Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Similar documents
Design of Stormwater Wetlands

Green Infrastructure Flood Reduction Computations

RETENTION BASIN EXAMPLE

Effect of Land Surface on Runoff Generation

Design Example Residential Subdivision

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.

Permeable Pavement: A New Chapter

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Modeling Infiltration BMPs

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

Rational Method Hydrological Calculations with Excel COURSE CONTENT

FROM ROOFTOP TO DRAIN NON-TRADITIONAL APPLICATIONS OF HEC-RAS 2D FROM ROOFTOP. Calibration: A Hands-On Approach to Making a Model Reflect Reality

Water Resources Management Plan

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

SFPUC Wastewater Enterprise URBAN WATERSHED MANAGEMENT PROGRAM

SFPUC Wastewater Enterprise URBAN WATERSHED MANAGEMENT PROGRAM

EVALUATION OF VOLUME IN TWO BIOSWALE. Judy Horwatich US Geological Survey

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Infiltration Stormwater Control Measures. Andrew R. Anderson, M.S., E.I.T. Extension Associate Engineer

Appendix A. Compliance Calculator Guidance

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach

ORDINANCE APPENDIX F STORMWATER MANAGEMENT DESIGN CRITERIA

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017

NAU DRAINAGE PLAN NAU WATER BUFFALO ENGINEERING JIANGNAN YI CONNOR KLEIN YUZHI ZHANG YI YANG

Introduction to Storm Sewer Design

9220 Wightman Road, Suite 120 Montgomery Village, Maryland Phone Fax

WQ-08 ENHANCED DRY SWALE

Sizing Calculations and Design Considerations for LID Treatment Measures

USDA-ARS Runoff Drainage System Design

Memorandum. MIDS Work Group Barr Engineering Company

Modelling LIDs using PCSWMM and EPA SWMM5. March 28, 2012 Presented by: Rob James (CHI) Credit to: Lewis Rossman (US EPA)

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

CHAPTER 3 Water Quality Standards

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F:

Module 3: Rainfall and Hydrology for Construction Site Erosion Control

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

At least 2 feet above the seasonal high water table Overflow path or structure provided

How Climate Change Impacts Urban Runoff and Water Quality Design

Extended Detention Basin Design

Stormwater Quality Review Checklist - General

Minimum Design Criteria: Shaping the Future of Stormwater Management

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

Credit Calculations and Calculator Functions

Appendix C.1. Design Example 1 Shallow Wetland (W-1)

Table of Contents CHAPTER. Chapter 2 Hydrologic Analysis. 2.1 Estimating Runoff

Grass Channel STORMWATER MANAGEMENT SUITABILITY KEY CONSIDERATIONS

Runoff Calculations. Time of Concentration (T c or t c ) from one location to another within a watershed. Travel

Drainage Analysis. Appendix E

Introduction Hydrologic Analysis Existing Site Description

Tom Ballestero, Rob Roseen, James Houle, Tim Puls, Federico Uribe, Josh Briggs

APPENDIX A: STORMWATER HYDROLOGY

APPENDIX F RATIONAL METHOD

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

Permeable Pavement Hydrologic Modeling

12/19/2007. Due to limited land area, many coastal towns discharge stormwater into the ocean or into sounds/bays

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

Cumulative Precipitation

PRELIMINARY DRAINAGE STUDY

Runoff Hydrographs. The Unit Hydrograph Approach

iswm TM Technical Manual Hydrology:

Technical Memorandum

C-1. Infiltration System

Appendix 10-A. Optional Recharge Volume Approach

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Storm Water Standards 105

Design Example Handouts. DURANGO DETENTION WORKBOOK LUNCH AND LEARN CITY OF DURANGO Meeting Date: February 7, 2017

Water Quality Management Plan

Porous Pavement Flow Paths

Preliminary Drainage Analysis

Activity Calculating Property Drainage

Surface Skimmer and Baffle Sediment Basins, Modeling the Benefits

State-of-the-Practice Porous Asphalt Pavements. Kent R. Hansen, P.E. Director of Engineering National Asphalt Pavement Association

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Hydraulic and water quality analysis of an established bioretention cell using controlled flood testing

Ballard Phase I/Retrofit Supplemental Monitoring Plan

Applying the Water Quality Volume

Dr. Britt Faucette, PhD, CPESC, LEED AP Ecosystem Scientist. Designing with Nature: Compost Blankets & Filter Socks for Erosion & Sediment Control

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

WinSLAMM v Program Modifications Final, 3/16/19

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

LID PLANTER BOX MODELING

Natural and Engineered Wetlands for Stormwater Management

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Water Resources Management Plan Appendix B

REFERENCES AND DESIGN AIDS FOR ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II

Utilizing Sorbtive Media to Enhance Green Infrastructure Practices. Robert A. Gallucci, PE Imbrium Systems, Inc.

