Testing different approaches to energy reduction in five 1½-storey post-war houses. n Roof constructed of 2 x 6 roof rafters and 1 x 8 roof

SB-12, Chapter 3. Applicable to all building permit applications submitted after December 23, 2016

Project Profile: Riverdale NetZero Project Edmonton, Alberta

2010 National Building Code Adoption and Associated Process Changes

Exterior Perspective, East End

Single Family Homes - over 3,000 sqft. Parfitt Residence

Changes. With respect to Energy efficiency 2006 Code is 22% better than 1997 Code Code 37% better than 1997 Code

Energy Audit Report Lee Recycling Center Office and Facility 11 Recycling Center Rd, Lee NH August 16 & 17, 2011

Supplementary Standard SB-12. Energy Efficiency For Housing

Case Study #9 Phoenix Rising

Thermal Remodeling Wasilla, Alaska. Harvey Bowers

Supplementary Standard SB-12. Energy Efficiency For Housing

Net Zero Building Enclosure Retrofits for Houses: An Analysis of Retrofit Strategies

Airport Vicinity Acoustic Insulation

ENERGY EFFICIENT RETROFIT MEASURES GUIDE

In-situ thermal resistance testing of an energy efficient building envelope in the Canadian Arctic

ROW - Albertslund, DK

Energy Efficiency For Housing

Bedroom 4. island or table. communications center. -cell phone charging. -message center. -paper recycling. -phone books.

Benny Farm Redevelopment, Montréal

Energy Efficiency Requirements 9.36

Three-Story Victorian Partial Retrofit. Overview. Case Study

Thermal Characteristics of Exterior Building Wall (Above Heritage Building

Building your Energy Efficient New Home or Apartment Building

01-02 elevations sites + plan kitchen living room bedroom bath iso + exploded iso systems + features

About Insulation & R Value - cmhc.ca

SIP Homes: Built for a Lifetime of Comfort and Value

2014 British Columbia Building Code Changes

BUILDING PERMIT APPLICATION NBC SECTION C1 - ENERGY EFFICIENCY COMPLIANCE FORM FOR ZONE 7A

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS

The Homeowner s Building Application Checklist for Constructing a Residential Addition

Practical experiences with buildings in Arctic Greenland

Low-Income Energy Savings Program. Program Guidelines

Energy Efficiency For Housing

1.1 BUILDING DESCRIPTION:

9.36 Energy Efficiency

Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Future tree planting on the two acre lot will offset remaining lifetime carbon emissions.

CB04. Outback House. Case Study. Creative Spaces Australia. by Casey Brown Architecture

THE SPENCER RESIDENCE J&S ARCHITECT

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS


HOUSE ADDITIONS A guide to the plans required when applying for a Building Permit

One and Two Family Additions

Construction Table of Contents

Renovating for energy savings

COST AND BENEFIT ANALYSIS OF PROPOSED CHANGES FOR ENERGY EFFICIENCY IN HOUSING AND SMALL BUILDING IN THE NATIONAL BUILDING CODE

- Inbound/Outbound window placement - Window buck & air sealing - Weep holes IN THE WOODS DETAILS - WINDOW SILL

Residential Construction

Introduction to Canadian Residential Construction CANADIAN HOUSING IS ADAPTABLE, FLEXIBLE AND ACCOMMODATES DIVERSE CLIMATES.

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Building Envelope

FLOOR PLAN SCALE: 1/8 = 1 0

14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction

Grant Table for ecoenergy Retrofit Homes. Save NOW with a home retrofit grant Save LATER on your energy bills

Westford House. Westford House. Building America for Cold Climates: Westford, MA. Westford, MA. Project Overview

Ontario Standard Building Spec for A277 Mini Homes- March 2018 Specifications based on Mini Home with insulated floor

Design Project I. Zero Energy Homes. EDSGN 100 Section 003. Team Wally

Sapporo Net-Zero Energy Home Hokkaido, Japan. Description. Setting. Super E Canadian Member. Super E Japanese Member. Super E Case Study

GENERAL & AXIAL LOADBEARING

9.36. Energy Efficiency

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

WE International, Inc.

