Berth [China Shipping] Container Terminal Project - Environmental Review -

Similar documents
Berths [China Shipping] Container Terminal Project Draft Supplemental EIR Public Hearing

Berths [Everport] Container Terminal Improvements Project Draft EIS/EIR Public Meeting

Appendix D1 Screening Analysis

Introduction. Chapter 3 Modifications to the Draft EIS/EIR

DRAFT MITIGATION MONITORING AND REPORTING PROGRAM Document considered draft until Board considers document

Environmental Management Division, Port of Los Angeles

SPECIAL PUBLIC NOTICE

Berths [Everport] Container Terminal Improvements Project Environmental Impact Report

APPENDIX H Summary of Changes in the Recirculated Draft EIR

PUBLIC NOTICE ADDITIONAL INFORMATION PERTAINING TO DEPARTMENT OF THE ARMY PERMIT APPLICATION

COMPARISON OF ALTERNATIVES

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS

u.s. ARMY CORPS OF ENGINEERS, LOS ANGELES DISTRICT RECORD OF DECISION FOR THE BERTHS CONTAINER TERMINAL PROJECT PORT OF LOS ANGELES, CALIFORNIA

Central San Pedro Neighborhood Council Port Committee Meeting February 19, 2014 Augie Bezmalinovich Port of Los Angeles

Appendix B2. Air Dispersion Modeling

CESPL-RG 16 February 2010

SECTION SUMMARY. Section 3.3 Ground Transportation

DATE: NOVEMBER 14, 2008 ENVIRONMENTAL MANAGEMENT DIVISION

September Los Angeles Harbor Department c/o Dr. Ralph G. Appy 425 S. Palos Verdes Street San Pedro, CA 90731

ATTACHMENT 2 TABLE ES.8-1 SUMMARY OF ENVIRONMENTAL IMPACTS AND MTIGATION MEASURES

Analysis of Alternatives

1.1 Background to the Recirculated Draft SEIR

A-2 Criteria Pollutant Dispersion Modeling Analyses for the Port of Long Beach Pier S Redevelopment Project. July 2011

Green Port Long Beach

3.6 Ground Transportation and Circulation

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

2.1 Introduction and Project Overview

Mobile Air Toxic Exposure Study (MATES)

Contents. October Berths (YTI) Container Terminal Improvements Project Final EIS/EIR ICF

LA WATERFRONT PROGRAM WILMINGTON & SAN PEDRO

CAAP Stakeholder Meeting April 7, 2010

EXECUTIVE SUMMARY. Intended Use of the Final EIS/EIR Document

EXECUTIVE SUMMARY ES.1 INTENDED USES AND AUTHORIZING ACTIONS ES.3 DESCRIPTION OF THE PROJECT AND ALTERNATIVES. Project Location

Appendix C2 Dispersion Modeling of Criteria Pollutants for the Southern California International Gateway Project (Tables and figures in Appendix C2

LAX Terminals 2 and 3 Modernization Project DRAFT EIR PUBLIC MEETING. Tuesday, March 21, :00 pm to 8:00 pm

San Pedro Bay Clean Air Action Plan Frequently Asked Questions

Presentation Topics The Alameda Corridor Project Corridor Performance Goods Movement Challenges

Truck Management ` Strategies in Los Angeles

THE BERTH [TRAPAC] CONTAINER TERMINAL PROJECT (PORT OF LOS ANGELES):

INTRODUCTION. 1.1 Background Project Location and Brief Project Overview

Gateway Infrastructure Development Programs in Urban Centers on the west coast of North America

Berth [TraPac] Container Terminal Project Final General Conformity Determination

DATE: SEPTEMBER 7, 2018 FROM: PLANNING AND STRATEGY

Prepared by: Los Angeles Harbor Department 425 S. Palos Verdes Street San Pedro, CA (310)

3.12 UTILITIES Introduction Environmental Setting

SAN PEDRO & PENINSULA HOMEOWNERS COALITION PO BOX 1106 SAN PEDRO, CA 90733

South Coast Air Quality Management District

Addendum to the Berths APL Container Terminal Project Final Environmental Impact Report

Port of Los Angeles Emission Reduction Programs. Michael DiBernardo Deputy Executive Director November 1, 2018

Chapter 4 ALTERNATIVES COMPARISON

Boat Launch Analysis. 5.1 Introduction Boat Launch Study Overview Boat Launch Site Alternatives. Chapter 5

3.6 GROUND TRANSPORTATION

PUBLIC HEARING NOTICE PORT OF LONG BEACH LONG BEACH, CALIFORNIA

ATTACHMENT 1 MIDDLE HARBOR RESOLUTION

Mitigation Monitoring and Reporting Program

APPENDIX A. Notice of Intent/Notice of Preparation/Initial Study (NOI/NOP/IS)

Port of Los Angeles. America s Port Harbor Transportation Club June 20, 2013 Kathryn McDermott

CEQA Initial Study Checklist ENVIRONMENTAL CHECKLIST FORM. Potential Industries Solid Waste Facility Permit for a Recycling Transfer Station

Sustainability in Port Engineering Douglas J. Sereno Director of Program Management

WELCOME! Public Scoping Meeting for the Proposed Partial or Complete Closure of Defense Fuel Support Point San Pedro, California

Sample Outline of a Comprehensive Maritime Air Quality Improvement Plan

RTSA Technical Session

Green Port Long Beach Global Trade, Greener Seaports: Dramatically reducing the environmental footprint of trade related activities

ORDER NO. An Order of the Board of Harbor Commissioners of the City of Los Angeles amending the Port of Los Angeles Tariff No. 4.

