DESIGNING FOR MANDATORY TREE PROTECTION DURING CONSTRUC TION

Similar documents
TENANT DRAWINGS FOR SANTA MONICA REMODEL 1244 THIRD STREET PROMENADE SANTA MONICA, CA 90401

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

Tree Protection Policy

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

TOWN OF ATHERTON. Tree Preservation Guidelines. Standards and Specifications

Re: Arborist Report for 200 Dundas St. East, Toronto (WARD 27)

7. A saucer of soil shall be formed so that water is directed down through the roots or root ball rather than around the root ball.

TREE PRESERVATION AND PROTECTION SPECIFICATION FOR CONSTRUCTION NEAR TREES

DUKE UNIVERSITY DESIGN GUIDELINES

UNIVERSITY OF CENTRAL FLORIDA SECTION TEMPORARY TREE AND PLANT PROTECTION

Standing Permit for Repair by Utility Providers

Avoiding Tree Damage During Construction

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

TREE PROTECTION (no.) CODE 990

SECTION TREE & PLANTING PROTECTION

ISA Certified Arborist PN-6545A PO Box ISA Tree Risk Assessment Qualified Lake Forest Park, WA WA. Business #

TREE PERMIT APPLICATION Private Property- Section MBMC COMMUNITY DEVELOPMENT DEPARTMENT

B. The purpose of the meeting shall be to establish the conditions of all existing trees upon receipt of the Project site by the Contractor. Failure t

#2 Report replaces report #1 Revised plans received March 25, 2009 Report completed April 15, 2009

Oak Tree Permit Number PL Review 4895 Las Virgenes Road, Calabasas, California

TREE REMOVAL PERMIT NARRATIVE OR 213: I-205 REDLAND ROAD OVERCROSSING PROJECT

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

Arborist Report & Tree Preservation Plan. 231 Cobourg Street Ottawa, ON K1N 8J2

TREE AND LARGE SHRUB REPORT Golden Gate Park Soccer Fields

TREE PROTECTION/PRESERVATION POLICY

Tree Protection & Preservation

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

EBAY SOUTH CAMPUS MAIN STREET MULTI-PURPOSE BUILDING PROJECT

PERMITTING AND CONSTRUCTION MANUAL

TREE RETENTION AND PROTECTION SPECIFICATIONS

TREE CONSERVATION REPORT

Date: 3/27/12 Time: 1:20 p.m. Date of Last Inspection: 2/23/12 Weather: cloudy, 60 s

Village of Glen Ellyn TREE PRESERVATION GUIDELINES

#2 this report revises and replaces report #1 Revised plans received March 15, 2012 Report completed March 26, 2012

STATEMENT OF OFFICIAL ACTION

PRESERVING + PROTECTING VEGETATION DURING CONSTRUCTION

Street Tree Replacement Specifications and Homeowner Initiated Replacement Process

Muhlenberg College Tree Plan

DOCUMENT ADDENDA AND MODIFICATIONS

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

URBAN FOREST TECHNICAL MANUAL

ISA Certified Arborist PN-6545A PO Box ISA Tree Risk Assessment Qualified Lake Forest Park, WA WA. Business #

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

SECTION TRENCHING & BACKFILLING

PUBLIC WORKS DEPARTMENT GENERAL NOTES

Understanding & Protecting Trees During Municipal Construction Projects

Main Campus Urban Forest and Landscape Management Policy

City of Decatur Tree Canopy Conservation Ordinance Administrative Standards May 19, 2014

Morgan Hill Tree Service Moki Smith 9440 Trailblazer Way Gilroy, CA /

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Published (Revised )

Tree Assessment. Juliana Way Moss Beach CA. Prepared for: Verde Design 2455 The Alameda Suite 200 Santa Clara CA 95050

Sidewalk Regulations. Table of Contents

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS


Rick Moe and Craig Rowell March 15th, 2010 PO Box 3710 Revised August 16th, 2010 Santa Cruz, Ca Reviewed January 27 th, 2016.

