Cutting & handling recommendations

Similar documents
2017 TECHNICAL MANUAL

ULTRACOMPACT SURFACES. Worktop Design and Installation Manual

TECHNICAL MANUAL V

TECHNICAL MANUAL V

LAYING CONTENTS. 1. BEFORE LAYING 1 Hygiene and safety measures 1 Prior considerations 1 Tile-laying materials 2

Installation Guide. PAROC panel solutions

Exterior System installation instructions

Silestone worktops design and installation manual

Niagara / DLG-85 Shower Cabin Installation and User s guide

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Piles and pile accessories

STORAGE INSTRUCTIONS

Manual & Maintenance Guide

premium click optimum click

ATAS International, Inc. BUILDING PANEL TRANSIT, JOB SITE HANDLING AND STORAGE PROCEDURES

optimum glue Preparation INSTALLATION INFORMATION We recommend to order all panels for the same commercial flooring project at the same time.

1. PREPARATION 2. INSTALLATION 3. FINISHING 4. MAINTENANCE

Unloading Handling Storage

Pipes, Piles, and Accessories

INSTALLATION INSTRUCTIONS FOR WICANDERS 2G FLOORS

Product Data Sheet SikaFuko Swell-1 Positioning Description Uses Advantages Approval / Standards Construction Product Data Packaging

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

Sports center (Ciudad Real - Spain) - Arch. Javier Ramírez de Arellano Rayo

See pages 13 and 14 of the fabrication guide for more information.

INSTALLATION INSTRUCTIONS FOR WICANDERS HYDROCORK

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

MACHINE-LAY Installation Manual

1850 x 40/50mm Raised Shower Tray Kit

DLB-23 Shower Enclosure Installation and User s guide

INSTALLATION INSTRUCTIONS FOR WICANDERS 5G-C FLOORS

For more information on Pictura visit CI/SfB (41) R December New. Pictura. High performance cladding

Installation Manual. Handling Cutting and drilling Laying Processing

eos LightPanel Systems User Guide

Construction. Hydrophilic, swellable hose for sealing construction joints in watertight structures. (formerly Sika Injectoflex HPM)

INSTALLATION GUIDE DUOFUSE DECKING

Resysta Gold and Platinum Decking Installation Guidelines

DEXERDRY INSTALLATION INSTRUCTIONS - PAGE - 1

Inspection Remove the plastic sheet from the slab before cutting. Clean and examine the slab in direct light for:

premium click optimum click

Reinforced concrete double walls

Suggested laying methods for STONE pavers

Cembrit Windstopper Basic Cembrit Windstopper Extreme

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING

Reinforced concrete double walls

Installation guidelines System: Cofraplus 220

Introduction. Before you begin. Structure installation

Rigid Core Installation & Maintenance Instructions

Recommendations for Cutting and Handling Melamine Boards

INSTALLATION INSTRUCTIONS LAMINATE

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

Contract18. Vitrified paving FLAT ROOF BALCONY ROOF TERRACE DISPLAY AREA

Use a special underlay above 45 C. Click-it! Never use a hammer or tapping block. Keep indoor climate conditions above 0 C.

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

MTS Criterion Series 40

SPECIFICATION FOR REINFORCED SOIL WALL

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

Multi-Piece EasyStep Product Installation Instructions

elegrodeck Decking Installation Guide MATERIALS LIST Joist Spacing Installing the Decking Boards

KEEP FOR FUTURE REFERENCE FORKLIFT ADAPTER FOR MRTA6 AND MRTA8 LIFTERS READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Customer Packaging Guidelines

INSTALLATION GUIDE COMPOSITE DECKING

Aqua Swing Tub Door & EX/RT Panel

Installation Guide. Linear Drain Shower bases

Material Handling & Maintenance

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

European Siding System Installation Guide. v

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Vertigo Cladding Board

QUADLUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

Pod Lifting Frame. Introduction. Important Notes. Key Benefits. User Guide

INSTALLATION INSTRUCTIONS

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Installation and Fabrication Guidelines Sensitile Terrazzo - Terrazzo Lumina - PIXA

