Property Condition Assessment

Similar documents
Building Inspection Report

SAMPLE REPORT. January 1, 20XX. Mr. John Smith Company ABC Commercial Street City, British Columbia V0V 1X1. Dear Mr. Smith:

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

Inspection Report. Property Address:

HOME INSPECTION REPORT Prarie Circle

GROUNDS Grading General Grading, slope and drainage: Satisfactory N/A See Notes. Grading and slope at house wall

Alabama Home Inspections

National Property Inspections

The Inspector. Property Inspection Report

Inspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

4 POINT INSPECTION REPORT

component was performing its intended function; installation and condition were appropriate for age and use.

Inspection Report. Prepared for: Tonia Mann. Property Address: 56 Riverview Place Douglasville, GA Date: September 19, 2012

All Pro Home Inspection. Home Report South Your Town

Lake Highlands North Recreation Center Summary

ADDENDUM 2 - JULY 14, 2015

PROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station

Home Inspection Report

All Pro Home Inspection. Home Report North Your Town

City Of Mendota Construction Procedures

FAIRA TRANSPARENCY REPORTS Robert Wayne Dr, Pasco, WA July 18 th, 2017

Timberglen Recreation Center Summary

DISTRICT SERVICES BUILDING

Storm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

A Sample Report On The Conditions At:

REPORT CHECKLIST SUPPLEMENT

Calidad Home Inspection Colleyville, TX (817) /

1234 Main St. Buyer Name. Table of Contents

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

UP AND UP HOME INSPECTIONS

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Inspection Report. Prepared for: Tonia Mann. Property Address: 1295 Greyland Hills Drive Lawrenceville, GA Date: April 24, 2012

3D Home Improvement and Inspection Services, Inc

Date of Inspection: April 30th 2006 Client: Ivan M. House Inspector: Lee Ottewell (CPBC License #: 47384)

SUMMARY 1234 Main St.Loudon TN Buyer Name 08/28/2018 9:00AM

Rental Inspection Checklist

TML Home Inspectors, Inc.

Home Inspection Report

Building Permit Application

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

TruView Inspections (HI7112)

Division 00 Procurement and Contracting Requirements

4036 Sasha Court, Mississauga, Ontario

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

The Home Doctor, Inc.

Ottawa Inspections Inspection Report

Application for Commercial Plan Review and Building Permit. Address:

Jardine Place, Toronto, Ontario

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

flexible spaces all the right places... fogg.com

Access: All interior areas of the building were accessible. On the exterior, only the fenced area that houses the generator was not accessible.

New Jersey Home Inspection - Standards of Practice

Exterior Elevated Elements Inspection Guidelines

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

1200 Oakman Blvd INDUSTRIAL INVESTMENT/ USER OPPORTUNITY. Building A 85,999 SF. Building D. Building C 11,495 SF 15,046 SF.

Property Condition Assessment. Summary Report

Property Inspection Report

Appendix J - Custom Uniformat for EDU Migration

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

Inspection Report. Prepared for: Yaron Sternberg. Property Address: 926 Hemingway Road Stone Mountain, GA. Date: April 15, 2011

BUILDING CONDITION ASSESSMENT

Advanced Building & Development, LLC

a) For the purposes of this Section, the terms listed below shall mean:

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Building Inspection Report

APPLICATION FOR FINISHED BASEMENT PERMIT

Inspection Report. Jay Coleman. Property Address: Cooper Rd Brookshire TX Bill Harvey Inspection Services

SOUTH CAROLINA HOME INSPECTOR STANDARDS OF PRACTICE

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

TOP 10 RED FLAGS #10 - SITE GRADING AND DRAINAGE PROBLEMS. Understand what issues your homebuyers are on the lookout for and how to offer solutions.

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238

Inspect Hawaii. Property Inspection Report

Final Report. Community Recreation Inventory Ross River. Capital Management Engineering Limited. February 2016 Project Number

COUNTY OF NEVADA BUILDING DEPARTMENT POLICIES

National Property Inspections

Structural Condition Assessment

Permit Posting and Inspection Procedures

Property Inspection Report

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

Training Certification Categories

2800 TRANS-CANADA MONTREAL POINTE-CLAIRE

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Business Issues. Overview. Should you get into commercial inspections? Eight reasons to get into commercial inspections

VOLUME 4 DIVISION SPECIFICATIONS

Property Inspection Report

INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT

Building Safety Inspection Report Form STRUCTURAL

B. RESIDENTIAL MASTER PLUMBER $ $ $

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

JBR Property Inspections

Transcription:

Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072 262-367-1536 Inspector: Thomas Dempsey License #1055-106

Report Number: Pewaukee, WI 53072 Page 2 of 32 Table Of Contents 1.0 SUMMARY 3 2.0 INTRODUCTION 4 3.0 STRUCTURE 6 4.0 ELECTRICAL 7 5.0 HEATING 9 6.0 AIR CONDITIONING 11 7.0 VENTILATION 13 8.0 PLUMBING 14 9.0 ROOFING 16 10.0 INTERIOR 18 11.0 EXTERIOR 19 12.0 INSULATION 21 13.0 CLOSING COMMENTS 22 APPENDIX A: 23 PHOTOGRAPHS 23 APPENDIX B: 32 SUMMARY OF ROOFTOP EQUIPMENT 32

Report Number: Pewaukee, WI 53072 Page 3 of 32 1.0 Summary SUMMARY OF REPAIRS 1.1 SUMMARY OF NECESSARY REPAIRS The following table summarizes the recommendations made in this report that are of an immediate, necessary nature. Recommendations Report Reference Budget Cost (2015 Dollars) Electrical distribution equipment repairs. 4.2.6 Minor Service heating equipment. 5.2.4 Minor Service air conditioning equipment. 6.2.5 Minor 1.2 SUMMARY OF SHORT-TERM REPAIRS The following table summarizes the recommendations made in this report that should be addressed within the next 2 years. Recommendations Report Reference Budget Cost (2015 Dollars) 1.3 SUMMARY OF UNPREDICTABLE REPAIRS The following table summarizes the recommendations made in this report that are unpredictable by nature, but may require addressing within the next few years. Recommendations Report Reference Budget Cost (2015 Dollars) No repairs needed at this time. Reroof the entire roof system. 9.2.2 Over $20000 Improve roof insulation when reroofing. Minor * The timing for replacement of this component is unpredictable. Statistically, it has reached the end of its life expectancy at this time.

Report Number: Pewaukee, WI 53072 Page 4 of 32 2.0 Introduction As per the request and in the company of representing and in accordance with our proposal dated 1/6/15, a visual inspection was performed of the property. Our inspection was limited to identify the existing conditions of the following readily visible building components: Structure Heating System Plumbing System Ventilation System Insulation Electrical System Air-conditioning System Roofing System Exterior Components Interior Components This assessment meets or exceeds the ASTM standard for Property Condition Assessments. This report provides recommendations, preliminary cost estimates and priorities for: remedying major deficiencies, updating ageing major components, and undertaking further detailed investigations. The recommendations are for remedial actions that are considered to be beyond the normal maintenance of the building. Costs are provided for recommendations expected to exceed $3,000. The costs are only intended to provide an order of magnitude. Contractors should be contacted for exact quotations. This report is intended for the exclusive use of our client. Use of the information contained within the report by any other party is not intended and, therefore, we accept no responsibility for such use. INSPECTION AUTHORIZATION AND SCOPE This report is a professional opinion, based on the accessible features of the building. We evaluated the current physical condition; we did not perform a design analysis. We visually reviewed the performance, looking for evidence of distress. It should be understood that there are limitations to such an inspection. Throughout any inspection, inferences are often drawn which cannot be confirmed by direct observation. Therefore, it should be understood that we can reduce the number of unforeseen repairs; however, we cannot eliminate them. Consequently, no guarantee or warranty can be offered or implied. Only the items specifically addressed in this report were examined. No comment is offered on building code and building bylaw compliance, or environmental concerns. BUILDING DESCRIPTION This is a one-story commercial structure covering approximately 9,960 square feet per floor (very rough estimate). There is an office area at the front, covering approximately 4,000 square feet. The visible evidence suggests that the building was constructed in 1990. For the purpose of this report, the front of the building is considered to be facing north.

PLANS No plans or drawings were available at the time of this inspection. INQUIRIES TO LOCAL AUTHORITIES Report Number: Pewaukee, WI 53072 Page 5 of 32 As part of the Property Condition Assessment, inquiries were made at the local building department for any outstanding building code violations and to ensure a certificate of occupancy was issued for the building. An inquiry was made at the local fire department to check for any outstanding fire code violations. No inquiries have been made to the local building or fire departments. It is the buyers due diligence to check for code violations.

