Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany

Similar documents
CONTINUOUS POWER-TIE CONFIGURATION

The Reliability of the Individual UPS Still an issue?

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 10/02/2017 TSEWG TP-19: STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)

MGE Galaxy /30/40/60/80/100/120 kva. The recommended power protection for all critical applications

Combining our strength for a successful future How does cement production become energy efficient and environmentally friendly?

Information Document Protection System Information ID# R

CAT INTEGRATED SYSTEMS. Electric Power continuous power solutions

End-to-end electrical solutions for the biggest challenges involved with connecting wind energy to the grid. Solutions for Wind Energy Integration

Uninterruptible Power Supply

Microturbine CHP for Microgrids Microgrid2017

UPS installation safety requirements

REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE ELECTRICAL ENGINEER FOR UNIVERSITY OF CALIFORNIA, SAN DIEGO

MGE Galaxy /50/60/80/100/130 kva. The recommended power protection for all critical applications

Technical Assignment #2 Electrical Systems Existing Conditions and Building Load Summary Report. Executive Summary

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

PHOTOVOLTAICS HISTORY OF PHOTOVOLTAICS

Distribution Network Planning for Mumbai

SitePro. Uninterruptible Power Supply. Technology for the Digital World

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

UPS Electrical Design and. Installation. critica POWER SUPPLIES

Bonded in Trust - With Resistance Welding. Weld Processors

ELECTRIC ARC FURNACE WITH STATIC VAR COMPENSATOR PLANNING AND OPERATIONAL EXPERIENCE

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:

INTELLIGENT PARALLELING AND CIRCULAR REDUNDANCY: TWO TECHNOLOGIES FOR HIGHER UPS EFFICIENCY

Medium speed Heavy Fuel Oil (HFO)

DISTRIBUTED GENERATION AND POWER QUALITY

DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017

CERTS Microgrids. Tom Jahns Professor, University of Wisconsin-Madison. LPPC Rates Roundtable May 21, 2013

totally integrated power

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks

DOMESTIC COGENERATION OF HEAT AND ELECTRICITY

Power Quality Improvement in Distribution System Using Distribution Static Compensator

Thesis Proposal. Kristen Shehab. Mechanical Option Thesis Proposal. Instructor: Dr. Srebric Building Sponsor: CCG Facilities Integration

High Efficiency UPS Operating Modes

POINT OF CONNECTION FOR INDEPENDENT PROVIDERS APPLICATION FORM

Totally Integrated Power Answers for infrastructure.

General Plan OXYGEN SERVICE CONTAINER 2005 Version 1.02

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design

Secure energy supply Energy Automation for Airports

with our Partners Visit us at: WE POWER IT Come and talk to us

Critical POWER Supplies Projects Support

Distributing electrical power safely and economically

Design and Simulation of Micro-Power System of Renewables

Addressing System Restoration Issues for the ISO New England System. Michael I. Henderson ISO New England Inc. PES General Meeting July 2015

Control of a Microgrid in Islanded Mode

Comparing UPS System Design Configurations

Truly Modular UPS. SCU CMS Series Modular UPS

Analysis of DG Influences on System Losses in Distribution Network

PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation

Compact CHP units kw compact efficient reliable. Cogeneration

Liebert NXL 1100kVA / 1100kW UPS Maximum UPS Protection for Large Data Centers

Continuous Gas Measurements Greater Measuring Accuracy Lower Maintenance Costs Reliable Measurement. From ENOTEC

The power behind competitiveness. Delta UPS - Modulon Family. DPH Series, Three Phase kva. User Manual.

Partnering for reliable distribution

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY

ReliabilityFirst Regional Criteria 1. Verification and Data Reporting of Generator Gross and Net Reactive Power Capability

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

An Oracle White Paper June Microgrids: An Oracle Approach

mv & hv switchgears Installation Servicing Testing Commissioning

Vikas Dabeer Director- Business Development Applied Materials India Pvt. Ltd India

Connection of generation plant to distribution networks. Guidance on completing the application form

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System

THE ENERGY ENGINEERING COMPANY. E²CON-GE ENGINE CONTROLLER Retrofit system based on openecs for modernizing GE Jenbacher gas engines.

