Reform in China s Electric Power Industry. - A Case Study of East China s Wholesale Electric Power Market -

Similar documents
China s Electric Power Industry and Its Trends

By Leaps. and Bounds. Lessons Learned from Renewable Energy Growth in China. By Ming Ni and Zhixin Yang

Mexican Electricity Reform

Vietnam s Power Sector: An Overview. Richard Spencer Power Sector Experience Sharing Event Dhaka February 9, 2011

Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission

SPP at a Glance. Located in Little Rock. Approximately 600 employees

China Electric Utilities Program Strategy

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures

Business Plan FY 2017 of Organization for Cross-regional Coordination of Transmission Operators, Japan

PJM Overview: PJM Structure and Cross-Border Examples PJM 2010

Renewable Energy Trading in Cross-Region Power Market of China

Alberta Capacity Market

China s National Carbon Market Development Plan (Power Generation Sector)

Overview of the IESO- Administered Markets. IESO Training

Grain Marketing System Reform: A Case Study of A Major Paddy Production County. in Southern China *

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

Incentives and Barriers for Decentralised Power Generation in Finland and in Thailand

SUBSIDIARY LEGISLATION

STRUCTURE OF NATIONAL REPORTS

Introduction: from regulated to liberalized markets in electricity

The role of smart grids in integrating variable Renewable Energy sources

DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST

Participation in the monthly auction and the capability period auction shall consist of:

The Regulatory Assistance Project CHINA S POWER SECTOR. A Backgrounder for International Regulators and Policy Advisors

China s Renewables Curtailment and Coal Assets Risk Map

NORDIC EDIEL GROUP NORDIC CODE LIST LIBRARY

Development and Implementation of Energy Efficiency Resource Standards in China and Australia

U.S. Energy Market Deregulation

Quick Guide to the I-SEM

OPPORTUNITIES FOR RENEWABLE ENERGY AND DEMAND SIDE MANAGEMENT TO PARTICIPATE IN THE WHOLESALE ENERGY MARKET

Regulation Energy Management Market Simulation. June 14, 2011

The power market. How the power market functions Power trading Price formation International power trading Electricity output un the Nordic countries

China Offshore Wind Power Market Report. Green Industry Market Research Company Ltd. 新业视点咨询公司

CHAPTER 6 - Load Forecast & Resource Plan

Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market

Optimal Demand Response Bidding and Pricing Mechanism: Application for a Virtual Power Plant. Authors: Ashot Mnatsakanyan Scott Kennedy

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

BTM:NG Initiative Energy Market Design Concepts

The Evolution of the PJM Market in the United States: Looking Back to Look Forward

World Bank Group Toward a New Energy Strategy

Immediate Supply-Demand Stabilization Measures Accelerate the implementation of structural reforms related to energy. Contents

21,363 MW 22,774 MW ONTARIO ENERGY REPORT Q JULY SEPT 2014 ELECTRICITY. Electricity Highlights Third Quarter Ontario s Power Grid

Renewable Portfolio Standards

Recent Development in Reliable Energy Market in the US and Singapore

Coal and Coal Power s Role in China s Energy System

HRVATSKA ELEKTROPRIVREDA

STUDY SUMMARY (F) CDC-1319

The Optimisation of the supply-demand balance, the role of interconnections, and the impact of nuclear shutdown in Germany for EDF

Comparison of Renewable Portfolio Standards (RPS) Programs in PJM States

Steps To Avoid the Historic Boom/Bust Cycle in Power Sector

What is Hourly Pricing?

Modeling, Simulation, and Computational Needs for RTOs: A PJM Perspective

Integrating Wind into the Chinese Power Sector: Development, Barriers and Solutions

The Economic Principles for Demand Response and Implications for Market Structure and Market Power

Summary The world's capacity of renewable energies including hydropower is expected to increase from 2,200 GW at the end of 2017 to over 2,600 GW at t

ELECTRIC POWER MARKET MODELS IN DEVELOPING COUNTRIES

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Assessment of Wholesale Competition in the Nigerian Electricity Market

Price Formation. Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017

Responses for Full Liberalization of the Retail Sale of Electricity

CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET

Analysis on the Mode and Competitive Strategy of Electricity Sales in the Background of Electric Power System Reform

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

Meeting Natural Gas/Electricity Challenges in New England

Disclaimer: No part of this report may be reprinted by any means without written permission from IDE-JETRO or SASS.

TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO

Ireland. Chapter 10. Section II

Towards 50% Wind Electricity in Denmark

Reliability Pricing Model (RPM) DRAFT Business Rules

CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND ROADMAP STUDY. Energy Research Institute National Development and Reform Commission

Cost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC

New England Power Sector Overview

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

CHAPTER VI BUSINESS ENVIRONMENT ANALYSIS

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation

Competitive Markets 1

Introduction to the PJM Markets

U. S. SPOT MARKET REGULATION

Russian Wholesale Power Market

Definitions O - P. Open Access Same-Time Information System (OASIS) or PJM Open Access Same-time Information System:

Grid-Interactive Electric Thermal Storage (GETS) Space and Water Heating

SECTOR ASSESSMENT (SUMMARY): POWER

IMPACT OF CLOSING NAVAJO GENERATING STATION ON ARIZONA POWER MARKETS

Ping FU Deputy Director of Research And Development China Public-Private Partnerships Center November, 2015

EFFECTIVE REGULATORY REGIMES AS A REQUIREMENT FOR RENEWABLE ENERGY DEVELOPMENT. Zambia Lusaka August 7 to

Energy & Sustainability. Lecture 10: Electric Power Generation And Distribution February 10, 2009

Analysis of Potential Impacts of CO 2 Emissions Limits on Electric Power Costs in the ERCOT Region

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

NERC Reliability Functional Model

LOAD SERVING ENTITIES PJM REGION

Seeing China s Economy Through Electricity Thomas G. Rawski University of Pittsburgh March 22, 2017

OPTIONS FOR THE INSTITUTIONAL REFORM

Financial Transmission Rights

SB 843 (WOLK) Community Based Renewable Energy Self Generation Program. Utility & Policy Maker Frequently Asked Questions

Japan s Renewable Energy Policy

Taiwan Renewable Energy Certification (T-REC) Mechanism & Trading Guidance Pilot Program

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response

Transcription:

Reform in China s Electric Power Industry - A Case Study of East China s Wholesale Electric Power Market - Chun Chun NI 1 Preface China s power industry has been reformed in various aspects since 1985. Though the first stage of the reform was the procurement of funding, from 1996, reform of the power industry system concentrating on the introduction of competition has proceeded, following the tendency of power industry liberalization in developed countries. As the first step in introducing the principle of competition, the State Power Corporation of China was founded in January 1997, based on the policy of separation of the functions of administration and business. Furthermore, to promote market competition, the State Power Corporation of China was divided into power generation sector and transmission/distribution sector in December 2002, as a part of reforms directed towards the liberalization of the electric power market. Although no great differences can be seen in the power supply system before and after separation of power generation from transmission/distribution, from March 2004, in the North China region, and from May 2004, in the East China region, pilot program of wholesale power market has been conducted. Currently, transaction amounts on the market in both regions are 20% and 10%, respectively. In both cases, the respective provincial (municipal) power 1 Researcher of the Institute of Energy Economics, Japan Inui Building Kachidoki, 1-13-1 Kachidoki, Chuo-ku, Tokyo 104-0054 - 1 -

companies purchase power as single buyers. In this paper, issues and future direction of the present pilot program are concerned through an overview of the electricity market operation including amounts and prices traded in the East China region. 1. Economy, power supply and demand in the East China Region The East China region comprises Shanghai Municipality, Jiangsu Province, Zhejiang Province, Anhui Province, and Fujian Province (see Fig.1-1). Figure 1-1 East China Region Jiangsu Anhui shanghai Zhejiang Fujian Total population within the region amounts to only 11% of the total population of China, however, annual economic growth rate has been more than 10% during the last decade. The statistics in 2003 shows that the growth rate of GDP in the whole East China region was 12.5%, exceeding that for the whole of China, 9.1%, and a high double-digit growth rate has been maintained for 12 consecutive years - 2 -

since 1992. In 2003, the region s GDP accounted for 31.8% of the total GDP for China, playing the role of a powerful engine in the Chinese economy. This rapid growth of the region s economy and other factors, such as unusual weather conditions in recent years, have led to power shortages within the region since 2003. The amount of power supplied in the East China region in 2003 reached 411 GWh (a 17.0% increase from the previous year), of which 93.0% was thermal power (383 TWh), 7.0% was hydropower (29 TWh). In 2003, power supplied to the four provinces and Shanghai are as follows: 99TWh (24.1%) to Zhejiang Province; 128TWh (31.1%) to Jiangsu Province; 54TWh (13.3%) to Anhui Province; 61TWh (14.8%) to Fujian Province; and 69TWh (16.7%) to Shanghai Municipality. 2 The total amount of consumption in the region in 2003 reached 452TWh, an increase of 19.1% on a year-to-year comparison. The growth rate of power consumption of the four provinces and Shanghai are as follows: 22% in Zhejiang Province, 20.7% in Jiangsu Province, 17.9% in Fujian Province, 14.2% in Anhui Province, and 15.3% in Shanghai Municipality. 2. The Wholesale Electric Power Market in the East China Region Since the East China region has experienced the implementation of a Single Buyer System 3 (1998-2001), following the Northeast China region, the region 2 Figures in parentheses show the percentages of the supply amount of the respective provinces (municipality) to the total amount of the region. 3 Single Buyer (SB) means the business of mainly purchasing wholesale electric power from power producers and reselling it to the final users directly or via monopolistic retailers. The Single Buyer System (SBS) is a market liberalization model proposed by France in September 1994. - 3 -

was designated as a test region for the wholesale electric power market by the State Electricity Regulatory Commission (hereinafter SERC ). In May 2004, the first simulation test was commenced based on the East China Power Market Experimental Program (issued in November 2003) formulated by the SERC. In August 2005, the East China Power Market Operation Code 4 is issued, and the current simulation test is scheduled to proceed to a pilot operation stage by the first quarter of 2006. The progress of implementation of the wholesale power market in the East China region is examined as follows. Participants in the wholesale electric power market: The participants in the East China wholesale electric power market can be divided into the East China Grid Company, who manages and operates the interconnections and electric power exchanges, provincial (municipal) electric power companies, power producers within respective areas, and power producers outside the region. In the East China region, types of power plants can largely be divided into Type A and Type B, where the Type A plants are coal-fired thermal power generation units with a single capacity of 100MW or more, and Type B plants are other power plants excluding Type A, i.e. self-generations, oil and gas fired thermal power units, nuclear power plants, and pumping stations. Power producers using Type A power plants are defined as Type A power producers, and those using Type B power plants are defined as Type B power producers. At the current stage, only Type A producers are allowed to participate in the market. Power producers outside the region refer to power suppliers outside the East China region such as, 4 The Code is also set up by the SERC as rules for operating the electric power market in East China region. - 4 -

the Three Gorges Dams, generators in Central China, Yangcheng districts and so on. Although the East China district is the engine of China s economic growth, it has depended on power supply from outside the region for many years, as the power supply is insufficient due to a shortage of primary energy resources. The Code allows power producers outside the region to sell surplus power for exchange, as well as signing up a power purchase agreement 5 with East China Grid Company as in the past. East China Grid Company established the East China Power Dispatching and Power Trading Center, which manages and operates the wholesale electric power market. The Type A power producers who wish to participate in market are requested to become members of the trading center and are required to register their eligible units (Type A unit); whereas, the provincial (municipal) power companies purchase necessary power sources from the wholesale power market as single purchasers. The current supply system is as illustrated in Fig. 2-1. Types of transactions in the wholesale power market: The transaction types of wholesale power in the East China region can be largely divided into bilateral contacts and market exchanges. About 90% of wholesale power is bilateral traded between provincial (municipal) power companies and power producers through various electric power contracts, and the remaining 10% is traded in the market (see Fig.2-2). The principal contract types can be largely divided into those 5 In the case of outside-area power interchanges, the East China Electric Grid Company serves as the single buyer. The East China Electric Grid Company representing the power companies of the four provinces and Shanghai municipality procures the shortage portion of the power demand from outside the area and thus distributes the procured power according to the shortage states of respective provinces (municipality). - 5 -