Kedeck Installation Guide

INSTALLATION GUIDE MODELS DMV2401 / DMV3001 / DMV3601 DMV4801 / DMV6001 / DMV60DS / DMV72DS

MEDIUM VOLTAGE SWITCHGEAR THE MODULAR CONCEPT

Dura Deck Type 146 Warranty Approved Install Instructions

Spare Parts PACKING, MARKING AND SHIPPING REQUIREMENTS. Contents

DR-6/DT-6 MEDIUM VOLTAGE RING MAIN UNIT. Lifting & Transport Instructions MEDIUM VOLTAGE SWITCHGEAR, BUILT TO LAST

Safe handling and movement of pallets

Premier Railroad Grade Crossing Installtion Guide PREMIER RAILROAD GRADE CROSSING INSTALLTION GUIDE GUIDE GROUNDED IN STRENGTH

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

INSTALLATION INSTRUCTIONS

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

Decking Installation Guide

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:

DuraLife Capped Composite Decking Installation Instructions

Sanitation Marketing Toolkit MANUAL FOR PRODUCTION AND INSTALLATION OF POUR-FLUSH LATRINES

ifix INSTALLATION MANUAL PV flat roof installation system Version

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

INSTALLATION GUIDE MODELS DMV2402 / DMV3002 / DMV3602

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:

Plaswood Product Range - DECKING. 4 Tough 4 Durable 4 Strong 4 Wide Range 4 Versatile 4 Environmentally Friendly 4 Low Maintenance

INSTALLATION MANUAL ORION BARRIER. NCHRP 350 TL-3 Portable Steel Longitudinal Barrier

Transcription:

Cutting & handling recommendations

CUTTING & HANDLING RECOMMENDATIONS Loading & handling itopker Packaging Hygiene & safety Inspecting the slabs Loading & handling 04 06 06 07 CONTENT Cutting Cutting with a disc cutter Cutting with a Waterjet equipment Protecting the edges 09 13 13 Installation Sink support Countertop reinforcements Resting the slab on the kitchen furniture Projecting sections 14 14 15 15

LOADING & HANDLING itopker PACKAGING itopker countertops are compact heavy slabs that need to be properly handled. The following table shows their weight by slab, A-frame and number of slabs. Once all 20 slabs have been packed onto a pallet on their A-frame, the corners are protected with 4 cork corner protectors. The slabs are also secured to the pallets with 3 slings, mounted on wood strips to prevent them from coming into direct contact with the slabs. The pallet is then secured with plastic straps to protect it from the rain and the elements. Weight of whole slab Weight per m 2 Slabs per A-frame Weight per A-frame 150 kg 34 kg 20 piezas 3150 kg The slabs are packed vertically onto pallets, fastened to an A-frame, to ensure their safe transportation and storage. 3 strips of cardboard are placed lengthwise between the slabs, along their 1500mm side, to keep them separate. Each A-frame bears a label with the name of the series, colour, finish and shade of the product, together with the batch number and quality rating to ensure its full identification. The label also lists packing details such as the weight, m2 per A-frame and number of slabs per A-frame. 4 CUTTING & HANDLING 5

