Requirement for installing Data Loggers in Mobile Cranes

Similar documents
Part 2: Mobile cranes

Presentation Outline Latest Requirements on Safe Lifting Operations. Presentation Outline

Implementing Data Logger Systems for Mobile Cranes-Its Purpose, Benefits and Specifications

Load Handling (Hoisting) Policy

FEDERATION EUROPEENNE DE LA MANUTENTION Product Group Cranes and Lifting Equipment

Load Handling (Hoisting) Policy

Self-Erecting Tower Cranes

Guideline No.: G-01(201510) G-01 CRANES. Issued date: October 20,2015. China Classification Society

ADMINISTRATIVE BULLETIN

MOUNT RAINIER CHAPTER FEDERAL SAFETY AND HEALTH COUNCIL

Part 3: Cranes Vocabulary. Tower cranes

ISO INTERNATIONAL STANDARD. Cranes Limiting and indicating devices Part 4: Jib cranes

Dr. Ahmed Hussien Elyamany 2017 Questions

Cranes and Derricks in Construction OSHA Narrative on Articulating/Knuckle-Boom Truck Cranes

Subj: WEIGHT HANDLING EQUIPMENT THIRD PARTY CERTIFICATIONS; PREPARATION FOR

Collision avoidance systems their benefits and potential for development. ITC Berlin 5 Nov Rémi DEPORTE

Self-Erecting Tower Cranes. September 2017 Draft Revisions

Approved Code of Practice for Cranes

REQUEST FOR QUOTATION

Presentation Handouts

Liebherr Group of Companies 4. Liebherr Tower Cranes 7. Product range 9

Crane Certification FAQs

Raising Standards of Crane Safety A Collaborative Approach

CURRICULUM DEVELOPMENT ADVISORY. Lifting Supervisor Safety Course (LSSC)

CURRICULUM DEVELOPMENT ADVISORY. Lifting Supervisor Safety Course (LSSC)

Cranes and Derricks Standard Summary. April, 2010

RECOMMANDATIONS TO MAINTAIN TOWER CRANES IN SAFE CONDITIONS

OSHA Issues Comprehensive Cranes and Derricks in Construction Rule

Presentation Overview. Background. Coast Crane Company Background. Coast Crane Company TOWER CRANE INSPECTIONS

Crane & Derrick Operation Procedures for Construction

COMPENDIUM OF TYPICAL HAZARDS ASSOCIATED WITH CLADDING WORKS AND THEIR CONTROL MEASURES IN THE CONSTRUCTION INDUSTRY CLADDING WORKS

Legal Summary SHE-037 Handbook of Business Operation in Thailand s Industrial Estate Version 2

Flammable & Hazardous Substances

Below-the-Hook Lifting Devices

Tower Cranes LN

SAFEGUARDING OF WORKERS (CRANES AND LIFTING APPLIANCES) (JERSEY) REGULATIONS 1978

TLILIC3008A Licence to operate a slewing mobile crane (up to 20 tonnes)

National Occupational Standards Development Pack for Plant Operations (Construction)

At Chimes Crane Hire, we are committed to the safety of our clients and to the reduction of risk factors that may occur during our operations.

Lifting Appliances of Ships and Offshore Installations

A clever solution for wind turbine installation and maintenance

WSH Guidelines Safeguarding Against Falling Objects

Effective Date: 10-January Table of Contents

Mobile Elevating Work Platforms

The following is Queen's Printer for Ontario, Occupational Health and Safety Act - R.R.O. 1990, Reg. 851

1 Equipment and lifting solutions Verification of Competency Cranes & Rigging V2.0 Oct-2105

START. Your Safety and Work. A guide to help small- and medium-sized enterprises get started on workplace safety and health

The need for defining safety standard in the tower crane industry: A look at product standards and beyond. Dr. Peter Schiefer, CEO

Smart Crane Features for Intelligent Bulk Handling

(Construction) Level 2 NVQ Diploma in Plant Operations (Cranes and Specialist Lifting) Level 2 NVQ Diploma in Plant Operations (Extracting)

Regulatory Perspective on Chemical Management in Singapore

Management Processes for Tower Crane Selection and Support Design

Ontario ENGINEERING STANDARD SPECIFICATION 1/9 REV. CIVIL LIFTING LIFTING DEVICES - REQUIREMENTS. Approved by. Revision by. Issue Date YYYY/MM/DD

