By Eli Schragenheim Supporting TOC implementations worldwide

Similar documents
By Eli Schragenheim Supporting TOC implementations worldwide. Workshop th October 2015 Paris, France Hosted by Marris Consulting

The Five Focusing Steps

By Eli Schragenheim Supporting TOC implementations worldwide

Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology

Throughput Accounting (Relevant to PBE Paper II Management Accounting and Finance)

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM

Back to Basics TOC: Throughput Accounting

MBF1413 Quantitative Methods

Differential Analysis: Relevant Costs the Key to Decision Making

What can we learn from the development of the profound ideas of Dr. Goldratt?

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009.

8 Tools to Over Manage the Bottleneck

YOUR MOST IMPORTANT DECISION!

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Eli Schragenheim

YOUR MOST IMPORTANT DECISION!

A beginners guide to moving to an ERP

The five focusing steps of the Theory of Constraints have been successfully applied to the improvement

Profit Center Planning & Analysis

Throughput Accounting Fundamentals Financial reporting for operational decision-making

4 reasons why adding Excel is better than customizing Salesforce CPQ

Choosing the right business solution is a team sport. EVERYONE WINS

Applying Situation Appraisal to Assess Project Status

Production Flexibility. The Example

SS ynchronous olutions

10-1. Learning Objective. Identify relevant and irrelevant costs and benefits in a decision.

AGENDA: DIFFERENTIAL ANALYSIS: THE KEY TO DECISION MAKING

Understanding and Managing Uncertainty in Schedules

We all know that what you measure gets done. But what if you are. measuring the wrong things and doing the wrong things as a result?

Decision making and Relevant Information

P rofit t (1 + i) t. V alue = t=0

Planning. Dr. Richard Jerz rjerz.com

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Grow Your Business. Driven by Force Executed By Directions.

Food and Beverage Companies Become Market Leaders with Vanguard Predictive Planning

The Core Structure of TOC Thinking Processes and their Applications to Improve Systems. Oded Cohen

Drum-Buffer-Rope in PlanetTogether Galaxy

Lessons for production management for MTO Using G-Sim Simulator

The Total Economic Impact Of SAS Customer Intelligence Solutions Intelligent Advertising For Publishers

MANAGING NEXT GENERATION ARTIFICIAL INTELLIGENCE IN BANKING

ACCT323, Cost Analysis & Control H Guy Williams, 2005

Sawtooth Software. Sample Size Issues for Conjoint Analysis Studies RESEARCH PAPER SERIES. Bryan Orme, Sawtooth Software, Inc.

DEMAND CURVE AS A CONSTRAINT FOR BUSINESSES

Synchronous Flow Helping the Countertop Fabricator to synchronize the business system March 2017 Ed Hill

Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management

Reading Essentials and Study Guide

How to Determine the Feasibility of Your New Business Idea A Step by Step Guide to Small Business Feasibility Study

MANHATTAN ACTIVE INVENTORY PLANNING

Differential Analysis: The Key to Decision Making

WorkJam, Inc. For more information visit:

Hunting & Farming Suppliers

Siegwerk Academy. Introduction to the Theory Of Constraints TOC

Integrating Cost, Capacity, and Simulation Analysis

The Dirty Little Secret of Software Pricing

PRISM. Jobcosting Strategy. Mike Lysecki CTO, LMN

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

THE ANALYSIS OF PRODUCTION LINES BOTTLENECKS IDENTIFICATION AND WAYS OF MANAGEMENT

10 Things You Need to Know Before Buying a New or Used Cosmetic Laser

2007 ALLDATA LLC. All rights reserved. ALLDATA is a registered trademark of ALLDATA LLC. ATI is a mark of Automotive Training Institute.

Turning Enterprise Asset Management into Real Earnings Per Share

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

LivePlan Method Planning Meeting. A script and agenda for your advisory engagement. 10/19/2018 Palo Alto Software LP Method Planning Meeting (New)

541: Economics for Public Administration Lecture 8 Short-Run Costs & Supply

Industrial Engineering Prof. Inderdeep Singh Department of Mechanical and Industrial Engineering Indian Institute of Technology, Roorkee

ARE YOU SPENDING YOUR PPC BUDGET WISELY? BEST PRACTICES AND CREATIVE TIPS FOR PPC BUDGET MANAGEMENT

Dr. Eli Goldratt Unplugged

Producing Goods & Services

Chapter 2 The Project Management Life Cycle

INTRODUCTION. Professional Accounting Supplementary School (PASS) Page 1

Third-party logistics at your fingertips.

FOR OWNERS: MANAGING VENDOR ACCRUALS AND VENDOR INVOICE MATCHING ON LARGE CONSTRUCTION PROJECTS

Demystify the Dynamics AX JumpStart

Process Plant Design: The High Cost of Slow Decisions Using Risk Analysis Software to Confidently Speed the Design Process

PwC Digital Services Connected manufacturing. Collaboration realized.

Five Interview Phases To Identify The Best Software Developers

PRODUCTION PLANNING SYSTEM CHAPTER 2

2016 CIO AS BUSINESS DEVELOPER. CapaSystems - CIO as Business Developer 1 7

Drum Buffer-Rope. Skorkovský. Based on : R. Holt, Ph.D., PE

THE ITERATIVE ENGAGEMENT MODEL A CALCULATED RISK AND A WHOLE LOT OF REWARD. By Mikhail Papovsky CEO, Abraic, Inc.

Oil Export Tanker Problem- Demurrage and the Flaw of Averages

5 Strategies to make Money in Your Warehouse!

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

USING THE THEORY OF CONSTRAINTS TO PRODUCTION PROCESSES IMPROVEMENT

Metrics Madness. What Gets Measured Gets Managed? Examining the Gaps Between Managers Beliefs About Metrics and What Workers Actually Do

The Total Economic Impact Of The Expensify Expense Management Platform

Three Reasons Why Spend Analytics Is The CFO s Next Major Focus

Aggregate Planning and S&OP

Gather the Data. How predictable are sales results? The answer will help the organization understand business cycles and the timing of sales results.

Dilbert Management tips Scott Adams

Meeting Guide and Agenda by Course

Contingency Planning

Measurements That Count (and Some That Don t) Hank IT DEPENDS Barr CFPIM, CSCP, CLTD, CSCM, 6σBB, C.P.M., CLA/CLT Vancouver BC November 1, 2018

Why Do So Many Online Businesses Fail?

The Benefit Cost Analysis of the Aggregator`s Position as it Relates to the Nitrous Oxide Emission Reductions Protocol

Relevant Costs for Decision Making

KING ABDULAZIZ UNIVERSITY FACULTY OF COMPUTING & INFORMATION TECHNOLOGY DEPARTMENT OF INFORMATION SYSTEM. Lab 1- Introduction

Investment Readiness answers 4 Key Questions to the Business Model. 2. Investment Readiness: am I ready to start?

Resource Critical Path Approach to Project Schedule Management

Sell More, Pay Less: Drive Conversions with Unrelated Keywords

Oracle CRM: It s Really Better Than Salesforce.Com When You Do It Right

Transcription:

By Eli Schragenheim Supporting TOC implementations worldwide

The need How decisions regarding new opportunities in the market are made today? Fully based on the intuition of Sales and top management? Based on the cost-per-unit? Based on T/CU? Based on detailed calculations of both the financial and the capacity aspects? Considering that capacity aspects might impact the financial results. How many market opportunities are not even checked because they are out of the boundaries of the current intuition and thus look risky???

For example A large potential client gives you an offer for monthly delivery of several products. The snag is that the client is ready to pay 15% less than your normal price. Overall the monthly total quantity would add 13% to the revenues and require, on average, 15% of the total available capacity A detailed capacity calculations revealed that from the five critical work centers the additional capacity is: M1 needs 7% to process the everything for the new offer. M2 needs 21%, M3 needs 11%, M4 needs 18% and M5 needs 6%. Currently M3 is the weakest link. Currently it is loaded to 93% of its available capacity. What additional information you need to make the decision?

Back in 1983 Goldratt created huge controversy in APICS when he said: Cost Accounting is Enemy no 1 of Productivity The statement, even though backed up by logic and examples, created huge resistance Because, product costing was, and still is, the most common way to make decisions, especially in manufacturing It has somewhat less obvious impact in services, but if you look hard enough it is there as well

The ultimate flaw of all Cost Accounting All cost accounting methods assume that any utilization of capacity carries the cost of maintaining that capacity The hidden (flawed) assumption of cost-accounting is: It is possible, at least in the long time period, to match capacity to demand Three reasons why the assumption is invalid: 1. In order to have predictable performance most resources must have excess (protective) capacity 2. Purchasing capacity is possible only in certain sizes that could be quite large 3. Market demand changes faster than the ability to change the capacity levels

Throughput what the organization strives to generate as much as possible Throughput, T, is defined as the rate at which the organization generates goal units The deeper interpretation of T is the measurement of added value created by the organization When the organization is for-profit then the definition of T is money and then the definition becomes: The revenues minus the truly variable costs (TVC) per single sale This definition of T makes it similar to the definition of contribution, but there is one critical difference: Usually the direct labor is NOT part of the truly variable costs!

