The Perth Freight Link: Facts and Fiction

Similar documents
Detroit River International Crossing Study Canadian Frequently Asked Questions. Q. Why have you decided to focus on this area of analysis?

SOUTH WEST METROPOLITAN REGION INTEGRATED TRANSPORT FRAMEWORK AND COMPONENT PROGRAMS

Illawarra Business Chamber/Illawarra First. Submission on NSW Draft Freight and Ports Plan

Committed to improving water quality in Cockburn Sound

26 October Perth Transport Plan for 3.5 million Department of Transport GPO Box C102 Perth, WA Dear Sir/Madam,

Introduction. Freight and Logistics Council of Western Australia BULLETIN # ISSUED JUNE 2014

Ports of Auckland Development Proposals MAY 2013

Trade Supply Chain. Developing Rail and Sea Access. Peter Keyte PBPL

Using MOVES2010 for Estimating On-Road GHG Emissions

GLOBE LINK CONNECTING SOUTH AUSTRALIA TO THE WORLD

Gateway Infrastructure Development Programs in Urban Centers on the west coast of North America

Nature Conservation Council of NSW. Sustainable Transport Policy

SOUTH WEST GROUP STRATEGIC PLAN to 2025 FINAL. 5 May South West Group Strategic Plan Final 5 May 2015 Page 1

The Victorian Transport Plan (Department of Transport, 2008).

GLOBELINK A STRONG PLAN FOR REAL CHANGE 1

Report on 2013 Traffic Congestion Workshop - Developments

Roberts Bank Terminal 2 Project Environmental Impact Statement Comments on Completeness April 30 June 15, 2015

Appendix M. Criteria, Measures and Indicators for Effects Assessment

I-81 Update July 2007

Greater Golden Horseshoe Transportation Plan

Table of Contents. List of Tables. 11. Advantages and Disadvantages

American Association of Port Authorities Spring Meeting March 24, 2009

Supports Item No. 3 T&T Committee Agenda February 17, 2009

PROGRAMMATIC AGREEMENT

Noise and Vibration Management for the Southern Suburbs Railway Project

Intermodalism -- Metropolitan Chicago's Built-In Economic Advantage

2010 Indiana Logistics Summit

Northeast Rail Operations Study (NEROps)

Avalon Airport Rail Link. Community and Stakeholder Issues and Ideas Report Understanding what s important. December 2011

NEW SOUTH WALES INTERMODAL FORUM. August 2017

PORT OF NEWCASTLE CONTAINER TERMINAL PRESENTATION FEBRUARY 2018

Freight transport policy and measures in Norway

Port of Vancouver Strategic Plan Update

Alexandra Basin Redevelopment Project. and a. Possible Future Eastern Bypass

Speech by Michael Kilgariff Supply Chain Management Conference Tuesday 24 May 2016

The Gerald Desmond Bridge is a critical piece

CEDA Future proofing Perth s freight network

AIR ACTION PROGRAM. Overview of Port Metro Vancouver Air Initiatives. Metro Vancouver Sustainability Breakfast June 04, 2014

Massachusetts Rail Plan. September 16, 2010

Speech by Michael Kilgariff, ALC Managing Director. To the Victorian Transport and Infrastructure Summit. Wednesday 11 September 2013

Australia's transport is falling behind on energy efficiency

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Submission Cover Sheet Fishermans Bend Planning Review Panel

Stakeholder Consultation Outcomes

Australian and Canadian Imports and Exports: Trade and Transportation by

SEARs project justification and conclusion

The Global Supply Chain and Greenhouse Gases: a North American Perspective

Presentation Date: September 13, 2017 Location: Fogolar Furlan

Input from Engineers Ireland Into the Department of Transport s Statement of Strategy

Project 24 Rail Transport Energy Efficiency and Sustainability. Project background Commenced July Completed December 2006

Regional Goods Movement Planning in the Bay Area

Great Lakes Basin Transportation, Inc. Railroad Proposal

Cross Border Rail Transportation: A Canadian Perspective. Canada-United States Cross-Border Rail Peer Exchange May 25, 2011 Burlington, Vermont

SUBMISSION ON THE STRATEGIC INFRASTRUCTURE PLAN FOR SOUTH AUSTRALIA

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

Submission in response to: New South Wales Draft Climate Change Strategic Plan and. Draft Plan to Save Energy and Money

Mega Projects at WSDOT

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION

Urban Congestion The COAG Review

North-South Corridor Strategic Investment Outline

Changes to Air Quality

Network Operation Planning - A new approach to managing congestion

1. Claim: Asphalt is not a toxic environmental hazard.

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

Ag TC Meeting June 26, 2014 San Francisco. Whiteside & Associates/Alliance for Rail Competition Billings, Montana

Policy Brief EXPANDED COMMODITY EXPORTS WILL CREATE JOBS, INCREASE INVESTMENT. Part 4 in Our Series: Trade and Transportation

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

Rail Freight Service Review. Submission of the New Brunswick Department of Transportation

Planning For Employment and Industry in Melbourne s Growth Areas

Information Paper. Moorebank Intermodal Terminal Project. October 2011 Moorebank Project Office

LEVIN TO WELLINGTON ROAD OF NATIONAL SIGNIFICANCE - QUESTIONS AND ANSWERS

The Murray Darling Basin Plan. May This occasional paper provides an overview of the process of developing the Murray Darling Basin Plan.

