VENDOR INSPECTION REPORT

Similar documents
Pre-shipment Inspection Report DOCUMENT #:AQI-DOC-PSI REPORT

Pre-shipment Inspection Report

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

COATING SPECIFICATION HIGH BUILD EPOXY COATING ON BUTTERFLY VALVES COATING SPECIFICATION: D2 ISSUE: 2 DATE: FEBRUARY 2016

INSPECTION REPORT. Beyond AQL FAILED I. GENERAL INFORMATION II. INSPECTION SUMMARY III. REMARKS. Client: XXX Conclusion Report Date: 3 July 2012

Inspection Report(PSI)

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1

In-Process Inspection

Tested in accordance with ISO , high expected durability in corrosivity category C5-I. Property Test/Standard Description

COATING SPECIFICATION INORGANIC ZINC SILICATE, EPOXY PRIMER MIST-COAT, TWO PACK ACRYLIC TOP COAT ON STEEL OR CAST IRON

BV PROPRIETARY SAMPLE DOCUMENT INSPECTION REPORT A. GENERAL B. INSPECTION OVERALL RESULT SUMMARY C. REMARKS

G SPECIFICATION: EXTRUDED POLYOLEFIN COATING ON STEEL GAS PIPE VOLUME: 6. REVISION: (See ) 6/17/14 5 Years

COATING SPECIFICATION ZINC RICH EPOXY PRIMER, EPOXY MASTIC COATING ON STEEL OR CAST IRON COATING SPECIFICATION: C3 ISSUE:2 DATE: OCTOBER 2016

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Specification for Pipe Fittings

Supplier cooperation Supplier organization Inspector s opinion on the factory Average Average Average

Inspection Report(PSI)

Marking and packing check Acceptable. Take photo during the goods Subject to buyer s evaluation. Sampling test at SGS lab Acceptable

COATING SPECIFICATION EPOXY MASTIC, POLYURETHANE TOP COATING ON FUSION BONDED POLYETHYLENE COATING (SINTAKOTE )

Prepared By: Engineering Staff Approved By: Jerome T. Schmitz


REPORT NUMBER. Inspector / Reviewer INSPECTION DATE VENDOR MANUFACTURER INSP LOCATION

ENGINEERED COMPOSITE REPAIR SYSTEM

Property Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

COATING SPECIFICATION HIGH BUILD CERAMIC FILLED EPOXY COATING ON NEW AND EXISTING PUMPS COATING SPECIFICATION: F3 ISSUE: 1 DATE: 12 DECEMBER 2012

Tianjin Nolite Steel Co. Ltd.

Bharat Heavy Electricals Limited Piping Centre Chennai-17. Specification Number Revision Number Sheet Number PC:E:GF: of 7 CONTENTS

REPORT NUMBER. Inspector / Reviewer INSPECTION DATE

Inspection Report(CLC)

SECTION POLYETHYLENE TAPE WRAPPING FOR PIPE

GAIL (India) Limited (A Govt. of India Undertaking) NEW DELHI, INDIA

MATERIAL REQUISITION FOR BOLTS AND NUTS

A. INSPECTION RESULT SUMMARY (Details can be referred to corresponding sections in this report)

3M Scotchkote Liquid Epoxy Coating 323+

COATING NEW STRUCTURAL STEEL SIGN SUPPORT STRUCTURES - Item No. Special Provision No. 911S09 November 2006

Pigeon Forge, Tennessee City Hall and Thurman Lift Station Coating Rehabilitation. Contract Documents

Photo: Salzgitter Mannesmann Grossrohr GmbH. Photo: Salzgitter Mannesmann Grossrohr GmbH

Unmatched Coating Performance! DRY BULK STORAGE

API 5L ERW Pipe 168.3*( )from DPBD,TIANJIN

NAPCA Bulletin

CHINA INSPECTION SERVICE CO.,LTD

SECTION 15 STRUCTURAL STEEL

Application Procedures for Uncured Rubber Linings on Pipe

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

Tnemec Fluid Applied Thermal Break Long Form Specification

CHINA INSPECTION SERVICE CO.,LTD

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (33 C) calculated VOC-US/Hong Kong

Inspection Report(IPC)

Pre-qualification testing in accordance with NORSOK M-501, Rev. 5, System 1, suitable for exterior exposure in offshore environment, below 120 C.