LOADING & HANDLING HYGIENE & SAFETY To handle itopker porcelain slabs properly, the necessary safety precautions must be taken, including the use of safety gloves at all times. LOADING & HANDLING To load, unload and transport the slabs, use a forklift truck, overhead crane or other similar lifting equipment, following the manufacturer s instructions at all times, complying with the maximum permitted loads, and making sure that the equipment is kept in good working order. During the handling and transportation processes, the slabs should be kept in a balanced position, bearing in mind their centre of gravity, to prevent them from bending or breaking. When removing the slabs from the A-frames, remember that they are fixed to the A-frame with vulcanized alligator clips or conventional ones to prevent them from moving or falling off, in compliance with the maximum permitted loads. Remove the slabs one by one from alternate sides of the A-frame so as to keep it balanced and prevent it from tipping over. INSPECTING THE SLABS Before proceeding to fabricate a countertop, clean the slabs well and carry out exhaustive visual checks to make sure that they have no flaws. No claim will be accepted for slabs once they have been installed or machined, even if they have factory flaws. Surface appearance: To check for flaws in itopker countertops slabs, place them perpendicular to you and observe them from a distance of one metre in natural light. ST CO RD Usable area of slab: 1500x3200 mm Irregularity in similar colour <3 mm Irregularity in different colour <1 mm Usable area of slab: 750x3200 mm Slabs for supporting countertops If slings are used or any other handling equipment with metallic parts, make sure that the metal does not come into contact with the surface of the slabs. Curvature: The maximum permitted curvature is <2 mm. This must be measured by resting the slab on a totally flat horizontal surface and measuring the highest curvature point with a feeler gauge. 6 CUTTING & HANDLING 7

CUTTING CUTTING WITH A DISC CUTTER itopker countertops porcelain slabs are conspicuous for their outstanding technical properties. The key benefits they offer include a very high resistance to scratches, impacts, high and low temperatures, staining and wear and tear. This makes them perfect for use as countertops. Because the surface is non-porous, this prevents the spread of bacteria and mould, while also ensuring food grade properties. itopker countertops slabs must be cut and handled using top-quality specific tools at all times. If the right tools are not used, problems might occur and the slabs, tools or machinery might even get damaged. For this reason, before proceeding to cut and/or handle itopker slabs, ask for details of the right tools and equipment to use. Orientation: Plan how to cut the slab before beginning the cutting process so as to take maximum advantage of its surface. With this in mind, take into account which way the slab faces when cutting or making holes in it. Make sure that all cut-outs are made nearer the middle of the slab, as shown in the illustration, since this area is more resistant to any pressure generated by the cutting process. Make sure that the whole slab rests on the cutting table. This should be solid and strong, with a flat level surface and no unevenness. A rubber or wooden mat should be placed between the slab and cutting table to cushion any vibrations from the disc. The right disc to use will depend on the make. It should be in good condition, with no surface flaws that might affect the quality of the cuts it makes. Follow the manufacturer s recommendations at all times with regard to the right revolutions and cutting speed. Examples of makes of cutting discs are: ADI (http://www.aditools.com) 300 mm Ø 350 mm Ø 400 mm Ø Revolutions 1800 RPM 1600 RPM 1500 RPM Cutting speed 1,2 ml / min 1,2 ml / min 1,2 ml / min FREDIMAR (http://www.fredimar.com/es/) 300 mm Ø 350 mm Ø 400 mm Ø Revolutions 2500 RPM 2200 RPM 1900 RPM Cutting speed 1,5 ml / min 1,5 ml / min 1,5 ml / min To begin, cut a strip of approximately 3cm away from each side to reduce any stress (cutting the long sides first and then the short ones) and to ensure a good edge. 8 CUTTING & HANDLING 9

Make sure that the disc is properly cooled with water as the slab is cut, because itopker porcelain slabs are very hard and solid. The water jet should be aimed directly at the cutting point where the disc is in contact with the slab. Cut the first and last 30 cm more slowly than the recommended speed (half the speed) to ensure a good finish. A bigger radius will ensure a higher structural resistance. In contrast, angles with no radius create a stress point on the surface. NEVER LEAVE 90º ANGLES. In the case of Blanco Plus coloured slabs, reduce the cutting speed by half across the whole surface. To make the corners of the cut-out, drill them with a bit with a radius of >3 mm. The cutting speed for 45º mitred joints should be 0.5 ml/mins. Making cut-outs with a cutting disc: Always leave a minimum distance of 5 cm between the cut-out and the edge of the slab. The angles of cut-outs should have a minimum radius of 3 mm. Next, cut from one hole to the next, in a straight line, using a bridge saw and working at a minimum speed to prevent the slab from breaking due to the stress to which it is subject. 10 CUTTING & HANDLING 11

