EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)

Similar documents
Post-tensioned Structures Solutions for Repair and Protection

Evaluation and Repair of Existing Post- Tensioned Buildings with Paper Wrapped Tendons Experiencing Corrosion Damage

The Assessment of Concrete Structures affected by Steel Corrosion

CSU GUIDELINES. April 27, 2018 FOR POST-TENSIONED CONCRETE STRUCTURES.

1. Cast-in-place concrete is specified in Section

Evaluation and Repair of Post-Tensioned Concrete

SUNSHINE SKYWAY BRIDGE

NDT in Grouted PT Inspection for Bridges

Evaluation of Corrosion Damage in Unbonded Post-Tensioned Concrete Structures:

Rak Production Technology of Concrete Structures (2015) Concrete Reinforcement

Concrete Design Guide

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

Florida DOT efforts toward improving Post Tension Durability

POST TENSIONED SLABS. Imagineering the possibilities

Stone and Masonry Veneer

ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Post-tensioned Concrete Design PT Installation Guidance

Included in our report are our visual observations, recommendations for follow-up evaluation, and conceptual repair recommendations.

Technical Notes. Mandatory Barrier Cable Inspection Requirements

In Association with. DSE PROJECTS - Lebanon

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

Concrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout

Construction Management Study

Natural Sweater Village Ltd

EXECUTIVE DEPARTMENT OFFICE OF GENERAL SERVICES DESIGN AND CONSTRUCTION GROUP - DIVISION OF DESIGN PROFESSIONAL CONSULTATION REPORT

GUIDELINES FOR EXECUTION OF ADAPT-PT 1

1. CORROSION OF REINFORCEMENT

SPECIAL SPECIFICATION 4492 Tie Back Anchors

Atkinson Engineering, Inc.

Table of Contents. List of Drawings

Green Street Parking Garage East and West End Study City of Ithaca, New York

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung

STRUCTURAL PRECAST CONCRETE

SMITHFIELD-LIBERTY HELIX RAMP REHABILITATION

Corrosion Evaluation of Post-Tensioned Tendons on Mid-Bay Bridge

Barrier Cable Systems, Inc.

Pro-Con Structural Study of Alternate Floor Systems

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician?

HARVEY MUDD COLLEGE TEACHING AND LEARNING CENTER SECTION Page 1 of 6 VOIDED CONCRETE SLAB

Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844)

Table of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5

GLULAM BEAM REPAIR/REINFORCEMENT TINORA HIGH SCHOOL DEFIANCE, OHIO

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

November 30, University of Virginia Facilities Management Engineering & Design Division P.O. Box Charlottesville, VA

The assessment is based on the following fire test from SINTEF NBL as.:

Intermountain Section AWWA Conference - 2.0MG Layton Water Tank. Jake O Brien

***************************************************************************************************************

ASSESSMENT, REPAIR AND MONITORING OF THE GENTILLY-1 CONCRETE CONTAINMENT STRUCTURE

Commercial Structures

Extreme Loading for Structures Version 3.1

Technical Assignment 1 10/8/03

***************************************************************************************************************

EXECUTIVE SUMMARY POST-TENSIONING TENDON PROTECTION STRATEGIES FOR PRECAST ELEMENTS

Mr. Eric Ryffel, Manager October 5, 2015 Sanibel Beach Club 626 Nerita Street Sanibel Island, Florida 33957

East Lyme Middle School EAST LYME MIDDLE SCHOOL

Post-Tech PTI Impregnation System. Corrosion Protection System for Bonded Post-Tension Tendons

CONCRETE TECHNOLOGY CORPORATION

SUMMARY SHEETS OF INTEGRAL CONNECTIONS

B. Related work in other Sections related to Post-tensioned Concrete include: 1. Section Structural Testing Laboratory Services.

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60

GIRDER DESIGN FOR BUILDINGS

S T R U C T U R. Structural Failures. magazine

Stay-Cable Replacement Design

Concrete Parking Garage Degradation

Deflection Analysis with Shoring Load Transfer Coefficient for Post-Tensioned Slab

Hickam Air Force Base Headquarters

Topic Outline. Two Stage Analysis Procedure: Podium Design. Part 2: Rigid Lower Portion Philip Miller, S.E. 2/8/2018

Surface Repair Using Form-and- Pour Techniques

US-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer

WJE ENGINEERS SPECIALIZED POST-TENSIONING ASSESSMENT AND REPAIR. Western Bridge Engineers Seminar. September 10, :30 AM

Post-Tensioned Concrete in Buildings

DISTRESS PHENOMENA OFTEN MISTAKEN FOR FOUNDATION MOVEMENT

ACI MANUAL OF CONCRETE PRACTICE-2009

ADAPT PT7 TUTORIAL FOR BEAM FRAME 1

Corrosion Evaluation of Prestressed Piles in Refit Wharf #3

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures

STRENGTH EVALUATION OF A CRACKED SLAB REINFORCED WITH GROUTED TENDONS 1

Guidelines for the Design of Post-Tensioned Floors

Investigation for the Removal of Steel Tie Rods in a Historic Segmental Arch Floor

Effect of Grout Filling Condition on Corrosion of Prestressing Steel in Existing Prestressed Concrete Bridges

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

3. INSPECTION FINDINGS

THE NEW ACI STANDARD SPECIFICATION FOR UNBONDED TENDONS

An Introductory Study on Void Detection Inside Internal Polymeric Post-Tension Ducts Using Ground Penetrating Radar

Structural Option April 7 th, 2010

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

POST-TENSIONED SLABS SPECIALISED ENGINEERED SOLUTIONS FOR STRUCTURES.

