Charter for High Speed Rail A Greengauge 21 commentary

Similar documents
Public participation in major transport infrastructure planning

Our approach to Options Appraisal

Megaprojects and sustainable development OMEGA lecture

Agenda Item 7: Strategic Transport Forum Revised Terms of Reference

Environmental principles and governance consultation: a briefing for local groups

Financial Implications None. The governance costs of the Deals will be met from within existing budgets.

CLOCK IS TICKING. A Mid-Term Report Card on the Federal Government and its Work on the Environment

SECRETARY OF STATE FOR TRANSPORT 15 MARCH 2013 SUMMARY TO ASSIST THE MEDIA

New arrangements for prioritising, commissioning, funding and evaluating research, education and treatment. Statement of intent

Strategic Transport Forum

Improved participation in the planning process?

Proportionality guidance for departments

Input from Engineers Ireland Into the Department of Transport s Statement of Strategy

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One.

NHS VOLUNTARY SECTOR PROVIDERS FORUM CONSULTATION RESPONSE. Substantive Guidance on the Procurement, Patient Choice and Competition Regulations

Consultation response. February 2014

Defra Consultation on Environmental Principles and Governance after EU Exit

Making the Journey A Manifesto for Transport

Comments on the ecological content of the HS2 Draft Environmental Statement and associated documents

NACCHO GOVERNANCE CODE: NATIONAL PRINCIPLES AND GUIDELINES FOR GOOD GOVERNANCE

Lord Adonis Minister of State for Transport Department for Transport Great Minster House 76 Marsham Street London SW1P 4DR. 13 th February 2009,

Project Appraisal Guidelines

Commons Report Stage of the Agriculture Bill Briefing for MPs

Customer Engagement Strategy

Making use of Planning Policy Statement 12: Local Spatial Planning (PPS12)

Proposed Development Plan Scheme

Community Empowerment (Scotland) Act Part 2 Community Planning Guidance

Welsh Transport Appraisal Guidance (WelTAG) 2017

Commission on Parliamentary Reform Written views from Scottish Federation of Housing Associations

PROPOSED APPROACH FOR AUCKLAND S RAPID TRANSIT NETWORK PROGRAMME

SUBMISSION BY IRELAND AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES

Dimensions 2020 A strategic vision for the Dimensions Group

European Grid Declaration on Electricity Network Development and Nature Conservation in Europe

Designations and Outline Plans

Pre- submission Core Strategy and associated documents consultation. Submitted on behalf of Extra Motorway Services Area Group

Response to Transport Committee Freight and Brexit Inquiry

All Party Parliamentary Group for Excellence in the Built Environment - Call for evidence

A response from the Irish Council for Social Housing to Building for the Future: A Voluntary Regulation Code for Approved Housing Bodies in Ireland

Department for Transport Consultation on the National Policy Statement for National Networks (NN NPS) Written Evidence from GB Railfreight

Briefing for MPs on the committee stage of the European Union (Withdrawal) Bill

Getting the best from our land

Ewan Hall GMB Convenor

Local Transport Plan 4

Short Life Ministerial Working Group for Onshore Consents Joint position paper by Heads of Planning Scotland and COSLA

UK Committee on Climate Change Call for Evidence: Scottish Climate Change Bill. Response from Stop Climate Chaos Scotland February 2017

Banded Hours Contract Bill Ibec Submission to the Joint Committee on Jobs Enterprise and Innovation

Climate Change Strategy Tackling Climate Change

Socio-economic Requirements

EY Midlands Engine Devolution Survey

SPSF 1: Core guidance. Shared Purpose: Shared Future. Statutory guidance on the Well-being of Future Generations (Wales) Act 2015

REPORT TO OSCE/ODIHR RESPONSE TO OSCE'S ELECTION EXPERT TEAM REPORT FROM THE 2017 PARLIAMENTARY ELECTIONS

Electricity System Operator Forward Plan 2018/19

Presented to Parliament by the Secretary of State for Communities and Local Government by Command of Her Majesty. October 2016 CM 9345

Transport Select Committee Inquiry into the National Policy Statement (NPS) for National Networks Written Evidence from GB Railfreight

Parliamentary briefing: Second reading of the Agriculture Bill

National Commissioning Board. Leading Integrated and Collaborative Commissioning A Practice Guide

Welsh Government Housing Regulation

Brexit Briefing: The Implications for UK Environmental Law

WORKING TOGETHER: A new Compact for Bradford District

DORSET PROCUREMENT. Procurement Strategy

Making a difference to life: Biodiversity and you

SUBMISSION ON JOINT IMPLEMENTATION

Review of Older People s Engagement with Government

Guidance on the role of flood and coastal defence in nature conservation in England

