Excellence in. Modular Building Design

Similar documents
Z SYSTEMS CORPORATION 4902 Roy J Smith Drive Killeen, TX 76543

2. House Designs. SAL Review

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING

RESIDENTIAL DESIGN GUIDELINES FOR BENT TREE OF ROGERS

Architectural Design Standards - Character

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r

West Valley Community Design Guidelines & Process Review. November 6, 2015

Virginia. County of Powhatan, Application: Development Design Pattern Book. For Office Use Only. Case Number. Date of Approval

SMOKY RIDGE HOMEOWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITTEE (ACC) GUIDELINES EFFECTIVE DATE: April 22, 2019

City of Aurora, Ohio. Architectural Board of Review. Residential Guidelines

Link to APPENDIX Title Page. Appendices

City of Richmond Zoning Ordinance Page 12-1

Residential Uses in the Historic Village Core

Architectural GFRC. Project Gilbert Christian High School. L. Smith / H & S International LLC. general contractor. S T O N E Location Gilbert, Arizona

GREEN PASTURES - RESIDENTIAL ARCHITECTURAL REVIEW GUIDELINES

ARCHITECTURAL REVIEW CHECKLIST ARCHITECTURAL REVIEW SUBMITTAL REQUIREMENTS SINGLE MODEL

DRAFT IV. RESIDENTIAL NEW CONSTRUCTION

PROJECTS COMPLETED WITH DIVERSIFIED EMPLOYEES (COMMERCIAL)

Yorkshire United Methodist Church

Single Family District

(d) Metal buildings used for industrial uses are not exempt from additional landscape standards as required in Section (e).

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

PROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station

Yorkshire United Methodist Church

Maintaining Materials Within the District

Residential Design Standards Draft 9 August 2013

Architectural Standards

Construction Table of Contents

CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS

Public and Institutional Development

Deferred Maintenance Plan

Standards for Single Family Detached Lots

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

MASONRY, ARCHITECTURE DESIGN AND BUILDING STANDARDS


Division 09 FINISHES TABLE OF CONTENTS

Design Guidelines. The Lakefront

South Main Station. 150 Main Street, Longmont, Colorado 16" COMMON PARAPET DETAIL AREA. Date

Architectural Standards

Corridor Commercial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Building Excellence IV Capital Levy Projects Under Construction

Staff Review June 12, 2013

CENTRAL GREAT PLAINS SERIES

COLORADO'S TIMBER RIDGE HOMEOWNERS ASSOCIATION POLICY AND ARCHITECTURAL GUIDELINES FOR IMPROVEMENTS (As Revised (1/18/2018)

Introduction. Massing and Overall Form. Catalina. Catalina is a 111 lot, single-family home community by Costain Arizona, Inc.

KEEGO HARBOR ARCHITECTURAL DESIGN CHECKLIST

The Cabin Shell Series

RESIDENTIAL DESIGN GUIDELINES - INFILL

1. Adequate framing details, sizing, spacing and technical information shall be indicated on the documents.

Residential Design Guidelines Village of Elwood, Illinois

Architectural Standards

SALT LAKE CITY HISTORIC LANDMARK COMMISSION

Introduction. Massing and Overall Form. Ridgeview Estates. Ridgeview Estates is a 48 lot, single-family home community by Trammel Crow.

flexible spaces all the right places... fogg.com Resource Business Centre I, II, III & IV 5399 Lancaster Dr. & Resource Dr.

CITY OF CANANDAIGUA ARCHITECTURAL STANDARDS

Overlay Design Guidelines. Prairie Village Overlay Design Guidelines

SECTION 6.3 DOWNTOWN HISTORIC DISTRICT (DTH)

Corsicana High School

Unity Office Building 400 Unity Street Latrobe, PA 15650

OLDE WEST CHESTER ARCHITECTURAL ADVISORY GUIDELINES

Commercial Development

AGILITAS Property Development

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

Alderbrook Homes in Phase 1

HENSON FARMS HOMEOWNERS ASSOCIATION BUILDER PACK

Manufacturing Facilities Proposal

Guidelines for New Construction in Albany s Residential Historic Districts & Neighborhoods

SECTION 8. COMMERCIAL ZONING DISTRICTS

BUILDING DESIGN STANDARDS

Introduction. Massing and Overall Form. Andalusia I and II

Chapter Institutional District

The developer / builder desires to follow the Design Guidelines and Design Features as listed below in lieu of the Basic Standards.