Sections:

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Urban Design Manual 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY. Definitions. Air Photo: Standards General Vegetation Overview:

SIDEWALKS ASSESSMENT PROJECT TOWN OF MOUNTAIN VIEW, COLORADO

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

University of Maryland - College Park Tree Management Plan 2017

TITLE 2 BOARDS AND COMMISSIONS, ETC. CHAPTER 1 TREE BOARD

Attention To/ Contact Phone . Project Name: LDP # **To be completed by applicant**

SECTION 1500 REMOVALS

Municipality of Waterville Public Sidewalk Repair Policy

TREE CONSERVATION REPORT

Air-Excavation Procedure

Tree Inventory, Valuation and Construction Guidelines 885 El Camino Real & th Street/ Central Park San Mateo, CA

Discussion Demolition of the existing structure is nearly complete. Excavation and shoring will occur between May and August 2012.

SAN MARINO PLANNING AND BUILDING DEPARTMENT Submittal Checklist for PRIVATE TREE REMOVAL REQUEST

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

Community Tree Planting and Establishment Guidelines

Arborist Report. Attachment Buena Vista Avenue Walnut Creek, CA Y PREPARED FOR Larson Shores 1940 Union Street #22 Oakland, CA

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

Site Plan Review -Tree Felling Application Supplement

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

Richard Johnson & Associates, Vista Canyon Project Off Site Oak Tree Report, City of Santa Clarita (February 2010)

SUBCHAPTER TREE PRESERVATION AND PROTECTION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

404 Daly Avenue Tree Conservation Report

Construction Specification for General Excavation

(as amended) Adopted September 5, 2006 Reprint May 2011 BEACH LAND CODE SITE DEVELOPMENT FERNANDINA DESIGN REQUIR CHAPTER. Ordinance EMENTS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

ARTICLE II. TREE PRESERVATION. Sec Intent.

CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS

Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit. Design and Construction Guidelines

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

SECTION B PART 5 TREE PLANTING AND PROTECTION GUIDELINES (TPP)

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

Submittal Checklist for PRIVATE TREE REMOVAL REQUEST

Portland State University. Campus Tree Care Plan

ATTACHMENT 8 STIPULATED UNIT PRICES

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

CHAPTER 3 EXCAVATIONS

SECTION EXCAVATION AND FILL

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

TREE RETENTION, RELOCATION AND REPLACEMENT GUIDELINES

Transcription:

DESIGNING FOR MANDATORY TREE PROTECTION DURING CONSTRUC TION City of Santa Monica Community Maintenance Department Public Landscape Division 2600 Ocean Park Blvd. Santa Moni ca, CA 90405 (310) 458-8974

DESIGNING FOR MANDATORY TREE PROTECTION DURING CONST RUCTION 1. What is tree protection & why is it necessary? Construction activities can cause irreparable damage to adjacent street trees and it is important that they be protected to insure the longevity of Santa Monica s Community Forest. This is why architects need to consider how a proposed project will impact existing street trees as well as trees on the site of the proposed project or the adjacent properties when designing a project. Policy 2.5 of the City s Community Forest Management Plan mandates that measures be implemented for the protection of existing City trees during construction activities. During construction projects, Tree Protection Zones must be established around all City trees prior to the commencement of construction activities. Construction impacts to existing trees can be minimized by including the tree as an element of the City s infrastructure that must be protected during construction. The photo at right shows an inadequate protection zone around a City street tree that resulted in irreversible damage to its trunk. When designing plans for construction projects it is important to consider the impact a proposed project might have on the adjacent City street tree. Projects should be designed so they blend into and/or accentuate the existing conditions on the street right-of-way. Contractors should also have a clear understanding of how to access the site during construction, where to locate construction trailers, install utility meters, how building materials should be delivered or stored and eventually how to make repairs to sidewalks, curbs and gutters.

2. What is a Tree Protection Zone? A Tree Protection Zone (TPZ) is the designated area that encompasses an entire tree plus an additional radial distance of ten feet (10 ) beyond the edge of the canopy. However, for practical purposes the City of Santa Monica requires that the parkway be delineated with chain link fencing and posted to alert contractors on the site and others that no equipment, materials, debris, supplies or fill soil shall be located within the TPZ. 3. How is a Tree Protection Zone determined? When designing a new project it is important to determine how the structure will be built and how contractors can access the site without harming any existing trees. This is done by calculating the critical root zone (CRZ). This measurement is oftentimes consistent with the dripline of the tree which is the greatest extent of the tree s branches. Dripline of the tree Critical Root Zone DSH = Diameter at Standard Height Measured at 4.5 feet above finish grade Tree Protection Zone (TPZ) extends 10 beyond the dripline

For some trees with narrow crowns, such as the tree shown in the photo below, this distance is not near enough to insure that the critical tree roots will be protected. To accurately determine the critical root zone of a narrow crowned tree, measure its trunk diameter at 4.5 feet above the ground with a diameter tape. Then multiply that number by 1.5 and express the results in feet. For example; if the tree in the photo below has a trunk diameter of 24 inches then the critical root zone has a radial distance of 36 feet, or a total diameter of 72 feet across. Dripline DSH = Diameter at Standard Height Measured at 4.5 feet above finish grade Critical Root Zone Tree Protection Zone (TPZ) extends 10 beyond the dripline Once the CRZ has been determined the boundary of the TPZ can then be established to determine, underground utilities, drainage lines, location of driveway approaches and the ultimate size of the proposed structure.

