OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME

Similar documents
6. CONCLUSIONS AND RECOMMENDATIONS

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

The following approach was then taken to delineating recommended buffer zones for the initially mapped freshwater ecosystems:

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

10.0 Environmental protection, follow-up and monitoring

A R E P O R T F O R : E S K O M H O L D I N G S S O C D E A R E F N O : 1 4 / 1 2 / 1 6 / 3 / 3 / 1 / D AT E : J U N E

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENTAL SCREENING REPORT

WASTE MANAGEMENT PLAN

EBRD Environmental and Social Action Plan

Source of requirement EBRD. - Each six months during construction - Annually during operation. Best practice EBRD PR 1

Eskom Management Systems to avoid or mitigate the Biodiversity impacts of Wind energy projects. Rudi Kruger Corporate Specialist Eskom South Africa

The three alternative sites were inspected by the specialists in order to:

Environmental Management Plan

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Manningham Works Code of Practice

Environmental Management Programme (EMP)

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction

ESKOM HOLDINGS LIMITED

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice

DRAFT FOR CONSULTATION OCTOBER 7, 2014

South Landfill Annual Cover Rate Screening Criteria Checklist

EMP for 132kV line from the Kudu Substation to the proposed Dorstfontein Substation,Mpumalngha

DRAFT OPERATION AND MAINTENANCE ENVIRONMENTAL MANAGEMENT PLAN FOR ESKOM S OPEN CYCLE GAS TURBINE POWER PLANT ADDITIONAL UNITS AT MOSSEL BAY

Executive Summary INTRODUCTION NEED FOR THE PROJECT REQUIREMENT FOR AN ENVIRONMENTAL IMPACT ASSESSMENT OVERVIEW OF THE UNIVERSAL WIND PROJECT

KENT BREEZE WIND FARMS

Council Roadside Reserves Project. Site Management Checklists and Safeguards

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

Works, services and infrastructure code

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

Eskom Management Systems to avoid or mitigate the Biodiversity impacts of Wind energy projects. Rudi Kruger Corporate Specialist Eskom South Africa

Birds and Wind Energy Guidance Supporting the transition towards a truly sustainable green energy

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE

9.0 Environmental Protection Program

Construction Environment Management Plan

Annex F Scoping Checklist

Gold Coast Airport Tenant Environment Management Guideline

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

Kitchener Drain Depollution Project: Drain Rehabilitation Solid Waste. Non-Technical Summary

Environmental Assessment Approval

ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPR)

FRAMEWORK EMP (femp) FOR OPEN CYCLE GAS TURBINE POWER STATION AND ASSOCIATED INFRASTRUCTURE NEAR MOSSEL BAY

Environmental impact assessment of council roadside activities

Management Plan: Hazardous Materials Removal & Demolition

Conditions of Approval for the MDP for the brickworks at Perth Airport

Minimise the adverse effects of solid waste management and disposal on human health and the environment.

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Chapter 13 Management and Monitoring

Ensuring that EMP s are a positive EIA legacy as the EAP s opportunity to facilitate sound project implementation.

DOORNVALLEI EXT 5 & 6

Borrow Pit and Quarry Management Procedure Environmental

ATTACHMENT C MEASURES TO MINIMIZE HARM

Bahrain LNG Environmental Impact Assessment (2014) Summary

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV

EF10 Site Environmental Audit - 1 / 8

Chapter 13 Management and Implementation

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

STAFF/STUDENT POLICIES

The Standard Criteria, current as of November 2013, as defined in Schedule 4 of the EP Act are as follows:

ESKOM DISTRIBUTION DIVISION

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Division 8 Intensive Animal Husbandry Code

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

8.11. Soil Erosion control Safety Compliance Summary Recommendation... 16

D EROSION AND SEDIMENT CONTROL. Table of Contents

CRUCEA NORTH WIND POWER PLANT

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

PROPOSED RESIDENTIAL DEVELOPMENT ON ERF 271 BAKKERSHOOGTE, SOMERSET WEST

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

Phase of concern: Operation Intensity: Low Overall significance rating: High (positive)

ROW: Siting, Vegetation Management, and Avian Issues - Program 57

ANNEXURE N: LETTER TO I&APs NOTIFYING THEM OF AVAILABILITY OF DRAFT EIR

Proposed Terms of Reference for EIA studies

WIND ENERGY FACILITY ON KANGNAS FARM NEAR SPRINGBOK IN THE NORTHERN CAPE FINAL LIFE-CYCLE ENVIRONMENTAL MANAGEMENT PROGRAMME DEA 14/12/16/3/3/2/346

Marble River Wind Farm: Contact Information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Environmental Assessment Approval

Murra Warra Wind Farm Project Environmental Management Plan

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Chapter 4. Airport Authority Governance, Statutes and Policies

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

SLAUGHTERHOUSES AND ABATTOIRS

GMO.1 Genetically Modified Organisms

BEAVER CREEK SOLAR FARM

8 IMPACTS ON AVIFAUNA. 8.1 Introduction. 8.2 Methodology

Environmental Management Programme

Environmental Management Programme: Langhoogte Wind Farm, Western Cape

Appendix General Environmental Risk Analysis

Environmental Assessment Approval

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

7 MONITORING PLAN 7.1 INTRODUCTION

Transcription:

OPERA PHASE: ENVIRONMENTAL MANAGENT PROGRAMME 1. OBJECTIVE The overall goal for the Environmental Programme (O) is to ensure that the operation of the wind energy facility (WEF) does not have unforeseen negative impacts on the environment and to ensure that all impacts are monitored and the necessary corrective action is taken timeously. In order to achieve this goal, it is necessary to operate the WEF in a way that: Ensures that operational activities are properly managed in respect of environmental aspects and impacts. Enables the WEF operational activities to be undertaken without significant disruption to other land uses in the area, in particular with regards to noise impacts, farming practices, traffic and road use, and effects on local residents. Minimises impacts on birds and other fauna found onsite. Monitors and evaluates the impacts of the WEF on birds and bats in order to mitigate appropriately. Established an environmental baseline for WEF sites in De Aar with regard to priority bird species using the site. 2. COMPLIANCE MONITORING Prior to the commissioning of the WEF, a suitably qualified Environmental Manager () should be appointed by Longyuan Mulilo De Aar Wind Power. The role of the during this phase would be to address the on-going operation of the WEF and to ensure that the issues that have been identified in the O are properly addressed on a continued basis and in a manner that limits any environmental impact. 3. O FRAMEWORK The O is presented in tabular format illustrating the activity, aspect, impact, mitigation measure, performance indicators, resources, schedule and verification. These criteria are listed and defined below: Activity: component/ activity of the project for which the impact has been identified; Aspect: the aspect of the above activity which will be impacted; Impact: the environmental impact identified and to be mitigated; Mitigation measure: measures identified for implementation in terms of environmental management to reduce, rectify or contain the identified environmental impact mitigation is divided into the following: o Objective: desired outcome of mitigation measure, o method of achieving the objective; Performance indicators: outcomes that will indicate achievement of objective/s; Responsibility: party or parties identified for implementation of mitigation measure/s; Resources: available resources to aid implementation of mitigation; Schedule: timeframe in which identified impact and mitigation measure is anticipated to occur; and Verification: party or parties identified as responsible for review and assessment of final outcome. Page 1

Table 1: Programme Framework Activities Activities Environmental management documentation and procedures. Protection of the surrounding environment (aquatic and terrestrial) No framework within which to locate the management of the operational phase. No procedures against which to assess environmental performance during the operational phase and thus no measure of compliance. Impacts of the operation and maintenance of the WEF on the surrounding environment (including local flora, fauna, bats, avifauna and watercourses around the proposed development. Objective: To ensure that the operation of the WEF does not result in avoidable impacts on the environment and that any impacts that do occur are anticipated and managed. 1) Appoint a suitably qualified Environmental Manager () to monitor compliance (either independent or in-house). 2) Audit the compliance with the requirements of the environmental specification contained within the O. Objective: To maintain minimised footprints of disturbance of vegetation / habitats on-site. To ensure and encourage plant regrowth in areas of post-construction rehabilitation. 1) Vehicle movements will be restricted to designated roadways. 2) Existing roads will be maintained to ensure limited erosion and impact on areas adjacent to roadways. 3) Implementation of the Revegetation and Rehabilitation (Appendix 10). 4) Implementation of the Alien Vegetation Removal Programme (Appendix 11). 5) Ongoing implementation of the Storm Water (Appendix 12) to ensure compliance with applicable regulations and Environmental impacts effectively monitored and managed during the operational phase. Comprehensive record of compliance and remedial actions available to the authorities. No further vegetation. Continued improvement in rehabilitation efforts. (Operation and Maintenanc e) Twice in the 1 st three years and then once every five years Revegetation and Rehabilitation Alien Vegetation Removal Programme Storm Water Open Space Regular inspection of plant regrowth, performance of rehabilitation efforts and weed infestation Page 2

prevent off-site migration of contaminated storm water or increased soil erosion. 6) Ensure ongoing implementation of the Open Space (Appendix 13). Protection of Objective: To reduce the impact of the activities avifauna operating WEF on priority bird species. Disturbance to or loss of birds as a result of collision with the turbine blades. Disturbance to or loss of birds as a result of collision with the overhead power line. Electrocution as a result of the power line. 1) Implementation of the Avifaunal Post-Construction Monitoring Programme (Appendix 7). Lesser Kestrel 2) Adaptive management must be implemented for the influx of Lesser Kestrel linked to locust invasions and species presence during the summer season at the WEF area. 3) Counts must be conducted during the summer season at the De Aar roosting sites and any additional roosting sites in the vicinity of the WEF. No additional avifauna populations on the WEF site. No additional avifauna populations along the length of the power line route. Continued improvement of avifauna protection efforts. Bird specialist Avifaunal Post- Construction Monitoring Programme In accordance with the Avifaunal Post- Construction Monitoring Programme (Appendix 7). Verreaux s Eagle 4) Continue with the Argos / GPS satellite tracking. 5) Implement adaptive management for the Verreaux s Eagle based on the satellite tracking monitoring results. 6) Monitor the breeding activity of eagles in the area by assessing the number of pairs and breeding success (productivity and fledgling rates), including (if feasible) the identification of individual adult birds. Page 3

