WHITE PAPER. Kanban execution: Optimizing work-in-progress (WIP) Towards achieving a shorter lead time and better flow rate.

Similar documents
WHITE PAPER. Assessing Kanban fitment in the Fluid and Fast-paced World of Software Development. Abstract

Monitoring Kanban Execution WHITE PAPER

RETRANSFORM BEYOND AGILE FOR FASTER, INTEGRATED IT SERVICE DELIVERY

RETRANSFORM BEYOND AGILE FOR FASTER, INTEGRATED IT SERVICE DELIVERY

CHANGE IMAGINED. CHANGE DELIVERED

KEEP THE LIGHTS ON - APPLICATION MAINTENANCE AND SUPPORT

REDUCING TIME TO MARKET WITH DEVOPS

INFOSYS BUSINESS PROCESS MANAGEMENT OFFERINGS

ACCELERATING DIGITIZATION THROUGH NEXT-GENERATION INTEGRATION

TRANSFORMING THE LANDSCAPE FOR INSURANCE CLAIMS

SBDEFT: Scrumban Driven Engagement Framework for Testing

VIEW POINT. The Enterprise QA Transformation Model A solution to enhance an enterprises testing maturity. Abstract. Reghunath Balaraman, Aromal Mohan

AUTOMATING BIG DATA TESTING FOR PERFORMANCE

WHITE PAPER. Count your inventory in the right way for right result

DevOps Journey. adoption after organizational and process changes. Some of the key aspects to be considered are:

WHITE PAPER. Application Grading for Comprehensive Quality Assurance. Abstract

A PATH TO GDPR READINESS WHITE PAPER

BEST STORIES FOR DIGITAL IN COMMUNICATION SERVICES

A 7-STEP FRAMEWORK TO IMPLEMENT CICD IN ETL TESTING

MARGIN MANAGEMENT IN THE OIL & GAS INDUSTRY WHITE PAPER

INFOSYS PROCUREMENT AND PLANNING PRACTICE

ACCELERATE YOUR JOURNEY TO BEING DIGITAL

PERSPECTIVE. Accounting General Ledger Challenges in Facets. Vikas Kumar Abstract

ENHANCING BUSINESS EFFICIENCY WITH AI AND ENGINEERING DATA ANALYTICS

WHITE PAPER. Master Data Management as a Solution Using SAP MDM and Complementing Technologies

BEST STORIES OF INFOSYS SALESFORCE IMPLEMENTATION

MODERNIZING THE MIDDLEWARE

RPA VALIDATION PITFALLS AND HOW TO AVOID THEM

INFOSYS SMART OILFIELD SERVICES SOLUTION FOR SAP ERP

DIGITAL OUTLOOK INDUSTRIAL MANUFACTURING INDUSTRY

WHITE PAPER. Effective Audit Hosting Strategy: A Perspective. Abstract. Pranav Gadre, Sanjay Martis

DIGITAL OUTLOOK CONSUMER PACKAGED GOODS INDUSTRY

Boundaryless Information PERSPECTIVE

turning data into dollars

Agile & Lean / Kanban

THE NEED TO IMPRESS. External Document 2018 Infosys Limited

VIEW POINT. Experience Commerce

DIGITAL OUTLOOK AUTOMOTIVE INDUSTRY

WHITE PAPER. Getting started with Continuous Integration in software development. Amruta Kumbhar, Madhavi Shailaja & Ravi Shankar Anupindi

PERSPECTIVE. Need for a Comprehensive Test Maturity Model. Abstract. - Reghunath Balaraman, Harish Krishnankutty

PRODUCT COMPLAINTS MANAGEMENT. Infosys Handbook For Life Sciences

MAN, MACHINE AND FINANCE - THE FINANCE ORGANIZATION THROUGH 2030

PERSPECTIVE. Creating Business Value with Mature QA Practices. Abstract

BANKING WITH THE RIGHT REGULATIONS

PERSPECTIVE. Customer Loyalty Quotient Strategy: Key to an emotional connect with customers. Abstract

Cultural shift - Transition from Waterfall to Agile

Abstract Now that the Agile campaign has entered cross organizations and industries, lot of variations are emerging. Hybrid Agile is a new

Software Development Life Cycle

ADVANTAGE YOU. Drive TCO* reduction through Infosys TIBCO solutions

ENABLING SALES TEAMS TO CREATE WINNING QUOTES

HOW AGILE DO YOU WANT IT?

