CERCLA & Clean Water Act Overlapping Authorities & Cross-Program Implementation

Similar documents
Focusing the Right Regulatory Approaches on Surface Water Source Control at Sediment Sites using Portland Harbor as case study

Portland Harbor in the Post-ROD World Integrating In-Water & Upland Remedies and Permitted Discharges --Legal Structure and Tools

CERCLA, CWA and State Law: Complexities With Overlapping Authorities

August Report

Portland Harbor Superfund Site - Introduction

Newtown Creek Superfund Site Point Sources Sampling CAG Meeting March 22, 2016

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN

KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM

IMPLEMENTING OREGON S HUMAN HEALTH WATER QUALITY CRITERIA

State of Oregon Department of Environmental Quality

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

Overview of Chapter 21

Legal Context for Green Infrastructure Under the Clean Water Act

Lower Duwamish Waterway Source Control Strategy

Contaminant Loading to Marine Sediment Stormwater Inputs to Sediments in Esquimalt Harbour, CFB Esquimalt

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL.

Stormwater Management Regulation & Implementation Overview

Floating Plants & Boxes of Dirt The Future of Stormwater Treatment

FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office

CERCLA & Clean Water Act Coordination Strategies: Sediment Remediation, Stormwater Management and Water Quality Permitting

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

McCormick and Baxter Superfund Site Long-Term Performance Monitoring

WHY Opportunity? Intro to Precast Product Opportunities in Stormwater Management. REGULATORS: It s the LAW! It s the LAW! It s the LAW!

Effectiveness of Non-Structural Measures in Watershed Restoration

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

EPA Briefing March 2012 Enforcement Briefing. Gowanus Canal Superfund Site Brooklyn, NY

Chapter 21 Stormwater Management Bylaw

Section Treatment of Sewage and Stormwater

Federal and State Regulation of Stormwater Discharges From Construction Sites

Urban Geology Spring 2011

What Does It All Mean? CWA? Sara Esposito, P.E. DNREC Division of Watershed Stewardship

The Purpose and Scope of this Guidance

East Tacoma PCB Investigation Results & Next Steps

1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL

Comprehensive Modeling of Dredge Resuspension and Residual Effects of Remedial Alternatives: Portland Harbor Feasibility Study

c. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit:

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

Federal Storm Water Requirements

City of Tacoma Surface Water Management Manual

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

APPENDIX E: TOOL FOR EVALUATING STORMWATER DATA. Section 1 Basis for Using the Charts as a Screening Tool

Stormwater Management Plan Best Management Practices

Recent Changes in Phase II MS4 Permitting

Integrated Planning for Meeting Clean Water Act Requirements

Storm Water Management Pollution and Treatment

Stormwater Management at Municipal Solid Waste Landfills

IDDE From the Regulatory Perspective. Chris Kallis IEPA

Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015

Stormwater Runoff & Pesticides What Monitoring Done Elsewhere May Suggest for South Portland

Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit

MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT

Innovative Storm Water Program Implementation

Use of the PCB CSL to determine boundary is not protective

State of Oregon Department of Environmental Quality

NPDES Waste Discharge Permit Evaluation Report Industrial Stormwater General Permit No A

Fact Sheet. Chesapeake Bay Water Quality

Developing Water Quality Monitoring Programs for Agricultural Runoff/Discharges in the Central Valley of California

INTRODUCTION AND BACKGROUND

June 27, 2012 Holly Galavotti U.S. EPA

Policy Resolution Water Quality in the West A. BACKGROUND

FACT SHEET And NPDES WASTEWATER DISCHARGE PERMIT EVALUATION

PORTLAND HARBOR SUPERFUND CLEANUP MOVING FORWARD TO A RESPONSIBLE, COLLABORATIVE SOLUTION

Regional Stormwater Program 2013 Stormwater Management Plan

Permitting strategy for addressing mercury in municipal and industrial wastewater permits

Annual Stormwater Pollution Prevention Training

Clean Water Act Methods Update Overview of Proposed CWA Method Update Rule and Other Method Activities. NEMC July 2015 Adrian Hanley, U.S.

