Module 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program

Similar documents
Module 4 Regulatory requirements for Land Disturbing Activities

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages...

Chapter CONSTRUCTION SITE EROSION CONTROL

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

Annual Standards and Specifications. Stormwater Management. Erosion and Sediment Control

LOCATION AND DESIGN DIVISION

SACHSE EROSION CONTROL GUIDELINES

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

CCSD#1 Stormwater Standards

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Before we get to the E&SC

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

Minnesota Pollution Control Agency requires that the City of Brainerd develop written procedures for

Section 3. Plan Submittal/Review Requirements

SUDAS Revision Submittal Form

Annual Standards and Specifications

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

APPENDIX I. Plan Reviewer Checklist

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

3. LAND DISTURBANCE PROJECT PLAN APPROVAL - STORMWATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL PLANS

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Regulatory Requirements

Building Better Storm Water Quality

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

Performance Standards Compliance Checklist

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

D EROSION AND SEDIMENT CONTROL. Table of Contents

PART 3 STORM WATER TECHNICAL MANUAL

Stormwater Pollution Prevention Plan Engineering Department Requirements

Water Resources Management Plan

SITE PLAN Scale 1"= 10'

Virginia Department of Transportation Pollutant Discharge Elimination System

COMMONWEALTH of VIRGINIA

CHAPTER 11 Grading, Erosion and Sediment Control

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

1.2 REGULATORY REQUIREMENTS

Richland County Department of Public Works Engineering (Land Development) Division

Residential Site Soil Erosion and Sedimentation Control Permit Application

Chapter 9.37 Soil Erosion and Dust Control

North Carolina Sedimentation Control Law

York County STORMWATER LUNCH & LEARN

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

SOIL EROSION AND SEDIMENT CONTROL

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

CITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES

EROSION CONTROL AND GRADING PERMIT APPLICATION

CHAPTER 2 DEFINITIONS AND ACRONYMS

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

City of Glendale Stormwater Management Plan Checklist

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

Single Family Residential Construction Erosion/Sediment Control Standards

Erosion Control Inspection Form

WOODFORD COUNTY, ILLINOIS EROSION, SEDIMENT AND STORM WATER CONTROL ORDINANCE

Chapter 21 Stormwater Management Bylaw

Arlington s New Stormwater Management Ordinance. Informational Meeting May 28, 2014

STANDARD PLAN FOR MINOR EARTH DISTURBANCES

Water Quality Regulatory Programs and Our Citywide EPA / DEQ Stormwater Permit. Public Works Engineering City Council Briefing June 7, 2016

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Virginia Stormwater Management Permitting

VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS OFFICE: FAX:

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

LAND DISTURBANCE PERMIT

Landfills And The New Virginia Stormwater Management Program Regulations

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

STORMWATER MANAGEMENT PROGRAM. Table of Contents

CITY OF MILTON CONSTRUCTION NOTES

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

JEFFERSON COUNTY STORM WATER MANAGEMENT

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

LAKE COUNTY STORMWATER MANAGEMENT COMMISSION GENERAL PERMIT NUMBER 3 AUTHORIZING MINOR MAINTENANCE DREDGING ACTIVITIES

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

Residential Construction Minimum Required Inspections

Ordinance No Lot Surface Drainage

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

SINGLE FAMILY RESIDENCE COMMON PLAN of DEVELOPMENT or SALE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) For Construction Activities At:

Small Site Stormwater Quality Permit Application

Erosion & Sedimentation Control Policy

Transcription:

Module 3. Virginia Erosion & Sediment Control Program Module 3a. Statutory and Regulatory Requirements: Virginia Erosion and Sediment Control Law and Regulations As of July 1 2013: A lot of local ESC ordinances are out of date! 1