PERSPECTIVE. MAKING GPP (Global PAYplus) TESTING PREDICTABLE

WHITE PAPER. Loss Prevention Data Mining Using big data, predictive and prescriptive analytics to enpower loss prevention.

PERSPECTIVE. Effective Capacity Management with Modeling and Simulation - assisted Performance Testing. Abstract

Scrum Master / Agile Project Manager An Approach for Personal Competency Development

ORACLE SUPPLY CHAIN MANAGEMENT PRACTICE

WHITE PAPER. End User empowerment for improved Asset Maintenance

WHITE PAPER. Pick the right SAP UI/UX offering for your business. Abstract

FROM MONOLITHIC MAINFRAMES TO CLOUD FOR FASTER TIME TO MARKET

WHITE PAPER. Banks Regulatory Reporting Compliance The Challenges and the Solution. Abstract

Converting Complaints to Customer Experience A Framework to Redefine the Complaint Management Process in Banks WHITE PAPER

WHITE PAPER. Assuring success in blockchain implementations by engineering quality in validation

TRANSFORMING THE IT LANDSCAPE

Best Stories of Omni-channel Commerce

MAKING PRODUCTS TALK THROUGH SMART LABELS

PERSPECTIVE. Abstract

Theory of Constraints for service. What is your Goal? Krishna Sivaramakrishnan, Qualitriz. Qualitriz. All rights reserved

Our Approach to the Scaled Agile Framework (SAFe )

WHITE PAPER. Technology Trends for Road User Safety in Public Sector. Abstract

THE EVOLUTION OF CRM HOW MASS MARKETING DIED OUT AND WAS REPLACED BY A PERSONALIZED APPROACH THAT IS NOW THRIVING IN THE DIGITAL ERA

PERSPECTIVE. Assuring the digital utilities transformation. Gaurav Kalia Client Solution Manager

WHITE PAPER. An Insight into Microservices Testing Strategies. Abstract. Arvind Sundar, Technical Test Lead

VIEW POINT. Making risk-free, accelerated legacy modernization possible! Abstract

SEVEN FEATURED PEGA CASE STUDIES. Different needs, different industries, tailored solutions leveraging Pega solutions

WHITE PAPER LEVERAGING 3-C PHILOSOPHY FOR ENHANCED ROI FROM CHANNELS

VIEW POINT. Delivering large IT programs Choosing the right implementation approach. Abstract

WHITE PAPER. Improved Compliance Management in Banks through Cognitive Analysis

SDEFT: Scrum Driven Engagement Framework for Testing

ThermoFab and DBR: Manufacturing At Warp Speed. A White Paper Report

INFOSYS SALESFORCE PRACTICE Empowering global enterprises to make smarter business decisions and bring engaged customer ecosystem experiences to life

WHITE PAPER. IoT-enabled Banking Services

RETAIL AND CPG HUMAN AMPLIFICATION IN THE ENTERPRISE

WHITE PAPER. Cloud-Based Human Capital Management: Accelerating Organizational Evolution to be #MoreTogether. Abstract

PERSPECTIVE. Shrink Resolution Times with Field Service Automation (FSA) Abstract

welcome to Agile Learning Labs Understanding Kanban

A Stronger IT/Business Relationship

Kanban kick- start (v2)

WHITE PAPER. BPM for Structural Integrity Management in Oil and Gas Industry. Abstract

DIGITAL TRANSFORMATION WITH INTELLIGENT SOLUTIONS FROM INFOSYS AND PEGA

NAVIGATE YOUR NEXT TARGET PERFORMANCE WITH DIGITIZE CFO DASHBOARD

KNOWLEDGE-BASED ENGINEERING (KBE) Key product-development technology to enhance competitiveness

FINDING AIRCRAFT PARTS BEFORE THEY ARE LOST, WITH PREDICTIVE ANALYTICS

Real Time Management of All Operational Domains and Workflows in Your Laboratory. Chris Christopher Csquared Global Healthcare Consulting

PREDICTIVE ANALYTICS FOR DATA-DRIVEN DECISIONS

PERSPECTIVE. A connected enterprise in the sky. Abstract. Manoj Narayan

CASE STUDY. Streamlined Operations Through New Business Process Transformation

PRESS #1 FOR CUSTOMER SERVICE. When a customer calls for help, you want to offer the best. But they often fear the worst.