Transcription:

Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to Treat 2 Determine Surface Area Required 3 Select Soil Type 4 Decide Depth of Soil 5 Size Underdrain Pipes 6 Select Appropriate Overflow Bypass Treatment Volume: Background Collect Data: Watershed Area Watershed Composition (rooftop, lawn, parking lot) If permeable areas: Soil Type & Group? Treatment Volume: Background Determine Curve Number: Function of Land Use and Soil Group Range from mid 30 s to 98 Higher # More Runoff Developed by USDA-NRCS Treatment Volume: Curve Numbers Land Use/ Cover Soil Group A B C D Parking Lot/ Rooftop 98 98 98 98 Lawn, etc (grass 49 69 79 84 cover 50-75%) Lawn, etc (grass 39 61 74 80 cover > 75%) Woods in Fair Condition 36 60 73 79 1

Composite CN or Not? Treatment Volume: Curve Numbers Composite? Not issue if only one land use/soil type If distinct regions Do NOT composite If watershed is well mixed Composite Treatment Volume: Curve Numbers Composite? Use following Equation: CN COMP = %W/S A CN A + %W/S B CN B Where A & B are Land Use-Soil Type zones within Watershed (W/S) Treatment Volume: Calculation Three Part Process: 1 Decide Design Storm 2 Determine Runoff from Each Land Use/ Soil Type 3 Multiply by Watershed Area Treatment Volume: Calculation 1 Decide Design Storm: Varies from 0.50 to 1.50 Dependent on... frequency of rainfall developed condition 1.00 Typically Used Treatment Volume: Calculation 2 Runoff Produced per Land Use/Soil Type: Use Curve Numbers (CN) Calculate Storage Volume on and within Soil (S) S = 1000 CN - 10 where S in inches 2

Treatment Volume: Calculation 2 Runoff Produced per Land Use/Soil Type: Use Storage Volume (S) and Design Storm (P) to Calculate Runoff (R/O) Employ SCS Equation Treatment Volume: Calculation 3 Multiply by Watershed Area Volume of Runoff to Treat Vol TREAT = A R/O R/O = (P - 0.2S) 2 (P + 0.8S) Treatment Volume: Example Treatment Volume: Example Given: Total Watershed Area of 10,000 sf 2,000 sf of rooftop 8,000 sf of dense growth lawn Find: Volume of Water To Treat from P=1.00 Treatment Volume: Example Find Volume of Runoff from Rooftop 1 Determine Curve Number: 98 2 Find Soil & Surface Storage, S: S = 1000/ 98-10 S = 0.20 Treatment Volume: Example Find Volume of Runoff from Rooftop 3 Find Runoff, R/O, from Design Storm P=1.00 S = 0.20 R/O = (1.0-0.2 0.20) 2 (1.0 + 0.8 0.20) R/O = 0.80 inches 3

Treatment Volume: Example Find Volume of Runoff from Rooftop 4 Find Total Volume to Treat, Vol TREAT R/O = 0.80 Watershed Area = 2000 sf Vol TREAT = 2000 sf 0.80 in Vol TREAT = 1600 sf-in (133 cf) Treatment Volume: Example Find Volume of Runoff from Lawn 1 Determine Curve Number: 74 2 Find Soil & Surface Storage, S = 3.51 in 3 Runoff Amount, R/O = 0.02 in 4 Treatment Volume, Vol TREAT = 160 sf-in Treatment Volume: Example Find Total Volume from Roof & Lawn Vol TREAT (roof) = 1600 sf-in Vol TREAT (lawn) = 160 sf-in Vol TREAT (total) = 1760 sf-in Vol TREAT (total) = 147 cf Bioretention Surface Area Factor of Vol TREAT and Allowable Depth Vol TREAT previously determined Bioretention Surface Area Allowable Water Depth range from 6 to 18 PG Co, Maryland specifies 6 Author suggest 6-9 reasonable for most applications 15-18 only if VERY SANDY application (e.g. in Sandhills) Bioretention Surface Area Divide Vol TREAT by Average Depth S/A = Vol TREAT D where S/A = surface area (sf) Vol TREAT = volume stored in B-R (sf-in or cf) D = Average Depth of Water (in or ft) 4

