Available online at ScienceDirect. Procedia Engineering 145 (2016 )

Similar documents
Available online at ScienceDirect. Procedia Engineering 145 (2016 )

Available online at ScienceDirect. Procedia Engineering 85 (2014 )

Case Study of Smart Meter and In-home Display for Residential Behavior Change in Shanghai, China

Attachment 8 Statement of Work (SOW)

Covering Advanced Construction Management Topics with Diverse Student Body

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS

Available online at ScienceDirect. Procedia Engineering 145 (2016 )

Available online at ScienceDirect. Energy Procedia 96 (2016 ) 94 99

Available online at ScienceDirect. Procedia Engineering 145 (2016 ) Identifying and measuring project complexity

Available online at ScienceDirect. Procedia Engineering 145 (2016 )

Available online at ScienceDirect. Energy Procedia 61 (2014 )

Available online at ScienceDirect. Procedia Engineering 121 (2015 )

Available online at ScienceDirect. Procedia Engineering 121 (2015 )

Available online at ScienceDirect. Procedia Engineering 100 (2015 )

Available online at ScienceDirect. Procedia Engineering 153 (2016 )

Energy performance certificate classifications across shifting frameworks Brøgger, Morten; Wittchen, Kim Bjarne

Available online at ScienceDirect. Energy Procedia 91 (2016 )

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

Available online at ScienceDirect. Procedia Engineering 121 (2015 )

Available online at ScienceDirect. Procedia Engineering 121 (2015 )

Available online at ScienceDirect. Procedia Computer Science 61 (2015 )

BIM Checklist. Introduction

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Available online at ScienceDirect. Energy Procedia 70 (2015 )

Pete Fowler CONSTRUCTION Services, Inc. Introduction to Construction Cost Estimating

Available online at ScienceDirect. Procedia Engineering 171 (2017 ) 33 39

Available online at ScienceDirect. Procedia Engineering 161 (2016 )

Enterprise Architecture Migration Planning Using the Matrix of Change

Available online at ScienceDirect. Procedia Engineering 121 (2015 )

Available online at ScienceDirect. Procedia Engineering 81 (2014 )

Available online at ScienceDirect. Energy Procedia 78 (2015 )

A Comparison of SAE ARP 4754A and ARP 4754

ScienceDirect. Material-Technological Modelling of C45 Steel Die Forgings

Effective Strategy for Solving Voluntary Turnover Problem among Employees

Available online at ScienceDirect. Procedia Engineering 145 (2016 )

Available online at ScienceDirect. Energy Procedia 70 (2015 )

Florida Cleanroom Systems

Facility Basics for Bond Project Communications

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

THE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

- DATA REQUIREMENTS BIM

Diffusion of motor systems energy efficiency measures: an empirical study within Italian manufacturing SMEs

Section I - Introduction

ScienceDirect. Numerical model of a district water distribution system in Bucharest. A.-M. Georgescu a, *, S. Perju a, S.-C. Georgescu b, A.

Analysis of the effect of artificial lighting on heating and cooling energy in commercial buildings

Construction Family of Documents

Available online at ScienceDirect. Procedia Engineering 118 (2015 )

Available online at ScienceDirect. Procedia Engineering 121 (2015 )

Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017

Multi-Family Housing Program Directors, Coordinators, Specialists, State Architects and Engineers

Design-Build Data Sourcebook

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

INTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE

LIFE OF A CAPITAL PROJECT

Available online at ScienceDirect. Procedia Engineering 135 (2016 )

Engaging Code Officials Early in the Process to Achieve High-Performance Buildings

Available online at ScienceDirect. Procedia Engineering 121 (2015 )

Procedia - Social and Behavioral Sciences 110 ( 2014 ) Contemporary Issues in Business, Management and Education 2013

Feasibility Study of Songao s Low Carbon Town Planning, China

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY

Procedia - Social and Behavioral Sciences 219 ( 2016 )

Available online at ScienceDirect. Energy Procedia 92 (2016 )

ScienceDirect. Network analysis of water distribution system in rural areas using EPANET

A PERFORMANCE STUDY OF PROJECT SUSTAINABILITY: REDUCING CONSTRUCTION WASTE THROUGH BIM

BIM Execution Plan. Copyright 2009 Rights Reserved - The Trustees of Indiana University and SHP

Available online at ScienceDirect. Procedia Engineering 118 (2015 )

1.0 ABOUT THE NU GUIDELINES

San Antonio Water System Standard Specifications for Construction

Feasibility study of CO2 free hydrogen chain utilizing Australian brown coal linked with CCS