State Environmental Planning Policy No 63 Major Transport Projects

Hume Regional Development Australia Committee. Freight Directions in the Hume Region Summary Report

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE

Mendocino Forest Products Grading For Industrial Land Improvements

Long-term Plan Transport Proposal. 29 October 2014

COEXISTING: FREIGHT FACILITIES & COMMUNITIES. The Capital District Intermodal and Automotive Terminal Rick Crawford, Norfolk Southern April 24, 2013

Regional First and Last Mile Pilot Project

Fishermans Bend. Integrated Transport Plan Victorian Planning Panels. Cccc Eco City World Summit July Neal Giles, Fishermans Bend Taskforce

Gladstone Australia s 21 st Century Industrial City

August 19, (c) Establishment of Performance Measures.

CONTAINER PORT GOALS 10-2

FACT & ACTION SHEET THE TARKINE

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps

The APA would be pleased to discuss on-site options for the cable route with Ausgrid representatives.

REGIONAL RAIL REVIVAL

SECTION V - STATE AND FEDERAL IMPLEMENTATION

Peter Hewitt. Transport for London

A more detailed description of Transportation, and its programs and initiatives can be found at

How HRTPO Helps Freight Move. Presented by Robert B. Case, PE, PhD Transportation Technical Advisory Committee Agenda Item #13 April 1, 2015

Effects on environmental conditions of constructing a u-turn in East Tehran Highway

Northwestern University Transportation Center

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites

QUEENSLAND ELECTION 2017

Comparative Analysis and Urban Public Policies: A methodology for conceptualizing the role of the actors

Too much we don t know Too many mis-statements

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L)

Rail Intermodal Keeps America Moving

Using MOVES to Estimate On-Road Greenhouse Gas Emissions and Energy Consumption

Transcription:

The Perth Freight Link: Facts and Fiction Prepared by Peter Newman and Philip Jennings for the Beeliar Group Professors for Environmental Responsibility The supporters of Roe 8 and the Perth Freight Link (PFL) have been spreading misinformation and half truths about the developments. Their aim is to discredit alternatives by the selective use of the facts. This analysis of the Roe 8 and PFL myths provides a more complete picture.

Myth 1: The PFL has been on the books for 60 years and no one objected until recently. The PFL was a Prime Minister Abbott Captain s Call presented to the former Transport Minister, Dean Nalder, at a meeting in Canberra in early 2015, along with similar highly controversial roads in Melbourne and Sydney. The Melbourne East-West Link was rejected by the Victorian people at their last election. It is extremely unusual to have a road project proposed by a Commonwealth politician and it has disrupted all planning processes since it was dropped on Perth without any history or warning. The PFL is still a vague proposal and the detailed design has never been released publicly or assessed by the EPA. Roe 8 was included in the Metropolitan Region Scheme in 1955 without any public consultation or environmental impact assessment as part of a ring road bringing traffic to the southern end of the port. The Cockburn Wetlands Study of 1975 first suggested that the road should not proceed. The first environmental assessment was carried out by the EPA in 1978 and it recommended in its System Six report in 1980 that a new route be found because the proposed route was environmentally unacceptable. It repeated this view in its strategic assessment in 2004. The Government then took this on board and developed a comprehensive Freight Network Strategy which included a new port in Kwinana and the deletion of Roe 8. The current Government abandoned this strategy and reverted to the obsolete 1955 plan without having a comprehensive approach to managing container freight and trucks, which were never imagined in 1955. Myth 2: Labor and the Greens are responsible for the predicament in which we find ourselves over the Perth Freight Link. PFL advocates claim that by deleting the Fremantle Eastern Bypass in 2006 the ALP and the Greens cut off the planned link from Roe 8 to the port of Fremantle and this left us with an expensive and difficult planning problem. This is a half-truth. The ALP and the Greens did support the deletion of the FEB, which was part of the Stephenson-Hepburn Plan of 1955. However, they did this after careful consideration of the social, economic and environmental impacts. The Freight Network Congress in 2001 supported the deletion of the FEB and this was an open, democratic process involving a representative group of the key stake-

