Backer Box INSTALLATION

Similar documents
Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips)

Installation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips)

Installation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips)

Installation Guide and Safety Manual QuietClip (Resilient Sound Isolation Clips)

Low-Profile Multi-Piece Shower with blue, high-density polyurethane bottom

Understanding Flanking Noise

FREEWILL BARRIER FREE ACRYLIC BATH AND SHOWER MODULES

Installation Guide and Safety Manual

Multi-Piece Shower with Trench Drain

Duct Wrap Flexible Wraps

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

30mm Height Linear Drain Shower Trays

A Rater s perspective from the field. Thomas H. Marston, February 21, 2007

INSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required:

GypLyner (Ceilings) Concealed grid ceiling lining system. GypLyner UNIVERSAL.

Multi-Piece Shower with Trench Drain

GypLyner UNIVERSAL (Ceilings)

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

Install Guide D4B-IC2A-R-T-3 SERIES BRO I/C AIR TIGHT HOUSING

SECTION GYPSUM BOARD ASSEMBLIES

(Suited for seismic categories A, B, C, D, E, F)

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Impression Graphic panels

Section 11 FIRE STOPPING

Multi-Piece Shower with Trench Drain

FORMWORK 66 x 40 x 24 Lithic Freestanding or Alcove Box Bathtub Installation Guidelines. STYLE No. CAUTION: BATHTUB IS EXTREMELY HEAVY

Install Instruction LOOP RECESSED

Multi-Piece EasyStep Product Installation Instructions

PROVEN, RELIABLE SOUND CONTROL COST EFFECTIVE SOLUTION FOR WALLS/CEILINGS MULTI-FAMILY, SINGLE FAMILY, HOME THEATER

ROOF MOUNT KIT OWNERS MANUAL

Chapter 14 - Air Sealing

ROOF MOUNT KIT OWNERS MANUAL

PROVEN, RELIABLE SOUND CONTROL COST EFFECTIVE SOLUTION FOR WALLS/CEILINGS MULTI-FAMILY, SINGLE FAMILY, HOME THEATER

Multi-Piece EasyStep Product Installation Instructions

A. Flat corner wall-to-wall See page 8. C. Outside corner wall-to-wall See page 8. B. Inside corner kit wall-to-wall See page 7

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

RSIC-1-LOW PROFILE SOUND ISOLATION CLIP RSIC-1-LOW PROFILE INSTALLATION GUIDE RSIC-1 LOW PROFILE. For use in conjunction with the RSIC-1 clip

RSIC-1-LOW PROFILE SOUND ISOLATION CLIP RSIC-1-LOW PROFILE INSTALLATION GUIDE RSIC-1 LOW PROFILE. For use in conjunction with the RSIC-1 clip

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

HOMEGA DESCRIPTION. UNIQUE PATENTED PRODUCT ON THE MARKET US Patent No CAN Patent No

SECTION GYPSUM BOARD

RSIC-1-LOW PROFILE INSTALLATION GUIDE

SECTION GYPSUM BOARD & SHEATHING SYSTEMS

1850 x 40/50mm Raised Shower Tray Kit

GypLyner (walls) Metal framed wall lining system. GypLyner.

ASC ACOUSTIC. ASC IsoDamp Guide to High Performance Soundproofing. Table of Contents SCIENCES CORPORATION. Introduction Page 2

DEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A

AUTHORIZATION TO MARK

METALWORKS RH215 Faceted Custom Hook-on Panels

Explaining the Thermal Bypass Checklist. Ed Minch, Energy Services Group Kelly Parker, GWS

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 17

Model 5000 Cargo Lift Installation and Operations Manual

Installation Instructions

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 11

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Feature Zone IECC 2009 IECC

Container Installation Guide

Please Note: PhoneStar was previously branded as Phonewell

Insulation boards PhoneStar

3/4/5 LBS SJ. Low Base 3, 4 and 5 piece Showers with SnapJoint. Installation Instructions

SQUARE SUN TUNNEL INSTALLATION INSTRUCTION

PLYWOOD FLOATING FLOOR

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

SECTION GYPSUM BOARD ASSEMBLIES

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System

Solve your noise problem. Call now to get it right the first time

1. What are the benefits of Decorative Wall Panels? 2. Where can these decorative panels are used? 3. Are the panels waterproof?

METHOD STATEMENT FOR Dry Wall With Resilient Clip

Adjustable Suspension Hanger Technical Datasheet

Staggered stud acoustic partition system

Basic Suspension Systems

Interior Hangers. Application

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

Model 5200 Cargo Lift Installation and Operation Manual

Suggested Materials and Tools:

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

RSIC-1-INSTALALTION GUIDE RSIC-1 SOUND ISOLATION CLIP

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

PC-PH SERIES BTUH

Specialists in Acoustic Flooring and House to Flat Conversions

SECTION SOUND ISOLATION

Product Guide Specification

CEILING & WALL SYSTEMS

Technical performance and principles of system design

NatureScape. 3 Thermally Broken 2 Non-thermal

Suggested Materials and Tools:

INSTALLATION AND OPERATING INSTRUCTIONS

The ultimate impact resistant partition

Contents. Timber framing to be installed in accordance with AS:1684 Metal framing to be installed in accordance with BCA Volume: 2

GypWall RAPID db Plus

P36-10 / P36E-10 Gas Fireplace. 11 W.C. (2.74 kpa) 10 W.C. (2.49 kpa) 6.4 W.C. (1.59 kpa) 22,000 BTU/h (6.44 kw) 28,500 BTU/h (8.