On-site Assessment (OSA) Contents

Managing Workplace Health Hazards Strategies & Approaches

Crane 101. An introduction to mobile cranes by Anthony Crane USA

No Brief Description of Project Year


Mobile cranes Experimental determination of crane performance. Part 2: Structural competence under static loading

James E. Thompson, Inc. dba JTS Construction

NATIONAL COMPETENCY STANDARD

ISO INTERNATIONAL STANDARD. Mobile elevating work platforms Design, calculations, safety requirements and test methods

Cranes and hoists Selection of wire ropes, drums and sheaves

Contents. Technical Test Learning. Crawler Crane Tower Crane

TO THE OPERATING ENGINEERS - CRANE RENTAL. between. Alberta Crane Owners' Association. and

Apprenticeship and Industry Training

ADVANCED SYSTEMS THAT PAY OFF SMART CRANE FEATURES

Presentation Title. OSHA Cranes & Derricks Subpart CC. October 1, Presenter Name Presenter Title Event Name

THE NEW CRANE STANDARD

Elevating Work Platform Operators Safety And Maintenance

Apply for Working at Heights Permit

Range of services offered for tower cranes.

ALO (Any line open) Knowledge Briefing OTPS LNE&EM

Section Subparts T. Cleveland State University Work Zone Safety and Efficiency Transportation Center. Demolition

5000 SERIES BUILDING MAINTENANCE UNITS SPECIALIST BUILDING ACCESS SOLUTIONS

Crane and Lifting Tier 1 Best Practice Page 1 of 26

Document Revision Change Table Revision Number

Construction Safety Audit Scoring System (ConSASS) Audit Checklist

View thousands of Crane Specifications on FreeCraneSpecs.com AC USt capacity class All Terrain Crane Datasheet imperial AC 500-2

ALO Planning & Assurance Requirements. RRV Safety Improvement Programme

AC USt capacity class All Terrain Crane Datasheet imperial AC 500-2

Cskills Awards L6 NVQ Diploma in Controlling Lifting Operations - Planning Lifts (Construction) QUA893

ASSEMBLY / DISASSEMBLY POWER LINES POWER LINES. Identify Work Zone. Work Zone

SUBMISSION TO THE VICTORIAN WORKCOVER AUTHORITY BY THE CIVIL CONTRACTORS FEDERATION (VICTORIA)

Crane Operator Qualification

Apply for Crane Permit

CURRICULUM DEVELOPMENT ADVISORY

FRIDAY, NOVEMBER 21, WORKPLACE SAFETY AND HEALTH (APPROVED CODES OF PRACTICE) NOTIFICATION 2014

Peter Juhren Corporate Service Manager Morrow Equipment Co. L.L.C. Salem, OR USA. What s New in Tower Crane Standards?

Crane Facts. Associated Training Services, Corp.

Presentation Title. OSHA Cranes & Derricks Subpart CC. Washington Metropolitan Area Construction Safety Association.

AKC CRANE RANGE FOLDABLE KNUCKLE AND TELESCOPIC BOOM TYPE

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY

CANDIDATE HANDBOOK. Boom Truck Operator

LEARNER GUIDE. Telescopic Materials Handler (TMH) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

TOWER CRANE OPERATOR

Workplace Safety and Health Guidelines Contractor Management

Cranes & Derricks in Construction. AIHA/ASSE September 17, 2010

Reporting High Risk Defects

Lifting Operation Safety

Transcription:

Requirement for installing Data Loggers in Mobile Cranes A Great Workforce A Great Workplace Ian Teh Yi Tian Engineering Safety Branch OSH Specialists Department Occupational Safety and Health Division, MOM

Scope of Presentation a Data Logger Benefits c Implementation Plan e Data Logger Requirement f g d Co-funding scheme (for existing cranes) Application process for co-funding

Benefits Records key operational parameters Allow retrieval of data to review and monitor the lifting operations. Take proactive intervention programme to prevent any unsafe operations Aid in the investigations of crane-related incidents

Implementation Plan Effective date of implementation: All mobile cranes registered with MOM on or after 1 August 2015 will have to be equipped with data loggers; and All existing mobile cranes registered before 1 August 2015, will be required to be retrofitted with data loggers by 1 August 2018.