April 23-25, 2012 Sheraton Gateway Hotel Atlanta, Georgia

BULWARK BOLLARDS M30 & M50

Product Index. Coating Thickness. Porosity. Adhesion. Inspection Kit. Surface Profile. Surface Cleanliness. Gloss

Product Index. Coating Thickness. Porosity. Adhesion. Inspection Kit. Surface Profile. Surface Cleanliness. Gloss

PRODUCTION MONITORING INSPECTION REPORT

Unmatched Liquid Coating Performance! Specify the Best! Liquid Storage Potable Water Wastewater Fire Protection Industrial Liquids

PRODUCTION MONITORING INSPECTION REPORT

Property Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Product Index. Coating Thickness. Porosity. Adhesion. Inspection Kit. Surface Profile. Surface Cleanliness. Gloss

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Prepared By: Approved By:

: Final Random Inspection

ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # ADDENDUM NO. 3 April 02, 2019

CONSUMER GOODS USA. We make global trade flow smoother and safer

SUPPLIER QUALITY CODES

Property Test/Standard Description

More than Just Paint TEXAS PUBLIC WORKS ASSOCIATION AUSTIN, TEXAS

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (32 C) calculated VOC-US/Hong Kong

Tested in accordance with ISO , high expected durability in corrosivity category C5-I. Property Test/Standard Description

Overview of Canusa-CPS. Diversity of field-applied pipeline coating technologies. Robert Buchanan Canusa-CPS, Toronto, Canada

A Systematic Approach to Decision Making

Summary of Substantive Changes between the 2007 and 2015 editions of AWWA C213, Fusion Bonded Epoxy Coatings. and Fittings

Model Specifications for Sclairpipe High Density Polyethylene (HDPE) Pipe

SECTION POLYURETHANE MIC COATINGS. A. Furnish and install special coating systems in accordance with the Contract Documents.

PPG HI-TEMP 1000 VS. PRODUCT DATA SHEET December 10, 2014 (Revision of June 30, 2014) DESCRIPTION

SQS Supplement C. Galvanizers. MnDOT Supplier Qualification Standard

PROCESS SPECIFICATION- SURFACE FINISH

Property Test/Standard Description Solids by volume. ISO 3233 Gloss level (60 ) ISO 2813

1.4 kg/l (11.4 lb/us gal) Maximum 272 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) To 650 C (1200 F) To 538 C (1000 F)

3M Scotchkote Abrasion Resistance Epoxy Coating 328

Coating Performance Not as Simple as it would Appear

Property Test/Standard Description. 53± 2 % matt (0-35) Flash point ISO 3679 Method 1 25 C calculated IED (2010/75/EU) (theoretical)

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

Ministry of Forests & Range

POLYURETHANE COATINGS ON STEEL OR DUCTILE IRON PIPE

Eurotaff HG31 Chemical Resistance to Gasolines

Girth Weld Coating With Fusion Bond Epoxy

There is an inspection report prepared after the Digester cleaning was carried out.

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1

Approved. Property Test/Standard Description STANDARD GRADE. semi gloss (35-70) Flash point ISO 3679 Method 1

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition

Application Guide for Jotun Reveal Edge D / W Powder Coatings

Draft. innovation in the field. Modern pipeline maintenance and new construction

FABRICATED STEEL PIPE AND SPECIALS

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Welcome. Mission. About Us. to Sharjah Steel Corporate Portfolio

IGS-C-TP-010-Amnd2 Oct IGS. Iranian Gas Standards -(./ !" # 3 % % 2 '(!)*+ Amendment No. 2 to Three Layer Polyethylene Coating System

TQM INSPECTION SERVICES LTD.

