SESAR Solution Regulatory Overview

Similar documents
SESAR Solution Regulatory Overview

SESAR Solution Regulatory Overview

SESAR Solution Regulatory Overview

SESAR Solution Regulatory Overview

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Notice of Proposed Amendment

The Network Strategy Plan. Brian Flynn

ICB Industry Consultation Body

Stakeholder Consultation Workshop on the Draft Regulatory Material.

WHAT IS THE SESAR DEPLOYMENT PROGRAMME

Building a regulatory framework for remote aerodrome ATS

Final Project Report. Abstract. Document information

SRC POSITION PAPER. Review of the Product Safety Case for Local And sub-regional ASM Support System (LARA) Version 1.2, dated 08 December 2010

Industry Consultation Body. Role of the Interoperability sub-group. 18 th December 2008 ETSI

EUROCONTROL Guidelines on conformity assessment for the interoperability Regulation of the single European sky

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT

of 28 May 2010 AND for a Commission Regulation XXX/2010 on safety oversight in air traffic management and air navigation services

ESARR 1 SAFETY OVERSIGHT IN ATM

EASA Standardisation Annual Report 2015 How are we doing?

Navigating CPDLC Mandate for ANSPs: Status and the Road to Completion WAC 2017

EUROCONTROL Guidelines on conformity assessment for the interoperability Regulation of the single European sky

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT

Single European Sky Interoperability Regulation

SESAR Overview. WAKENET3 Europe Workshop. Paul Adamson SJU Programme Manager (WP6/12)

L 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL.

NEFAB Project Initiative 10 Joint Evaluation of Technology within CNS and ATM

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project SAFETY CASE REPORT. Version 3.

Final Project Report. Abstract. Document information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

Acceptable Means of Compliance (AMC) and. Guidance Material (GM) to Part-ATM/ANS.OR. Common requirements for service providers

Final Project Report. Abstract. Document information

Subject matter and scope

We also believe that among the objectives of the RMT the following should be added:

SESAR Deployment Alliance AISBL. Resourcing Call for ADS-B Planning Expert

SESAR development and deployment

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT. Information note

THE ROADMAP FOR DELIVERING HIGH PERFORMING AVIATION FOR EUROPE. European ATM Master Plan

Single Sky II and the aviation package

C-Roads Platform Terms of Reference

EAM 4 / GUI 6 EXPLANATORY MATERIAL ON GROUND BASED SAFETY NETS

C-Roads Platform Terms of Reference

SESAR Deployment Programme

ICB Industry Consultation Body A high level vision for achieving the Single European Sky

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

ANNEX 5 -QUALITY OVERSIGHT 1. INTRODUCTION 2. SCOPE

EUROCONTROL Guidance Material for Approach Path Monitor Appendix B-2: Generic Safety Plan for APM Implementation

SESAR Deployment Alliance Resourcing Call III for the SESAR Deployment Manager

COMMISSION REGULATION (EU)

Call for Expression of Interest EASA Graduate Traineeship Programme (GTP) 2018

PLANNING GUIDANCE MATERIAL FOR SESAR DEPLOYMENT PROGRAMME IMPLEMENTATION PLANNING VIEW. 20 December 2017 LET S DELIVER TOGETHER

ICB Industry Consultation Body

Master Plan edition 2

Contextual note SESAR Solution description form for deployment planning

DEPLOYMENT PROGRAMME December 2017 LET S DELIVER TOGETHER

CEF Transport Info day 2016 Greece

Iris Public Event summary & activities in Salzburg, 5 February 2013

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT MANDATE TO CEN/CENELEC/ETSI FOR THE DEVELOPMENT OF

NAVISAT. Certification Study - Phase 2. Initial Requirement Baseline

H2020-SESAR WA 1: Exploratory Research

2) AGENDA ITEM 1 WELCOME, INTRODUCTION AND WORKSHOP OBJECTIVES

SESAR European ATM Master Plan & SESAR2020

Change Management in the ATM Industry Principles and Process

Memorandum of Understanding (MoU)