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

Performance measurement models: an analysis for measuring innovation processes performance

Experimental Performance Analyses of a Heat Recovery System for Mechanical Ventilation in Buildings

Construction Documents Education Program

Chapter 1, Introduction

Thoughts on Managing Site Visits

Chapter 4 State Requirements for Educational Facilities Section 4.1

Construction Industry Integrated Delivery System Interest Indicator Questionnaire

Software Safety Testing Based on STPA

Optimizing the Configuration of a Compact Thermal Facade Module for Solar Renovation Concept in Buildings

Procedia - Social and Behavioral Sciences 138 ( 2014 ) Discussions on the Local Rail Transit System in the Urbanization

Available online at ScienceDirect. Energy Procedia 78 (2015 )

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

Available online at ScienceDirect. Procedia Economics and Finance 31 ( 2015 )

Approach of using Corn Residue as Alternative Energy Source for Power Production: A Case Study of the Northern Plain Area of Thailand

FACTION CONSTRUCTION

Available online at ScienceDirect. Procedia Engineering 111 (2015 )

Residence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning

Cook Islands: 100% renewable energy in different guises

Available online at ScienceDirect. Procedia Engineering 150 (2016 )

Developing leadership skills in Norwegian military officers: Leadership proficiencies contributing to character development and officer competency

Available online at ScienceDirect. Procedia Engineering 146 (2016 ) 60 68

PLANNING AND EVALUATION PRELIMINARY DESIGN

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Educational Use Only S A M P L E S A M P L E

Optimum sizing of residential cogeneration for prefeasibility estimations. An analytical approach

Available online at ScienceDirect. Procedia Engineering 125 (2015 )

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY GROUND STORAGE. Section GROUND STORAGE TANK (GST) MODIFICATIONS, CLEANING AND DISINFECTION

ScienceDirect. High Efficiency Cogeneration: Electricity from cogeneration in CHP Plants

Transcription:

Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 145 (2016 ) 158 163 International Conference on Sustainable Design, Engineering and Construction Integrating Research Findings into Sustainable Building Delivery Teaching Suat Gunhan a * a The University of Texas at San Antonio, 501 West Cesar Chavez Boulevard, San Antonio, TX, 78207 Abstract Construction management is a practice oriented field and its course content needs to include many elements from practice. Many new developments take place, new technologies emerge and the necessity of redefining working dynamics among project stakeholders necessitates construction educators to constantly evaluate and reorganize the scope of courses. This situation justifies the necessity of bringing research findings into classroom. The paper exemplifies how research findings are brought into a major construction course. Project Management course at the University of Texas at San Antonio covers broad range of topics such as fundamental concepts of management and roles in the construction industry, project delivery and contract methods, detailed analysis and administration of different phases of a construction project. The demand for sustainable projects is growing. Its delivery method requires lots of input from wide range of experts. So far, there is no set or accepted method for sustainable building project delivery. During the coverage of project delivery methods, the instructor brings the characteristics of a sustainable projects. The comparative analysis is made between conventional and sustainable projects. The phases of sustainable projects include many additional elements and early involvement of defined tasks from phases of conventional projects. A recent research study accomplished by the author highlights the differentiating aspects of conventional projects from sustainable projects. The findings obtained from a research that is conducted with the major national firms will be incorporated to future lectures. The research has explored the sustainable delivery practices of the major national construction firms. They will be used as a case study to complement the theoretical part of the lecture. The impact on students learning will be identified. Students appreciate and value the knowledge brought outside the textbook especially if the research is original and accomplished by the course instructor. The approach can be taken as an example for various topics which are recent to AEC industry. Keywords: Sustainability, buildings, delivery methods, pre-construction, construction, post-construction, design-build, CM at risk. * Corresponding author. Tel.: +1-210-458-3181; fax: +1-210-458-3091. E-mail address: suat.gunhan@utsa.edu 1877-7058 2016 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer-review under responsibility of the organizing committee of ICSDEC 2016 doi:10.1016/j.proeng.2016.04.037