Inspection Report. Failed beyond AQL. * Refer to Section C for Remarks

Transcription:

Inspector: Mr. Tom Tu Page : 1 of 19 Project name: Piping Inspection - China - Litonglian Executing Country: Client: XX Holding Group PO No.: 42010 Contact: JM +49 Vendor/Manufacturer: Litonglian / HEBEI CHANGFENG STEEL TUBE MANUFACTURING GROUP CO.,LTD. Contact: Jane Zhang Cangzhou city, Hebei province, China. Ref / Order No.: n/a Vendor s Ref: Place of Inspection: Cangzhou city, Hebei province, China. Attendees: Mr. Hu & Mr. Fu Date of Inspection: 05-11-2014 Equipment/goods inspected: pipes (63 pcs) Inspection according to: ITP / QCP No.: ITP and Revision Codes / standards: ASME B16.10:Piping API 5L: Specification for ERW steel pipes. Specification: declare if from vendor or client side is Drawing No.: no drawing has provided. Scope of work: visual inspection, dimensional inspection, full inspection partial inspection random inspection - 20 % Inspection result: Satisfactory partial non-conforming rejected aborted Documentation: Complete and in order not complete (please see report details) Deviations found: None to contract to drawings to ITP / QCP / PO Remarks: (Please see separate nonconformance report) The inspector has carried out visual inspection, dimensional check and documents review during inspection. 1. The markings & the appearance of the coating of the checked samples were in comply with the specification of DIN 30670: Polyethylene Coating, without obviously defect was found out during inspection. 2. All pipes have been completed and ready for shipment, coated & printed marks during inspection.

Inspector: Mr. Tom Tu Page : 2 of 19 INSPECTION DETAILS Material / Products / Components inspected: Item No. 1 2 3 4 5 6 7 8 Description Actual Q ty Specification O.D/mm W.T/mm Length/ m Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 5 508.0 6.35 11.8 Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 6 457.2 6.35 11.8 Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 9 406.4 6.35 11.8 Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 4 114.3 3.05 11.8 Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 28 406.4 9.53 11.8 Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 7 114.3 6.02 11.8 Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 3 114.3 6.02 11.8 Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE coated 1 88.9 3.05 6 Total 63 Detailed Scope of Inspection: Acc. to VERITELL INC Work Order scope of inspection 127xxxxxx-xxx, object of the inspection was: 1. Visual inspection The markings & coating of all checked sample pipes were in comply with specification, without any obviously defect was found during inspection.

Inspector: Mr. Tom Tu Page : 3 of 19 2. Dimensional Inspection & Additional Conditions of Coating. For the following items, the inspector have checked their thickness of coating as requirements. Item 1 2 3 4 5 6 7 8 Attex Code X154264 5110028-6 X154264 5110027-6 X154264 5110026-6 X154264 5110016-6 X154264 5150026-6 X154264 5150016-6 X154264 5150016-7 X154264 5150014-7 Note of Sales Actual Quant. 176855 60 176855 72 176855 108 176855 48 176855 336 176855 84 176855 36 176855 6 Goods Description Length Size Result & Actual Status BURIED PIPE: API 5L X65 ERW PIPE, SCHEDULE 10 + 3LPE EXTERNAL COATING ACC. TO DIN 30670 OR CAN/CSA Z245, BBE BURIED PIPE: API 5L X65 ERW PIPE, SCHEDULE 10 + 3LPE EXTERNAL COATING ACC. TO DIN 30670 OR CAN/CSA Z245, BBE BURIED PIPE: API 5L X65 ERW PIPE, SCHEDULE 10 + 3LPE EXTERNAL COATING ACC. TO DIN 30670 OR CAN/CSA Z245, BBE BURIED PIPE: API 5L X65 ERW PIPE, SCHEDULE 10 + 3LPE EXTERNAL COATING ACC. TO DIN 30670 OR CAN/CSA Z245, BBE BURIED PIPE: API 5L X65 ERW PIPE, SCHEDULE STD + 3LPE EXTERNAL COATING ACC. TO DIN 30670 OR CAN/CSA Z245, BBE BURIED PIPE: API 5L X65 ERW PIPE, SCHEDULE STD + 3LPE EXTERNAL COATING ACC. TO DIN 30670 OR CAN/CSA Z245, BBE AIR PIPE: API 5L X65 ERW PIPE, SCHEDULE STD + EXTERNAL EPOXY PAINT, BBE AIR PIPE: API 5L X65 ERW PIPE, SCHEDULE STD + EXTERNAL EPOXY PAINT, BBE DRL 20" 5 pcs DRL 18" 6 pcs DRL 16" 9 pcs DRL 4" 4 pcs DRL 16" 28 pcs DRL 4" 7 pcs DRL 4" 3 pcs SRL 3" 1 pc 9 1 Manufacturing Schedule No 10 1 Preliminary Calibration Measurement Instruments yes 11 1 Quality Plan yes 12 1 Inspection Test Plan (for pipes and coating) yes 13 1 Procedure Test yes 14 1 Quality Controls Protocols yes 15 1 Safety Data Sheet yes 16 1 Coating (external & internal) Quality Plan yes 17 1 Mill Test Report yes 18 1 Surface Preparation Procedure yes