History of the ESC law and Regulations Since 2010 Integration Bill: 1. Changes to ESC Law 2. Changes to ESC Regulations 3. Changes to ESC Training and Certification Regulations Recodifying and rewording as part of the move: 1. ESC Law (was 10.1-560 576 now 62.1-44.15:51-66) 2. ESC Regulations (was 4VAC50-30 now 9VAC25-840) Erosion and Sediment Control in Virginia Law ( 62.1-44.15:51 through 62.1-44.15:66) Regulations (9VAC25-840-10 through 9VAC25-840-110) Erosion and Sediment Control Importance of Understanding the Law The ESC Law is the legal basis for the ESC program. The Law establishes the rights and responsibilities of: VESCP and the public and private land users who must comply. A good understanding of the Law helps to effectively implement local ESC programs. Unless local officials act within the limits of the law, enforcement actions may become unsuccessful. 2

Know your constraints But don t be afraid Regulated Activities & Overview of the ESC Law The stated intent of the law is for the effective control of soil erosion, sediment deposition, and non-agricultural runoff to prevent the unreasonable degradation of properties, stream channels, waters and other natural resources 3

Definitions (Section 62.1-44.15:51.): VESCP An authority approved by the Board to operate a Virginia Erosion and Sediment Control Program include: a state entity, including the Department; a federal entity; a district, county, city, or town; linear projects subject to annual standards and specifications (electric, natural gas, and telephone utility companies, interstate and intrastate natural gas pipeline companies, railroad companies) The rest of Module 3 Plan Review Administration Establishing a VESCP (3b) Plan Review (3c) Inspection and Enforcement Inspection and (3d) Enforcement Program Review (3e) VESCP VESCP Plan Review Module 3b. Inspection Establishing a Virginia Erosion and Sediment Control Program Program Review MODULE 4b. ESTABLISHING A VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM 4

Role of State Water Control Board and DEQ (62.1-44.15:52) The State Water Control Board Develop a program Adopt Regulations Provide technical assistance Adopt Minimum Standards Conduct periodic compliance reviews DEQ Administer education and training Ensure qualified field inspectors Who needs to adopt a VESCP? Must adopt a VESCP Counties Cities May adopt a VESCP Towns Operate a VESCP through submittal of annual specifications State entities Federal entities Linear projects (44.15:54-A) Note: Currently there are 164 ESC programs Required VESCP Personnel VESCPs are required to have the following certified persons on staff: Detailed in 62.1-44.15:53 Program Administrator Inspector Plan Reviewer Or a combined administrator who may be the same person. 5

Roles and Responsibilities in a VESCP Program Administrator Ensures plan review, approval, inspections, and enforcement are being properly conducted reporting; record keeping; fee collections; and Ordinance updates Roles and Responsibilities in a VESCP Inspector Conducts periodic inspections of active construction sites to ensure proper installation, construction, and function of BMPs and other ESC measures Documentation of inspection Enforcement Roles and Responsibilities in a VESCP Plan Reviewer Reviews ESC plans to ensure they adhere to the VESC Regulations, ESC Handbook, and local ordinance(s) 6

Roles and Responsibilities in a VESCP Combined Administrator who may be the same person Assistance with VESCP responsibilities Detailed in 62.1-44.15:58-B The VESCP is authorized to use an outside entity to assist with the administration, plan review and inspection of land disturbing activities. Authorization for more stringent standards Detailed in 62.1-44.15:65 Local programs may require more stringent standard except in plan review and permitting The more stringent standards need to have a defendable or scientific basis Must go through the public hearing process at the locality 7

Scientific basis for more stringent standards Prevent further degradation to water resources Detailed in Address total maximum daily load requirements 62.1-44.15:65 Protect exceptional state waters Address specific existing water pollution including: 1. Nutrient and sediment loadings 2. Stream channel erosion 3. Depleted groundwater resources 4. Excessive localized flooding within the watershed Civil Penalties Detailed in 62.1-44.15:54-K Local programs are allowed to adopt an ordinance providing for Civil penalties in lieu of criminal sanctions for violations. Civil penalty for any one violation with an approved plan shall be $100 to 1,000 per day, with a max. total of $ 10,000 VESCP Integration Flood Plain Management Stormwater Management 44.15:54-D Chesapeake Bay Preservation Act Flood Insurance Erosion and Sediment Control 8