Some Performance Results and Lessons Learned from EQuilibriumTM Housing Monitoring Avalon Discovery 3

Passive House Project documentation

City of High Point Airport Overlay District Noise Level Reduction Design Standards

Ontario Standard A277 Modular Building Spec - March 2018 Specs are based on Modular homes installed on full basements

$308,900. Caleb Crescent Collection The Algonquin Model 1113 Sq. Ft. Elevation A. Updated: September 28, Elevation B

6" TRIM AT GARAGE DOORS (TYP) 6" TRIM (TYP) OPTIONAL PATIO DOOR

Values That Matter PLAN CERTIFICATION WORKSHEET

National Grid Deep Energy Retrofit Pilot Program Cape Basement Renovation Turned Comprehensive DER

SINGLE FAMILY PASSIVE HOUSE case studies

ENERGY STAR Qualified Homes National Program Requirements, Version 3.0

Step Code for Part 9 Buildings: Process and Case Studies

Consumer Energy Tax Credit

National Building Code Part 9 Energy Efficiency: Focus Paper to Assist in the Review of Proposed Changes

OR LEGAL DESCRIPTION PLAN: BLOCK: LOT: APPLICANT / CONTACT:_ INSPECTION RESULTS TO BE MAILED TO THIS ? YES NO

Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12

ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING

Framing Methods Structural Components

Jamie Shipley Senior Advisor Ontario Region Research and Information Transfer

The Elithis Tower is an experimental and demonstration. Elithis Tower in Dijon, France. nzeb case studies

ENERGY STAR Homes version 3 Designing and Building to Meet the 2011 Changes. Thursday, February 24, 2011

Secondary Suite This form is used for both existing and new construction of a secondary suite in an existing structure

Deep Green Retrofits. Rob Dumont Dumont and Associates

Required effective insulation values are available on information sheets for each climactic zone.

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

Building Guide. Colorado Chapter of the International Code Council

Customer A101. Front Elevation. Roof Peak 24' /32" Roof 17' - 6" Main Floor 9' - 6" Floor Joist 8' - 6" Basement 0' - 6" Grade 0' - 0"

Chapter 1: Compliance

DESIGN SUMMARY: Shadow Trail. Passive Solar, Forest Meadow Home. Conceptual Drawings

Town of Pawling Residential Building Permit Application

A. GENERAL INFORMATION

Morning Glory Meadows 8345 North Morning Glory Road Paradise Valley, Arizona

GENERAL & WIND BEARING

lighthouse Martin Rose Sheppard Robson

Transcription:

RESEARCH HIGHLIGHT March 2015 Technical Series Design and Construction of the Northern Sustainable House Arviat, Nunavut INTRODUCTION To support sustainable housing design in the North, Canada Mortgage and Housing Corporation (CMHC) has worked with northern housing providers to conceptualize, design, build and monitor innovative highly energy-efficient housing projects in each of the three territories. The goals of the Northern Sustainable House (NSH) initiative are to demonstrate approaches to affordable, energy-efficient and sustainable housing while addressing the local housing needs and taking into account the interests of future occupants as well as the community and other stakeholders. Each of the demonstration projects followed a similar process whereby input from the local community was sought through an integrated design charrette to ensure input and buy-in from stakeholders. Participants worked to create housing designs that targeted a minimum 50% reduction in the energy consumption relative to the 1997 Model National Energy Code for Houses (MNECH) while striving to address unique cultural needs of the local community in terms of living space functionality. This highlight provides a summary of the design and construction of the Northern Sustainable House (NSH) in Arviat, Nunavut (figure 1). The NSH in Arviat was designed and built by the Nunavut Housing Corporation (NHC). Design charrette Housing in Arviat is confronted with significant construction challenges such as cold weather, limited building season, shortage of skilled labour, the need for long lead times and high cost of materials and shipping. Wind load, Figure 1 Northern Sustainable House in Arviat (Credit: NHC) snow drift, permafrost, and infrastructure requirements (for example truck-hauled water) add to the challenge of designing and building durable, energy-efficient and affordable housing. The Arviat NSH began with two design charrettes and workshops in 2005 and 2006 to engage the local community and stakeholders in discussions pertaining to identified challenges as well as cultural and family demographic concerns. The objective of the charrettes was to help ensure that proposed design of the Arviat NSH would address all technical and cultural requirements.