Suat Gunhan / Procedia Engineering 145 (2016 ) 158 163 159 1. Introduction Construction management is a practice oriented field and its course content needs to include many elements from practice. Many new developments take place, new technologies emerge and the necessity of redefining working dynamics among project stakeholders necessitates construction educators to constantly evaluate and reorganize the scope of courses. This situation justifies the necessity of bringing research findings into classroom. The paper exemplifies a good example of a research that is conducted on sustainable building delivery process and its future coverage in the classroom. The demand for sustainable projects is growing. It is slowly becoming an architecture-engineering-construction (AEC) industry standard. It requires lots of input from a variety of experts. So far, there is no set or accepted method for sustainable building project delivery. During the coverage of project delivery methods, Construction management at risk (CMR) and Design-Build (DB) are presented as the two possible delivery methods that can be used in sustainable projects. The majority of the top green building contractors in the United States are experienced in CMR and DB delivery methods [1]. These methods are well recognized with their processes which allow collaboration among stakeholders. However, the study by Korkmaz et al. [2] also revealed that design-bid-build (DBB) is used in green office-building projects delivery. Nomenclature A radius of B position of C further nomenclature continues down the page inside the text box 2. The Theoretical Content of the Sustainable Project Delivery Lecture The theoretical of the course introduces students to DBB, DB, CMR, and construction management agency (CMA). In addition, project chronology and scope of each phase is covered during the lecture. The scope of each phase is revisited for sustainable projects as well. The content is covered in the form of a comparative analysis between conventional and sustainable building delivery scopes. The differences in sustainable project delivery can be attributed to the additional tasks in different phases of the project. The scope and tasks in each project phase from a detailed design phase to post-construction phase is compared. The following paragraphs describe the theoretical course content that is currently covered for conventional building project process. The design phase of a building project is composed of four distinct sub-phases which are in order programming, schematic design, design development and construction documents [3]. Programming is the written statement of the requirements of the building, and it is the basis of design. It describes the spaces needed, defines the relationships of the functions to be performed in the building and it necessitates extensive involvement of the user. It is followed by the schematic design stage which is the preliminary phase of the design. Site investigations are accomplished in this stage. Decision is made on foundation types, alternate design are discussed, and conceptual estimates are prepared. Owners usually make go/no go decision for the project. The design is refined and the detailed information is obtained during the design development phase. Major building systems are finalized such as structural, mechanical, electrical, plumbing (MEP), elevator and exterior façade. Real costs are obtained. The final phase of design is the

160 Suat Gunhan / Procedia Engineering 145 ( 2016 ) 158 163 construction documents where final working documents are obtained. These documents are used to bid the job for construction as well as build the job in the field. The procurement phase is the overall process of finding and purchasing the materials called for in the contract and hiring the best subcontractors to build the project. The construction phase is about managing and coordinating the field operations. Scheduling the crews in the proper sequence, choosing the most efficient and safe construction techniques and methods. Construction phase is conducted with appropriate administration methods to control changes to scope of the project, accounting for payments, financial control, maintaining work schedules, keeping track of all contract documentation and monitoring quality control tasks. The startup includes testing of piping, ductwork, and machinery both individually and as a total system. Training for owner s employees is provided by general contractor. As-builts are submitted to the owner at this phase. Turnover is a legal process during which the building becomes the legal property and responsibility of the owner. Turnover involves obtaining various legal certifications, such as the certificate of occupancy and the certificate of substantial completion. Many documents pass back and forth among the parties. Insurance certificates, inspection reports, completed change orders, types of waivers that protect all the parties. Finally, the last phase is the post-construction phase in which obviously the owners have the sole responsibility. Operating costs are significantly greater than the construction costs. Planning ahead for this phase is required. Especially the economic analysis needs to be accomplished to find out life expectancy of the facility, the design/build costs, the operating costs, and the cost of capital. When it comes to sustainable building projects design phase, the lecture informs the students about the additional tasks, such as the increased level of communication among stakeholders. These tasks also include analysis of renewable sources and sustainable technologies, and early start for commissioning planning in schematic design phase. Life cycle cost analysis and continuing commissioning planning in design development; finalizing life cycle cost, final constructability analysis, and detailed commissioning planning are provided in construction documents stage. Even though building information modeling (BIM) is also used in conventional building delivery, its integration to sustainable buildings process is necessary to manage relatively more complex scope due to integration of more technical specialties such as managing energy modeling applications and renewable energy technologies. The major differentiation of construction phase comes from documentation requirements. More specialty items are added to submittal process. Obviously this situation makes the scheduling of sustainable projects more challenging. The additional scope may include renewable energy technologies and their commissioning. Facilities management is gaining more popularity in the industry since post-construction phase (useful life) of a building is the largest responsible phase for energy use [4], [5]. Designing sustainable buildings with more sophisticated equipment to reduce the energy consumption can provide more involvement for contractors in postconstruction phase [6], [7]. Contractors who provide facilities management services are more innovative than their counterparts who do not provide facilities management services [8]. Adding facilities management to their services does not only expand the scope of work, but also sophistication of construction companies in all areas. The same findings indicated that the companies with facilities management services employees have higher level of education.