Reporting to DEQ Listing of all LDA for which the authority has approved an ESC plan Detailed in 62.1-44.15:59 VESCP Authority DEQ On a schedule established by DEQ Annual Standards & Specifications State Agencies (must) Linear Projects (must) Federal Agencies (may) Annual specifications required for: electric telephone companies natural gas pipeline companies railroad companies Wetland Mitigation Banks (may) C. Comply with more stringent local program standards. DEQ 44.15:56 C VESCP Plan Review Module 3c. Plan Review Process Inspection Program Review 9

Approved Plan Required LDA? First 44.15:55-A Approved ESC plan before starting land disturbing activities Evidence of Stormwater Management permit coverage What is an Adequate Plan? Does the plan meet Minimum Standards in the Erosion and Sediment Control Regulations (9VAC25-840-40) Does it meet more stringent requirements of VESCP authority (if applicable) Are all problems of erosion and sedimentation adequately addressed? Approved Plan Timeline Plan Review 60 days 44.15:55-B Provided written comments if inadequate within 45 days Review of resubmitted plan in 45 days 10

Comparison of VSMP & VESCP Plan Approval VSMP Process (9VAC25-870-108) VESCP Process ( 62.1-44.15:55) SWM Plan submitted to Authority ESC Plan submitted to Authority [or agreement inlieuof for SFH] 15 days to determine completeness and notify applicantin writing 45 days to review and providewritten notice with explanation for plans that are not approved 60 days from time of notification toreviewplan and notify applicantin writing 60 days to review and approve plans that are adequate Ifno action taken in timeframe above, SWM plan deemed approved Ifno action taken in timeframe above, ESC plan deemed approved 45 days from date of resubmission to review and respond in writing to previously disapproved plans 45 days to review and respond in writing to plans that were previously disapproved 60 days to reviewand respond in writing to modifications of approved plans Individualresponsible for carrying out LDA must be identified (i.e. RLD) Plan Approval Timeline (RLD) Name of the RLD needs to be provided at time of plan approval 44.15:55-B Option to waive RLD certificate for construction of single-family homes under agreements in lieu of plans Change of Plan? Plan may be changed when: 1. Inspection reveals inadequacies 2. Change in circumstances 44.15:55-C (But all changes need to be consistent with the law, regulations and specifications) 11

Variance Procedure Regulations Detailed in 9VAC25-840-50 Request At time of plan submittal During construction when field conditions/situations changes Must be done in writing Cannot be done solely for economic reasons (i.e. too expensive) Review 10 days After 10 days, it is automatically denied Review must be judicious Additional Approved Plan Requirements (A) Provides option for submittal of multijurisdiction projects (can be done by the Department) (F) Allows local programs to require plan approval for lands identified as Erosion Impact Area. (G) Identifies the land owner as responsible for plan submittal & approval. 44.15:55-A, F & G Additional Approved Plan Requirements 44.15:57 Requires an approved plan before issuance of permits for land disturbing activities Coverage under the VPDES Construction General Permit for Stormwater required (after July 1, 2014) Provides option to require bonds or surety Requires return of unused bonds or surety within 60 days of adequate stabilization 12

VESCP Plan Review Module 3d. Inspection and Enforcement Inspection Program Review Inspections 44.15:58 Requires inspections of land disturbing activities by program authority. Every two weeks or within 48 hours of a runoff producing rainfall event During or after installation of perimeter controls At the end of the project Regulations Detailed in 9VAC25-840-60 Inspections 13