Shipboard Electrical Power

Application Report AS-Interface

Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012

Community Clean Energy Resiliency Initiative PON-ENE BESS Request for Proposals Question and Answer Log

Cummins power ensures uninterrupted patient care

SCOPE OF WORK SUBSTATIONS

Slide 1. ABB August 23, 2016

FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0

STRATEGIC INTERCONNECTED NETWORK TRANSITIONING

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

Power Up With a Load Management System: Setting Up a Load Management System

Power Systems. Power Up With a Load Management System: Setting Up a Load Management System

Microgrids in New England Technical Challenges & Opportunities

Connection tariffs

Liebert NXL Power-Tie Controls

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

DCS - SCADA - BMS - EMS - imcc - LV - MV

DANVEST POWER UNIT. with special Low Load Unit for wind-diesel power stations

Han MK, Business Development (Power Generation), 23rd March 2010 ABB Power and Automation Days ABB in Power Generation

APC by Schneider Electric APC SYMMETRA MW 400 kw to 1600 kw Multi-Module Uninterruptible Power Supply

Generation Application Part B: Technical Form

Daniel Feltes Phone: Fax:

Let s share a vision Schneider Electric - Industry Levente Balasa 14/10/2010 2

The complete guide to transformers and packaged substations

Galaxy 300. Operation 05/

Gas-insulated medium-voltage switchgear 8DJH 36 siemens.com/8djh36

Power and Energy Systems Engineering

A*STAR Funded IEDS Project - Microgrid Energy Management System. by H B GOOI

POWER TO MATCH THE CHALLENGE.

Optimum Fuel Cell Utilization with Multilevel DC-DC Converters

Transmission Losses Report 2015

The Distribution System Security and Planning Standards

Design & Implementation of an Industrial Facility Islanding and Load Shed System

Transcription:

Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Frank.Herbener@Piller.com, Germany 1

Contents 1 Scope 3 2 Power Demand and Distribution in today s Mission Critical Applications 3 3 Limits of LV Distribution in High Power Applications and the Solution 4 4 Integration of UPS-Systems in the MV-Distribution 5 5 Redundancy Concepts 6 6 Space and Losses are Key Factors for large Systems 7 7 A MV-UPS serving Air Field Lighting 9 8 Power Supply of a 35 MW Semiconductor Fab 10 9 Redundant MV-UPS at a High Rise Data Centre 11 10 Conclusion 12 11 References 12 2

1 Scope The tendency towards Mega Data Centres in the internet and IT business requires an increasing demand of high reliability power at single locations. More and more large critical industrial processes rely on a power quality level which can not be provided by the public grid. The distribution of the electrical power within those installations is realized in medium voltage (MV) technology because a low voltage (LV) distribution with its high current levels is physically and economically limited. Likewise a centralized high power uninterruptible power supply (UPS) system represents a reasonable technological solution, particularly if designed as a medium voltage UPS or integrated Diesel-rotary-UPS (DRUPS). Medium voltage UPS technology reduces distribution losses downstream of the UPS and reduces space due to the lower number of transformers required. Short circuit currents are limited to a manageable value while the reliability of the power distribution is kept on a high level when using a high quality UPS system. The MV distribution allows paralleling of several high power UPS or DRUPS systems on one common output bus in an N+x configuration and thus avoiding the use of an extensive number of low voltage switching devices to create redundancy. The modular design of a line interactive UPS simply allows a replacement of the grid-to-load interface from low voltage to medium voltage components, keeping the basic parts of the UPS and the storage the same as for LV applications. In this way the good and familiar experience with the functionality and maintainability of a reliable LV UPS is maintained. The paper describes the design of a MV UPS unit and its integration into a redundant MV UPS system. Space and electrical loss aspects are presented as well as configurations realized in the field for a Data Centre, an Airport and a Semiconductor Fab. 2 Power Demand and Distribution in today s Mission Critical Applications Fast growing E-commerce over the last decade forced a rapid rise both in space and electrical power required to operate data centres. The power density in kilowatt per square metre then gets higher and cooling power becomes a critical issue. Operators and customers of those data centres expect a safe and reliable power supply covered by an uninterruptible power supply (UPS) system. Often, dictated by the risk of thermal runaway, the entire electrical 3