Suat Gunhan / Procedia Engineering 145 (2016 ) 158 163 161 3. The Practical Content to Cover in the Classroom After the theoretical content is covered, results of recent research study by the author will be incorporated. The study has explored the sustainable building delivery practices from the national construction companies perspective. The Table 1 compares the theoretical content covered during the lecture with the findings obtained from the research. This is how the research findings from practice will be brought into teaching. The findings from the research is very recent and they will be part of the lecture. Most topics from design to post-construction phases are parallel to what has been said during the coverage of the theoretical content. The additional or differentiating findings from research are as follows: The findings indicate that there is minimal difference in timing of constructability and value engineering. However the theoretical content suggests that these services are provided much earlier. The theoretical content suggests that contractors may provide energy modeling and simulation applications. However, according to research findings contractors are not leading among other project participants in providing energy modeling and simulation applications. The same is true when it comes to providing life cycle assessment services. The research findings regarding the Construction phase indicate that the integration of renewable technologies add more activities to scheduling, and consequently the coordination efforts increase. This is followed by more documentation, such as more submittals to process. More efforts are also required during the final phase of construction stage since more specialty equipment may be involved in the project. The theoretical content of the sustainable building delivery highlights the importance and potential of facilities management field in sustainable projects. The findings of the research indicate that the area is premature for contractors. A few construction firms provide facilities management services.

162 Suat Gunhan / Procedia Engineering 145 ( 2016 ) 158 163 Table 1. Comparison of Theoretical and Practical (Research Findings) Contents for Sustainable Projects Theoretical Content (Project Tasks Differing in Sustainable Building Projects) Design Phase CMR and DB mostly preferred Increased level of communication Start for commissioning planning earlier Timing and content of constructability analysis and value engineering is earlier and intense MEP/Specialty contractors timing and involvement BIM is an efficient technology use Contractors may provide energy modeling applications Contractors may be expected to provide life cycle assessment Construction Phase Management and coordination of the field operations Scheduling of crews in proper sequence Apply appropriate construction administration methods Conduct start-up and testing Findings from Research (Project Tasks Differing in Sustainable Building Projects) Design Phase Used methods are CMR and DB More intense, additional level of early communication among stakeholders is required Much earlier start for commissioning planning Minimal difference in timing of constructability and value engineering Timing is much earlier and involvement is more extensive with MEP contractors Majority of contractors use BIM Contractors are not major providers of energy modeling and simulation applications Some contractors provide life cycle assessment Construction Phase Integration of renewable technologies. Sustainable materials Added activities for coordination More documentation, especially submittals to process Added equipment for commissioning Post-Construction Phase Contractors may provide facilities management services Post-Construction Phase Contractors may provide facilities management services 4. Conclusions Construction management is a practice oriented field. It is crucial to bring practical content into its core courses. In addition, bringing the practical content based on research findings can enhance students learning experience. The case study exemplifies how the sustainable building project delivery topic can be brought into classroom with the integration of research findings. The findings obtained from the research which is conducted with the major national firms will be incorporated to next semester s lecture, and the impact on students learning will be identified. The approach can be taken as an example for various topics which are recent to AEC industry.

Suat Gunhan / Procedia Engineering 145 (2016 ) 158 163 163 References [1] Tulacz, G. J., The Top Green Contractors, Engineering News Record, August 11/18, 85-90, 2014 [2] Korkmaz, S., Riley, D., and Horman, M., Piloting Evaluation Metrics for Sustainable High-Performance Building Project Delivery, Journal of Construction Engineering and Management, ASCE, 136(8), 877-885, 2010. [3] Gould, F. E. and Joyce, N. E. (2014). Construction Project Management, Prentice Hall, OH. [4] Junnila, S., Horvath, A., & Guggemos, A. A. (2006). Life-cycle assessment of office buildings in Europe and the United States. Journal of Infrastructure Systems, 12(1), 10-17. [5] Scheuer, C., Keoleian, G. A., & Reppe, P. (2003). Life cycle energy and environmental performance of a new university building: modeling challenges and design implications. Energy and buildings, 35(10), 1049-1064. [6] Bröchner, J. (2003). Integrated development of facilities design and services. Journal of Performance of Constructed Facilities, 17(1), 19-23. [7] Glover, N., Corne, D., Liu, K., & Clements-Croome, D. (2004). Information technology, communications and artificial intelligence in intelligent buildings. Intelligent Buildings: Design Management and Operation. [8] Bröchner, J. (2008). Construction contractors integrating into facilities management. Facilities, 26(1/2), 6-15.