WHITE PAPER. Evaluation Framework: To Build or to Buy CRM Software? Abstract

VIEW POINT. The future of financial planning and analysis (FP&A): Robotized and digital

STUDY. The State of the Store Insights from Consumers and Retailers into the European Shopping Experience

Transcription:

WHITE PAPER Kanban execution: Optimizing work-in-progress (WIP) Towards achieving a shorter lead time and better flow rate Abstract This is the second of a three-part paper on Kanban. In the first paper Assessing Kanban fitment in the fluid and fast-paced world of software development we explained Kanban principles in simple terms to make it easier to understand Kanban applicability in software development projects along with the various facets of Scrum and Kanban that should be considered while selecting the method. This second paper details the various aspects of work-in-progress (WIP) in the various workflow stages and how a Kanban team can optimize it to build a predictable outcome with balanced flow.

A deep dive into Kanban execution To move forward in the Kanban adoption journey, it is critical to understand the visualization of workflow stages in the requirement / task execution pipeline and the work-in-progress (WIP) limit in-depth. Workflow visualization The first step in implementing Kanban in the software development life cycle (SDC) is to visualize and plot the stages that any work item passes through in the project. If the work item is the user story, the left most column of the workflow stage will hold it, while the remaining columns can depict the task breakdown required to complete the user story. To ensure work items move on a daily basis / frequently, work breakdown must be done while staying true to the agile spirit, i.e., effort span should not be more than a day or a maximum of two days worth work. The workflow can be depicted on any information radiator such as the Big Visual Chart (BVC), whiteboard, or using a specific agile life cycle management tool such as Leankit Kanban, Swift Kanban, and more. Often, Scrum Board is used synonymously as Kanban board. While Kanban board may look like a Scrum board with more workflow columns, the major difference between the two is the WIP limit assigned to each column. A Scrum board generally has three columns Ready, In progress, and Done as the team commits to deliver all work pushed / selected in time boxed iterations, hence, tracking progress in more detail is not considered of much value. Setting up a WIP Once the workflow is in place, you need to address the most difficult challenge that the team faces deciding the WIP for each workflow stage as it has to be based on the team composition and internal constraints under which a project operates. We will dive deep on how to decide WIP with a practical example in the next section. However, it is important to understand that Kanban execution progress is based on the Pull system. As soon as the number of work items in a particular column falls below the defined WIP limit, a new work item can be pulled in from the preceding stage. A work item that cannot progress to the next stage due to any constraint is still counted in the WIP limit and will certainly, slow down the workflow. The flow of work can be a complete hold-up, if all the work items get blocked. In such a situation, the team will be forced to work with a single-minded focus on eliminating the blocker. This, in turn, would reduce multitasking and increase collaboration / team interaction as the team continues to practice Kanban and work with a disciplined policy of not breaching the WIP limit. The team can define explicit policies to breach the WIP limit based on their historical execution patterns to ensure that the team does not sit idle and revisit breach instances. Here, the team and all stakeholders must work as per the mutually agreed WIP breach policy, else it is easy to pull tasks more than the WIP which eventually can lead to failure of Kanban. Strive for the perfect WIP limit The real test for a Kanban team is to decide the WIP for each workflow stage (columns) which is similar to the enigma that the scrum team faces while deciding on the velocity to commit in the first sprint. In a traditional SDC, mostly, the team plan to start parallel tasking, considering that more WIP work items speed up delivery. But the focus of Kanban is on reducing WIP so that a work item moves towards completion faster. This is not easy to comprehend.

