IT IS HEREBY ENACTED AND ORDAINED by Paradise Township, York County, Pennsylvania as follows:

TOWNSHIP OF LOWER, COUNTY OF CAPE MAY, STATE OF NEW JERSEY ORDINANCE NO

HEIGHT, TOTAL SYSTEM: The height above grade of the system, including the generating unit and the highest vertical extension of any blades or rotors.

Section 11.01: Zoning Ordinance Subdivision 9.4: Utility and Communication Uses. 96 Chapter 11: Planning and Development

WIND ENERGY CONVERSION SYSTEMS

PAINT TOWNSHIP SOMERSET COUNTY, PENNSYLVANIA. ORDINANCE NO. OS ai? - I \

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)

Cheshire, MA SMALL WIND ENERGY SYSTEMS 12.0 SMALL WIND ENERGY SYSTEMS

Section 2202 Applicability. This regulation applies to all lands within the boundaries of Austintown Township, Mahoning County, State of Ohio.

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

EXCERPT FROM EMMET COUNTY ZONING ORDINANCE. A. Definitions For purposes of this section, the following definitions shall apply:

6.5 SMALL WIND ENERGY SYSTEMS

NORTH EAST TOWNSHIP ORDINANCE NO.2013-

CITY OF DELANO COUNTY OF WRIGHT STATE OF MINNESOTA ORDINANCE NO.

6.6 RESIDENTIALLY-SCALED, LAND-BASED WIND ENERGY CONVERSION FACILITIES

WINTHROP, MAINE SMALL WIND ENERGY SYSTEMS ORDINANCE

TOWNSHIP OF WEYMOUTH ATLANTIC COUNTY NEW JERSEY ORDINANCE NO

ARTICLE X TRANSMISSION TOWER REGULATIONS

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

SMALL WIND ENERGY FACILITIES ORDINANCE. Ordinance No

Local Law No. 3 of 2015, entitled: Solar and Wind Energy Facilities Law

Addition to Section 4 - Special Use Regulations

Zoning Regulations for Large and Small Wind that are Working

SECTION 11. ACCESSORY USES. Accessory uses are permitted in any zoning district in connection with any principal use, which is permitted.

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent

MEETING DATE: ADOPTED ON EARTH DAY: APRIL 22, 2008 AGENDA ITEM COMMENTARY

CHAPTER 14 WIND AND SOLAR ENERGY

WIND ENERGY CONVERSION SYSTEMS APPLICATION

BILL NO. B ORDINANCE NO TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

Wind Energy ARTICLE XL - WIND ENERGY AN ORDINANCE REGULATING THE DEVELOPMENT OF WIND ENERGY SYSTEMS

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

Abandonment means to discontinue use with no intentions of rehabilitation of use or reinstating use within the next 18 months.

TITLE 20 MISCELLANEOUS CHAPTER 1. TELECOMMUNICATIONS TOWERS AND ANTENNA ORDINANCE. CHAPTER 1 TELECOMMUNICATIONS TOWERS AND ANTENNA ORDINANCE

Nance County Zoning Regulations for Wind Energy Conversion Systems

West Mead Township Crawford County, Pennsylvania Ordinance No

Proposed UNION COUNTY ORDINANCE # 73

COUNTY OF CAPE MAY STATE OF NEW JERSEY ORDINANCE NO ESTABLISHING REGULATIONS FOR SMALL WIND ENERGY SYSTEMS AND SOLAR ENERGY SYSTEMS

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity.

CHAPTER 1292: WIND ENERGY TURBINES

ARTICLE 16 CITY OF EUDORA ZONING REGULATIONS

2.04 Applicability. This ordinance applies to all unincorporated lands within the boundaries of Henry County.

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6

Box Elder County Land Use Management & Development Code WIND ORDINANCE

Ordinance. No

ARTICLE XII. NONCONFORMING USES, STRUCTURES, AND PROJECTS

CITY OF TONKA BAY COUNTY OF HENNEPIN STATE OF MINNESOTA ORDINANCE NO

DIVISION 15. TELECOMMUNICATIONS

SECTION ENERGY SYSTEMS (WIND AND SOLAR)

ORDINANCE OF THE NEWTON COUNTY BOARD OF COMMISSIONERS TO REPEAL CONFLICTING PROVISIONS; AND TO AMEND THE ZONING ORDINANCE OF NEWTON COUNTY, GEORGIA

Humboldt County Ordinance #68 Commercial/Utility Grade Wind Energy Conversion Systems (WECS) PURPOSE DEFINITIONS

City of Walker DRAFT 1_6_09 Wind Energy Ordinance

Clustering: The grouping of wind turbines positioned or occurring closely together around a particular dwelling.