4. What is the proper way to set up a Tree Protection Zone? Construction equipment can injure the above ground portion of a tree by breaking branches, tearing the bark, and wounding the trunk. These injuries are permanent and, if extensive, can be fatal to the tree. Parkways must be fenced off to protect street trees during construction. The location of the fence must be shown on the plans and the following notes regarding the TPZ fencing are typically added: a. Obtain TPZ requirements from Community Forester s office and post the tree as required by the City of Santa Monica. b. Fence the TPZ (field example shown below ) with a six foot (6 ) chain link fence to prevent wounds to the tree and soil compaction within the root zone. Post the protected tree with the tree protection zone requirements. Chain link fence per plan Proper tree protection fence

Occasionally there are circumstances that require access to the construction site be through the TPZ. In those cases where access is necessary through the TPZ, a steel plate may be utilized to bridge over the parkway for access. In other situations construction work may need to be conducted within the TPZ. In those situations steel plates can be placed over a mulch base to create a temporary work surface. These measures will prevent soil compaction within the critical root zones of trees. In order to obtain authorization for this type of approach it must be detailed on the plans submitted to the City and authorized prior to any construction activities taking place. Steel plate When bridging over a parkway the steel plate should rest on the top of the curb and the top of the concrete sidewalk on the opposite side of the parkway.

5. Construction access and permanent driveways. Once the Critical Root Zone has been established a better understanding can be gained of how the proposed design can fit into the project site. Equally as important is how to access the site, both during the construction phase as well as once the project is completed. It is always best to utilize an existing driveway for both construction access and as a permanent driveway as that has the least impact on existing street trees. a. Construction access: Constant traffic associated with a construction project that continually crosses over the parkway can have a negative impact on the root zone. To avoid this it s important to utilize the existing driveway approach or the alley if possible. Construction access on existing driveway b. New permanent driveways: On projects when a new driveway is planned, it is important to remember the critical root zone of existing trees when deciding on where exactly to locate the driveway. Keep in mind that the trunk of an existing street tree as well as its root system will increase in size. In order to avoid future conflicts between a driveway approach and the surface roots of an existing street tree the edge of new driveways must be located at least ten feet (10 ) away from the outside edge of the trunk of the 10 street tree. This new driveway is positioned 10 from the street tree

6. How should trees be shown on the plans? Whether a project consists of constructing a new building, or renovating an old one, it is important to know what fixed features in the public right-of-way need to be worked around. Street trees are part of Santa Monica s infrastructure and probably one of its largest elements. The easiest way to understand the impact of having to work around a fixed object is to know its actual size. a. Plans must accurately show the actual sizes of the street tree canopies to scale on all pages that show the street right-of-way or any portion of the street right-ofway. b. Elevation sheets should also show a silhouette of the actual size of all existing street trees as in this example:

7. How should a Tree Protection Zone be shown on the plans? The plans must show a Tree Protection Zone (TPZ) around existing street tree(s). The TPZ needs to encompass the canopy plus an additional radial distance of ten feet (10 ) beyond the dripline. An example is shown below: Construction access called out Actual canopy size noted & drawn to scale Boundary of TPZ noted Chain link fence called out TPZ labeled Tree trunk noted & drawn to scale The TPZ should be clearly shown on all pages that show the street right-of-way or any portion of the street right-of-way. This includes but is not limited to the site plan, demolition plan, grading & drainage, utility site plan, shoring plan, elevation sheets and landscape plan. The TPZ should be labeled with the following notes; a. Coordinate all off-site improvements within the TPZ with the Community Forester s office. b. No construction materials or activities allowed in this area. c. Pruning of City trees to provide clearance for construction activities shall only be done by City of Santa Monica Community Forest Operations.