power needed is covered by UPS. Whereas a typical data centre in the early nineties required some one to three megawatts, today ten to twenty megawatts per installation is not rare. Also industrial enterprises like semiconductor fabrication, chemical and food industry require more often a safe power supply because major production losses caused by mains interruptions can not be tolerated. Single locations have grown larger with a demand on a safe power supply up to 40 MVA. In addition the production area is often wide spread and distribution of a high amount of electrical power throughout the location is necessary. Long distances in the power distribution also have to be overcome in applications like airport, runway lighting. 3 Limits of LV Distribution in High Power Applications and the Solution At low voltage system levels of 400 volts or 480 volts a maximum capacity of approximately 5 MVA at the common bus is reached very soon. The limitation to 5 MVA is given by the current capability of bus bars and breakers of about 6000 amps on one side and the short circuit capability of the switchboards of typically 100 ka on the other side. Higher ratings of both will let the costs and the dimensions of the switchgear increase dramatically while the component availability in the market is very limited. Additionally, high currents require high copper cross sections and cause rather high resistive losses, both resulting in increasing costs for power transmission. A way to reduce the currents and to enable a further increase of the power is the move to a medium voltage (MV) system level. At a typical MV level of 13.2 kv, which is quite common in the US, the maximum system power rises up to 27 MVA using a standard MV breaker size of 1200 amps and up to 57 MVA with a breaker size of 2500 amps. Medium voltage levels go up as high as 34.5 kv, allowing a system power rating of up to 70 MVA. Power distribution using UPSs follow the same electrical rules: Paralleling of UPS modules at a low voltage level on a common bus is subject to exactly the same limitations. Figure 1 illustrates a possible situation: - The left side shows a group of paralleled UPS modules. The addition of a 4 th module results in an overload situation (shown in red) of the secondary winding of the supply transformer and the downstream bus work. - In the middle the UPS group has been moved to the MV side of the transformer, eliminating the overload situation at the bus work attached to the UPS modules. But 4

staying with one MV-transformer only this will still overload its secondary winding and the LV bus work. - On the right side also parts of the distribution have been moved to the MV side and there are three separate transformers used to supply the load. Splitting the LV distribution into three separated paths eliminates the overload situation for the transformer and the LV bus work. Figure 1 Paralleling of UPS modules in a high power distribution 4 Integration of UPS-Systems in the MV-Distribution An obvious way for integrating one ore more standard low voltage UPS modules into a MV distribution is adding a transformer both at the input and at the output side. These additional step-up and step-down transformers increase the total number of components, require additional space and reduce the efficiency of the entire power supply system. By using an integrated MV-UPS both transformers can be omitted. As shown in Figure 2 further components can be saved if a high power UPS replaces four or five standard dual conversion LV UPS modules. This configuration offers space savings around the power supply system and operates at higher efficiency. Figure 2 MV-UPS technology reduces the total number of components 5

