.3.6.2 Prototype Programme 9.01103 FPT.9.01103 7.3.6.3 Product Approval Process 07740 FPT.IFP059 7.4.1.3 Customer Approved Sources 7.5.1.1 Control Plan 7.5.1.7 Feedback of Information from Service 7.5.3 Identification and Traceability 9.01100 FGP-Procedure 01 Attachment 06 Request For Quotation (RFQ) and Statement Of Requirements (SOR) 9.01102 07171 FPT.9.01102 FPT.IFP059 FPT.MAP048 08018 Supply Quality Performance (SQP) 07170 9.01105 9.01106 FPT.IFP057 9.01105 9.01106 7.6.3.2 External Laboratory 07740 FPT.IFP059

Date: 03/02/2011 Revision 02 Page 5 of 10 ISO/TS 16949:2009 8.2.1.1 DESCRIPTION Customer Satisfaction Supplemental 8.2.2.2 Manufacturing Process Audit CUSTOMER-SPECIFICS FGA FPT 08018 Supply Quality Performance (SQP) FGP-Procedure 16 FGP-Procedure 14 FGP-Procedure 15 Layout Inspection and Functional 8.2.4.1 07740 FPT.IFP059 Testing 8.3.4 Customer Waiver 08090 FPT.IFP059 8.5.2.1 Problem Solving 08018 8.5.2.4 Rejected Product Test/Analyses 08018 Supply Quality Performance (SQP) 9.01100 FGA/FPT Customer-Specific Requirements added to ISO/TS16949 1. Customer Representative (Ref. 5.5.2.1) The Organization s Top Management shall individualize in its structure at least one Customer Representative in the Quality Department and/or in the Technical Area. The Representative shall have responsibility and authority to ensure that these Customer requirements are addressed and implemented. 2. Report characteristics related documentation (Ref. 7.2.1.1) Supplier shall draw up a specific documentation related to qualification and/or homologation and to production processes from which it must be evident, moreover, how, by whom and with which results the involved characteristics have been put on trial and approved. This documentation shall be stored by the Supplier for at least 15 years. Supplier shall ensure that checks and inspections can be performed by competent authorities. Remarks: FPT Report Characteristics are identified by PQC-S FGA Report Characteristics are identified by 3. IMDS (Ref. 7.2.1 Point C and Procurement Specific 9.01107) 3.1. FGA The Organization shall upload to the International Material Data System (IMDS), http://www.mdsystem.com, the data related to the chemical composition of its products. The

Date: 03/02/2011 Revision 02 Page 6 of 10 Organization is even responsible for the data uploaded in IMDS related to the products of its own Suppliers. In case of product under development, the data uploading shall be done before the Process Verification (VP). 3.2. FPT The Organization, if requested, shall upload to the International Material Data System (IMDS), http://www.mdsystem.com, the data related to the chemical composition of its products. The Organization is even responsible for the data uploaded to IMDS related to the products of its own Suppliers. In case of product under development, the data uploading shall be done before the Pilot Phase. 4. Special Characteristics (Ref. 7.3.2.3) 4.1. FGA A product characteristic is a potential "Key" characteristic when its variation out of the technical specifications (Non-Conformity) can compromise important aspects of the product itself, such as passenger safety (Report), Law/Legal approval Conformity, external Customer satisfaction, internal Customer satisfaction. The Key characteristics related to the last two type of product aspects shall be pointed out on technical documentation with the symbol. 4.2. FPT A product characteristic is a potential "Key" characteristic when its variation out of the technical specifications (Non-Conformity) can compromise important aspects of the product itself, such as passenger safety (Report), Law/Legal approval Conformity, external Customer satisfaction, internal Customer satisfaction. The Key characteristics related to the last two type of product aspects shall be pointed out on technical documentation with the symbol PQC. Supplier can use its proper symbology for the identification of Key characteristics. However, a correlation table must be established between Supplier and Customer documentary systems and must be quoted on the drawing. Standard FPT.IFP053 must always be considered.