holders. The Freight Network Congress did not ignore the consequences of the deletion of the FEB, in fact it proposed a 6-point strategy to provide for freight movement through the Metropolitan Area out to 2030. The incoming Barnett Government in 2008 chose to discard the 6-point plan and return to the old Stephenson-Hepburn Plan of 1955 and this is what has created the present planning problems. Myth 3: The PFL project will create 10,000 jobs and is economically beneficial Main Roads claims that the PFL will create 10,000 jobs, while the Premier claims it will create 3,000 jobs. Main Roads has refused an FOI request for it to release its cost benefit analysis for this project, and has not yet released it despite its refusal to release having been largely set aside by the State s Information Commissioner. Further, a cost benefit analysis can make no sense while there is no plan to get trucks through to the port at the end of Roe 9, so no real time savings can be calculated. Most of the jobs suggested will be very short term and very few new jobs will be created. There is no real economic value that could compare with the Outer Harbour and its associated Fremantle waterfront redevelopment where the following benefits have been estimated. Employment Gross Reginal Product Outer Harbour 11,000 direct jobs when the 1600 ha is fully developed $13.9 billion Net Present Value over 20 years Fremantle water Front Development 7,265 direct jobs when 15.7 to 29 ha of land are redeveloped $4.4 billion Net Present Value over 20 years Investment $5 billion Net Present Value of external investment initially $3.5 billion Net Present Value of external investment initially

The Outer Harbour will enable larger ships to enter a major new modern container port with all the space it requires and with the best road and rail connections to enable containers to be moved around the city. Figure: Outer Harbour land area and road and rail links. Source: Indian Ocean Gateway.

The Fremantle Inner Harbour is a typical sailing ship port in the mouth of the Swan River similar to most cities that created ports in the 19th century to facilitate cargo and passenger movements in a less exposed environment. It was not created for containers and trucks. The Fremantle Inner Harbour can be rejuvenated as a people-oriented place with many port functions such as cruise ships which brought 10,000 people in the past year. Fremantle s heritage and fabric can flourish as has Darling Harbour in Sydney and the old port area of Singapore, Capetown, Vancouver and London. Myth 4: Building the Outer Harbour in Cockburn Sound will involve more social and environmental damage than building the PFL Comment: An important part of the Freight Network Strategy 6-point plan was to accelerate the construction of the Outer Harbour in Kwinana, together with improved rail access via an intermodal terminal at Henderson. Road access was to be provided via Roe 7 and the Kwinana Freeway and via the Tonkin Highway, with connections via Rowley, Anketell and Thomas Roads. A private port proposal at James Point had already been assessed and approved by the EPA and the Minister in 2000. There are no seagrass meadows at James Point as they were destroyed by industrial pollution and the building of the BHP port site in the 1960s. The shipping channels through the Success and Parmelia Banks were dredged by Cockburn Cement under licence for shell sands in the 1980s. The Royal Australian Navy and large grain ships already use these channels. The road network to the Outer Harbour is largely in place already and there are no direct impacts on Bush Forever sites or the Beeliar Regional Park. The only environmentally contentious issue is with the proposed Rowley Road extension which runs adjacent to Lake Wattleup and along the southern boundary of Mt Brown. This proposal was subjected to considerable discussion in 2004 and an agreed route was found that minimized the environmental impact. Therefore, the environmental and social impacts of building the Outer Harbour and its access roads are much less than putting the PFL through the Beeliar Wetlands and through the established suburbs of Coolbellup, Hilton, Hamilton Hill, White Gum Valley, Palmyra and East Fremantle.

Myth 5: Roe 8 will be needed in any case, regardless of whether the whole PFL is built. Comment: The supporters of Roe 8 (Stage 1 of the PFL) say that it would be needed for access to the Outer Harbour, regardless of whether stages 2 and 3 are built. Roe 8 will end at a busy intersection with Stock Road in Hamilton Hill. Without stages 2 and 3 of the PFL, access to the Fremantle Port from Roe 8 and Stock Road will be slower than using Leach Highway, which trucks will choose to continue using. Access to the Outer Harbour will be difficult due to congestion and traffic lights on Stock Road. It will be easier for trucks to reach it by leaving Roe Highway at the Kwinana Freeway and travelling south to the Rowley, Anketell or Thomas Road exits. The Freight Network Review of 2001-2007 took all of this into account when it considered the future needs of the freight industry and concluded that Roe 8 was redundant and that the best solution was to upgrade Leach Highway and accelerate the development of the Outer Harbour in Kwinana. Myth 6: Roe 8 will be built on land that is already partly cleared for power lines. Comment: This is a half-truth. The EPA required Main Roads to move the alignment of Roe 8 to the north to use the power line easement through the North Lake wetlands. However, Roe 8 still involves the clearing of 97.8 hectares of good quality banksia woodland, including 5.4 hectares of the Beeliar Regional Park and 7 hectares of Bush Forever site 244. Also 6.8 ha of conservation category wetlands will be cleared for Roe 8 and the wildlife habitat at North Lake will be severed and fragmented. Most of this land is also the habitat of the endangered Carnaby s black cockatoo (80 ha). Main Roads are also planning to construct wastewater basins within the Beeliar Regional Park to collect runoff from Roe 8.