ORDINANCE # AN ORDINANCE ESTABLISHING REGULATIONS FOR SMALL WIND ENERGY SYSTEMS AND SOLAR ENERGY SYSTEMS

WIND ENERGY CONVERSION SYSTEMS (Section Added by Ordinance 52-M, Effective ) (As Amended by Ordinance 52-P, Adopted )

Town of Rensselaerville LOCAL LAW NO. 2 OF THE YEAR 2009


Ordinance Number AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS

17. Commercial WECS S P X X X X X X X X B C

The following are exceptions to the use regulations of the district regulations of this ordinance.

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

ORDINANCE BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF NORTH MYRTLE BEACH, SOUTH CAROLINA, IN COUNCIL DULY ASSEMBLED, THAT:

Town of Lyme Renewable Energy Law

Town of Allegany Wind Energy Regulations. Proposed Amendments to the Town s Zoning Ordinance Draft: February 13, 2007

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses:

A LOCAL LAW # 2 FOR THE YEAR 2006 AMENDING THE ZONING LAW OF THE TOWN OF COHOCTON, NEW YORK TO REGULATE WINDMILLS AND WINDMILL FACILITIES

Proposed Southampton Substation Microwave Tower May 31, 2017

ARTICLE 12 - PERFORMANCE STANDARDS 12-1 GENERAL REQUIREMENT

YOLO COUNTY ZONING CODE TITLE 8 LAND DEVELOPMENT CHAPTER 2: ZONING REGULATIONS. Article 11: Energy and Telecommunications Development Standards

BOARD OF COUNTY COMMISSIONERS FOR SOMERSET COUNTY, MARYLAND ORDINANCE NO.

MARTIN COUNTY WIRELESS COMMUNICATION FACILITIES

CHAPTER 43 WIRELESS TELECOMMUNICATIONS TOWERS

ORDINANCE #12 CLARKE COUNTY TELECOMMUNICATIONS TOWER AND ANTENNA ORDINANCE

City of Rome, NY Site Plan Review Application Checklist Consult Chapter 80 of the City of Rome Code of Ordinances.

H 6062 S T A T E O F R H O D E I S L A N D

Joe Rust Company

SECTION 16. REGULATIONS FOR I-1 INDUSTRIAL DISTRICT

DRAFT Commercial Solar Bylaw November 8, 2011

CHAPTER 725. Solar Farms.

NOTICE OF POSTING OF A PROPOSED ZONING TEXT AMENDMENT ORDINANCE

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

Proposed Boykins Substation Microwave Tower May 31, 2017

ARTICLE VIII - RESIDENTIAL DISTRICT R-3. be for one or more of the following uses:

SOLAR ENERGY CONVERSION FACILITIES. Carroll County Code of Public Local Laws & Ordinances As of December 1, 2015

MOBILE HOME DISTRICT OR "MH" DISTRICT AND MOBILE HOMES EXCLUSIVE OF MOBILE HOME DISTRICTS (Ord.No )

ARTICLE 11.5 STANDARDS FOR TELECOMMUNICATIONS ANTENNAE AND TOWERS

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee:

Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS

Acreage: Total acreage, /- Area to be considered, 10,000+/- square feet disturbed area

TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO ADOPTED: October 1, EFFECTIVE: October 22, 2018

Wind Energy System Zoning Ordinance

CHAPTER 23 WIRELESS TELECOMMUNICATIONS TOWERS AND ANTENNAS

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

ARTICLE XII. (O-1, O-2, O-3, O-4) OFFICE DISTRICT REGULATIONS

CHAPTER 4 FENCE REGULATIONS

PROPOSED TEXT AMENDMENT TO THE EATON COUNTY LAND DEVELOPMENT CODE

ORDINANCE NO. BEAVER TOWNSHIP, BAY COUNTY, MICHIGAN, ORDAINS:

THERFORE, the Board of Supervisors hereby adopts the following amendments to the Zoning Ordinance by adding the following:

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

Transcription:

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 Section 1. Purpose and Intent The purpose of this article is to regulate the placement, construction and modification of small wind energy systems while promoting the safe, effective and efficient use of small wind energy systems and not unreasonably interfering with the development of independent renewable energy sources. Section 2. Definitions Hybrid system: An energy system that uses more than one technology to produce energy or work (for example, a wind-solar system). Small Wind Energy System: A wind energy conversion system consisting of a single wind turbine, a tower and associated control or conversion electronics, which will be used primarily to reduce on-site consumption of utility power. System Height: With regard to a small wind energy system, the tower height plus the blade length. Tower: With regard to the small wind energy system, the structure on which the small wind energy system is mounted. Tower Height: With regard to the small wind energy system, the height above grade of the fixed portion of the tower, excluding the wind turbine itself. Turbine: The parts of the small wind energy system including the blades, generator and tail. Section 3. Permitted Zones: A-1 Agricultural, M-1 Industrial, M-2 Industrial Section 4. Applicability The requirement set forth shall govern the siting of small wind energy systems used to generate electricity or perform work, which may be connected to the utility grid pursuant to Virginia s net metering laws (Section 56-594, Code of Virginia), serve as an independent source of energy or serve as a hybrid system. Section 5. Siting Requirements The requirements for siting and construction of all small wind energy systems shall include the following: 1. Small wind energy towers shall maintain a galvanized finish or silver, gray, offwhite or white finish to reduce visual obtrusiveness. A photo simulation shall be required. 2. Small wind energy systems shall not be artificially lighted unless required by the FAA or appropriate authority. 1 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS

3. Small wind energy systems shall not have any flags, signs, writing or advertising. 4. Small wind energy systems shall not exceed forty five (45) decibels during normal operation, as measured at the closest non-participating property line. That level, however, may be exceeded during short term events such as severe windstorms. 5. The applicant shall provide evidence that the proposed height of the small wind energy system meets current code and industry standards for structural stability to include increased loading for high wind weather events, ice storms, etc. 6. The applicant shall provide evidence that the provider of electric utility energy service to the site has been informed of the applicant s intent to install an interconnected customer-owned electricity generator, unless the applicant intends and so states on the application, that the system will not be connected to the electric grid. This action shall not construe approval for net metering by the electric utility. 7. The applicant shall provide information demonstrating that the system will be used primarily to reduce on-site consumption of utility electricity. 8. The wind energy tower height shall not exceed a maximum height of sixty five (65) feet on a parcel of less than five (5) acres or a maximum height of eighty (80) feet on a parcel of five (5) acres or more. 9. The minimum distance between the ground and any protruding blades utilized on a small wind energy system shall be fifteen (15) feet as measured at the lowest point on the blades. The supporting wind energy tower shall also be enclosed with a six (6) foot tall fence or the base of the wind energy tower shall not be climbable for a distance of twelve (12) feet. 10. The applicant shall provide proof of adequate liability insurance for a small wind energy system. Whether or not the applicant is participating in the net metering program, the applicant shall meet the insurance coverage requirements set forth in 20 VA 50315-60. 11. The small wind energy system generators and alternators shall be constructed so as to prevent the emission of radio and television signals and shall comply with the provisions of Section 47 of the Federal Code of Regulations, Part 15 and subsequent revisions governing said emissions. 12. On-site power or transmission lines to the maximum extent possible shall be placed underground. 13. The small wind energy system shall be sited to reduce the possibility of shadow flicker. 2 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS

14. Small wind energy systems shall not be permitted in overlay Historic Districts or within five hundred (500) feet of such districts, only with a special exception permit and after finding that it will have minimal or no visual impact on the Historic District. Section 6. Compliance with Federal and State Regulation: 1. Compliance with the Uniform Statewide Building Code: Building permit applications for the small wind energy system shall be accompanied by standard drawings of the wind turbine structure, including the wind energy tower, base and footings. An engineering analysis of the wind energy tower showing compliance with the Uniform Statewide Building Code and certified by a licensed professional engineer shall also be submitted. 2. Compliance with FAA regulations: Wind energy systems shall comply with applicable FAA regulations, including any necessary approvals for installations close to airports. 3. Compliance with the National Electric Code: Building permit applications for small wind energy systems shall be accompanied by a line drawing of the electrical components in sufficient detail to allow for a determination that the manner of installation conforms to the National Electric Code. 4. Compliance with regulations governing energy net metering: Small wind energy systems connected to the utility grid shall comply with the Virginia Administrative Code 20 VAC 5-315: Regulations Governing Energy Net Metering. 5. Compliance with American National Standards Institute (ANSI). Section 7. Removal of Defective or Abandoned Wind Energy Systems: Any wind energy system found to be unsafe by the Building Official shall be immediately repaired by the owner to meet federal, state and local safety standards or it shall be immediately stabilized and removed within ninety (90) days. Any abandoned wind energy system shall be removed within ninety (90) days. Section 8. Setbacks In addition to the requirements established above, the small wind energy system shall be set back a distance of at least three hundred (300) feet from adjacent property lines, one thousand (1,000) feet from occupied buildings of non-participating property owners and 500 feet from occupied dwellings of participating property owners. In the case of more than one requirement for the setback, the more stringent shall govern. If sound levels of the wind are exceeded at the prescribed setbacks, then the setbacks shall be increased to meet the decibel levels indicated, or the small wind energy system shall meet all of the setback requirements for primary structures for the zoning district in which the small wind energy system is located in addition to the requirements set forth 3 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS

above. Additionally, no small wind energy system guy wire anchors may extend closer than two hundred (200) feet to the property line. 4 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS

85 5 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS