Assignment I Design of a Marine Outfall

Similar documents
IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology

EXAMPLE SHEET FOR TOPIC 2 AUTUMN Q1. What is the significance of the Reynolds number Re for the flow of fluid in a circular pipe?

Hydroelectric power plants

Use of IDF Curves Design of a roof drainage system

Nuclear Power Plants Authority, 4 El-Nasr Avenue, Nasr City, P.O. Box 8191, Nasr City 11371, Cairo, Egypt

Form of waste water discharge in Khamir port solar distillation for environmental management by the empirical equations

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant

Doc No.:FAD17 (2224)C Draft INDIAN STANDARD IRRIGATION EQUIPMENT RAIN GUN SPRINKLER Specification PART 2 TEST METHOD FOR UNIFORMITY OF DISTRIBUTION

Irrigation Design (1) IHD302

COLLECTION AND DISTRIBUTION OF WATER

Designing Low Impact Wastewater Discharge from Solar Distillation Site to Sea

11/10/2009. Lake Uist - BAKER PT. Distributor from bore to penstocks Lowest level in draft tube FSL Top of surge tank.

UNIT I: UNIFORM FLOW PART B

FINAL Examination Paper (COVER PAGE) Programme : Diploma in Mechanical Engineering. Time : 8.00 am am Reading Time : 10 Minutes

Power Plants in northern Germany Project examples for optimizing intakes and outfalls

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT

EPANET. Ivan Solinas

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

= Guide angle = angle between direction of jet and direction of motion of vane/bucket.

Fluid Mechanics. The Energy Equation [7] Dr. Mohammad N. Almasri

ASSIGNMENT 2 Coal and Ash Handling System and Draught Systems

SCHOOL OF COMPUTING, ENGINEERING AND MATHEMATICS SEMESTER 1 EXAMINATIONS 2015/2016 ME257. Fluid Dynamics

SCHOOL OF COMPUTING, ENGINEERING AND MATHEMATICS SEMESTER 1 EXAMINATIONS 2014/2015 ME257. Fluid Dynamics. Answer FOUR out of SIX questions

T.E. (Mech., Mech. S/W) (Semester II) Examination, 2011 TURBOMACHINES (New) (2008 Pattern)

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

H AIR QUALITY MODELLING OF ROAD PROJECTS USING A 3D COMPUTATIONAL FLUID DYNAMICS (CFD) MODEL. Malo Le Guellec, Lobnat Ait Hamou, Amita Tripathi

Chapter (2) Prepared by Dr. Assim Al-Daraje


5555ter supply the Eugene Mill Race is a costly task that may have alternatives not explored by its

In this lecture... Solve problems related to First law of thermodynamics for closed and open systems Heat engines Refrigerators and heat pumps

CEE 371 Water and Wastewater Systems

Wastewater Collection System

Pretreatment Improvement for Membrane and Thermal Desalination Systems

General Overview of 316(b) November Energy Group Power & Intakes, Americas

OIL POOL FIRE IN A LARGE TURBINE HALL CFD simulation

Understanding. Hydraulics. palgrave macmillan. Les Hamill. University of Plymouth THIRD EDITION

Eng Thermodynamics I: Sample Final Exam Questions 1

FANROOMLESS VENTILATION SYSTEM FOR AN UNDERGROUND PARKING LOT

oe4625 Dredge Pumps and Slurry Transport Vaclav Matousek October 13, 2004

SURFACE DISCHARGES OF WARM WATER FROM THERMAL POWER STATIONS INTO RIVERS

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose

Wet granulation of blast furnace slag has been

WATER SUPPLY ENGINEERING

TIDEFLEX MULTIPORT MIXING SYTEMS Four High-Performance Mixing Systems

COURSE OUTLINE: ENVIRONMENTAL HYDRAULICS VVR N40 September October 2018

CONSTRUCTION PLAN CHECKLIST

Analysis of Uniformity and Energy Consumption in. Supermarket installed DurkeeSox Air Dispersion System. with PE Air Dispersion Model


A NEW APPROACH TO EFFLUENT PLUME MODELLING IN THE INTERMEDIATE FIELD

CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

AN INNOVATIVE PUMPED-STORAGE PROJECT IN AN UNDERGROUND MINE. Ernst Zeller November 2017

2. (a) How do you classify water turbines? (b) Define and explain different efficiencies of a water turbine. [8+8]

Mathematical modelling of salt water intrusion in a northern Portuguese estuary

What happens when LNG is released underwater? Does a LNG pool form on the water surface? What are the attributes of the vapor released?