CUTTING Planning large cut-outs: If one or more large cut-outs have to be made, leave a strip to hold the countertop in place. This can then be cut off once the countertop has been installed. In this way, the likelihood of the slab breaking when it is handled or installed will be reduced. a) Large cut-out: Cutting material (fastener) Intalled slab CUTTING WITH WATERJET EQUIPMENT Cut a 3cm strip from each side to reduce the stress to which the slab is subject (first from the long sides and then from the short ones). A pressure of about 3900 bares and cutting speed of 0.7 m/mins will be needed. The slab should be fully supported by the cutting bed of the waterjet cutter. Finish the cut working toward the edge of the slab if the waterjet software permits this. The first and last 30 cm should be cut at a slower speed (half the recommended speed). Start inside the section to be cut out and move toward the cutting line at 60% of the recommended speed to prevent the slab from splintering. Use carpenter s squares to stop the slab from moving. b) Interrupted sink cut-out: Cutting material (fastener) Installed slab PROTECTING THE EDGES Once they have been cut, the edges of itopker countertops countertops must be treated with a sealant to waterproof the slab (STOPDIRT / DEEP ENHANCER). Higher intensity on the edges and better finishes are achieved using this type of products. The edges can also be polished once cut. For this purpose, use appropriate discs, always starting with finer grit ones and increasing the grit size progressively until the required finish is achieved. If the wrong type of cutting tool is used, the machine or slab might be damaged or even break. Problems might also occur if the whole weight of the slab is concentrated on one single point as it is cut, due to pressure from the cutting disc. For this reason, it should be cut by passing the cutting disc across it several times. Remember, too, that too slow a cutting speed can be counterproductive since the diamond edge might get damaged and the cutting disc have to be changed. 12 CUTTING & HANDLING 13

INSTALLATION SINK SUPPORT A support bar should be included in the case of large sinks. This should be fixed to the base on which the countertop rests. Without it, the weight of water from a fully open tap or other everyday materials might cause the countertop to break or come loose from the sink. RESTING THE SLAB ON THE KITCHEN FURNITURE If the slab rests on a slatted base instead of a stable solid surface, a minimum distance of 25 cm should be left between the crossbars, as indicated below: Sink itopker countertop < 25 cm Furniture Support bar COUNTERTOP REINFORCEMENTS All joints in the countertop should be reinforced on the underside. Areas round cut-outs that do not rest on a solid base should be reinforced with suitable material to guarantee stability and resistance. PROJECTING SECTIONS When the countertop is being designed, it is important to plan how much projecting sections jut out so that it does not break during normal use. Generally speaking, these projecting sections should not jut out more than 10 cm from the edge of the base. < 10 cm If there is room and you would like it to jut out more, a prior study must be made of the necessary reinforcements to use in each particular case. 14 CUTTING & HANDLING 15

Our technical documents do not cover all possible applications or factors involved in the installation and use of a material. For this reason, before our products are used, the project manager, architect or materials specifier should make sure that this and any other products used in the installation process are suitable for the intended use. In all circumstances, this person shall be fully liable for the results of their work. In the event of failure to comply with these recommendations, Inalco shall be exempted from all liability for the material s improper use or faulty installation. No claims will be admitted for materials once they have been installed.

INDUSTRIAS ALCORENSES CONFEDERADAS, S.A. Partida Saleretes, s/n. 12110 ALCORA (Castellón - España) Tel.: (+34) 964 368 000 e-mail: correo@inalco.es www.inalco.es www.inalcotrends.com Date of issue: February 2017