between power producers and provincial (municipal) power companies of respective areas, and between provinces (municipality). The power producers generally draw up annual power purchase agreement with power companies of respective areas, and sometimes draw up annual power interchange contracts with power companies for outside-area power interchanges upon the request of provincial (municipal) power companies. Furthermore, among the provinces (municipality), bilateral inter-province power exchange contracts are drawn up for interchanges of power among the province (municipality). Figure 2-1 Power Supply System in the East China Region Wholesale power exchange In-province power producers Bilateral contracts (90%) Market transactions 10% East China Power Dispatching and Power Trading Center (monthly market) Outside power producers Transmission East China Grid Company Distribution and retail Single buyer Shanghai, Jiangsu, Zhejiang, Fujian and Anhui electric power companies All customers (monopoly of each company in district) Figure 2-2 Power Source Allocation Methods Annual power purchase agreement portion Installed capacity*4,500h Monthly market transaction portion Installed capacity*500h Other contract portions Installed capacity * 1,500h Operation hours set in annual power purchase agreement: 5,000h Operation hours set in other contracts: 1,500h Annual operation hours 6,500h - 6 -

For exchange transactions, the current transaction commodities set in the East China Power Dispatching and Power Trading Center are handled in the monthly (for the following month) transaction market according to the peak time period (8:00-22:00) and the off-peak period (22:00-8:00). Figure 2-3 Contract Implementation Methods Annual power purchase agreements Long-term inter-porvincial (municipal) bilateral contracts (including outside region) Medium-term inter-provincial (municipal) bilateral contracts Monthly supply-demand schedules based on respective long/medium-term contracts Medium-term load estimation Monthly market transactions Short-term inter-provincial (municipal) bilateral contracts Daily supply-demand contract schedules based on respective contracts Load estimation for the next day Supply-demand schedules for the next day Power delivery for the day Transaction methods in the monthly transaction market: Each province (municipality) submits various existing contract schedules, and the maximum power output in the peak/off-peak periods for the next month to the East China Power Dispatching and Power Trading Center, based on a given format for the exchange by 17:00 of the third business day of the middle ten days every month. - 7 -

The East China Power Dispatching and Power Trading Center calculates available transmission capacity of the inter-provincial connected lines for the next month based on the presented information, by 17:00 of the fourth business day of the middle ten days every month, and releases information on the purchasing and selling amount of power available in the exchange, the existing contract amounts for the next month to the power producers and provincial (municipal) power companies. The power producers and provincial (municipal) power companies bid on the amounts and prices of power selling and power buying from 8:00 of the fifth business day of the middle ten days every month to 17:00 of the twentieth day every month. The results are announced by 17:00 on the first business day of the last ten days every month. When bidding, the power producers tender bids on the price (yuan/mwh) and generation amount according to the peak and off-peak time periods; whereas the provincial (municipal) power companies set prices that correspond to the amount of power generation in a maximum of four stages. Uncontrolled rises in the transaction prices of the exchange and risks are prevented by price cap regulation (at the peak time period: 482 yuan/mwh; at the off-peak time period: 310 yuan/mwh). After closing acceptance of bids, the data is processed by the East China Power Dispatching and Power Trading Center. This allows for the creation of curves for the power generation units in the order of the cheapest proposed price and for the purchasing price in the order of the highest proposed price. The price of the crossing point of the two curves is set as the system price and the amount is set as the transaction amount. When congestion of the connected lines - 8 -

is expected, the region is divided into respective provinces (municipality), and the supply and demand balanced price (zone price) for each area (zone) is calculated. After the contract is settled in this way, the transaction participants receive notice of the amount of their own selling or purchasing corresponding to their own bid prices. This is completed by 17:00 of the first business day of the last ten days every month. In the East China region, installation of a 15 minute-meter is imposed, which is the same as in the Northeast region. Respective system operators settle real time (every 15 minutes) delivery amount of their various contracts everyday and charge on a monthly basis (see Fig.2-3). The transaction amount relating to interconnections is settled by the East China Grid Company and the transaction amount within the respective provincial (municipal) area is settled by the respective provinces (municipality). The ancillary service currently provided is only Automatic Generation Control (AGC) and stand-by power sources. As service providers, even though all the market participants (system operators, power producers) have a duty of supply, an appropriate framework has not yet been sufficiently designed at the present stage. A pricing system for service charges and marketing of services will be sought in future. Previous results: In the East China region, a total of 15 simulation experiments have been implemented centering on the monthly commodities from May 2004 to August 2005. The number of registered units has increased initially from 171 to 189 currently. In the same period, registered capacity increased from 43,387 MW to 50,707 MW. At present, the registered units account for 60% of the total power - 9 -