Figure Trickling Filter

Numerical Simulation of Variabledensity Groundwater Flow: Submarine Groundwater Discharge

Atmospheric Air Pollutant

MASS TRANSFER AND HYDRAULIC DETAILS ON INTALOX PhD PACKING

Studies on Components for a Molten Salt Reactor

Piping layout for fire sprinkler system: An overview

2-D Numerical Model of the Impact of Circulating Water Intake-drainage Project in Power Station. X.Z. ZHANG & X.P. DOU & L. DING & J. JIAO & Z.X.

Theoretical determination of the number of adits and cross-sectional area for the airflow requirements of the New Level Mine Project

Power Engineering II. Technological circuits of thermal power plants

CONTROL VOLUME ANALYSIS USING ENERGY. By Ertanto Vetra

Lecture (6) on. Schematic of a Thermal Power Plant. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.

Dr. J. Wolters. FZJ-ZAT-379 January Forschungszentrum Jülich GmbH, FZJ

Modeling of thermal pollution in the northern coastal area of the Persian Gulf and its economical and environmental assessment

Numerical Simulation of the Flue Gas Desulfurization in the Sieve Tray Tower

GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION

10.0 Storm Sewer Systems

Irrigation Crossing Structures

CE 240 Soil Mechanics & Foundations Lecture 4.3. Permeability I (Das, Ch. 6)

Utilization of Water Flow in Existing Canal System for Power Generation through Flow Acceleration Using Converging Nozzles

Pumps, Turbines, and Pipe Networks, part 2. Ch 11 Young

HY-12 User Manual. Aquaveo. Contents

New Large Geothermal Storage Project in Zurich/Switzerland for Heating and Cooling

Appendix T MRWPCA GWR Discharge Dilution Analysis

The Hydrogeology Challenge: Water for the World TEACHER S GUIDE

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

In Vessel Retention Strategy VVER 1000/320 VVER 2013 Conference

UNIT I FLUID PROPERTIES AND FLUID STATICS

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

A STEADY STATE MODEL FOR THE HEAT PIPE-ENCAPSULATED NUCLEAR HEAT SOURCE

Determination of Flow Patterns in Vertical Upward Two- Phase Flow Channel via Void Fraction Profile

Martha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines

Annex S Potlatch Corporation Effluent Diffuser Modification Plan

(a) the inlet and exit vane angles, (b) work done (c) Efficiency of the system. [16]

The Rio Grande project - Argentina

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

Numerical Analysis of Ventilation Effectiveness in Occupied Zones for Various Industrial Ventilation Systems

EXPERIMENTAL AERODYNAMICS FLOW TROUGH AN ORIFICE LAB SHEET

Mixing, Short-Circuiting, Stratification, Buoyant Jet, DBPs, Water Quality, Water Age

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

FLUID MECHANICS PROF. DR. METİN GÜNER COMPILER

POROSITY, SPECIFIC YIELD & SPECIFIC RETENTION. Physical properties of

Hydraulic Machines, K. Subramanya

We proudly present the first up to Six Jets Horizontal Pelton Turbine.

Transcription:

Assignment I Design of a Marine Outfall Environmental Hydraulics DESIGN OF A MARINE OUTFALL WITH A DIFFUSER FOR COOLING WATER A cooling water flow of 20 m 3 /s from a nuclear power plant should be discharged into a very large fresh water receiving body (lake). When the cooling water passes the condensers of the power plant, a heat flux of 1600 MW is transferred to this water flow, thus increasing its temperature Δtemp = 19 0 C. The cooling water should be discharged to the receiving water in such a way, that the surface water temperature of the receiving water does not increase more than 2 0 C in relation to the normal, undisturbed condition. The topographic and geological conditions of the lake are shown in Fig 1. The lake is assumed to be homogeneous (i.e. not stratified) for the sake of the design procedure. It can also be assumed, that the intake is designed in such a way, that recirculation of discharged cooling water to the intake can be avoided. The water movements (circulation) in the lake do not affect the dilution course of events. 1

DESIGN OF A MARINE OUTFALL WITH A DIFFUSER FOR COOLING WATER (cont d) A feasibility study has shown, that the outfall should be constructed as a tunnel in the rock below the bottom of the receiving water all the way to the location of the diffuser. The main tunnel ends with a branch tunnel (both with square cross sections). The branch tunnel is equipped with vertical shafts, through which the cooling water is brought to the horizontal nozzles with circular cross sections, located at a small, vertical distance from the bottom of the receiving water. Each shaft is connected to two nozzles according to Fig 2. Make an economical optimization of the tunnel and the diffuser system. Nuclear Power Plant 2

12 Lake Topography and System Layout Buoyant Jet and Dilution 3

Schematic of tunnel and nozzle arrangement Details of Diffuser 4

Conditions for optimization 1. Manning s coefficient M for the tunnel is 32 2. The excavation cost of the tunnels is 50 SEK/m 3 3. The efficiency of the cooling water pumps is 80% 4. The cooling water flow rate is constant throughout the year, equal to 20 m 3 /s 5. Each nozzle is directed horizontally and with a circular opening 6. The water depth at the nozzles should be chosen in such a way, that the excess temperature is 2 0 C at most, when the cooling water jet reaches the lake water surface. In this context one should consider the fact, that a homogenization of the temperature distribution takes place in the jet, when it reaches the surface. The factor 1.4 should be used for this consideration Conditions for optimization 7. Each nozzle is located at a distance of 2.5 D nozzle from the bottom of the lake 8. It is important to consider water level variations in the lake of ± 0.5 m during a year 9. The distance between each pair of nozzles is 50 m 10. Construction of a vertical shaft requires a special, provisional dam, which is placed around each shaft in order to make it possible to empty the area at each shaft from lake water. The dam could be considered to have the same vertical height as the water depth at the location of the shaft, considering water level variations. The total cost for one dam + vertical piping through the shaft + two nozzles is 10000 y + 10000 SEK, where y = water depth 11. The annual cost of the investment (excavation of the tunnels + the dams) when performing an economical optimization is 10 % 12. The marginal cost for pumping the cooling water is 0.02 SEK/kWh 5

Optimization Procedure The optimizing process should be carried out as a two-step procedure according to the feasibility study. In the first step the result of 10, 12, 14, 16, 18 nozzles respectively is determined. This means, that for each case (number of nozzles) the required main tunnel length is determined for two different initial jet velocities from the nozzles, 2.0 m/s and 3.0 m/s respectively. For each number of nozzles (10, 12,..., 18) one chooses the jet velocity, which gives the shortest main tunnel length. These five different tunnel lengths are then used as an input to the second step. In this final step three different cross sectional areas of the main tunnel, 18, 20, 22 m 2, are investigated, i.e., 15 = 5 3 different cases exist. The cross sectional area of the branch tunnel should be half of that of the main tunnel. The 15 cases are studied in terms of an economical optimization. This means, that the lowest total cost of annual investment cost + annual operation cost should be determined. The annual operation cost is, for simplicity, assumed to consist only of the marginal energy cost for pumping the cooling water through the main tunnel, the branch tunnel and out into the lake. When evaluating head losses in the branch tunnel, it as allowed to make a reasonable, simplifying assumption, as this head loss is of minor importance. Dilution Rate in a Circular Jet 6

Density Deviation from Maximum Value ρ =1000 σ Calculation Procedure I. Determine required dilution rate S m II. Determine main tunnel length for 10, 12, 14, 16, and 18 nozzles for u o =2.0 and 3.0 m/s. Select the velocity that yields the shortest tunnel length (S m + F D => y o => tunnel length) III. Investigate three tunnel cross-sectional areas: 18, 20, and 22 m 3 (energy equation => E p and pump power P) IV. Do an economic optimization 7

Required power to pump: ρgqe P = p η Energy loss in the tunnel (Manning s formula): h L 2 Q = AMR 2 2 4/ 3 L A R = P Costs Involved pumping nozzles and vertical shafts tunnel Compare annual costs 8