BIOLOGICAL TREATMENT of RUNOFF. Sarah A. White, Ph.D. 27 July 2017

Release Reporting Requirements. Stoel Rives LLP

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018

SUDAS Revision Submittal Form

Duwamish River Cleanup Coalition

Recommended Best Management Practices Nutrients (Includes Phosphorus, Nitrogen, & Ammonia)

Environmental Cleanup in Oregon

MS4 Permits. Understanding MS4 Permits (Municipal Separate Storm Sewer System) P508-17

Post-Development Stormwater Runoff Performance Standards

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

ALMY POND TMDL MANAGEMENT PLAN

Stormwater Pollution Prevention Training

MODEL STORMWATER MANAGEMENT GUIDELINES FOR ULTRA-URBAN REDEVELOPMENT

APPENDIX G. Applicable or Relevant and Appropriate Requirements (ARARs) Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area

Nebraska Department of Environmental Quality

Whitewater River Region SWMP Appendix L

City of Grand Junction Illicit Discharge Detection and Elimination Manual

Mike Mitchell U.S. EPA Region 4

The California Industrial Permit and the Solid Waste Industry Laura Carpenter and Sean Porter Brown and Caldwell San Diego, CA

City of Dallas Contractor/Vendor/Consultant,

The Use of Best Management Practices (BMPs) as Industrial Local Pretreatment Limits

Stormwater Data Characterization Results from Phase I Monitoring

BUREAU OF WATERSHED MANAGEMENT PROGRAM GUIDANCE. Feed Storage Area Runoff Controls for CAFOs X/X/2016. EGAD Number: 3800-XXXX-XX

Photo Optional. Using a PMP Approach to Attain TMDLs (An update to the PMP Approach to PCB Loading Reduction at Two Amtrak Facilities) Presented by:

Septic System Impacts on Stormwater and Impaired Waterbodies. December 8, 2016 Tim Denison, Johnson Engineering Marcy Frick, Tetra Tech

City of Dallas Contractor/Vendor/Consultant,

Remedial Program Status Updates GE Plant Sites in Hudson Falls and Fort Edward. Hudson River Community Advisory Group June 27, 2013

8/18/2014. Presentation Outline. Abbreviations and Acronyms. A Comparison of Stormwater Management Practices in US and Australian Cities

Part 2.0 Non-Numeric Effluent Limitations

MAINE STORMWATER CONFERENCE. October 24, 2017

OHIO S NPDES STORMWATER GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES OHC Justin Reinhart, PE Division of Surface Water

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group.

Weldcraft Boatyard Clean-up and Redevelopment Project

Transcription:

CERCLA & Clean Water Act Overlapping Authorities & Cross-Program Implementation Joan Snyder Stoel Rives LLP 900 SW Fifth Avenue, Suite 2600 Portland, OR 97204-1268 (503) 294-9657 jpsnyder@stoel.com

Potential Sources of Recontamination that Need To Be Controlled Upstream/tributary contamination Contaminated Suspended solids Dissolved contaminants Overland transport/ sheet flow Riverbank erosion Groundwater

Potential Sources of Recontamination that Need To Be Controlled Overwater Activities Stormwater discharge Wastewater discharge Atmospheric deposition

Steps to Control Identify source Determine Remedial Action Objectives In-water Possibly also point of compliance Evaluate and choose remedy Legally require remedy Monitor Re-assess

Importance of Source Control Fresh Contamination Taints Superfund Foss Waterway The News Tribune - Tacoma, Wash. * Oct 15, 2006 Recent laboratory tests of bottom-dwelling critters exposed to [Thea Foss] Waterway sediment confirm it has been recontaminated. The problem is excess phthalates, or plasticizers, which enter the waterway through Tacoma's storm drain system, said EPA, city officials and others.... Portland-based PacifiCorp and two other utilities spent $8.5 million to clean up that part of the Superfund project. The rest of the Foss cleanup - costing more than $90 million - was coordinated by city officials.

Sources Typically Subject to CERCLA/State Cleanup Law Remedies Riverbank erosion Groundwater Overland transport/sheet flow To extent can remediate upland source areas Overwater activities (after fact/cleanup)

Sources NOT Typically Subject to CERCLA/State Cleanup Law Remedies Upstream/tributary contamination Can be coordinated as part of another site Permitted NPDES wastewater discharges Permitted NPDES stormwater discharges Atmospheric deposition

Federally Permitted Release CERCLA 107(j): Exemption Recovery by any person (including the United States or any State or Indian tribe) for response costs or damages resulting from a federally permitted release shall be pursuant to existing law in lieu of this section.