8. What about excavation & utility installation within TPZ s? The excavation that is necessary to install underground utilities will likely have a negative impact on sections of the of street tree s roots adjacent to a project. During the design phase of a project the staff at Community Forest Operations can help you understand where roots may be growing. The roots of street trees are found mostly in the upper 6 to 12 inches of the soil yet the roots of a mature tree can extend far beyond the edge of the canopy. In fact, many times roots can be found growing a distance of one to three times the height of the tree. The amount of damage a tree can suffer from root loss depends, in part, on how close to the tree the cut is made. Severing one major root can cause the loss of a significant portion of the root system, affecting its health or its stability. This is why it is important to show the locations of proposed utilities and their proximity to existing street trees. The example above clearly shows the utilities and how they are being proposed to be installed. Since they are within the boundary of the TPZ and could have an adverse impact on the CRZ, design alternatives should be presented to the City and a workable solution arrived at during the design phase and well before construction gets underway.

9. What if there is a conflict between utility trenches and tree roots? In cases where proposed utility lines are in conflict with existing tree roots trenchless methods are recommended. This is a much more advantageous method because excavation is not necessary between access points and construction activity is concentrated at the access sites, rather than along the entire length of the proposed trench. Trenchless methods offer several potential advantages in addition to root preservation. They can reduce noise, dust, construction vibration, and other environmental impacts. These methods also have minimal impact on the public near a construction site, traffic is not interrupted, and other utilities are minimally affected. Trenchless technologies are also generally safer both for the construction workers and the general public. 10. How should off site repairs and improvements be made? When conducting off-site work such as sidewalk or driveway repairs it is important to consider the impact of that work on the critical root zone and individual roots. When removing hardscape materials the use of mechanical equipment is acceptable. However, to avoid damaging the surface roots and allow for proper root pruning to take place, remove the broken up material manually as shown in the photo below. All excavation within the TPZ shall be done either manually or through the use of an air spade. This will help to preserve the root structure and allow a more precise determination to be made on root pruning requirements. More importantly it will avoid unnecessary damage to roots which should be preserved. This in turn helps to prolong a tree s life and insure its stability after construction has been completed.

STANDARD TREE PROTECTION ZONE GUIDELINES 1. Trees within the public right-of-way may not be removed for any reason and are to be protected from injury or damage during construction. This tree is a significant tree in the City of Santa Monica. Pruning shall only be done by Community Forest Operations staff to provide clearance for construction activities. Questions regarding street trees may be directed to the Community Forester at (310) 458-8974. 2. The typical TPZ should encompass the canopy plus an additional radial width of ten feet (10 ). However, since these conditions are unique, the application should be evaluated with the final limits of the TPZ being established by the Community Forester. 3. Mulch the entire area of the TPZ in an effort to improve the growing environment for the roots. During construction phase maintain a four to six inch layer of chip mulch over the soil surface to reduce soil compaction, improve aeration, enhance moisture retention and reduce temperature extremes. Mulch generally consists of shredded leaves or bark, pine straw, peat moss, wood chips or composted greenwaste. 4. Fence the TPZ with a six foot (6 ) high chain link fence to prevent wounds to the tree and soil compaction within the root zone. Post the fence with a sign stating: TREE PROTECTION ZONE KEEP OUT. 5. Should it be necessary to trench within the TPZ all trenches shall be hand dug. No roots larger than two inches (2 ) shall be cut unless no other alternative is feasible. All smaller roots that require cutting shall be cut with pruning saws. Cuts shall be made flush with the side of the trench. If at any time twenty-five percent (25%) of the area within the TPZ is being separated from the tree by a trench, then the line shall be either relocated or installed by boring. 6. Removal of hardscape and/or excavation within the TPZ shall be done manually. 7. The minimum distance between an open trench and any tree shall be between six inches (6 ) to one foot (1 ) for every inch of trunk diameter measured at four and a half feet (4 ½ ) above existing grade, depending on the species of tree. Minimum clearance shall be ten feet (10 ) from the trunk of the tree. 8. In the event root pruning is required to accommodate grade changes or the installation of hardscape features the root pruning procedures shall be directed by Community Forest Operations staff. 9. At no time shall any equipment, materials, supplies or fill soil be allowed in the TPZ unless necessary. 10. Prune and fertilize the trees after the completion of all exterior work on the building and at the beginning of the landscape phase. 11. Prior to the commencement of your project contact the City s Planning Arborist at (310) 458-8974 to determine the precise requirements of the TPZ.