NARI National 2018 CotY Program Categories Please read category descriptions carefully as some criteria have changed.

STAGE 9 ARCHITECTURAL GUIDELINES. TAMANI COMMUNITIES #200, Ave SE, Calgary, AB, T2Z 3X1

Roof Tutorial Wall Specification

Mountain West SERIES

AN OFFERING OF 1661 EAST OGLETHORPE HIGHWAY FLEMINGTON, LIBERTY COUNTY, GEORGIA PRESENTED BY WHITLEY AND ASSOCIATES, INC.

Wallingford, CT. Project Manager: Karen Charest Ext. 233

TECHNICAL MANUAL TITLE 4 - ARCHITECTURAL

The CornerStone Cottage Series

THE PRESERVE ARCHITECTURAL DESIGN GUIDELINES

City of Valdosta Land Development Regulations

Exterior Elevations and Materials

Environment Planning Development Solutions, Inc.

306 6th Street SW

Architectural Design The design of new buildings is intended to be referential to existing traditional buildings in Lititz Borough.

STAFF BRIEF. Kristin Park

INTERIOR PACKAGED FEATURES: EXTERIOR PACKAGED FEATURES: (4) 2BR/2 Bath Apartments - 1,005 Sq. Ft. Per Apt. Built to Benchmark Specifications.

AN ALL-SINGLE STORY DEVELOPMENT IN A BEAUTIFUL MASTER PLAN COMMUNITY In Picturesque. Mesquite, NV Sales: or

Moonlight Architecture, Inc. Architecture Interior Design Site Planning

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Corridor Commercial Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Estimating & Scope. Additional Lessons Tools / Measuring / Masonry / Framing/

Advanced Building Technologies

PARAGON RESIDENTIAL DESIGN

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

Roof Tutorial. Chapter 3:

CLASS A OFFICE BUILDING

Inspection Report. Property Address:

Transcription:

Excellence in Modular Building Design 2008 & 2009

2010 2nd Place Honorable Mention Permanent Office Under 10,000 sq. ft. Pacific Mobile Marysville Branch Marysville, WA The factory was able to incorporate the engineering on the entire site-built aspect of the project to make the assembly of the building very straight forward. The roof design and entry portico, in combination with the factory components, created a finished product that had no resemblance to typical modular construction. Throughout the process we made a conscience effort to not use any finishes that were considered to be typically used in modular buildings. Examples of this are the tape/ textured walls, custom carpeting, slate tile flooring, oak hardwood fooring, tegular ceiling with parabolic lighting, custom cabinetry with unique hardware, and custom exterior lighting.

2010 2nd Place Honorable Mention Temporary Office Under 5,000 sq. ft. Bureau of Reclamation Folsom Dam Folsom, CA This 2160 square foot modular office building was built with (3) standard 12x60 building sections and is being used for a sheriff s training & locker room. The interior layout was designed for the training room to be next to main entrance lobby, plus have separate entrances to the restrooms & locker room area. The break room was positioned so it can double as a large work space outside the private offices. We also added some closets for additional storage capability. The exterior stucco finish and steel entry porch was incorporated to take away the typical modular building look.

2009 2nd Place Honorable Mention Temporary Office over 5,000 sq. ft. Joint Powers Authority Riverside, CA Two buildings of 5,760 and 2,880 sq. ft., respectively, were designed and built for a large office staff to move to an entirely different location, the March Air Reserve Base. This was due to their current office being old, small and originally being designed for different purposes. The March JPA worked with us to design and build two buildings to accommodate their increasing staff and conference needs. The primary building utilizes eight 12 x60 floors and consists of fourteen private offices, two large conference rooms, a break room, IT rooms, file storage, and a cubicle area. The second building consists of four 12 x60 floors; its primary purpose in design is for large development meetings consisting of private and government interests.

2009 2nd Place Honorable Mention Temporary Office under 5,000 sq. City of Atwater Atwater, CA This modular building, consisting of two 36 x60 sections attached in an L shape configuration, was part of an expansion project for city services. While the building provides offices for city departments, it is also publicly accessed. Since this is located on city property, it needed to blend with a permanent building that was built in 1968. Placement of the building required consideration of an existing parking lot, handicap access and a water feature.