The cost of generating T While T measures the flow of value generated into the organization it is NOT the PROFIT Even when we measure the T of a specific delivery the T is just the amount of added-value due to the delivery I for Investment : The capital that has been invested in the infrastructure to enable it to generate T The money tied up in the organization OE measures the expenses that are not included in the TVC Expenses/costs that serve the needs of more than a single sale I and OE are always expressed in money Even when the T, for not-for-profit organization is expressed as another entity

The basics of the TOC decision support There are cases where a decision might impact both the T and the OE, as well as impacting the I The TOC decision criteria is: P = Τ- ΟΕ ΟΕ must be positive Note, the above term is holistic in the sense that it expresses the delta-profit for the whole organization It includes all the direct and indirect impact of the decision on the bottom line When the I is also impacted by the decision, then Τ ΟΕ per period represents the resulting payments and they must compare to Ι

The basics of the TOC decision support The impact of a decision on Τ is: 1. The direct T generated by the subject of the decision that is added to the total T 2. T that might be lost (or gained) due to the above decision When a capacity resource constraint (CCR) is active, then T is lost due to the capacity limitations of the CCR In this case, the T per constraint unit is a relative measure of the exploitation of the CCR This is called T/CU The T/CU is used to measure the effectiveness of the product mix and whether it could be improved

The distinction between TOC and marginal costing Marginal costing is a costing methodology that looks for the net contribution (T) to base a short-term decision Let s ignore possible differences in treating direct labor as TVC There are two clear differences in approach: 1. Marginal costing do not actively look for capacity profiles and they lack the tools for that Which means they do not look for the possible loss of existing sales or the real costs of purchasing quick capacity 2. TOC uses T as a key measurement which the organization likes to maximize Thus, reducing prices is very carefully checked because their direct impact on T is significant Salespeople should be measures according to the real delta-t they generate and not according to sales

The current limitations of Throughput Accounting The current spread understanding of TA is based on the following logical statement: Product mix decisions are impacted by the capacity availability of only ONE critical resource (the CCR) Really? Technically TOC never said there is only ONE constraint It only claimed that having more than one interacting constraints cause unstable performance When we contemplate a large decision we need to consider the option that another resource would become either an interactive constraint or even a bottleneck

The problematic nature of T/CU Throughput per constraint-unit (T/CU) expresses the profitability of a product/deal relative to others However, this is true only when the following two necessary conditions apply: 1. There is an active internal constraint and only one 2. The decision under consideration is relatively small and thus would not cause another constraint to emerge Thus, in most cases we cannot use T/CU as a simple tool to determine whether a certain deal, client or market segment are worth to go after The dependable tool is to calculate the resulting Τ ΟΕ

Estimating Τ ΟΕ Τ ΟΕ of a specific deal is the result of the change in the bottom line when we add the deal to all the other current sales Both Τ and ΟΕ represent the total changes to the T and to the OE as a result of adding the deal under consideration This means that T lost due to lack of capacity taken by the deal is included in the Τ And the real cost of adding capacity required for the deal is included in the ΟΕ In order to calculate the Τ ΟΕ we need to consider all the current T, generated by the current sales, the current level of OE and the capacity status of all resources Can we do it?

Updating a key TOC paradigm Instead of checking the capacity of just one resource, let s treat a small group of critical resources and watch their capacity profile The total load of all the demand versus the available capacity A critical resource is a resource that might become a capacity constraint if and when the product mix changes in a certain way Only few critical resources exist in any organization We d need good enough data of those few resources to support fair assessment of the required capacity for a certain product mix We assume we are able to roughly assess the required protective capacity of the weakest link and then the protective capacity of the other critical resources that ensure smooth operations