Alternative Inspection Program Regulations Detailed in VS Approved by the Board Established in writing Based on a system of minimum priorities that address: the amount of disturbed project area, site conditions, and stage of construction Documented by Right of entry Provides the right of entry by the Department or VESCP of any property for the inspection and enforcement. 44.15:60 41 Monitoring Reports 44.15:58 Authority may require monitoring reports from the the person responsible for the project (RLD). 14

Potential Violation Overview A. Notice to Comply procedure 44.15:58-A & C C. Stop Work Order procedure o After notice to comply, unlesso LDA without an approved plan o Imminent danger o Length of time Stop Work is in effect Allows for other enforcement action to commence... Alleged Violation No Approved Plan Inspection Report Notice to Comply Stop work Order Imminent Danger Appealing a Stop Work Order The owner may appeal the issuance of a stop work order to the circuit court 44.15:58 15

Stop Work Order By Board Allows property owners to request state intervention Allows Board to pursue Stop Work Order Aggrieved property owner gives written notice to VESCP & DEQ Director DEQ investigates complaint If VESCP authority response does not stop alleged violation after 30 days, property owner may ask DEQ for stop work order DEQ gives written notice to VESCP authority of intention to issue stop work order 44.15:64 If VESCP authority does not stop violation within 10 days of notice, DEQ may issue a stop work order after a hearing Judicial Appeals 44.15:62 Final decisions of local and state program authorities to be judicially appealed Penalties, injunctions, and other legal actions 44.15:63 Violators shall be guilty of a Class 1 misdemeanor Outlines procedure for administration of civil penalties 16

Injunctive Process Detailed in 62.1-44.15: 63-C Affected Property Owner Designated Land Owner, VESCP Authority, DEQ Circuit Court Write letter No response in 15 days? Civil Penalties Civil Penalties Behavior Assessing penalty Penalty Violated, failed, neglected or refused to obey any of the following: VESCL Regulations or order of the Board Local VESCP authority order, notice or requirement DEQ order, notice or requirement Permit Court may assess a civil penalty of $2,000/day for each violation. Subsection K of 62.1-44.15:53. Penalties assessed by court paid into treasury of localitywhere project located. Iflocalityor its agent is the violator, penalties paid into state treasury VESCP Plan Review Module 3e. Inspection DEQ Compliance Review of a VESCP Program Review 17

Local ESC Programs Detailed in 62.1-44.15:54-C VESCP Part C - Local programs shall be approved by the Board Local ESC Programs If a compliance review by the Board reveals that the program is inconsistent: The Board shall establish a schedule for the VESCP authority to come in compliance. The Board may impose civil penalties, revoke program approval, or take legal action. Detailed in 62.1-44.15:54-F Local ESC Programs DEQ conducts compliance review of VESCP Deficiencies found DEQ corrective action plan with schedule to Board Detailed in 62.1-44.15:54 Board authorized to: VESCP authority fails to implement action plan in specified timeframe VESCP authority should implement action plan in specified timeframe Revoke approval of VESCP Take legal action Issue special order and civil penalty With Board approval, locality s district adopts regulations and administers VESCP Board finds VESCP provisional and DEQ assists with program administration until program comes into compliance 18

Local ESC Programs Part H allows provisional operation of the VESCP Detailed in 62.1-44.15:54-H Module 3f. Minimum Standards 1-18 MS-1 (Site stabilization) Not at Final Grade Stabilize in 14 days Temporary seeding + Mulch Mulch Permanent stabilization if dormant > 1 year At Final Grade Stabilize in 7 days Permanent or Temporary Seeding + Mulch Mulch 19

MS-2 (Topsoil stockpiles) Soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures Applies to on and off-site stockpiles and borrow areas MS-3 (Final stabilization) A permanent vegetative cover shall be established on areas not otherwise stabilized Permanent vegetation shall not be considered established until it is uniform, mature enough to survive and will inhibit erosion MS-4 (Perimeter controls) Sediment basins, traps, dikes and sediment barriers intended to trap sediment shall be installed as a first step measure They must be made functional before up-slope disturbance takes place 20