CONCRETE TECHNOLOGY CORPORATION

A MEDLEY OF PRECAST AND PRESTRESSED CONCRETE SYSTEMS

North Mountain IMS Medical Office Building

Plan Check No. Checked by: An Appointment Is Required for Verification

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing.

DISTRESS PHENOMENA OFTEN MISTAKENLY ATTRIBUTED TO FOUNDATION MOVEMENT

Elevated Slab Sequence

TECHNICAL SPECIFICATION

CHAPTER 8. Concrete Work

Major Building and Special Structures

Transcription:

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 1 of 23

The following presentation discusses the review, evaluation and repair of a corrosion damaged post-tensioned roof lift slab. The process used may be applicable to many similar structures that are in service today throughout the country. The subject structure is a three story post-tensioned lift slab residential structure along the Central Coast of California. The 8 thick slabs were lifted in two sections (approximate section area of 5000 sq. ft). Built in or around 1960, the roof slab due to its location and a combination of poor detailing, lack of proper maintenance and old technology suffered serious corrosion deterioration to significant portion of its prestressing steel. (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 2 of 23

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 3 of 23

1. Visual Inspection and Site Assessment 2. Review of As Built Structural Plans 3. Destructive and Non-Destructive Testing to allow Inspection of Post-Tensioning Wires, Mild Reinforcement, Anchorages, Embeds, Etc 4. Structural Analysis and determination of possible Repair Options: a. Evaluation of Original Capacity b. Evaluation of Existing Capacity c. Determination as to the Need of Repair d. Review of possible repair options e. Analyze roof slab with the different retrofit options 5. Execution of Chosen Repair Method 6. Durability Considerations (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 4 of 23

1. Visual Inspection and Site Assessment: a. Scan the site for spalled or excessively cracked concrete b. Document locations of visibly broken tendons c. Inspect tendons live and dead ends locations d. Document locations of apparent rust / corrosion e. Review slab to column connections It is worth stating that in this case, the extent of spalled concrete at the slab to column connections, prompted the engineer to require that shoring be installed at all locations with apparent damage. Further investigation was needed to assess the damage and determine the appropriate action. Patched Area at Slab Collar (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 5 of 23

Spalled Concrete at a Broken Tendon near a Column (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 6 of 23

Broken wire Tendon exposed Upon Removal of Roofing Material Broken Tendon due to severe corrosion (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 7 of 23

2. Review of As Built Structural Drawings Often times, as-built plans for privately owned buildings are not well kept and finding structural information can prove to be a difficult task. In this case, a partial set of structural drawings for a twin building was located. Though certain connections were done differently based on the actual field conditions (slab collars to column connections in this case), useful information was obtained from these documents: a. Material properties for concrete, mild reinforcement and prestressing b. Member sizes and reinforcement cover c. Reinforcement size and quantities d. Post-tensioning system used e. Post-tensioning forces and profiles This information was vital in assessing available capacities and the extent of structure retrofit work. In their absence, a tremendous amount of destructive and non-destructive testing would be required to develop a sense of the slab capacity. (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 8 of 23

3. Destructive and non-destructive Testing to allow inspection of Post-Tensioning wires, mild reinforcement, anchorages, and slab collar to column connections: Even though the as-built plans are helpful in providing the conditions of the building at the time of construction completion, destructive testing is essential in determining the condition of the embedded items within the concrete at the time of the investigation. Rust stains, spalling of concrete are the symptoms and exposing these various elements can expose the root of the problem and its extent. As the investigative engineer, it is our responsibility to develop a comprehensive testing plan that provide the necessary information to provide an opinion upon which an owner and his contractor can determine the feasibility of structure repair or replacement. Depending on the evidence of corrosion, sufficient number of tendons need to be exposed and examined at high points, and possibly low points as well near their anchorages. In the case of the roof slab herein, every tendon was exposed at one of their high points. Additionally, the anchorages at the tendons dead and live ends were exposed at several spots. Furthermore, all accessible slab collar to column connections were exposed at the slab soffit with some at the slab surface as well to ensure that the connection was not undermined by corrosive action of the salt water. Furthermore non destructive testing of the welds was performed (Magnetic particle imaging). This is important as the failure of these connections would be catastrophic. The result of the testing showed that the slab column connections were not impaired. However, due to the use of a continuous 8 wide pour strip at the tendons stressing ends, and pour water proofing conditions, extensive damage was observed near the tendons live ends and along the tendons near the slab surface (high points). The investigation showed that for the 202 tendons in the roof slab, there were 15 broken tendons, 64 corroded tendons and 123 rusted tendons (no significant pitting). (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 9 of 23