7) Implement specific management measures as part of adaptive management, which will increase the resident eagles productivity based on the results of ongoing research. Blue crane 8) No specific mitigation is required at this stage, but ongoing monitoring should be performed to record any potential changes in this pattern of occurrence. activities Protection of bats and fauna Disturbance to or loss of fauna, including bats, and/or habitat. Direct mortalities. Waterbirds 9) No specific mitigation measures are required at this stage as far as the turbines are concerned. 10) The fitting of Bird Flight Diverters on the 33 kv power line which crosses the narrow kloof between Smouspoort and Swartkoppies is recommended. Objective: To minimise impacts on fauna, including bats. 1) Vehicle movements to be restricted to designated roadways. 2) Adherence to reduced vehicle speeds by all vehicles moving on site. 3) The minimal number of visits would be 24 over a period of 12 months. 4) During the first two years postconstruction monitoring would be required. Based on the results, changes could be considered in terms of: time within a year, number of visits and frequency, and number No additional fauna populations on the WEF site. Continued improvement of fauna protection efforts. Bat specialist Phase Bat In accordance with the Bat Phase (Appendix 8). Page 4

of turbines sampled. 5) Special attention should be devoted from October to April as the preconstruction monitoring results show that this is a peak period for bat activity. 6) Implement an Phase Monitoring programme (included in Appendix 8). 7) Apply an Adaptive based on the results of the Phase Bat Monitoring Programme. Appropriate Litter or Objective: To minimise the production of activities handling and contamination of the waste. To ensure appropriate waste management of site or water disposal. To avoid environmental harm hazardous through poor waste from waste disposal. substances and management waste practices. 1) Hazardous substances must be stored in sealed containers within a clearly demarcated area. 2) structures and/or components replaced during maintenance activities must be appropriately disposed of at an appropriately licenced waste disposal site or sold to a recycling merchant for recycling. 3) Care must be taken to ensure that spillage of oils and other hazardous substances are limited during maintenance. Handling of these materials should take place within an appropriately sealed and bunded area. Should any accidental spillage take place, it will be cleared up according to specified standards for bioremediation. 4) Used oils and chemicals will be No complaints received regarding waste on site or indiscriminate dumping. Internal site audits identifying that waste segregation, recycling and re-use is taking place. No contamination of soil or water. Waste collection must be monitored on a regular basis. Page 5

appropriately disposed at a licensed facility. 5) General waste will be recycled where possible or disposed of at an appropriately licensed landfill. 6) Hazardous waste (including hydrocarbons) and general waste will be stored and disposed of separately. 7) Disposal of waste will be in accordance with relevant legislative requirements, including the use of licensed contractors. Visual aesthetics Activities Environmental management of the operational phase Impact of the proposed development on the surrounding visual aesthetics of the area Positive impacts on socio-economic environment during operation Objective: To ensure that impacts on the visual aesthetics are minimised during the operational phase. 1) During operation, the maintenance of the turbines, the internal roads, the power line servitude and other ancillary structures and infrastructure will ensure that the facility does not degrade, thus aggravating visual impact. 2) Turbines should not display brand names. Objective: To ensure that the operation of the wind energy facility maximises positive impacts on the socio-economic environment. 1) Train local people for operation and maintenance of facility. 2) Employ local labour for the operational phase, where possible, Condition of the project infrastructure and roads. Consult annual skills and training records, employment records and proof of staff residency in the area prior to employment As required based on annual inspections of the project During Phase (full lifetime) when the need arises to employ people. Page 6

and particularly for day to day operations and maintenance. Activities Protection of Objective: To ensure that the operation within the Eskom of the WEF does not result in avoidable buffer infrastructure impacts on the Eskom powerlines. zones of the Eskom powerline s Impact of the proposed development on the Eskom powerlines 1) Liaise with Eskom to come to an agreement regarding suitable risk mitigation measures to be put into place for operational management. 2) No mechanical equipment, including mechanical excavators or high lifting machinery, shall be used in the vicinity of Eskom s apparatus and/or services, without prior written permission having been granted by Eskom. If such permission is granted the must give at least seven working days notice prior to the commencement of work. This allows time for arrangements to be made for supervision and/or precautionary instructions to be issued by the relevant Eskom Manager Note: Where and electrical outage is required, at least fourteen work days are required to arrange it. 3) Unobstructed access shall be granted to Eskom to access their servitudes. 4) Equipment shall be regarded electrically live and therefore dangerous at all times. Safety and best practice standards with regards to all safety hazards related to electrical plant shall be employed for the projects. Compliance with Eskom s guidelines During Phase lifetime) (full Eskom Page 7