MS-5 (Earthen structures) Stabilization measures shall be applied to earthen structures immediately after installation MS-6 (Traps and basins) Sediment traps and sediment basins shall be designed and constructed based on the total drainage area served by the trap or basin Sediment Trap < 3 acres Sediment Basin 3 acres MS-6 (Traps and basins) 21

MS-10 (Inlet protection) All storm sewer inlets made operational during construction shall be protected so that sediment laden water cannot enter without first being filtered or treated to remove sediment MS-11 (Outlet protection) Before newly constructed stormwater channels or pipes are made operational, adequate outlet protection, and any temporary or permanent channel lining shall be installed MS-12 (Work in live watercourse) When working in a live watercourse, precautions shall be made to minimize encroachment Non-erodible materials shall be used Earthen fill may be used if armored by nonerodible materials 22

MS-13 ( Temp. Stream crossings) When a live watercourse must be crossed by construction vehicles more than twice in a six month period, a temporary stream crossing shall be provided MS-14 (Other applicable regulations) All applicable federal, state and local regulations pertaining to working in watercourses shall be met MS-15 (Stream bank stabilization) The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is complete 23

MS-16 (Underground utility lines) Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: No more than 500 feet of open trench at one time Excavated material shall be placed on the up-hill side of the trench MS-16 (Underground utility lines) Effluent from de-watering shall be filtered or passed through an approved sediment trapping device Material used for backfilling shall be compacted to minimize erosion Re-stabilization shall be accomplished in accordance with these regulations Applicable safety regulations shall be complied with MS-17 (Construction entrance) Where construction vehicle access routes intersect public or paved roads, provisions shall be made to minimize transport of sediment onto the paved surface 24

MS-17 (Construction entrance) When sediment is deposited on the road surface, it shall be removed by: Shoveling & sweeping Then disposal Street washing is only done after shoveling and sweeping Applies to single family dwelling lots! MS-18 (End of project) All temporary erosion and sediment control measures shall be removed within 30 days of final stabilization or when no longer needed What about MS-19? The VSMP Law and Regulations regulate LDA 1 acre The ESC Law and Regulations regulate LDA 10,000 square feet (or stricter; i.e. CBPA=2,500 sf) MS-19 regulates post construction stormwater discharge MS-19 is still applicable for areas 10,000 square feet and < 1 acre But MS-19 was changed by the consolidation bill 25

Changes to MS-19 as a result of the Consolidation Bill Sections: Introduction Natural Channel Design l m Refer to Stormwater Law and Regulations n MS-19 Protection of downstream properties and waterways from: Sediment Deposition Erosion & damage due to... MS-19 increases in: Volume Velocity Volume X Velocity = Energy Peak Flow Rate of a stated frequency storm of 24 hour duration 26

MS-19 (Introduction) Stream Restoration and Relocation Projects! Those that use natural channel design are not man-made channels and are exempt from any flow rate capacity and velocity requirements for natural or man-made channels: MS-19 (l) (l.) For projects approved before July 1, 2014, if you can meet the energy balance equation in the stormwater regulations you satisfy MS-19 Energy balance equation (40VAC5060-65) Qpost I.F. x (Qpre x RVpre)/RVpost or (Qpost x RVpost) I.F. x (Qpre x RVpre) Where Qpre =Pre-development peak flow rate (cfs) RVpre = Pre-development runoff volume (in.) Qpost = Post-development peak flow rate (cfs) RVpost = Post development runoff volume (in.) I.F. = Improvement factor (0.8 for sites>1 acre, 0.9 for sites < 1 acre 27

MS-19 (m & n) (m.) Projects approved after July 1, 2014, must comply with the Virginia Stormwater Management Act including the Grandfathering provisions. (n.) Meeting the requirements of the Virginia Stormwater Management Act satisfies MS-19. 28