Report Number: Pewaukee, WI 53072 Page 6 of 32 3.1 DESCRIPTION 3.0 Structure GENERAL The building is of slab-on-grade construction. FOUNDATIONS/WALLS The concrete-block foundations support concrete-block exterior walls. FLOORS The floors are reinforced concrete slabs. ROOF The steel roof deck is supported by masonry bearing walls and steel beams and columns. 3.2 OBSERVATIONS AND DISCUSSION FOUNDATION/WALL 3.2.1 No major structural defects were noted. FUTURE PLANS 3.2.1 Warehouse 3.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame 3.4 LIMITATIONS The examination of the structural components was visual only; a design review was not undertaken. The evaluation of the building s structure was limited because of the exterior finishes. The evaluation of the building s structure was limited because of the interior finishes.

Report Number: Pewaukee, WI 53072 Page 7 of 32 4.1 DESCRIPTION 4.0 Electrical SERVICE The electrical service to the building is underground. The building is equipped with a 200 amp, 120/240-volt, single-phase service. The building is equipped with a 1200 amp, 480-volt, three-phase, three-wire electrical service. This capacity was determined by the rating of the main disconnect switch. Each sub-service is individually metered. PANELS The distribution panels employ circuit breakers. WIRING All wiring examined is copper. 4.2 OBSERVATIONS AND DISCUSSION 4.2.1 It is impossible on an inspection such as this to determine adequacy for commercial demands. 4.2.2 While detailed load calculations were not performed, no problems are suspected with the service capacity. 4.2.3 This service should be adequate for the present usage. 4.2.4 However, the current occupants indicated that no power interruptions have been encountered. DISTRIBUTION EQUIPMENT 4.2.5 The distribution equipment is well arranged. 4.2.6 Deficiencies noted at the distribution equipment are as follows: Several double-tap circuits were noted in the main panel. Ideally, additional circuits or an auxiliary panel would be provided. BRANCH WIRING 4.2.7 Representative samples of accessible wiring were examined and electrical switches were spot tested in the areas inspected. 4.2.8 All switches tested operated satisfactorily. 4.2.9 No major deficiencies were noted.

Report Number: Pewaukee, WI 53072 Page 8 of 32 4.2.10 The general condition is considered to be good; however, improvements are recommended as follows: GROUNDING 4.2.11 The electrical system appears to be properly grounded. 4.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame Electrical distribution equipment repairs. Minor Immediate 4.4 LIMITATIONS This was a visual review only. No load calculations or equipment testing was undertaken.

Report Number: Pewaukee, WI 53072 Page 9 of 32 5.1 DESCRIPTION 5.0 Heating FORCED AIR SYSTEM The office is heated by a gas-fired, high-efficiency furnace with an output of 120,000 BTUs per hour. The front office is heated by a roof-mounted, gas-fired, heating (electric cooling) unit. The warehouse section is heated by two gas-fired, ceiling-mounted unit heaters. There is a single gas meter for the building. Appendix B gives details of the roof-mounted equipment. 5.2 OBSERVATIONS AND DISCUSSION CAPACITY 5.2.1 While detailed heat loss calculations were not performed, no problems are suspected with heating capacity. LIFE EXPECTANCY 5.2.2 These units are approximately 5-8 years old. 5.2.3 The life expectancies for high-efficiency furnaces are not yet well defined. Problems relating to premature failure resulting from corrosion have been encountered with many makes. 5.2.4 While it is impossible to predict with certainty when a heat exchanger will fail, the average life for roof top heating systems of this type is 15 to 20 years. OPERATING STATUS 5.2.5 The heating units were observed while in operation. 5.2.6 No major deficiencies were noted. 5.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame Service heating equipment. Minor

5.4 LIMITATIONS Report Number: Pewaukee, WI 53072 Page 10 of 32 This was a visual review only. No load calculations or equipment testing was undertaken.

Report Number: Pewaukee, WI 53072 Page 11 of 32 6.1 DESCRIPTION 6.0 Air Conditioning CENTRAL AIR CONDITIONING The office section of the building is air-conditioned by one rooftop unit and one air-cooled, split system. The total available cooling capacity for the building is eight tons. The air is distributed through the same air handling equipment previously mentioned in the Heating section. Details of the air-conditioning equipment are provided in Appendix B. REFRIGERANT The refrigerant used in the air conditioning systems was identified as R-22. 6.2 OBSERVATIONS AND DISCUSSION CAPACITY 6.2.1 While detailed heat gain calculations were not performed, no problems are suspected with cooling capacity. 6.2.2 Adequate cooling capacity should be available under normal circumstances. LIFE EXPECTANCY 6.2.3 These units are approximately 5-8 years old. OPERATING STATUS 6.2.4 The air-conditioning equipment was not operating. 6.2.5 Severe damage to the compressor can result from operating this equipment when the outside temperature is below 15 o C (60 o F). Please refer to Appendix A. AIR DISTRIBUTION 6.2.6 The air distribution appears adequate. 6.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame

Report Number: Pewaukee, WI 53072 Page 12 of 32 Service air conditioning equipment. Minor 6.4 LIMITATIONS Since the heating components were operating at the time of this inspection, the rooftop units were not observed in the cooling mode.