Federally Permitted Release CERCLA 101(10): Exemption The term federally permitted release means (A) discharges in compliance with a [NPDES permit], [or] (B) discharges resulting from circumstances identified and reviewed and made part of the public record with respect to a [NPDES permit] and subject to a condition of such permit, [or] (C) continuous or anticipated intermittent discharges from a point source, identified in a [NPDES permit] or permit application, which are caused by events occurring within the scope of relevant operating or treatment systems...

Oregon Permitted Releases Exemption ORS 465.405(2) In adopting rules under this section, the commission shall exclude from the list and inventory... (c) Releases specifically authorized by and in compliance with a current and legally enforceable permit issued by the Department of Environmental Quality or the United States Environmental Protection Agency..

Oregon Permitted Releases Conditional Exemption OAR 340-122-030 (2) Conditional Exemption of Permitted Releases. These rules do not apply to permitted or authorized releases of hazardous substances, unless the Director determines that application of these rules might be necessary in order to protect public health, safety or welfare, or the environment. These rules may be applied to the deposition, accumulation, or migration resulting from otherwise permitted or authorized releases.

Can Cleanup Be Imposed on Top of NPDES Permits? Are Those Permits Currently Protective of Health, Safety, Welfare & the Environment? OAR 340-045-0080(1): A permittee in compliance with a [NPDES permit] during its term is considered to be in compliance for purposes of enforcement, with Sections 301, 302, 306, 307, 318, 403, and 405(a)-(b) of the federal Clean Water Act (CWA) and ORS 468B.030, 468B.035, and 468B.048, and implementing rules, applicable to effluent limitations, including effluent limitations based upon water quality basin standards, and treatment systems operation requirements.

CERCLA/State Cleanup Law and CWA As Legal Tools for Source Control CERCLA /State cleanup NPDES Riverbank erosion Groundwater Overland transport/sheet flow Overwater Activities X X Partial (to extent of upland cleanups) (After fact) (Stormwater authority for docks)

CERCLA/State Cleanup Law and CWA As Legal Tools for Source Control CERCLA /State cleanup NPDES Wastewater discharge? (state) X Stormwater Partial X (but currently not all discharges covered)

CERCLA/State Cleanup Law and CWA As Legal Tools for Source Control CERCLA /State cleanup NPDES Upstream/tributary Partial Partial Atmospheric deposition

Focusing on Stormwater...

Tools that Won t Work.. CERCLA alone Federally permitted release exemption State permitted release conditional exemption Vast number of small sources that need to be controlled

Tools that Won t Work.. Souped Up 1200Z permit new 1200Z permit requires quarterly monitoring for benchmark parameters Assume expand to whole Portland Harbor parameter list (TSS, TOC, Metals, phthalate esters, chlorinated herbicides, organochlorine pesticides, selected SVOC, PAHs, PCBs) at meaningful detection limits Cost per water analysis = $2200 $1340 for analysis $860 for sampling and QA/QC Not including any report preparation

Tools that Won t Work.. Quarterly water sampling for the 76 existing 1200Z permits in Portland Harbor Study Area = $0.7M per year If for ½ presumed 300 outfalls in Study Area = $1.3M per year on water sampling alone

Think Outside the Box...

Thinking Outside the Box... Joan Snyder Stoel Rives LLP 900 SW Fifth Avenue, Suite 2600 Portland, OR 97204-1268 (503) 294-9657 jpsnyder@stoel.com 22

Thinking outside the box... New NPDES Stormwater Permits Tiered Bmp/SWPCC based Focused on risk-driving contaminants With monitoring only for higher-tier sources Possibly sub-tiered» TSS» Site specific contaminants E.g. Michigan Stormwater permit approach 23

Thinking outside the box... Incentives for Green Building and Green Infrastructure Reducing amount of stormwater or reducing surge Infiltration (downspout disconnect, eco-roofs, permeable pavers, etc.) Collection (CSO tunnel, wetlands (e.g., purchasing conservation easements for existing wetlands; building constructed wetlands), retention tanks) Re-use (e.g. rainwater harvesting for irrigation and gray water applications) 24

Thinking outside the box... Stormwater Trading Nationwide, being considered for nutrients, TSS, 25 temperature, oxygen demand Usually TMDL driven, but TMDLs currently limited to mercury and dioxin for Mainstem Willamette Willamette Partnership developing in Oregon initially focused on temperature Suitable for TSS Could be suitable for some chronic risk exposures within habitat/risk areas EPA policy would allow consideration of bioaccumulative compounds in pilot project

Thinking outside the box... Educational Outreach 26