From the different UPS configurations on the market, the line interactive UPS offers the best choice for integration into a MV system. Figure 3 provides an overview: - The MV breakers and the coupling choke as the link between mains and load replace the corresponding LV parts and will fit into the MV switchboard. - The MV-transformer is an additional part and represents the interface to the remaining standard LV UPS components. These standard LV UPS components consist of a synchronous motor-generator which provides continuous and stabilized power for the load, a frequency converter which connects the energy storage and an optional Diesel engine attached via a mechanical clutch. The energy storage may be a chemical battery or a space saving flywheel (POWERBRIDGE) for bridging short mains interruptions, until the Diesel engine has taken over the load. A major advantage of such a configuration is the fact that all low voltage components including the entire control electronic and the operation software are taken from standard and long term proven LV units. Figure 3 Design of an integrated MV Diesel Rotary UPS (DRUPS) Type UBTD, showing the electrical (single line diagram) and the physical (grey boxes) arrangement of the systems components. 5 Redundancy Concepts A high quality power supply for mission critical applications presumes a redundancy concept. For LV designs there are some well known and proven concepts like the N+1 parallel redundant concept or the N+N system redundant configuration with two redundant A and B feeders where dual corded loads can be connected to. Without major effort, these concepts can directly be adapted to a MV layout. They represent simple and clearly arranged 6

installations, keeping the systems manageable for operators and maintenance personnel. Figure 4 shows single line diagrams of such systems. Again, the power distribution from the UPS location to the load transformers is done in medium voltage. Figure 4 MV-UPS modules in redundant system configurations A new modern concept to achieve redundancy while limiting the short circuit power is the Isolated Parallel System (IP-System). The loads are individually fed by separate UPS modules loaded to a certain degree below full load. A module failure will cause the assigned load to be fed from a common IP-bus, which is contributed by each of the UPS modules via an IP-Choke. Figure 5 shows the basic layout of a Medium Voltage IP-System, which allows the realization of a highly reliable power supply system that offers some benefits compared to the above two systems [1]. Figure 5 MV-UPS modules integrated in an IP-System 6 Space and Losses are Key Factors for large Systems One of the major cost issues in a data centre or a production facility is floor space. Reducing the space for infrastructure equipment like power supplies results in additional space for IT or manufacturing equipment. Often the available area for the UPS system is given and limited, particularly in existing buildings, but the required power is increasing. High power UPS modules with kinetic energy storage in LV or MV technology are well suited to overcome this challenge. 7

In Table 1 a space comparison between various LV and MV redundant concepts is shown. These comparisons are based on a load requirement of 10 MVA in total and a feeding voltage level of 13.2 kv. Typical values for the foot print for static and rotary UPS modules, 5 minute batteries and switchgear cabinets are taken from manufacturer brochures. MV transformer and choke are of cast resin dry type with foot prints taken from real projects. The entire system consists of 7 groups of 1670 kva each, realized with 3 static UPS units in parallel or 1 rotary unit per group. Each static unit is equipped with a 5 minute battery, the rotary unit with flywheel storage. Redundancy is achieved by the 7 th group, so the configuration is 6+1. Table 1 Comparison of space required of a 10 MVA, 13.2 kv, N+1 redundant UPS system in different design concepts A comparison of the 1 st and the 2 nd line in Table 1 shows, that the total space required by the system increases by approximately 33 % if the static LV UPS units are arranged between a step-up and a step-down transformer. A drastic reduction in space is achieved by using a rotary UPS both in LV and MV, as shown in lines 3 and 4. Besides the foot print the electrical losses are an important point to look at, too. Particularly at long distribution distances in large industry facilities or wide spread airport areas distribution losses become an issue. A comparison with the above configurations including a cable of 100 meters (328 ft) between UPS and load is shown in Figure 6. The typical losses for UPSs and transformers are taken from brochures. The losses for the cable have been calculated by using an adequate type of cable suitable for the current. The LV cable in this example generates 1.5 % losses (line 1) whereas the MV cable has 0.1 % losses only. The step-up step-down solution requires another 2.4 % losses for the transformers (line 2), so this is not the ideal way. The high power one module rotary UPS generates 0.5 % less losses (line 3) but by removing the step-up step-down transformers the losses decrease substantially (line 4). Accumulated to losses per year the difference between the last two examples is more than 1 million kilowatt-hours or approx. 100,000 US$. 8