Myth 7: The PFL will reduce traffic congestion This is supposed to be one of the major reasons for building the PFL, but it is a road to nowhere. The Roe 9 tunnel will dump thousands of cars and trucks each day at the corner of High Street and Stirling Highway, where there is already serious congestion. Roe 8 will terminate at Stock Road in Coolbellup and traffic is likely to become congested there also. The Stock Road, South Street intersection is already badly congested and trucks carrying dangerous cargoes will have to use Stock Road and Leach Highway to reach the port as they will not be allowed to use the tunnel. Myth 8: The PFL will reduce pollution and greenhouse gas emissions Wetlands are a carbon sink from which carbon dioxide and other greenhouse gases will be released once bulldozed. This is not mentioned in the Main Roads planning documents. Main Roads main approach has been to focus on the reduction in idling by the anticipated freer flowing traffic. However the likely increased congestion at the entry to and exit from the Roe 9 tunnel will mean that trucks will spend time idling in these locations and this will increase local pollution levels. The tunnel is likely to be vented at the entry and exit and this will release diesel fumes into the atmosphere in large quantities, especially the fine particles which are increased not decreased by fast moving trucks. These fumes are toxic and carcinogenic and the background levels in the Fremantle area are already above the nationally accepted upper limit. Greenhouse emissions are likely to increase as freeways are known to encourage people to use private cars rather than public transport. Assessments of freeways that claim reductions in greenhouse and other emissions are now discredited as they do not provide a comprehensive approach to the problem.

Myth 9: The PFL will improve road safety and transport efficiency The PFL will do nothing to improve road safety or transport efficiency. Leach Highway is already a very safe road, thanks to improvements made over the past decade. In contrast Roe Highway has a much higher accident rate. Trucks carrying toxic or explosive cargoes will not be allowed to use the Roe 9 tunnel and so they will continue to use Leach Highway, South Street and High Street. The Outer Harbour, with its far superior road and rail access that will allow long trains (currently excluded from access to the Inner Harbour), will be far better in its road traffic safety and efficiency. A new passenger rail route has been announced, with bi-partisan support, for the Thornlie to Cockburn section of the present Kewdale to Fremantle freight rail route corridor. In the future, passenger rail could continue around the freight corridor to Fremantle completing an important rail link in the southern suburbs but only if the port were shifted to the Outer Harbour as there is insufficient space for both freight and passengers in the Fremantle section of the corridor. This would be a comprehensive upgrading of transport efficiency and safety for the whole of Perth. Myth 10: Now that clearing has commenced we may as well complete the project The Government is recklessly clearing a path through the Beeliar Wetlands in the hope that it will cause irreversible damage and that Roe 8 will go ahead regardless of the outcome of the March Election. Labor has pledged to halt the destruction and transfer the funding to a modern port in Cockburn Sound. The Beeliar wetlands will recover quickly once the bulldozing is stopped. Wetlands have a remarkable ability to regenerate and considerable knowledge has been gained about wetland regeneration in the Beeliar area over recent decades. The Banksia woodlands will take longer to recover and there are 500 year old trees being felled for the Roe 8 that will be particularly slow to recover and which will be greatly missed by the public and by the wildlife that use them for habitat. It is irresponsible to continue clearing for a road that may never be built. The clearing should be stopped.

Final Comment: The Roe 8/PFL saga is a planning disaster that the Government has brought upon itself. It has succumbed to persistent lobbying by the City of Melville and the Main Roads Department. They have persuaded the State Government to discard a modern, carefully considered freight strategy (the 6-point plan) and revert to an obsolete plan that was drawn up 50 years ago so as to be able to respond to a, now, ex-prime-minister s Captain s Call. The weaknesses in the Stephenson-Hepburn Plan were identified by the EPA in its System Six study in the 1970s and it warned in 1980 that Roe 8 was unacceptable. Several other aspects of the Stephenson-Hepburn plan, such as the Stephenson Highway and the Point Walter/Point Resolution bridge, have also been deleted from the MRS for social and environmental reasons. We should be aware that the EPA did not exist in 1955 and the original Stephenson Plan was never subjected to environmental or social review or to public input. In contrast the Freight Network Strategy of 2007 was carefully considered and publicly reviewed and was being implemented when the current Government came to office and discarded it in 2008. It is not too late to correct this error.