P Final Project Report

Clean Power for Transport. The Directive on the deployment of alternative fuels infrastructure

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU)

AIR NAVIGATION SERVICE PROVIDERS

COMMISSION REGULATION (EU)

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL. Measures of the Permanent Commission MEASURE N

New Regulatory Framework for UAS CEPT Workshop on Spectrum for Drones/UAS Copenhagen, The EASA Team

THE SESAR PROGRAMME R&I 2020: FUTURE DEVELOPMENTS

RECOMMENDATION FOR USE RFU-CCS-077

Air Traffic Standards Oversight. Guidance Notes for complying with Commission Implementing Regulation (EU) 1035/2011 Common Requirements

ACCEPTABLE MEANS OF COMPLIANCE AND GUIDANCE MATERIAL TO COMMISSION REGULATION (EU) NO XXX/XXXX

Notice of Proposed Amendment Embodiment of Level of Involvement (LOI) requirements into Part-21

PUBLIC LIMITE EN COUNCIL OF THE EUROPEAN UNION. Brussels, 22 May /07 Interinstitutional File: 2005/0235 (CNS) LIMITE AVIATION 92

SRC DOCUMENT 46 SAFETY SCANNING

ICB Industry Consultation Body

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Single European Sky (SES)and the relation with the Global Performance Framework Version 2. A user guide

INTERMEDIATE REPORT ON THE DRAFT REGULATORY APPROACH FOR

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Iris Annex. (Prepared by the European Space Agency) V1.1, 1/10/2008

Work Package Final Report

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Subject matter and scope

SESAR & NextGen Working together for Aviation Interoperability

ATM & UTM INTEGRATION

NEFAB Project Feasibility Study Initiative 6 Harmonisation of Operational Rules and Procedures

RECOMMENDATION FOR USE

ENAV EUROCONTROL FREQUENTIS INDRA

SESAR Deployment Programme

DEPLOYMENT PROGRAMME Mai 2017 LET S DELIVER TOGETHER

Guidance Material for SESAR Deployment Programme Implementation

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment

COMMISSION DELEGATED REGULATION (EU) No /.. of XXX

Post-ops performance adjustment process

Safety Regulation for Rail Sector in Europe

Terms of Reference Energy Finance Consultant

Implementation of the Single European Sky and its extension to Third countries

Transcription:

SESAR Solution Regulatory Overview Extended projected profile (EPP) availability on ground Document information Document Name Extended projected profile (EPP) availability on ground Edition 01.00.00 Abstract This document contains an overview of the SESAR Solution Extended projected profile (EPP) availability on ground documented recommendations from regulatory, standardisation, oversight and certification perspectives resulting from the cooperation between the SESAR Joint Undertaking and the EASA and National Authorities. 1 of 8

Authoring & Approval Prepared By - Authors of the document. Name & Company Position & Title Date Mara Dame Regulatory Affairs expert 03/11/2016 Document History Edition Date Status Author Justification 00.00.01 21.10.2016 Draft MDA Incorporation of initial results 01.00.00 03.11.2016 Final MDA Finalised document 2 of 8

Table of Contents 1 INTRODUCTION... 4 2 GENERAL RECOMMENDATIONS... 5 3 SPECIFIC RECOMMENDATIONS... 6 3.1 ON THE REGULATORY FRAMEWORK... 6 3.2 ON THE STANDARDISATION FRAMEWORK... 6 3.3 ON THE REGULATORY OVERSIGHT AND CERTIFICATION ACTIVITIES... 6 3 of 8

1 Introduction The purpose of this document is to provide an overview of the SESAR Solution Extended projected profile (EPP) availability on ground documented recommendations from regulatory, standardisation, oversight and certification perspectives resulting from the cooperation between the SESAR Joint Undertaking and the EASA and National Authorities. The document presents the recommendations issued by the National Authorities and EASA, for an acceptable deployment of the concepts contained in the SESAR Solution. These recommendations must be taken into consideration by the entities in charge of deployment of the correspondent SESAR Solution. 4 of 8