Report of the workshop on facilitating shared ownership on health and wellbeing boards

Role Profile. Franchise Change Manager. Commissioning, Programme and Project

Community Housing Cymru s Code of Governance

Planning and Environment Amendment (General) Bill 2009

8. But so far the principle of local and regional self-government has not been properly respected in the EU framework. The problem is not confined to

Getting involved in planning in Northern Ireland: Planning Applications

Comments from ACCA January 2009

Regulation of Water Resources Planning in Scotland

IUCN Policy on Biodiversity Offsets

NEW ZEALAND. Submission to SBSTA on Article 6.4 of the Paris Agreement October 2017

OFFICIAL. Scottish Police Authority Board. Meeting. Case: Paper by Interim Chief Officer and Accountable Officer Reference B 08.

The Newcastle Compact

High Speed Rail: Investing in Britain s Future. Consultation on the route from the West Midlands to Manchester, Leeds and beyond

Comments on NSW Biodiversity Conservation Bill 2016 and Local Land Services Amendment Bill 2016

Jack Dromey MP House of Commons London SW1A 0AA. Our ref: 336Dromey Date: 15 September 2016

ANNUAL PERFORMANCE REPORT DATA ASSURANCE PLAN 2015/2016

Policy Statement. Next Steps for agricultural policy a new deal for society SUMMARY. The voice of British farming. March 2017

The Five Stages of a Successful Agile Transformation

Reward in a Recession. By Roger Down

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps

How to do a Constitutional Convention in the UK

Code of Governance for Community Housing Cymru s Members (a consultation)

Welsh Government M4 Corridor Enhancement Measures (CEM) Participation Report Executive Summary

Welsh Government. Taking Wales Forward. Welsh Government s Well-being Objectives (2016) November gov.wales

a) Strongly agree b) Agree c) Neither agree, nor disagree d) Disagree e) Strongly disagree

Managing the workforce. Cutting costs and restructuring

ROYAL TOWN PLANNING INSTITUTE A NEW VISION FOR PLANNING DELIVERING SUSTAINABLE COMMUNITIES, SETTLEMENTS AND PLACES. Mediating Space - Creating Place

FSB Wales response to Cardiff Council

Connected and Autonomous Vehicles 2 - Stream 3 FS. How To Read Your Feedback

Public Procurement: A consultation on changes to public procurement rules in Scotland

The New Towns Act 1981 (Local Authority Oversight) Regulations

Conwy County Borough Council Report by the Auditor General for Wales. Preliminary Corporate Assessment August 2010

CAP Post Key issues from the Environmental Pillar

Statutory Guidance for the Well-being of Future Generations (Wales) Act 2015

Internet Governance. Why the Multistakeholder Approach Works

Transport Strategy in South. Manchester and East. Cheshire. Think piece for discussion. by Keith Buchan, Director, MTRU

Transcription:

Charter for High Speed Rail A Greengauge 21 commentary The Right Lines Charter was released on 7th April by a group of charitable bodies: Campaign for Better Transport, CPRE, the Chiltern Society, Civic Voice, Environmental Law Foundation, Friends of the Earth, Greenpeace, RSPB, the Wildlife Trusts and the Woodland Trust. It is a short document which comprises the following statements together with four principles that it believes should be followed in planning high-speed rail in Britain. Statements from the Right Lines Charter: An efficient, sustainable transport system is vital to our prosperity and wellbeing. Reducing the damaging impact of travel on the environment and local communities by shifting journeys from road and air to rail needs to be a key priority. High Speed Rail is one option for increasing rail capacity and connectivity. This is a Charter for doing High Speed Rail well. The supporters of this Charter believe that: the process and particular proposals for High Speed Rail should comply with the principles set out below; the Government s High Speed Rail consultation and detailed High Speed 2 (HS2) proposals are unsound at present and fall well short of these principles. The Charter was welcomed by the Secretary of State for Transport who insisted that the HS2 plans were environmentally friendly and said that: I am pleased that so many respected organisations are voicing their support for high speed rail and they should be assured that the Government is already acting on their points of concern. The Government has a clear strategy for a greener, more efficient and more productive transport system with high speed rail at its heart. Greengauge 21 is pleased that the national environmental NGOs are engaging in the consultation process on high-speed rail. We agree with the need for principles in the planning of HSR - we used a set of Guiding Principles in the development of the Fast Forward strategy, although not the same ones. We also accept the Principles in the Charter although there are others too that need to be taken into account in practice. Overall, this is a contribution that should help move the debate forward. Where we differ from the authors of the Charter is in their assessment of how Government is performing against their adopted Principles. Some of the ambitions set out in the Charter would unduly prolong the planning period for HS2, and would help neither the promoters case nor that of objectors. Greengauge 21 response to HSR Charter Page 1