Inspector: Mr. Tom Tu Page : 4 of 19 19 1 Coating List Materials yes 20 1 Coating Procedure yes 21 1 Coating Inspection Procedure yes 22 1 Cleaning and Coating Test yes 23 1 Coating Test acc. to DIN30670 yes 24 1 Paint Test yes 25 1 Test Certificates yes 26 1 Manufacture Dossier no 27 1 Handling, Transport and Storage Procedure no 28 1 Touch Up Procedure no 29 1 Touch Up Repair Procedure no 30 1 FAT Test no 31 1 SAT Test no Weekly Progress Reports Note: Coating 3LPE must be acc. To DIM 30670 or CAN/CSA Z245.21 and: First coat: FBE with 150 micron minimum dry film thickness Second coat: copolymer (Adhesive) with 200 micron minimum dry film thickness Third coat: high density polyethylene with 2 mm To application of this type coating on the pipe, previously must be cleaned to white metal by abrasive blasting acc. to SSPC SP-5. Epoxy coating will be according to below scheme: Thickness coating layers: Zinc Inorganic 2,5 mils Epoxy Varnish Adhesive 2.0 mils Epoxy paint finish 16 mils Total thickness 20.5 mils (0.5mm) Acc. to AAS standard, color pipes must be Green RAL 6027. Above ground pipes will be protected against external corrosion. Pipes must be provided with External Epoxy paint acc. to AWWA C-210 Norm acc. to previous scheme. Repainting time are maximum 12 hours between coats, except bridge coating because will be acc. to advice manufacturer for a better adhesion. All materials (pipes and fittings) ends must be without coating, considering 100 mm calculated from bevel edge. End coating must be bevelled on 45º in angle. For Air Pipes it s necessary: Line number and flow direction, letters have to be on black color (RAL 9004) in a white sash/belt (RAL 9003) on the pipe. Maximum space between sash/belt is 10 [m]. Letter size: 12 cm height for pipes bigger than 4" and 6 The total thickness of the three layers coating is about 3mm N/A Total thickness is about 0.7mm N/A All pipes ends without coating N/A

Inspector: Mr. Tom Tu Page : 5 of 19 cm on minor pipes Nylon lifting belt is NOT acceptable, please to consider cotton belt. Lifting with cotton belts. 3. Documents Review the manufacturer have provided the following documents & certificates for review during inspection. Standards and Documentation: - Mill Test Certificate of Anti-corrosion (3LPE) (DIN 30670) - Mill Test Certificate of Anti-corrosion (FBE) (DIN 30671) - Record of Coating thickness & holiday & pipe end & appearance inspection - Record of Blasting & Salts Inspection - Record of Extrusion temperature & revolutions of Adhere and PE. - Record of 3PE Peel Strength & PBE thickness & Degree of Cure. - Coating Test Certificate (FBE,2PE,3PE) - Coating List Materials - Coating Materials Test Report - Products List - Quality Management System Certification - Anti-Corrosion factory (ISO9001:2008) (Please list all standards used during inspection and all documentation received, which must be numbered and attached accordingly) Witnessed Tests: (Please list all tests witnessed as requested; also indicate whether at hold or witness point) Used Test Equipment: Type of Equipment Identification Number Calibration Status Vernier Caliper(0~1000mm) 100291 Calibrated on 2014.Oct.18 Valid until 2015.Oct.17 Coating Thickness Meter 12061016 Calibrated on 2014.Mar.11 Valid until 2015.Mar.10 Electric spark leak tester 1010030 Calibrated on 2014.Mar.05 Valid until 2015.Mar.04 Tape 106096 Calibrated on 2014.Oct.18 Valid until 2015.Oct.17