B-R R Surface Area: Example Given: 1760 sf-in of water to be stored in Bio-Retention area Normal Depth = 9 Find: Required Surface Area B-R R Surface Area: Example S/A = 1760 sf-in 9 in S/A = 200 sf Bioretention Soil: Type What is In-Situ Soil? Will site be compacted during construction? Alabama Study found Infiltration Rates in Sand Decrease 10 fold If In-Situ Soil tighter than Sandy Loam OR Significant Construction, then Bioretention Soil: Type Underdrains and Fill Soil Needed Bioretention Soil: Type Selecting Fill Soil Type 1 By Permeability: K range from 0.5 to 6 per hour 1 to 2 in/hr (REC) 2 Recipe 85% - 88% Sand 8-12% Fines (Silt+Clay) 2-5% Organic Source 5

Bioretention Soil: Type Selecting Fill Soil Type 3 Mix of Known Fill Media 20-30% Ball Field Mix 70-80% Medium Sand In Phosphorus Sensitive Waters choose low-medium P-Index (15 to 30 in NC) How Deep does the soil media need to be? Bioretention Soil: Depth Vegetation Depth (ft) Comments Grass 1.5-2.0 Minimum Shrubs/Trees 2.5-3.0 Minimum Shrubs/Trees 3.5-4.0 Optimum Shrubs/Trees > 4.0 Sufficient but Extra Cost Bioretention Soil: Depth Think about the Pollutant TSS? Metals? Phosphorus? Nitrogen? Fecal Coliform? Temperature? No Required Depth Soil Depth > 12 inches Soil Depth > 12 inches Soil Depth > 30 inches No Required Depth Soil Depth > 36 inches + 4 Hours +18 Hours BR Water Table Depth Manual states 6 is closest high w.t. can be to the surface? Is that too restrictive? Depends on Depth of Bioretention area Recommend: No W.T. within 2 feet of bottom B-R Area 6

Bioretention Water Table 24 Water Flow Through Bioretention Assume Device follows Darcy s Law Q = K A H/L where K = Hydraulic Conductivity A Surface Area of Bio-Retention H = Height of Water above Gravel Layer L = Thickness of Soil Darcy s s Law Applied to B-RB Bioretention Water Table Soil - K (hydraulic conductivity) L H Ponding Zone Soil Zone Drainage pipes with gravel envelope Calculating Drawdown Calculating Drawdown 1 Calculate Drawdown Rate from Darcy s Law 2. Find Drawdown for Ponding Zone 3 Find Drawdown for Soil Zone Pond Soil Find Drawdown Rate Use Darcy s Law Assume H L Therefore, H/L 1 Q = (2.3E-5) K A 1 units: Q (cfs), K (in/hr), A (sf) 7

Calculating Drawdown Calculating Drawdown Ponding Zone Soil Zone 1 Find Treatment Volume 1 Choose Soil Porosity 2 Divide Treatment Volume by Drawdown Rate 2 Find Treatment Volume 3 Divide Treatment Volume by Drawdown Rate Given: A bioretention area is 200 sf. Bioretention has 4 feet deep layer of soil with K= 1 in/hr. Water allowed to pond 9 inches. Find: Time to Draw water down 24 from surface once Bioretention is full. 1 Find Drawdown Rate Q = 2.3E-5 1in/hr 200sf Q = 0.0046 cfs 2 Find Time to Drain Ponding Zone I. Determine Ponded Volume V P S/A d V P 200sf 0.75sf V P 150 cf 8

2 Find Time to Drain Ponding Zone II. Find Time to Remove Ponded Water T P = V P Q T P = 150 cf 0.0046 sec T P = 33,000 sec T P = 9 hours 3 Find Time to Drain Soil Zone I. Select Soil Drainable Porosity, n Range from 0.25 to 0.50 depending upon soil type and how loose it is Assume Fill Soil Loose Choose n = 0.45 3 Find Time to Drain Soil Zone II. Determine Volume in Top 24 V S S/A n 2 V S 200sf 0.45 2 V S 180 cf 3 Find Time to Drain Soil Zone III. Find Time to Remove Water from top 24 of Soil T S = V S Q T S = 180 cf 0.0046 sec T S = 39,000 sec T S = 11 hours 4 Total Drawdown Time T P + T S = Total Time Total Time = 9 + 11 hours Total Time = 20 hours Underdrain Pipe Selection Soil Layer with Drawdown Rate, Q This is within 48 hour window. Drainage pipes with gravel envelope 9