Analysis There are four principles, in each case a statement (bold text) followed by a commentary. We accept the principles but only some of the commentary that follows them. Principle 1. National Strategy High Speed Rail proposals need to be set in the context of a long-term transport strategy stating clear objectives. The Government s High Speed Rail proposals are at present not part of any comprehensive long term transport strategy or nationally agreed priorities. By contrast, all the other countries developing High Speed Rail are doing so within a national framework. Objectives need to be ambitious yet realistic and could include: reducing the need to travel, improving rail capacity and connectivity throughout the country, reducing regional economic disparities and ending dependence on oil. A particular challenge for a UK strategy is to tackle rising carbon emissions from land transport swiftly. The Committee on Climate Change says1 that at least a 60% cut in domestic emissions is needed by 2030 to be on the path to secure a 90% cut (equivalent to 80% once emissions from international aviation and shipping are factored in) by 2050. High Speed Rail therefore needs to be planned and justified as a strategic element of a sustainable, near zero carbon transport system. This first principle is of course desirable, and Greengauge 21 agrees with it. We consider that the key objectives for HSR and for transport are already clear even if we do not have a national transport strategy, as such, in place at the moment. In respect of the critical driver of the case for high-speed rail the need for more transport capacity at the national level there is a broad policy context in place. Government is clear that the key objectives of HS2 are to deliver a substantial increase in rail capacity, thereby promoting long-term and sustainable economic growth. It is clear that Government has no intention of adding extra motorways or runways where the demand pressures are greatest: it is high-speed rail that will be used to add capacity because this is the most sustainable practical approach. The Government s National Infrastructure Plan of 2010 set out a strategy to deliver the transport infrastructure necessary to support sustainable economic growth. And we expect the need for a broader policy context to be met at least in part through the publication of the National Policy Statement for transport, as is provided for under the 2008 Planning Act. It is necessary to consider the length of time it might take to develop a long term transport strategy and get it agreed, which would entail its own consultation process. And realistically, it would need to be subject to regular updating to deal with shifting circumstances. Furthermore, much of the relevant broader policy context lies in the fields of energy policy and regional policy. Greengauge 21 response to HSR Charter Page 2

Indeed, from the standpoint of objectors to HS2 as well as those who are keen to see it implemented, following the first principle too literally would entail a substantial delay to the planning process, extending periods of uncertainty and of non-statutory planning blight. So this first principle may not deliver on its apparent appeal. Principle 2. Testing the Options Major infrastructure proposals, such as High Speed Rail, need to be 'future-proofed' by comprehensive testing against different scenarios. This will help identify the best solutions for genuinely furthering sustainable development. It is not possible to predict impacts accurately over a 75 year timescale, as is being attempted for HS2. This has led to the methodology for assessing HS2 s benefits being seriously called into question. The treatment of impacts that cannot be monetised, such as those on landscapes, heritage and habitats, has been particularly limited in HS2 s business case, with very limited weight given to them. A new strategic and transparent approach is needed for High Speed Rail in an increasingly uncertain future. Assumptions about future transport policy and trends need to be exposed to scrutiny, taking account of possible technological changes as well as changes to the cost of different forms of travel. This is a good principle and Greengauge 21 supports it. High-speed rail should be tested against different scenarios. The objective of finding solutions for genuinely furthering sustainable development is well-chosen. There can be no claim of accuracy in predicting the impacts of HS2 over a 75 year period. But there is value to having a central estimate, based on explicit and testable assumptions. Amongst other merits, this ensures comparability with the effects of other solutions, as this Principle seeks, in a consistent way. As the HS2 consultation materials make clear, the business case for HS2 has already been tested under a variety of different scenarios to understand its strengths and weaknesses. There is no a priori reason why the weight given to impacts on landscape, the heritage and habitats would be greater if a financial value is placed upon them. As the incorporation of carbon into the monetised cost benefit framework illustrates, there is little consensus on the monetary value to ascribe and much depends on scenarios in the case of carbon, on for example the future make-up of electrical power generation sources. It has to be right that possible technological changes are taken into account along with cost and price information when assessments are made. Transparency and availability for scrutiny should be watch-words for an investment of this importance. Greengauge 21 response to HSR Charter Page 3