2 General recommendations In general terms, it must be underlined that: 1) When deploying a SESAR Solution, the compliance with all applicable regulatory requirements must be ensured by the different concerned entities; 2) In particular, it must be ensured that the appropriate safety argument for the concerned change to the ATM functional system is performed in accordance with Commission Implementing Regulation (EU) 2016/1377 of 4 August 2016 laying down common requirements for service providers and the oversight in air traffic management/air navigation services and other air traffic management network functions, repealing Regulation (EC) No 482/2008, Implementing Regulations (EU) No 1034/2011 and (EU) No 1035/2011 and amending Regulation (EU) No 677/2011 confirming validity of assumptions of the SESAR solution, addressing local specific risks and mitigation providing evidence that residual risks are acceptable. 3) The present SESAR Solution does not constitute in itself an acceptable Means of Compliance with the previously mentioned regulatory requirements. Means of Compliance are subject to their acceptance by the Authorities involved in each concrete local implementation. 4) A verification of the existing standardisation and regulatory frameworks has to be done before the date of local deployment to identify possible major changes to the ones applicable for the SESAR Solution. 5 of 8

3 Specific recommendations 3.1 On the Regulatory Framework On Regulatory part stakeholders should follow EASA activities within RMT.0524 Data link services Development of requirements for extended data link operations for safety-critical message use, including D-TAIX, DCL, protected mode controller pilot data link communication (PM CPDLC), D-ATIS and controller pilot data link communication (CPDLC), automatic dependent surveillance contract (ADS-C) outside VHF data link coverage. This task is stemming from the single European sky (SES) initiative and SESAR and will address the PCP ATM functionality 6 requirements as well as the existing issues related to the current DLS regulation (Regulation (EC) No 29/2009). It is foreseen to issue ToR and NPA for this task on 2017 Q2, Opinion on 2018 Q4 and Decision on 2019 Q4 3.2 On the Standardisation Framework The standardisation documents to be applied by the airborne part for EPP functionality are: - ED-228A Safety and Performance Requirements Standard for Baseline 2 ATS Data Communications Revision A; - ED-229A Interoperability Requirements Standard for Baseline 2 ATS Data Communications Revision A. 3.3 On the Regulatory Oversight and Certification Activities When proceeding with the local implementation of this solution, and following Commission Implementing Regulation (EU) 2016/1377, changes in the ATM functional system derived from the deployment of this solution are subject to the elaboration of a safety argument considering local specific risks and mitigation measures to those risks. ATM/ANS.OR.C.005 Safety support assessment and assurance of changes to the functional system (a) For any change notified in accordance with ATM/ANS.OR.A.045(a)(1), the service provider other than the air traffic services provider shall: (1) ensure that a safety support assessment is carried out covering the scope of the change which is: (i) the equipment, procedural and human elements being changed; (ii) interfaces and interactions between the elements being changed and the 6 of 8

remainder of the functional system; (iii) interfaces and interactions between the elements being changed and the context in which it is intended to operate; (iv) the life cycle of the change from definition to operations including transition into service; and (v) planned degraded modes; and (2) provide assurance, with sufficient confidence, via a complete, documented and valid argument that the service will behave and will continue to behave only as specified in the specified context. (b) A service provider other than an air traffic services provider shall ensure that the safety support assessment referred to in point (a) comprises: (1) verification that: (i) the assessment corresponds to the scope of the change as defined in point (a)(1); (ii) the service behaves only as specified in the specified context; and (iii) the way the service behaves complies with and does not contradict any applicable requirements of this Regulation placed on the services provided by the changed functional system; and (2) specification of the monitoring criteria necessary to demonstrate that the service delivered by the changed functional system will continue to behave only as specified in the specified context. 7 of 8

- END OF DOCUMENT - 8 of 8