Report Number: Pewaukee, WI 53072 Page 13 of 32 7.1 DESCRIPTION The washrooms are ventilated by individual exhaust fan units. Operable windows ventilate the offices. 7.0 Ventilation 7.2 OBSERVATIONS AND DISCUSSION WASHROOM 7.2.1 The washroom exhaust fans operated properly at the time of the inspection. These fans are properly vented to the building exterior. MAKEUP AIR 7.2.2 The amount of fresh air available to the offices appears adequate. 7.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame 7.4 LIMITATIONS

Report Number: Pewaukee, WI 53072 Page 14 of 32 8.1 DESCRIPTION 8.0 Plumbing SUPPLY There is a combination water supply to the building. The branch off for the domestic water supply is a 1in.-inch-diameter copper pipe. The main shutoff valve is located on the eastside of the building. There is one water meter for the building. All supply plumbing examined is copper. WASTE The visible waste piping is primarily PVC plastic. DOMESTIC WATER HEATING There is a 20 -gallon, electric domestic water heater above the rest rooms 8.2 OBSERVATIONS AND DISCUSSION SUPPLY 8.2.1 Adequate water pressure appears to be available. 8.2.2 No active leaks were noted in the supply plumbing pipes. WASTE 8.2.3 No active leaks were noted in the waste piping system. VENTING 8.2.4 The presence of appropriate venting for the waste plumbing could not be verified. DOMESTIC WATER HEATING 8.2.5 The domestic water heater is approximately 5 8 years old. 8.2.6 While it is impossible to predict with certainty when a domestic water heater will fail, these units typically last 15 years. 8.2.7 Therefore, updating the water heater may be necessary within the next few years.

FIXTURES 8.2.8 The plumbing fixtures that were tested operated satisfactorily. Report Number: Pewaukee, WI 53072 Page 15 of 32 8.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame No repairs needed at this time. 8.4 LIMITATIONS The evaluation of the well is beyond the scope of this assessment. The evaluation of the septic system is beyond the scope of this assessment. The water quality was not tested. The local health unit should be contacted for advice in this regard.

Report Number: Pewaukee, WI 53072 Page 16 of 32 9.1 DESCRIPTION 9.0 Roofing FLAT The building is covered by a single-ply EPDM rubber membrane on one level. The membrane is covered by a large-stone ballast. ROOF DRAINAGE The roof drainage is via an interior collection system. There are three drains on the roof. CHIMNEYS There are three metal chimneys above the roof. These chimneys are for the warehouse modines. 9.2 OBSERVATIONS AND DISCUSSION OTHER MEMBRANES 9.2.1 The EPDM rubber membrane appears to be in serviceable condition. 9.2.2 This type of system has an average life expectancy of 20 years or more. 9.2.3 The majority of problems found with single-ply membranes to date relate to incorrect installations and subsequent seam failures. This appears to be a single-ply installation. Two-ply installations are more desirable, as they tend to have longer life expectancies. No improvements are considered practical. METAL CHIMNEYS 9.2.4 The metal chimneys are in good condition. 9.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame Reroof the entire roof system. Over $20000 Unpredictable

9.4 LIMITATIONS The roof coverings could not be closely examined because of snow. Report Number: Pewaukee, WI 53072 Page 17 of 32

Report Number: Pewaukee, WI 53072 Page 18 of 32 10.1 DESCRIPTION The office ceiling finishes consist of ceiling tile. The office wall finishes consist of drywall. The office floor coverings consist of carpet and tile. 10.0 Interior 10.2 OBSERVATIONS AND DISCUSSION 10.2.1 Since interior components are subjective to some degree, our comments here will be general, except where functional concerns are noted. 10.2.2 Walls are relatively plumb, doorjambs are square and floors are reasonably level. 10.2.3 On the whole, the interior finishes are in good condition. 10.2.4 Water stains were noted on the block exterior walls. 10.2.5 All areas of staining were found to be dry at the time of the inspection. 10.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame 10.4 LIMITATIONS Moisture problems in basements can develop as a result of clogged or damaged perimeter foundation drainage tiles. There is, of course, no way to predict this during a visual examination.