Principle 3. Public Participation Early public involvement in the development of major infrastructure proposals, including High Speed Rail, is essential. People need to be involved when all options are open for discussion and effective participation can take place. The evidence from High Speed 1 and other major projects is that early and effective public involvement can reduce opposition and lead to better design and delivery of projects. The public should be able to have their say at a time when they can still make a difference. This is implicit in the Government s wider localism agenda. It is also an express requirement of the 1998 Aarhus Convention, to which the UK is a signatory. This principle calls for early public involvement in the planning decision at a time when all options are open again, a principle with which Greengauge 21 agrees. It is two years since Government announced its decision to proceed with HS2, one year since the plans were published in full, together with analyses of the alternatives that had been considered. During 2010, the published plans were extensively updated following a series of informal local consultations. There is now a five month formal consultation process under way in which a lot of the debate has been about the merits of alternatives to HS2. If following this process the Secretary of State elects to proceed with the project, it will be a through a Hybrid Parliamentary Bill, a process itself that is likely to take between two and three years, with detailed consideration of every aspect of the proposal. And on current plans, the Bill process would not start until 2013 to allow time for detailed revision and design, and a full Environmental Impact Assessment to take place postconsultation. This suggests that this Government and the previous administration has been open and is following an extensive and timely consultation process. It should not be criticised for setting out a clear view of its preferred way forward. If instead there were several rival options on the table, it would be very much harder for objectors to formulate their views and concerns. It is therefore surprising to see reference made to High Speed One. That project had a distinctly chequered history through its planning process from which many lessons do seem to have been learned. In the early stages of HS1 planning, a set of four routes was published, causing widespread concern and generalised blight over substantial areas in Kent, before a preferred (and different) route was selected. While the eventual Parliamentary Bill process and detailed planning progressed more smoothly, lessons have been learned from the mistakes of HS1: the HS2 planners have carried out sufficient work to recommend one preferred route while declaring alternatives rejected with the reasons for their rejection, thereby avoiding more generalised and avoidable blight and distress. Greengauge 21 response to HSR Charter Page 4

Principle 4. Minimising Adverse Impacts High Speed Rail proposals need to be designed from the start to avoid significant adverse impacts on the natural environment, cultural heritage and local communities (including biodiversity, landscape, tranquillity and access) during construction and operation. Setting inflexible objectives for HS2 to meet technical specifications such as a theoretical top speed of 400km/h and preconceived requirements such as interchange stations at airports has seriously limited the range of route options considered. It also limits the scope for those participating in the consultation to propose changes to the preferred route. Although mitigation can reduce adverse impacts, it is not as good as avoiding impacts in the first place. Specifications and design speed should not be rigidly fixed in advance but be shaped by the opportunities to minimise impact and maximise benefit. This requires respecting environmental limits and a strategic approach to reducing impacts by prioritising avoidance over mitigation, with compensation being the option of last resort. This principle is of course right it is essentially about taking environmental factors and impacts into account seriously and from the outset. But we don t recognise the assessment that follows. Setting a design standard at 400km/h seems to us to be a prudent provision that avoids the risk of a need in future to attempt re-engineering the infrastructure to accept evolved technology (as called for in Principle 2, in fact). There is a supposition that this design assumption has limited the choices of route and at a local level this may be true, but the HS2 Ltd reports suggest that relaxing this requirement offers little benefit: the route has to go somewhere. There was no preconceived requirement to serve airports in HS2 Ltd s remit, only that interchange had to be provided somewhere to access Heathrow. But this needn t restrict the alignment corridors studied and indeed it is clear from HS2 Ltd s published reports that there was a very wide examination of alignment corridors considered, including those (such as in the M1 corridor) that did not allow for direct access to Heathrow. Also, there is nothing at all to stop an objector making a case for another alignment with differing technological assumptions or for those revised assumptions (say a lower top speed) being applied to the preferred alignment. The strategic approach called for in this Principle entails providing for avoidance ahead of mitigation, in respect of environmental impacts. HS2 Ltd had six driving factors in their design process, including this one:...harnessing the principles of sustainable development, where possible avoiding or otherwise minimising, and then mitigating, environmental impacts This statement appears to match Principle 4 closely. Greengauge 21 response to HSR Charter Page 5

Conclusion The Charter with its four Principles is a helpful contribution to the consultation on HS2. The commentary surrounding the four principles, however, in large measure is not supported by evidence and in places is contradictory. We see no grounds for concluding (as the Charter s authors have) that the current HS2 proposals are unsound at present and fall well short of these principles. Substantively, there seems to be a compliance with what HS2 Ltd and Government has done to date in its planning of HS2. Ministers will nevertheless be wise to engage with these national groups to explore the extent to which the four principles have been applied to date and any changes to the HS2 planning process that might usefully be made. Greengauge 21 April 2011 Greengauge 21 response to HSR Charter Page 6