Inspector: Mr. Tom Tu Page : 6 of 19 INSPECTION ACIVITIES 1. Visual Inspection. Included coating, pipe ends, markings. Result: Conditional Accept. Actual found that, the letter size was 4cm height for pipes 16, 18 and 20. The letter size was 2 cm height for pipes 3 and 4. As the client provided packing list, which required the letter size: 12 cm height for pipes bigger than 4 and 6 cm on minor pipes. 2. Dimension Inspection Result: satisfactory 3. Ends of the pipes Result: Conditional Accept As requirements, all pipes ends must be without coating, considering 100mm calculated from bevel edge. End coating must be beveled on 45 in angel. However, the length of uncoated ends were about 100mm for pipes 18 and 20. The length of uncoated ends were about 85mm for pipes 3,4 and 16. Besides, the angel of end coating which did not checked due to the gauge has not provided during inspection. 4. Result:.. 5. Result:.. Documentation Control: - Mill Test Certificate of Anti-corrosion (3LPE) (DIN 30670) - Mill Test Certificate of Anti-corrosion (FBE) (DIN 30671) - Record of Coating thickness & holiday & pipe end & appearance inspection - Record of Blasting & Salts Inspection - Record of Extrusion temperature & revolutions of Adhere and PE. - Record of 3PE Peel Strength & PBE thickness & Degree of Cure. - Coating Test Certificate (FBE,2PE,3PE) Please list all documents controlled.

Inspector: Mr. Tom Tu Page : 7 of 19 Non Conformities: Please list all found non conformities and refer to the separate non conformity report including the report number. 1. there were 2 pipes which ends with tiny damaged during inspection. And the manufacturer promised that they will repair it before shipment. Manufacturer informed about non conformities Next visit: Inspection completed Signature: Disclaimer: This report reflects our findings during inspection in time and place according to the agreed scope of our performance or deliverables and does not release buyer and/or seller from their contractual responsibilities. This report does not construe any guarantee or warranty that the purchase contract between buyer and seller is fulfilled correctly and all performances have been delivered without any defect. Furthermore the report and its results does not affect any potential buyer s right to claim for compensation or remedy towards the seller/supplier of apparent or hidden defects not detected during our inspection or occurred afterwards. PICTURES: Picture Description: 01: Coating thickness check (3 LPE) 02: Length of uncoated end check

Inspector: Mr. Tom Tu Page : 8 of 19 03: Check the thickness of Expoxy coating. 04. Holiday Check for coating. 05. Appearance & marking.

Inspector: Mr. Tom Tu Page : 9 of 19 06. Letter Size; 4 cm height for bigger than 16 pipes Letter Size: 2 cm height for 3 and 4 pipes.

Inspector: Mr. Tom Tu Page : 10 of 19 Appearance of pipes

Inspector: Mr. Tom Tu Page : 11 of 19

Inspector: Mr. Tom Tu Page : 12 of 19

Inspector: Mr. Tom Tu Page : 13 of 19 Reviewed documents

Inspector: Mr. Tom Tu Page : 14 of 19

Inspector: Mr. Tom Tu Page : 15 of 19

Inspector: Mr. Tom Tu Page : 16 of 19

Inspector: Mr. Tom Tu Page : 17 of 19

Inspector: Mr. Tom Tu Page : 18 of 19

Inspector: Mr. Tom Tu Page : 19 of 19