For longer distribution lengths the influence of the cable will rise, which again would give a better result for the MV distribution. Figure 6 Comparison of losses of a 10 MVA, 13.2 kv UPS distribution in different design concepts Regarding investment costs the MV UPS and the MV switchgear need to be balanced against transmission cabling and distribution. MV UPS modules and MV switchgear are obviously more cost intensive than LV components. These higher costs can partially be compensated by utilising less copper for the distribution, especially in case of long and complex distribution networks. If a MV solution is required for technical reasons, the usage of real MV UPS modules is more cost effective and more efficient than any integration of standard LV UPS modules in a MV distribution. 7 A MV-UPS serving Air Field Lighting Classic applications for high reliability power supplies are safety relevant installations at airports like airfield lighting, radar systems and control towers. These critical loads are spread over a wide area across the airfield and the electrical distribution is often realized in medium voltage. An example is shown in Figure 7, where a total load of 3.8 MW is served by a MV supply system at a voltage level of 20 kv consisting of four 1670 kva Diesel UPS modules in a parallel redundant configuration. The total length of the MV network is 56 kilometres (35 miles). The UPS is inserted in series in the existing network. The four DRUPS are arranged in two groups of two paralleled units each. Depending on the load requirements the switchgear allows operation as n+1 or as system-system redundant. 9

Figure 7 DRUPS configuration for an airport runway lighting supply 8 Power Supply of a 35 MW Semiconductor Fab The second example shows the power supply system of a semiconductor fab [2] which includes a cogeneration plant of nine generator sets with natural gas engines, 3.9 MW each. Both electricity and heat power is transported over several hundred meters from the energy plant to the production facility. The voltage level is entirely 20 kv. The role of the UPS system is interfacing the high quality supply bus with the raw utility bus in order to provide back up from utility while blocking all grid born disturbances. As a second task the UPS with its flywheel storage provides stabilisation power for a constant voltage and frequency level during transient conditions. The unique mode of operation of the flywheel storage allows delivery and absorption of full power unlike other UPS systems. The ability of bi-directional power flow enables an excellent frequency control especially under transient conditions, keeping the whole systems frequency within tight limits. A single line diagram of the principal layout is shown in Figure 8. Figure 8 Combining cogeneration and grid backup to a high quality power supply for a semiconductor fabrication 10

9 Redundant MV-UPS at a High Rise Data Centre The third example, to be seen in Figure 9, explains the power supply of a large data centre. The entire load is almost 40 MVA, split into 28.8 MVA no break and 10.8 MVA short break load. The supply system is configured as isolated redundant at a voltage level of 11 kv. The UPS units are arranged in six primary groups of three modules each plus one redundant group of four modules to provide back up power in case of a failure of one of the six primary groups. So the total number of UPS units is 22, each of them laid out as a MV Diesel UPS, providing 1600 kva of no break and 600 kva of short break power. The further down stream distribution is performed in medium voltage to the individual floors of the data centre and ends in supply transformers complemented by static transfer switches close to the IT equipment. The isolated redundant back up line is realized with two alternative power supply paths to the loads: First on the MV level with automatic transfer switches (ATS) upfront the supply transformers and second on the LV level directly feeding the static transfer switches (STS) connected to the loads. Figure 9 Single line of a redundant 40 MVA high quality power supply system for an internet data centre 10 Conclusion Increasing power density and increasing total power demand at single sites combined with rising requirement for high reliability power in IT business and production facilities are today s trends. The power supply system has to respond with suitable UPS and distribution designs. As on the one hand, high power low voltage systems lead to current limitation in the distribution and as on the other hand often long distances need to be bridged, the step to medium voltage level is a suitable technical solution. MV systems reduce cable size and 11

losses which increases the efficiency of the distribution network. Additionally, the utilization of integrated high power MV UPS modules reduces the number of components to a minimum. Basic parts of those modules are taken from standard and proven low voltage equipment, including control hard- and software. The MV UPS enable a clearly laid out high power system configuration, keeping its complexity within manageable limits. 11 References [1] Frank Herbener Iso-Parallel UPS Configuration http://www.piller.com/ [2] Stephan Schroeter Präzisions Power (German language) E&M Magazine, 15th February 2007 12