Requirements Examples of types of mobile cranes required to be installed with DLs 601- Mobile Crane - Truck Mounted Variable Boom Length Type 602- Mobile Crane - Truck Mounted Fixed Boom Length Type 611- Mobile Crane - Crawler Mounted Variable Boom Length Type 612- Mobile Crane - Crawler Mounted Fixed Boom Length Type 621- Mobile Crane - Wheel Mounted (w/o prime mover) Variable Boom Length Type 622- Mobile Crane - Wheel Mounted (w/o prime mover) Fixed Boom Length Type 651- Mobile Tower Crane (Horizontal Boom) 652- Mobile Tower Crane (Luffing Boom) Note: 1. This classification refers to MOM s classification codes for lifting machines 2. Lifting machines under the above classification codes that does not require the installation of a load radius indicator (LRI) will be exempted from the data logger requirements The diagrams/figures are reproduce from Annex A of SS 536 : 2008 with the permission of SPRING Singapore. Singapore Standards are available from the Singapore Standards eshop

Requirements 1. The data logger must be able to perform functions and record operational parameters specified in the following paragraphs. 2. Requirement on Data Logger Functions The table below summarises the functions that have to be performed by the data logger. S/N Specific Features of Data Loggers 1 Detect and record any override key activation for the cranes safety devices (i.e. over-derricking limiter, over-hoisting limiter and rated capacity limiter) 2 Detect and record overloading occurrences (i.e. when load reaches and exceeds 100% of the cranes rated capacity) 3 Equip with data security and anti-tampering feature 4 Download recorded data 5 Generates reports

Requirements 3. Requirement on Operational Parameters to be Recorded The table below summarises the operational parameters that must be recorded by the data logger. S/N Recorded Parameters by the Data Loggers 1 Date and Time 2 Crane configuration 3 Permitted load, actual load, percentage of usage of rated capacity (for main hook and auxiliary hook) 4 Radius of load 5 Slew angle (applicableto cranes with safe working load that varies according to its slewing angle) 6 Main boom angle, fly jib angle (if applicable) 7 Boom length,fly jib length (if applicable) 8 Sequence of extension (for telescopic cranes) 9 Status of limit switches 10 Status of override key activation (for over-derricking limiter, over-hoisting limiter and rated capacity limiter)

Requirements 4. Other requirements i. The data logger must be automatically switched on and operational whenever the mobile crane is in operation. ii. The data logger must be synchronised with the mobile crane as an integrated system without safety implications, undue limitations and or restrictions to the crane operation. iii. Data from the data logger shall be downloadable by interested parties, such as crane owners or occupiers, on a regular basis. The report generated shall be in a readable format that is easily comprehensible.

Co-Funding Scheme for Existing Mobile Cranes Funding Assistance to support existing fleet of MC WSH Council will launch a co-funding scheme which will cover 50% of the cost of installation up to $5,000 for each registered crane. The funding will be available from 3 August 2015 on a first-come-first serve basis and it will cease on the 31 July 2018 or when the funds have been fully disbursed.

Co-Funding Scheme for Existing Mobile Cranes Eligibility Criteria Mobile Crane is registered with MOM before 1 Aug 2015; Has more than 5 years of remaining lifespan; Installed with a Data Loggers listed on WSH Council website Listed as one of the following mobile crane types (601, 602, 611, 612, 621, 622, 651 and 652). Design safe working load (Maximum Capacity) Maximum allowable years of service from the year of manufacturing 50 tons and below 20 Above 50 Tons but not more than 100 Tons 25 100 Tons and above 30

Co-Funding Manufactures Scheme role for Existing Mobile Cranes Crane Owner s role MOM Crane Owners Crane Manufacturer Authorised Examiner WSHC Crane manufacturers/ DL vendors can apply with MOM to conduct an assessment for the data loggers to be eligible for funding Engages crane manufacturer/ DL vendor to install eligible DL on the existing Mobile Cranes Manufacturer/ DL vendor proceeds to install DL on crane AE inspects crane to verify that DL installed is according to MOMs requirements Crane owners can make the fund application on WSHC website. If the application is in order, funds will be disbursed up to 50% or $5000 per crane whichever is lesser

Co-Funding Scheme for Existing Mobile Cranes Requirement for Approval (For Crane Manufacturers/ DL Vendors) 1. Crane Manufacturers/ DL vendors can make an application for the approval by submitting the below listed documents in a CD format to OSHD Documents to be submitted (in CD format): a A completed application form b Operational manual for the data logger c Sample report generated from the data logger 2. Upon receipt of the completed application, an inspector from OSHD may request for a demonstration of the functionality of thedataloggertobecarriedout. 3. Once the Ministry is satisfied with the assessment, a letter of successful application will be issued by the Department. The list of approved data loggers will be published on the WSH Councils website.

THANK YOU