Opting for Higher WIP is akin to inviting complacency More often than not, teams are tempted to choose a higher number for WIP as this would allow them to pick up new work items even when the task they are working on is blocked. As they say, the show must go on! However, think again. A higher WIP can lead to scenarios where team members may not require interaction. This would create knowledge silos and anychange in the team would then result in knowledge loss, preventing the team from delivering the work item with quality faster. In addition, a higher WIP may jam the traffic in one stage, for e.g., Test In Progress. This may be the result of a skewed team mix where testers are less compared to developers. Similarly, the time taken to complete development and testing are not proportional so the supply of completed work might most likely be slower than what a tester can turnaround. In such a case, work items will pile up in the Test Ready stage. Let s summarize the gain and loss in this case. Gains Flexibility to take up new tasks Workflow progress may not stick Maps with traditional SDLC, i.e., multitasking ways Allows for independent working of the team Continuous momentum for the team Losses Reduced focus on getting tasks unblocked (as it is not blocking the flow) Lead time of blocked work items can vary significantly Cycle time predictability reduces Less collaboration or one team Focus on multiple WIP work items leads to reduced amount of completed work Consolidated quality would be impacted Is opting for a lower WIP, effective Kanban? When a team starts on Kanban, skepticism on the lower number of WIP is bound to happen as they relate it to lower productivity. Initial thoughts might go towards opting for a lower WIP, in short, making the WIP equal in number to the number of people in the team working on the stage or slightly higher. But would that lead to the most effective Kanban? Not likely. In an enterprise application, distributed agile teams work in different time zones and a work item can move to the wait state, as against being a blocker. Though a lower WIP will help the team focus on completing a task and keep it moving to the last stage faster. However, know that it will also uncover the workflow dysfunction very fast. Therefore, stakeholders should be comfortable to change and address them quickly. Let s summarize the gain and loss in this case. Gains Playing by Kanban principles yields better outcomes Workflow bottlenecks would be visible very fast Smooth, continuous flow of work items towards Done stage leading to optimum lead time Single-minded focus on getting unblocked as the workflow might go to standstill faster Losses Team may feel stifled under constraints Stakeholders should be prepared for change and address blockers faster If workflow blockers are not addressed in time, there would be a loss of productivity (more idle time) Enforced (or increased) breach of WIP limit Improvement in team interaction and collaboration to complete other tasks when waiting for task blocks workflow Team policy would be reviewed frequently To summarize, the Kanban team must balance and understand the relativity of higher and lower WIP along with gains and losses in the context of project execution. The team can decide on accepting work items based on throughput and after duly considering training / skilling contingency for the person who just joined the project. As the team goes over and understands the nature of tasks, efforts, inflow, and team constraints, they move from `forming, `norming, and `storming to being a `performing team.

Let us take you through the scenarios to sync the WIP In the case below, a team composition of one Designer, three Developers, and one Tester is assumed. Option 1: Set the WIP limit equal to number of team members working on the work stage at any given point in time. WIP limit would be 1, 3, 1 for Design, Development and Test stages This looks good when the teams are collocated and the work will quickly move from one work stage to the next, however, to get the cost advantage, the teams work in a distributed mode. A distributed team working on enterprise applications in non- / less overlapping time zones more often than not, faces a situation where they are awaiting answers to pending queries from theclient. In such cases, the team experiences process losses in virtual teams where communication gaps appear even with a modern VC, Lync, and Webextechnology in place. This leads to some delays. In such a scenario, setting up a WIP directly equal to the team number can stifle the workflow and force WIP breach instances. Therefore, we recommend setting up WIP as per case 2. Option 2: Set the WIP limit = 2x where x is the number of people marked for that work stage. The WIP limit would be 2, 6, 2 for Design, Development and Test stages This gives flexibility to pull in a new task when a member is blocked on a task Based on the complexity of work items and categorized lead time taken by an average work item, WIP can be further fine-tuned for each stage as the team progresses and learns from the execution

Case illustration Let us look at the below day-wise illustration of case 2 to understand the nuances of Kanban and how it uncovers bottlenecks. Time Backlog Design In Progress Dev Ready Dev In Progress Test Ready WIP 2 6 2 Test In progress Release Ready Day 1 3 2 0 0 Day 1 End 1 0 2 0 0 0 0 Day 2 3 2 2 0 0 Day 2 End 1 0 2 0 2 0 0 Day 3 3 2 2 2 0 Day 3 End 1 0 2 2 0 2 Day 4 2 2 4 2 1 Day 4 End 0 0 2 4 0 3 Day 5 4 2 6 0 3 Day 5 End 2 2 0 6 0 3 (0 when work item released) Day 6 2 2 0 4 2 3 Day 6 End 2 0 2 0 4 0 5 Bottleneck clearly visible, Designer WIP needs to increase to have better supply towards Development stage hence team shuffled composition with 2 designers, 2 developers, 1 tester New WIP 5 4 4 2 Day 7 4 4 0 4 2 5 Day 7 End 0 0 4 0 4 0 7 Day 8 2 2 4 7 Day 8 End 0 0 2 2 2 0 7 (0 when work item released) Legend: Red underutilized WIP stage, Green 100% utilized, Blue Wastage (waiting or idle state)