Date: 03/02/2011 Revision 02 Page 7 of 10 5. Periodic layout inspection and functional testing (Ref. ISO/ITS 16949 8.2.4.1). Organization shall plan dimensional inspections and functional tests even if not expressly required by the Customer; this plan shall fulfill as minimum with the following: - Complete Self-Qualification every 2 (two) years (unless otherwise agreed by SQE). - Complete dimensional and material controls once per year. Records shall be available for Customer review and results must be submitted to Customer for revision. 6. Prototype Programme (Ref., 7.3.6.2) Supplier will provide all delivered prototype parts with Certification of Quality and Conformance of Prototypes. 7. Field Management (Ref. 8.5.2.4) On demand, Organization shall actively participate in the Tutorship and Field Management programs, in order to improve the Quality level of the products and to reduce the related warranty costs. 8. Organizations Performance Analysis (Ref. 5.6) and Review Output (Ref. 6.2.2.3) The Organization s Board shall analyze the Customer satisfaction factors monthly; The analysis shall at least include the following: i. Performance indicators available in SQP system (e.g. PPM, IP/E, CSL) ii. Customer validated Action Plan monitoring, due to negative outcome ( 2) of PCPA, 1DP, Program Review. iii. FIAT Customer specific Implementation Plans monitoring. iv. Poor quality cost monitoring (e.g. scraps, reworks, sorts, CSL2 and CSL3 due to internal failures, warranty, penalties, recall campaigns for external failures). Output of management reviews shall include detailed decisions and actions related to problems pointed out by Customer (CSL1, CSL2, PPM, etc.).

Date: 03/02/2011 Revision 02 Page 8 of 10 9. Product approval process (Ref. 7.3.6.3) 9.1. FGA The Organization shall use FGA-like methodologies (07740) for product approval process of its own Suppliers. In case the Organization cannot afford this requirement, the product approval process adopted shall be validated by FGA s SQE. 9.2. FPT The Organization shall use FPT-like methodologies (FPT.IFP059) for product approval process of its own Suppliers. In case the Organization cannot afford this requirement, the product approval process adopted shall be validated by FPT s SQE. Sub-Suppliers with quality system in development that do not fulfill minimum requirements for PPAP completion, must in accordance with the Supplier work out an Action Plan for PPAP implementation. 10. On Job Training (Ref. 6.2.2.3) Procedures shall be used in order to avoid that either contractors or agency personnel are assigned to quality critical jobs. 11. Personnel Safety (Ref. 6.4.1) The Organization, on its own liability, must provide evidence when applicable of suitable fire permission, issued by the competent authority. 12. Incoming Material Quality (Ref. 7.4.3.1) Incoming material inspection and testing if not in free pass are mandatory for all materials and components. 13. Customer Owned Production Tooling (Ref. 7.5.4.1) All the Customer owned tools, specially the ones for the low volume productions, must be subjected to preventive maintenance (see PCPA check list). Special attention must be paid to those tools used for either low volumes or sporadic productions. 14. Supplier Status Special Notifications (, item 8.2.1.1) Supplier will have to inform its own Certification Body within 5 working days in case of notification of Customer special quality issues:

Date: 03/02/2011 Revision 02 Page 9 of 10 - Supplier in NBH ( Business Hold); - Supplier with Controlled Shipment Level 2 and Level 3 (opened). 15. Customer-Specifics clarification Frequently Asked Questions with official FIAT replies will be periodically made public. These FAQs will be part of the FIAT Customer-Specifics. 16. Annexes The following documents shall be considered integral part of FIAT Customer-Specifics. 16.1. Annex 1: Program Review; 16.2. Annex 2: PCPA; 16.3. Annex 3: 1DP One Day Production. 17. Revision History DATE SECTION MODIFICATION October, 2007 All Document 26 th October, 2010 All Added Fiat Powertrain Technologies (FPT) Section A Added FGP-Procedure 13 (Program Review) Added FGP-Procedure 14 (PCPA/PSA) Added FGP-Procedure 15 (1DP) Canceled Procedure 07741 Canceled Procedure 07172 Added FGP-Procedure 16 (CSL/NBH) Section B Added FGP-Procedure 23 (Supplier Selection) Added Procedure 08090 for Change Control Canceled Procedure 07741 Added FGP-Procedure 01 (RFQ and SOR) Added FGP-Procedure 16 (CSL/NBH) Added FGP-Procedure 14 (PCPA) Changed 07740 with 07741 for 8.2.4.1 Added 9.01100 for 8.5.2.4 Par. 2 Par. 3 Added IMDS website Differentiated between FGA and FPT Requirements

Date: 03/02/2011 Revision 02 Page 10 of 10 DATE SECTION MODIFICATION 26 th October, 2010 (continued) 3 rd February, 2011 Par. 4 Par. 5 Par. 6 Par. 7 Par. 8 Par. 9 Par. 10 Par. 11 Par. 12 Par. 13 Par. 14 Par. 15 Par. 16 All Section B Differentiated between FGA and FPT Requirements Added requirements about analysis output Canceled Procedure 07741 Differentiated between FGA and FPT Requirements Modified logos Added point 7.1 of :2009, connected with FGP-Procedure 13 (Program Review) Added FGP-Procedure 15 (1DP) for 8.2.2.2 Checked and Signed by Marco Dalla Vedova FGP Supplier Quality VP