Design and Construction of the Northern Sustainable House Arviat, Nunavut The Arviat NSH project was specifically developed to meet the following objectives: 1. To meet the cultural and lifestyle needs of the local community with regard to housing design and performance. 2. To develop practical knowledge on energy-efficient, culturally appropriate houses in the North. 3. To compare different building envelope systems for ease of construction, maintenance and energy consumption. The design team developed and evaluated two alternative energy-efficient wall systems for the house: a double-wall system and a 165-mm (6.5-in.) structural insulated panel (SIP) wall assembly. The final design included features such as different winter and summer entryways, a cool room for sewing skins, and an open-concept living room/kitchen to accommodate large family gatherings. Window orientation on the south facade maximizes solar gains while the building form provides deflection from the cold northern wind. The proposed house design was presented to the original charrette participants who generally acknowledged that the design addressed the needs of the Inuit family. Design features The Arviat NSH is a one-storey, three-bedroom, 142-m 2 (1,530-sq.-ft.) open concept house that was completed in early 2013 (figure 2). 6-4 1/2 45-0 STORAGE (UNHEATED) WATER TANK WATER TANK MECH ROOM BEDROOM 1 SEALIFT BEDROOM 1 MASTER BED BOILER BATH HOT WATER 2-0 1/2 WIND PORCH FOYER 2 30-7 BEDROOM 2 SEWING ROOM KITCHEN DINING ROOM/ LIVING ROOM FOYER 1 W/D 11-0 1/2 21-1/2 +0 - WIND PORCH 5-4 1/2 Figure 2 Floor plan of the Northern Sustainable House in Arviat (Credit: NHC) 2 Canada Mortgage and Housing Corporation

Design and Construction of the Northern Sustainable House Arviat, Nunavut The unit has a highly insulated building envelope, an energy-efficient oil-fired boiler, a dual-speed heat recovery ventilator, triple-glazed windows, double doors on both entryways to provide an air lock, and a shed-style roof to provide wall area for future installation of photovoltaic or solar thermal hot water system (figure 3). Concurrent with the construction of the Arviat NSH, the NHC also built a second house, known as the E/2 SIP house, next to the NSH with the same orientation and on the same street in Arviat, to compare the performance of the houses with different wall assemblies. With everything else being identical to the Arviat NSH, the E/2 SIP house was constructed with 165-mm (6.5-in.) structural insulated panels assembly, as compared to the NSH which is stickbuilt using a double-wall system comprised of a staggered 38x89 mm (2x6 in.) and 38x140 mm (2x4 in.) wall assembly. The aim was to gain experience with both wall constructions, and to compare the ease of construction and energy performance of the houses given their respective wall assemblies. Foundation The Arviat NSH was built on a gravel pad and is supported by screw jacks that can be levelled individually as needed. An engineered laminated beam floor system supports the house. The crawl space between the gravel pad and the bottom of the floor is open to the exterior environment and is unheated. The gravel pad was laid and had time to settle for three years before the house was built. Roof The shed-style roof of 2:12 slope was constructed to increase the area on the southeast facade of the house for future solar panel integration. Tyvek spun-bonded olefin wrap was provided on the exterior of the roof assembly as the air barrier, and the 0.15-mm (6-mil) polyethylene near the interior of the assembly functions as a vapour barrier. LOCATION OF FUTURE PHOTOVOLTAICS Figure 3 Southeast elevation, Arviat NSH (Credit: NHC) Canada Mortgage and Housing Corporation 3

Design and Construction of the Northern Sustainable House - Arviat, Nunavut Building envelope The Arviat NSH was designed with a highly insulated building envelope: Ceiling designed at RSI-11.6 (R-66) nominal rating Double-wall assembly achieving RSI-8.0 (R-46) nominal rating Windows achieving RSI-0.92 (R-5.2) nominal rating Floor above crawl space insulated to RSI-9.1 (R-51.5) nominal rating The wall assembly of the Arviat NSH is a double-wall system consisting of a 38x140 mm (2x6 in.) exterior wall, a 12-mm (½-in.) air gap, a 38x89 mm (2x4 in.) interior wall, and 38x38 mm (2x2 in.) horizontal strapping with 37.5-mm (1.5-in.) rigid insulation on the interior. Thermal bridges are minimized by staggering the studs of the interior and exterior wall frames and the installation of a layer of interior rigid insulation. The wall assembly was designed so that the exterior 38x140 mm (2x6 in.) wall and the interior 38x89 mm (2x4 in.) interior wall could be assembled and then tacked in place without touching. Plywood strips were installed to brace and separate the two stud walls. Exterior sheathing was then installed, followed by the roof. The whole envelope was enclosed in Tyvek spun-bonded olefin wrap over the exterior of the wall and roof assemblies as a continuous air barrier system. The wall was then insulated and the 0.15-mm (6-mil) polyethylene was attached to the inside of the 38x89 mm (2x4 in.) wall as the vapour barrier. The 38x38 mm (2x2 in.) strapping was installed on the interior with 37.5-mm (1.5-in.) rigid insulation and finished with 12 mm (½-in.) drywall. Special attention was paid during construction to ensure the continuity of the air barrier system in the building envelope. Space heating The Arviat NSH uses an oil-fired boiler (Energy Star ) with a rated AFUE of 86.5%. It has an input of 112 MBH (32.8 kw) and an output of 98 MBH (28.7 kw). With a Weil Mclean zone controller WMCR-6, the heating system circulates hot water to Slant/Fin model 351-14 hydronic baseboard heaters inside each room. The oil-fired boiler also heats a 151-L (40-U.S.-gallon) indirect domestic hot water tank. The domestic water for the Arviat NSH is supplied by truck service and there is a 1,514-L (400-U.S.-gallon) cold domestic water holding tank in the mechanical room. Mechanical ventilation As is standard practice in new housing construction with the NHC, a heat recovery ventilator (HRV) in the house provides efficient and economical, year-round mechanical ventilation, supplies fresh air to all occupied rooms, and exhausts air from the kitchen and bathroom. Given space constraints in the mechanical room of the Arviat NSH, the HRV was installed in the heated ceiling space above the hallway. ENERGY MODELLING OF DESIGN OPTIONS FOR THE NSH The Northern Sustainable House initiative set a design objective to achieve a 50% reduction in energy consumption relative to the 1997 Model National Energy Code for Houses. Natural Resources Canada s HOT2000 residential energy consumption simulation tool was used to model the constructed unit. The modelling indicated that the modelled Arviat NSH consumes about 44% less energy than the MNECH baseline house. In terms of affordability, compared to the MNECH baseline house, the Arviat NSH is projected to consume approximately 70 kwh ($50) less in electricity and 2,200 Litres ($2,600) less in oil annually. Table 1 outlines the additional cost of envelope upgrades to the Arviat NSH as compared to typical construction. 4 Canada Mortgage and Housing Corporation