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 10 of 23

Exposed Slab / column connection (slab soffit) Exposed Slab / column connection (roof slab surface) (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 11 of 23

Pitted Wire Tendon Another example of Pitted Wire Tendon (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 12 of 23

Exposed Anchor at Dead End (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 13 of 23

Severely Corroded Anchor Plate Completely Corroded ¼ wires at Live End of Tendon (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 14 of 23

Exposed Tendons at High Point of Profile (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 15 of 23

Preparation for lift off of a Wire Tendon (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 16 of 23

(C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 17 of 23

4. Structural Analysis and selection of retrofit scheme: The structural analysis of the existing roof slab involved four stages: a. Determine required reinforcement based on self weight and code prescribed live load slab. Also, compute service stresses and deflection assuming all PT tendons are fully effective (to establish the available level of redundancy). b. Determine the present load carrying capacity based on the loss of the broken and the severely corroded tendons (based on all testing and investigation results). Determine need of repair and its extent c. Review of possible repair options d. Analyze roof slab with the different retrofit options a. Determine required reinforcement based on self weight and code prescribed live load slab. This step is performed early prior to completion of the bulk of investigation of visual inspection but subsequent to the execution of visual inspection. It is important as it serves as a clear indication of the redundancy of the slab (specifically in lean designs where little redundancy is available). As lift slabs are designed for construction loads and the stresses they are subjected to during the lifting operation, the analysis, in this case showed that for the load (floor dead load and code live load), the concrete experienced no tension stresses for all practical considerations. This in turn allowed the engineer more options in the retrofit schemes. b. Determine the present load carrying capacity based on the loss of the broken and the severely corroded tendons (based on all testing and investigation results). The investigation showed that a significant portion of the tendons were corroded or broken (more than one third of the total). This portion of the analysis showed that the residual slab reinforcement, with the damaged tendons considered ineffective, is not adequate to support the roof dead and live load and that the slab needs to be repaired. (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 18 of 23

c. Review of possible repair options. Three repair options were considered. The first two options considered a long term solution to the corrosion issue. These options addressed the fact that all the tendons had incurred some damage (since the investigation did not look at the entire length of every tendon). Option one involves the introduction of a network of upturned beams to carry the roof slab and it called for a portion (to be determined by analysis) of the existing tendons to be replaced with 0.6 diameter strands. The second option called for all existing wire tendons to be replaced with 0.6 diameter strand tendons. The third option considered the immediate need for repair and called for all the broken or severely damaged tendons to be replaced using 0.6 diameter strand. d. Analyze roof slab with the different retrofit options The analysis of the roof slab using newly placed network of upturned beams showed that 25% of the existing tendons need to be replaced using 0.6 diameter strand tendons. With this option, the loss of all remaining wire tendons would have no impact on the capacity of the retrofitted roof system to carry its service loads. The analysis of the roof slab considering the replacement of all wire tendons with strand tendons did not yield positive results and led to the withdrawal of this option. The analysis of the roof slab considering the replacement of approximately 80 wire tendons (effective force of 46.4 kips) with 0.6 strand tendon (effective force of 40 kips) showed that the repaired slab met the code strength requirement for the roof service loads. (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 19 of 23

5. Execution of chosen repair method: With option one and three to choose from, the owner opted to deal with their immediate needs and decided to repair the broken or severely corroded tendons. Since those tendons requiring replacement were spread out throughout the structure, the work was performed with little inconvenience to the residents. Tendons replacement was sequenced as to eliminate shoring of the slab. Tendons anchorage areas were chipped out and removed allowing access to remove the existing wires. The void was then pumped full with grease. Bare 0.6 diameter strands were further greased and pulled through the existing void. New encapsulated anchorages were applied in the field. High strength grout was poured behind the anchorages and the tendons were stressed and anchored. New 0.6 diameter Strand Tendon at Live End (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 20 of 23

New 0.6 diam. Strand Tendon with Encapsulated Anchor at Live End (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 21 of 23

New 0.6 diameter Strand Tendon at Dead End (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 22 of 23

6. Durability considerations: It is interesting to note that the removed wire strands exhibited corrosion damage for portion that were closest to the top of the concrete (high points). Also, due to the type of roof water proofing moisture appeared to cause serious corrosion damage at the cold joint between the main roof slab and the stressing pockets of the wire strands (no grease was observed to be left at these locations). Additional concrete top cover and proper detailing of water proofing at the cold joint as well as periodic maintenance of the roof membrane could very likely prevented much of the corrosion damage observed. (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 23 of 23