2007 2007 Honorable Mention Temporary Office: under 5,000 sq. ft. St. Andrews Church Sumner, WA

2007 2007 Honorable Mention Renovated Reuse: Greatest Renovation Bellingham Airport Bellingham,WA

2006 2006 Honorable Mention Permanent Office: under 10,000 sq. ft. Asante Three Rivers Grants Pass, OR This 4,990 sq. ft. permanent office building was build as additional office space for the Asante Three Rivers Hospital, and was installed ground level (access to the building via concrete sidewalks). The building features items such as painted sheetrock interior walls, painted interior door/window trims with accent walls, 26 ounce nylon carpeting, a T-grid suspended ceiling with recessed lighting and site-installed Dryvit stucco siding with large roof mansards.

2006 2006 Honorable Mention Permanent Modular or Assembly under 5,000 sq. ft. Olympic National Park Forks, WA

2006 2006 First Place Permanent Modular or Assembly over 5,000 sq. ft. Samoan Christian Fellowship Des Moines WA This 12,488 sq. ft. building was designed to fit into a mixeduse neighborhood with family homes, a large public school and another church/school nearby. Both modular construction (administration/classrooms/foyer) and panelized construction (sanctuary) were used in the process of erecting Samoan Christian Fellowship. The sanctuary was built first, the modular units were crane-set next, and then the roof was erected over the entire structure. The administration portion featured 11 suspended ceilings, while the sanctuary featured 25 high painted sheetrock ceilings. The sanctuary also featured a concrete sloped floor in order to allow parishioners to see the stage better.

2005 2005 First Place Special Application under 10,000 sq. ft. The Wine Group Ripon, CA The 108 x 50 & 24 x 34 L shaped laboratory features 10 tall interior ceiling height, exterior lap siding, 18 mansard accentuating the roof line of the modular, perimeter chassis for permanent foundation, HVAC split system with hepa filters at every supply register, custom fume hoods, specialty UV lighted rooms, acid resistant cabinetry, deck to deck interior wall system for sound dampening, 27 skylights for natural lighting, Orion chemical piping for acid disposal, sprinkler system, Stanley automatic door entry system, eye wash and emergency shower station, multiple offices, break room, multiple restrooms, and tape, texture, and painted interior finish.

2005 2005 First Place Medical/Administrative Clinic Shoalwater Bay Wellness Clinic Tokeland, WA This two-story medical building was designed to blend in with the existing buildings on-campus which included a variety of exterior sidings and color schemes. Due to the fact that the building is sited less than 200 feet from the Pacific Ocean, the clinic had to be engineered and built to meet a 100 mph, Exposure D wind-rating. This structure was the most complex building that Pacific Mobile has ever built and features an elevator and lifetime warrantee fiberglass exterior doors (due to the extreme rust-conditions common in sea communities).

2005 2005 First Place Education over 10,000 sq. ft. Smith Valley School Kalispell, MT This school was on a very tight budget, thus the structure was value-engineered for maximum cost-effectiveness with low-maintenance specifications. The imterior features painted sheetrock interior walls, suspended T-grid 8 ceilings with recessed lights, painted wood interior doors and window trim, and 28 ounce nylon carpeting. The exterior features painted vertical-groove concrete siding and an architectural shingle 3/12 pitch roof with 16 eaves.

2005 2005 Honorable Mention Permanent Education over 5,000 sq. ft. St. Madeleine Sophie Catholic School Bellevue WA Three 1,792 sq. ft. permanent classroom buildings were built in a campus-style layout with a grasses-in courtyard. The classrooms featured roof dormers and large front porches, which were installed ground-level to allow access via concrete sidewalks. The office building features items such as painted sheetrock interior walls, painted interior door/window trims with accent walls, 1/8 block tile flooring, vaulted sidewalls with T-grid suspended ceilings, lap-siding with board and batt siding.

2005 2005 Honorable Mention Education under 5,000 sq. ft. Monroe Montessori School Monroe, WA This childcare building had to be permanent, fit the design of the criteria of an adjacent residential community and meet the client s project budget. The building was built to look contemporary and attractive to an upscale clientele, at the client s request and features a a 5 X 12 pitch, architecture shingle roof.

2005 2005 Best Entry Education under 5,000 sq. ft. Seattle Pacific University Seattle, WA Seattle Pacific University was a two phase project that involved building a 4,000 sq. ft. classroom facility first, then later installing a 3,000 sq. ft. classroom facility directly adjacent to the first structure. These structures were designed to match the existing brick buildings which were highly visible. Limiting traffic noise in the classroom was extremely important. Each building included sound-rated windows and metal sound-channels inside the exterior walls. To incorporate audio-visual displays featuring manually-operated screens, the facilities were designed so that a portion of each classroom had 10 ceilings.