Some new insights Many decisions could be justified based on its impact on the bottom line (T-OE) simulating the impact of the decisions as being added to the current state of sales For that we need the support of an IT structure The IT should have the current sales profile for the considered period calculating the total T to be generated when we simply continue what we do now The IT support should consider the capacity profile for the critical resources supporting the sales profile Making sure the minimum protective capacity is available We need to consider the cost of adding capacity Taking into account the minimum chunk of capacity that can be purchased within the realistic time frame

Creating the platform of decisions Computers should not make the decisions for us! We need the intuition and knowledge of the key people The process involves the top management team gathered to make periodical decisions using computerized support The decisions involve priorities on product mix, pricing and capacity management The software should be able to process various what-if scenarios in seconds and come up with T-OE and I Based on the sales profile provided for checking Generates the resulting capacity profile of the critical resources along their deviations from the protective capacity limit The top management team should include, at the very least, the head of Sales and the head of Operations

Products and T-generators The term Product has two different perspectives: 1. The outcome of operations: it requires capacity from various resources and also truly-variable-costs (TVC), namely the cost of materials 2. Whatever is sold by the organization. It could be any package of products, plus additional services. I call Product to any output of Production I call T-generator what is eventually sold Each T-generator has a price tag And a list of the products that comprise the T-generator

The decision making process The reference for decisions is the current state: The predicted sales in the next period without taking any new initiatives This is a forecast based on the sales of last period possibly with some modifications The software should calculate the total T for it The level of total OE is given by Finance The capacity profile for the predicted sales The total load, given the amount of sales, for each of the critical resources Every new idea is checked by adding or changing some T-generators relative to the reference Where the software calculates the impact of T and on capacity

Continuing the decision making process The capacity profile for the critical resources points to deviations from the minimum protective capacity We use two parameters for the minimum protective capacity 1. % of the protective capacity for the weakest link 2. % of the protective capacity for the rest of the critical resources When the additional idea does not penetrate into the protective capacity then the obvious criterion for including the new idea is having positive Τ What if there is penetration into the protective capacity level? One option is to reduce the sales of something else that is included in the updated reference Another option is to add capacity, which would add ΟΕ

Adding capacity Capacity can be added in several ways Overtime, additional shifts, outsourcing and purchasing more units of the resource Every mean of adding capacity can be done only in multiples of certain minimum quantity So, every addition of capacity could be more than what is required for the idea under consideration Which then opens the door for more ideas that might use that capacity Eventually it is the changes of capacity that generates ΟΕ And the resulting decision criterion is Τ minus ΟΕ

Back to the example Suppose the following information is calculated: Τ of the monthly delivery of the offer is +10% before considering giving any other current demand The load before the offer on the five work centers are: M1: 78%, M2: 84%, M3: 93%, M4: 79%, M5: 85% Adding the offer without giving up any demand would load the critical five work centers to: M1: 85%, M2: 105%, M3: 104%, M4: 97%, M5: 91% The minimum protective capacity levels we assume we need are 5% for the CCR and 10% for non-ccr Suppose reducing other demand to bring the capacity profile to the accepted levels would reduce the total Τ to +1%

Continuing the example Looking at ways to increase capacity for M2, M3, M4 and M5 would cause ΟΕ that is equivalent to 9% of the current T. Eventually we could find a way to reduce some demand of 2% of the current T, while increasing capacity to cause ΟΕ up by the equivalent of 3% of the current T. This would mean that Τ - ΟΕ = +5% of the current T So, under this information we should accept the offer and get +5% addition to the profit before tax! If now, before the offer T-OE = (5% of the current T), then we actually have doubled the profit!

Dealing with uncertainty Uncertainty impacts especially the Profile of Sales Because we naturally consider forecasted sales Uncertainty also impacts the assessment of capacity Not always we have very deterministic numbers for capacity The minimum level of protective capacity of the weakest link, ensuring reliable delivery, is also impacted by uncertainty And the minimum protective capacity for other critical resources Direction of solution: a process of running two different scenarios at each such meeting: A reasonable optimistic scenario and a reasonable pessimistic one The two scenarios would point to different preferred decisions Then the final set of decisions would be determined, taken the risk and opportunities into account

What value we d achieve? Encourage Sales and Operations to check many additional ideas, including some that look risky until they are properly checked Matters like selling most of the production through promotions deserve to be properly analyzed Raising TOC to the daily attention of top management The platform is a necessary complimentary part of the S&T Analyzing the various market segments and justifying the growth Creating hand-shake between Sales and Operations Creating the platform where Sales and Operations fully understand each other Leading the whole organization to handle uncertainty