SECTION GYPSUM BOARD PART 1 - GENERAL

Transcription:

Backer Box INSTALLATION & BUILDING GUIDE 10.625" 17.5" Green Glue Cement Board Light Fixture 7/16 OSB 1

Building a Backer Box We all love the look of the light from an array of recessed ceiling cans. Be warned that a great deal of sound will travel through these thin metal cans. What can be done? Generally, the best method of encapsulating the sound coming through the can is to build a Backer Box. There are two main schools of thought on building Backer Box. 1. Cut a rectangular hole and slide a Backer Box up in the joist cavity. 2. Have a Backer Box up in the ceiling already, then drywall and cut a round hole for the light following manufacturing specifications. Both have difficulties. However, number 2 is clearly better for drywall finishing. We will pursue that option through this guide. The trick is having the Backer Box in the ceiling while not attaching any part of the light-can to existing structure (joists). Note: Backer Boxes can also be used for sealing up wall sconces, multi-gang outlets and other large drywall penetrations. Remodeling Light-Can Halo - H99RT (4 Aperture) CLIENT: Project: Backer Box Installation and Building Guide Description: The Soundproofing Company, presents these construction concepts with the understanding that local Building Codes vary. It is the responsibility of the installer to ensure that these concepts meet local Building Codes. The Soundproofing Company is not liable for mis-installation or non-compliance with local Building Codes. Revision: 2

Lighting Selection: Use a remodel light-can rather than a new construction light-can. Use the smallest diameter light-can available. This generally is 3-4 in diameter. Remodeling Light-Can Halo - H99RT (4 Aperture) New Construction Light-Can Halo - ET400 (4 Aperture) 4 5/8" 5 1/4" 11-1/2" 5" 5" 4 1/2" The remodel light-can will be attached to the drywall. The Backer Box will be sealed to the top surface of the ceiling drywall, eliminating any flanking path. The telescoping arms of the new Construction-Light will allow sound to travel into the ceiling joists. We want to avoid this. 3

Box dimensions: Consider the location where the Backer Box will be placed. Backer Boxes in your project may have different space limitations. Following the lighting manufacturer recommendations to determine how large the Backer Box should be. The light can needs to have sufficient clearance space (see manufacturer s recommendations). 10.625" 17.5" Green Glue Cement Board Light Fixture 7/16 OSB 4

The outside of box is built first, made from 7/16 OSB or plywood. Screw the panels together. Cut 1/4 or 3/8 cement board to line the inside of the OSB box. Apply Green Glue to the back side of Cement Board and then apply. 5

Install the bottom and the four sides of the Cement Board to the OSB/Plywood box. Screw Cement Board into place compressing the Green Glue between the OSB/Plywood and Cement Board. Seal the Cement Board edges with SilenSeal Acoustical Sealant. 6

Drill access hole for the electrical wiring. Make the hole just large enough to thread the wiring. Later we will seal this hole with SilenSeal Acoustical Sealant or Putty Pad. Apply SilenSeal Acoustical Sealant around the top edge of the box. 7

2" 2" 2" Add a small nailing flange to the box. That flange will accommodate the SilenSeal Acoustical Sealant later. The Backer Box cannot contact any original framing, pipe, duct, etc. 8

Run electrical wire according to local building codes. Leave the wire 24 longer than necessary inside the box. Run the wire through the boxes. Bend the wires so the wires won t slip back through the hole in the box. The wires are now temporarily holding the box in place in the joist cavity. 9

You can use a DC-04 Clip to secure the box to the joist. This will allow your Backer Box to remain in position without creating an additional flanking path. If your budget allows, this will help ease installation of finished drywall. (Make sure the Backer Box is installed at the same height of your joists or furring channel. The Backer Box needs to sit tight to the drywall.) Add a small amount of fiberglass insulation (no paper face) into the box. The location isn t a concern, but some absorption in the box to reduce resonance is preferred. 10

When you are ready to install the ceiling drywall, pre-mark the holes for the ceiling-can. Use the manufactures template to acquire a tight fit. Double check with a dry fit and then cut the hole before installing the drywall. Apply a heavy dose of SilenSeal Acoustical Sealant to the bottom of the Backer Box flange before installing drywall. 11

Adjust the final Backer Box location. You should easily be able to move the box where it needs to go (you have 24 of extra wire to adjust the Backer Box). Secure the Backer Box flange with drywall screws. This will securely seal the Backer Box and SilenSeal Acoustical Sealant to the ceiling drywall. 12

Seal the hole where the wire enters the box with SilenSeal Acoustical Sealant. Connect electrical wiring to light-can s junction box. Follow manufactures specifications for installation. With remodeling clips seated properly in can, insert the junction box into the Backer Box. 13

Hold light fixture against ceiling and push clips through the drywall hole. Lock clips into place by pushing flat portion against side of can (depending model). After drywall is finished and painted, install trim kit and bulb. Note: Backer Boxes can also be used for in-wall speakers, wall sconces and multi-gang outlets. 14