plants of the East China region (see Table 2-1). Table 2-1 Change of Registered United (Plant A) Year Month Tendered units Units under Untendered inspection units Total June 148 20 3 171 July 166 5 0 171 August 174 1 0 175 04 September 161 14 2 177 October 145 32 0 177 November 145 32 0 177 December 152 21 10 183 January 144 24 15 183 February 130 48 5 183 March 137 44 2 183 05 April 139 45 1 185 May 139 46 2 187 June 160 26 1 187 July 183 1 3 187 August 186 1 2 189 Figure 2-4 Change in Transaction Amount in East China Monthly Electricity Market 9,000 8,000 7,000 6,000 GWh 5,000 4,000 Off-peak Peak 3,000 2,000 1,000 0 June July August September October November December January February March April May June July August 04 05-10 -

Figure 2-5 Change in Transaction Prices in East China Monthly Electricity Market 600.00 500.00 400.00 300.00 200.00 100.00 0.00 June July August September Yuan/MWh October November December January February March April May June July August 04 05 Peak Off-peak The total amount of transactions up to now has reached 68.6TWh, of which 45.4 TWh in the peak time period and 23.2 TWh in the off-peak time period (see Fig. 2-4). The transaction prices are as shown in Fig. 2-5. Since the East China region is short of power supplies, the transaction prices (both in the peak and off-peak time periods) on exchange are higher than those of various contract prices and have fluctuated little since October 2004. 3. Issues and future direction The simulation experiments concerning the present wholesale power market in the East China region have been observed as described above. Through 15 tests, the following problems appeared in the regional market (four provinces and Shanghai Municipality): 1) Large gaps among the bidding prices. Since the reform and opening-up policy has been enforced in China, the government has placed an emphasis on the construction of power sources. To promote the development of power sources by - 11 -

local governments, private enterprises and foreign investors, a type of power producer investment that is entitled to preferential treatment has been implemented from 1985 to 1998. This treatment has led to various generation costs among the power producers. For instance, in 1996, the average wholesale electricity prices by foreign investors was 665.28 yuan/mwh, 3.8 times that of domestic producers of 174.03 yuan/mwh. This allows for no competition in the wholesale bidding prices on the same basis. As a result, from these 15 transaction experiences, a total of 15 companies among 63 exchange market participants suffered financial losses through market transactions. While, the power producers that acquired benefits through the market transaction are those who have large old power generation facilities. Therefore, in the current stage, market transactions have created large gaps in benefits among the market entities. 2) Negative influence of transactions on reliable operation of system. Since the Chinese government has placed an emphasis on generation development as stated above, the construction of more transmission/distribution networks has been delayed, which has caused a bottleneck due to a lack of capacity in meeting demand. The recent increase in power transactions inside and outside the region, which was caused by the rise of the maximum load within the East China region has disturbed the reliable operation of the system. This has negatively impacted the system ability to maintain proper quality of power and reliability of supply. 3) Linkage of wholesale electricity prices with retail electricity prices. Recent rises in coal prices for power generation led to the first introduction of the fuel adjustment system in May 2005. Currently, only price increases in the retail - 12 -

market are permitted if it is affected by an increasing in rising fuel costs. However, although the provincial (municipal) electric power companies purchase 10% of power sources from the market, they are not allowed to transfer the increased part of the purchasing cost to the retail electricity prices, so that the provincial (municipal) electric power companies face substantial risks from the fluctuations in market prices. Such risks tend to be high particularly in provinces (municipality) with larger demands. As seen from the above, in the simulation experiments of the current wholesale power market, problems such as electricity prices, and ability to maintain reliability and stability of power supply have emerged. In the East China region, the simulation experiments are scheduled to move to pilot operation stages by the beginning of 2006. Therefore, the introduction of rational electricity pricing system and the formulation of standards and rules for secure and reliable system operation are urgently required for future market operations. It is important to construct a market design of bringing partial liberalization into view. The key to the success of future market operations depends on how to cope with the conflict over benefits among the provinces (municipality) and among producers caused by the transactions, how to spread the principles of the market mechanism into a monopolistic supply system. Contact: report@tky.ieej.or.jp - 13 -