Report Number: Pewaukee, WI 53072 Page 19 of 32 11.1 DESCRIPTION 11.0 Exterior WALLS The exterior walls are solid masonry. DOORS The front entrance doors are aluminum-framed, single-glazed units. The exit doors are steel units. The overhead doors are metal sectional units. There is one loading docks in the east façade. There is one drive-in doors in the east façade. WINDOWS The windows are aluminum-framed, double-glazed units. The operable windows are awning type. RETAINING WALL There is a poured-concrete retaining wall along the east side of the property. SIDEWALK There is a poured-concrete sidewalk at the east side. ASPHALT PAVING There is asphalt paving on the east side.

11.2 OBSERVATIONS AND DISCUSSION WALLS 11.2.1 The exterior brickwork is in good condition. PERSONNEL DOORS 11.2.2 The exit doors are in good condition. 11.2.3 All doors that were tested operated properly. OVERHEAD DOORS 11.2.4 The overhead doors are in satisfactory condition. WINDOWS 11.2.5 The windows are in good condition. 11.2.6 All windows that were tested operated properly. Report Number: Pewaukee, WI 53072 Page 20 of 32 SIDEWALK 11.2.7 The poured-concrete sidewalk at the eastside is in good condition not visible due to snow cover. ASPHALT 11.2.8 The asphalt paving is in satisfactory condition not visible due to snow cover. 11.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame 11.4 LIMITATIONS The grading, asphalt paving and sidewalks could not be evaluated because of snow accumulation.

Report Number: Pewaukee, WI 53072 Page 21 of 32 12.1 DESCRIPTION 12.0 Insulation WALLS The presence of insulation in the exterior walls could not be verified. It is quite possible that little or no insulation is present. The cavity in the exterior masonry walls is typically minimal. It is probably not economically viable to fill this cavity with insulation. FLAT ROOF The amount of insulation in the flat roof could not be ascertained. 12.2 OBSERVATIONS AND DISCUSSION 12.3 RECOMMENDATIONS, COSTS, AND PRIORITIES Recommendations Costs Time Frame Improve roof insulation when reroofing. Minor 12.4 LIMITATIONS The determination of the presence of urea formaldehyde foam insulation (UFFI) is beyond the scope of this assessment.

Report Number: Pewaukee, WI 53072 Page 22 of 32 13.0 Closing Comments This report provides you with an overview of the condition of the major components in the building. Should you have any questions, please do not hesitate to contact us. Please find photographs documenting several conditions noted in Appendix A. Please find a summary of the rooftop heating and cooling equipment in Appendix B.

Report Number: Pewaukee, WI 53072 Page 23 of 32 Appendix A: Photographs Photo 1: North building elevation Photo 2: South building elevation

Report Number: Pewaukee, WI 53072 Page 24 of 32 Photo 3: East building elevation Photo 4: West building elevation

Report Number: Pewaukee, WI 53072 Page 25 of 32 Photo 5: General roof area Photo 6: General roof area

Report Number: Pewaukee, WI 53072 Page 26 of 32 Photo 7: Main domestic water service entrance Photo 8: Main electrical service equipment

Report Number: Pewaukee, WI 53072 Page 27 of 32 Photo 9: Main electrical service equipment Photo 10: Main electrical disconnects

Report Number: Pewaukee, WI 53072 Page 28 of 32 Photo11: Main heating equipment front office Photo 12: Main heating equipment Warehouse

Report Number: Pewaukee, WI 53072 Page 29 of 32 Photo 13: Main air conditioning equipment rear office Photo 14: Main air conditioning equipment front office

Report Number: Pewaukee, WI 53072 Page 30 of 32 Photo 15: Typical building interior Photo 16: Typical building interior

Report Number: Pewaukee, WI 53072 Page 31 of 32 Photo 17: Building parking area Photo 18: Warehouse

Report Number: Pewaukee, WI 53072 Page 32 of 32 Appendix B: Summary of Rooftop Equipment HVAC Unit # Front office Year Built Cooling Capacity X 1000 BTUs Heating Capacity X 1000 BTUs [output] Operating Mode Makeup Air Manufacturer Area Serviced Comments 2009 5 ton 130,000 btu Heat NA Trane Front office Compressor original