Selecting Drawdown Pipes As Factor of Safety: Design for pipes to remove 5-10X amount of water that flows thru Soil Find the Pipe Diameter, D, for a Type of Pipe (manning n) Use Form of Manning Equation: D = 16 (Q n s 0.5 ) 3/8 Selecting Drawdown Pipes Pipe Type and Diameter 4 Single Wall Corrugated Plastic 4 Smooth Wall Plastic 6 Single Wall Corrugated Plastic 6 Smooth Wall Plastic Manning Roughness Coefficient 0.014-0.015 0.010-0.011 0.014-0.015 0.010-0.011 Selecting Drawdown Pipes Find underdrain combination to handle water drawdown rate Redundancy of Pipes? Gravel Envelope at least 2 above top of drawdown pipe. Selecting Drawdown Pipes: Example Given: Bioretention Area with area = 200sf and drawdown rate, Q, of 0.0046cfs Find: Number & Diameter of Underdrain Pipes. Selecting Drawdown Pipes: Example 1 Flow Through Soil is Q SOIL =0.0046 cfs 2 Apply Factor of Safety (10) to Flow Q PIPE = 0.046 cfs 3 Assume 4 or 6 Smooth-Walled Plastic to be used. Manning Coeff: n = 0.011 10

Selecting Drawdown Pipes: Example 4 Assume Internal Slope of Pipe s = 0.5% 5 Insert Parameters into Manning Equation. D = 16 (0.05 cfs 0.011 0.005 0.5 ) 3/8 D = 2.6 inches Selecting Drawdown Pipes: Example 6 Choose NXD combination to carry flow > Q 2.6 inches. Select one 4 corrugated plastic pipe. 7 Decide if Redundancy is needed. If so, two 4 pipes used. 8 Gravel Envelope: 6 thickness minimum (4 pipe + 2 cover). Converting Pipe Diam to # of 4 4 or 6 Pipe Diameters Sizing the Overflow Weir D < (inches) 5.13 5.95 6.66 7.22 # of 4 4 Underdrains 2 3 4 5 D < (inches) 7.84 9.11 10.13 # of 6 6 Underdrains 2 3 4 Set allowable Height of water OVER ponding height Typically 2 (if parking lot median) BUT, could be higher (ex: 4, 6 ) Dependant upon Design Needs Use Weir Equation Q = C W L H 3/2 Sizing the Overflow Weir Adjusted Weir Equation L = Q (C W H 1.5 ) where L= Length (ft) Q = Peak Flow from Design Storm (cfs) C W = Weir Coefficient (set to 3) H = Height of Water above Weir (ft) Sizing the Overflow Weir: Example Given: Runoff from 0.4 AC parking lot. 10-year, 24-hour storm outlet control; 2 Max Height Find: Required size of Outflow Bioretention Area Outflow Weir Parking Lot 11

Sizing the Overflow Weir: Example 1 Find Peak Flow Q P (10) C I A where Q P = Peak Flow (cfs) C = Rational Runoff Coefficient I = Rainfall Intensity (in/hr) A = Watershed Area (acres) Sizing the Overflow Weir: Example 1 Find Peak Flow For Parking Lot, C = 0.95 RDU, 10-year, 24-hour I = 7.22 As given, A = 0.4 AC Q P =3 cfs Sizing the Overflow Weir: Example 2 Find Weir Length Know: C W = 3; H = 0.17 ; Q = 3 cfs Insert in: L = Q (C W H 1.5 ) L = 14.25 ft Sizing the Overflow Weir: Example 3 Convert to Outlet Size Outlet has 4 sides. Perimeter = Weir Length 1 side square outlet = Weir Length 4 14.25 4 3.5 X 3.5 OR 42 X 42 box 42 11 9 Surface Drawdown 12

2-Yr Storm Routing Account for Surface Drawdown Depends on Fill Media Type Loamy Sand (1.5 2.0 in/hr) Sandy Loam (0.5 1.0 in/hr) Example of this found in Bioretention Model to be used this afternoon Bioretention Q p Mitigation F l o w ( c f s ) 25.00 20.00 15.0 0 10.0 0 5.00 0.00-5.00 1/3 Inflow Vol Stored 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 Tim e (m inute s) In flo w (P o st D e v Q ) BR Outflow pre-dev 13