Design and Construction of the Northern Sustainable House - Arviat, Nunavut As evaluated by HOT2000, the Arviat NSH would achieve an EnerGuide rating of 85. An equivalent house in Arviat built to the standards of MNECH 1997 (baseline house) was also modelled in HOT2000 and achieved an EGH rating of 73. While the modelled results for the Arviat NSH fell just short of the 50% energy reduction goal, the EGH rating puts the Arviat NSH in the same category as some of the most energy-efficient new houses currently on the Canadian market. Table 1 Standard NHC system Arviat NSH system Additional cost of envelope upgrades of the Arviat NSH, compared to typical NHC construction Floor Wall Roof 305-mm (12-in.)deep joists No changes 38x140 mm (2x6 in.) with RSI-3.9 (R-22) + 38-mm (1.5-in.) semi-rigid insulation Add interior 38x89 mm (2x4 in.) with RSI-2.8 (R-16) batt insulation 2 layers of RSI-3.9 (R-22) batt + 38 mm (1.5-in.) semirigid insulation Deeper joist + 1 more batt of RSI-3.9 (R-22), no rigid insulation IMPLICATIONS FOR THE NORTHERN HOUSING INDUSTRY This project demonstrates that sustainable housing technologies and practices can be successfully deployed within the very challenging context of northern housing. In this respect, integrated design charrettes have a role to play in transforming local industry and consumer attitudes, awareness and knowledge regarding higher performance housing. Active engagement of all stakeholders from planning through to the commissioning can help innovative housing projects meet their objectives. The project also demonstrated the importance of quality assurance protocols to help ensure materials and systems are installed as planned and performed as expected. Finally, the project shows how innovative technologies and practices can be applied to housing projects in the Far North and the challenges associated with the deployment and maintenance of such systems. Additional material cost Additional labour cost Total additional cost N/A $2,300 $3,140 N/A $4,700 $500 $7,000 $3,640 Canada Mortgage and Housing Corporation 5

Design and Construction of the Northern Sustainable House Arviat, Nunavut CMHC Project Manager: Cate Soroczan Consultant: Arctic Energy Alliance Housing Research at CMHC Under Part IX of the National Housing Act, the Government of Canada provides funds to CMHC to conduct research into the social, economic and technical aspects of housing and related fields, and to undertake the publishing and distribution of the results of this research. This Research Highlight is one of a series intended to inform you of the nature and scope of CMHC s research. To find more Research Highlights plus a wide variety of information products, visit our website at www.cmhc.ca or contact: Canada Mortgage and Housing Corporation 700 Montreal Road Ottawa, Ontario K1A 0P7 Phone: 1-800-668-2642 Fax: 1-800-245-9274 2015, Canada Mortgage and Housing Corporation Printed in Canada Produced by CMHC 17-03-15 Although this information product reflects housing experts current knowledge, it is provided for general information purposes only. Any reliance or action taken based on the information, materials and techniques described are the responsibility of the user. Readers are advised to consult appropriate professional resources to determine what is safe and suitable in their particular case. Canada Mortgage and Housing Corporation assumes no responsibility for any consequence arising from use of the information, materials and techniques described.