In a steady state, Kanban work must flow smoothly and instances of task holdups should be reduced. In the example above, the team is underutilizing their Development capacity (waiting at development) since Design is full to the brim. A few observations below sum up the Kanban execution outcome. Only on the fifth day, the team was able to align with WIP (100% utilization) The analysis of Kanban flow discovered the design WIP as the bottleneck The team alleviated the constraint by changing the team composition, i.e., moving a Developer to the design stage Post the shuffle, the design capacity / WIP increased with an additional capacity to 4 From their learning, the team also took the proactive step of introducing a WIP on backlog as 5 (1 extra than design WIP to ensure the designer has a steady inflow of work) The team can benefit from the application of theory of constraints (TOC) which advises teams to focus on process / task in chain that is causing the delay in overall processing, causing low throughput. Here, the team should identify the bottlenecks: what is causing delays, underutilized states, and wastage? Joint brainstorming should be carried out by the team to come up with solutions to raise the constraints causing low output. It may be due to time- taking design reviews, complex systems and a new team, a new team member taking additional time, system access not given in time, downtime during certain periods, too many activities that the team is engaged in, and more. All this can help the team arrive at what can be an effective solution to weed out waste. They must then focus on these solutions and improve the system output. For instance, at the end of Day 6, there are four tickets to be tested and due to two WIP in the Test state, only two tickets can be taken up. This implies that two

tickets are in the inventory waiting for a low testing capacity (perhaps, because the number of testers is less, or the access to the testing environment is constrained to only two, etc.). This means that whatever the development team may expedite will not lead to an overall throughput increase as the testing team s lower WIP is causing delays. In this case, the team should be convinced to get over this low WIP state at TEST and try to elevate to maybe, WIP of four. This can be done by reading through the trend of hold ups in the `Test ready state. If this is consistent, it clearly shows that the capacity of the testing team needs to be increased by adding new testers, cross testing by developers, etc. Identify the system s constraint(s), e.g., maybe the testing team is idle, knowledge is localized, lead time is high due to pending access in system, clarification awaited Decide how to exploit the system s constraint(s) (how to get the most out of the constraint), e.g., if the testing team is idle, involve them in sharing production support tickets. If knowledge is localized, the team needs to be cross- trained on tickets Subordinate everything else to that decision Elevate the system constraints. Continue to improve In a nutshell, all the time spent by tasks in orange in the Ready state is the wastage which is increasing the lead time. To improve lead time, the team needs to reduce the wait time in the Ready state and/or tune WIP. Kanban is effectively practicing elimination of waste. All the blue numbers show bottlenecks or idle time for the work items that are leading to low throughput and increased lead time. Therefore, setting a WIP would make or break the Kanban execution. The team must always aim to optimize it to achieve smaller lead time, higher flow rate.

About the Authors Vikram Abrol Lead Consultant, Infosys Vikram Abrol is an IT professional with 16 years of rich experience. He holds PMP, CSM certifications. He is also affiliated with the leadership program at IIM Calcutta. He has been a Process Consultant and Quality Manager with seven years experience at client sites in the US. He has been an Agile Coach for a large retail e-commerce program and has guided various engagements on Agile transformation journey, Agile maturity assessment, and consulting. Ketan Navinchandra Shah Principal Consultant, Infosys Ketan Shah is a Principal Consultant, Agile and holds CSM, CSPO from Scrum Alliance, and Six Sigma Green Belt certifications. He has 14 years of IT experience which includes more than six years in E2E Agile execution from inception to implementation for several large enterprise engagements in various roles such as Agile Coach, Scrum Master / Mentor, Delivery Manager, and Agile Consultant. He is an Agile advocate, spreading Agile awareness via interactive trainings, mailers, community forum discussions, Agile COE initiatives, etc. For more information, contact askus@infosys.com 2017 Infosys Limited, Bengaluru, India. All Rights Reserved. Infosys believes the information in this document is accurate as of its publication date; such information is subject to change without notice. Infosys acknowledges the proprietary rights of other companies to the trademarks, product names and such other intellectual property rights mentioned in this document. Except as expressly permitted, neither this documentation nor any part of it may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, printing, photocopying, recording or otherwise, without the prior permission of Infosys Limited and/ or any named intellectual property rights holders under this document. Infosys.com NYSE: INFY Stay Connected