ORDINANCE NO. HD- AN ORDINANCE OF THE BOARD OF HARBOR COMMISSIONERS OF THE CITY OF LONG BEACH AMENDING ORDINANCE NO. HD-1357, DESIGNATED

ERRATA TO THE FINAL EIR

Port of Los Angeles Presentation to the Los Angeles Investors Conference March 19, 2018

USEPA-1 USEPA-2 USEPA-3 USEPA-4 USEPA-5

2.1 Introduction and Project Overview

Terminal Island (Pier 400) Railyard Enhancement Project

LOS ANGELES INTERNATIONAL AIRPORT (LAX) UNITED AIRLINES EAST AIRCRAFT MAINTENANCE AND GROUND SUPPORT EQUIPMENT PROJECT

Appendix B3 Health Risk Assessment

3.8 LAND USE Introduction Environmental Setting Regional Setting PMPU Area

Technical Memorandum 3 Executive Summary Existing Conditions and Constraints Presentation. March 22, 2006

Introduction Environmental Setting. Section 3.13 Utilities and Public Services Public Services

Prepared by: Los Angeles Harbor Department 425 S. Palos Verdes Street San Pedro, CA (310)

Introduction. 1 Executive Summary

III. BASIS FOR CUMULATIVE ANALYSIS

Terminal 5 Improvements

Gene Seroka Executive Director Port of Los Angeles Port Outlook

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS

6. CUMULATIVE IMPACTS

RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

Port of Long Beach. Green Port Policy AAPA Comprehensive Environmental Management Awards Competition

4.0 CUMULATIVE ANALYSIS. 4.1 Introduction Requirements for Cumulative Impact Analysis

FINAL MITIGATION MONITORING AND REPORTING PROGRAM. Berths (YTI) Container Terminal Improvements Project

3.9.1 Introduction Environmental Setting. Section 3.9 Land Use

MITIGATION MONITORING AND REPORTING PROGRAM. Berths (YTI) Container Terminal Improvements Project. Environmental Impact Report (EIR)

Pacific Los Angeles Marine Terminal Crude Oil Marine Terminal, Tank Farm Facilities, and Pipelines Project Final General Conformity Determination

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

City of Malibu. Whole Foods and the Park Shopping Center Draft Environmental Impact Report Volume I. Prepared For: Prepared by:

SECTION SUMMARY. Section 3.13 Public Services

CITY OF SAN MATEO GENERAL PLAN MITIGATION MONITORING AND REPORTING PROGRAM

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: August 3, 2018 Expires: August 23, 2018

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

Therefore, each of the alternatives to the Specific Plan addressed in this EIR were selected based on the following factors:

CHAPTER 3 ENVIRONMENTAL SETTING AND PROJECT IMPACTS

Transcription:

Berth 97-19 [China Shipping] Container Terminal Project - Environmental Review - A Re-circulated Draft Environmental Impact Statement/Environmental Impact Report (DEIS/EIR) on the Berth 97-19 [China Shipping] Container Terminal Project, prepared by the U.S. Army Corps of Engineers (Corps) Port of Los Angeles (Port), will released for public review. The DEIS/EIR provides information on the proposed project, alternatives to the project, anticipated environmental impacts of the project and alternatives, and mitigation to reduce or eliminate impacts. Following the public process, the Corps and Port will revise the DEIS/EIR and use it as a basis in drafting the Final EIS/EIR. Re-Circulation: The Port and Corps originally released the Berth 97-19 [China Shipping] Container Terminal Project Draft EIS/EIR in August 26. Based on comments received on the Draft EIS/EIR, a decision was made to re-circulate the document. The April 28 Draft EIS/EIR is a full re-circulation of the original Draft EIS/EIR and addresses comments received on the August 26 document. -Project Features- Due to a lawsuit associated with this Project, the proposed Project includes re-analysis of project components already built and in operation (Phase I). Since 22, the Project site has been partially developed as a container terminal and is operated by China Shipping. Operations officially began on June 21, 24. This Draft EIS/EIR analyzes all three phases of construction (Phases I, II, and III) and a 4 year lease (25-245) to China Shipping to operate the terminal. Berth 97-19 Container Terminal - Dredging and wharf upgrades - 1 New Cranes (4 cranes were installed in Phase I and 6 additional cranes will be installed in Phases II and III) - 4-year lease (25-245) - Use of the Berth 121-131 on-dock rail yard - New LEED-certified building - New energy efficient/shielded lighting - New truck entry gate - Relocating Catalina to Berth 95 Re-Circulated Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR)

-Proposed Project - -Proposed Project and Alternatives Comparison- Proposed Project Alt. 1: No Project Alt 2: No Federal Action Alt 3: No New Wharf at B12 Alt 4: No S. Wharf Extension at B1 Alt 5: Phase I Terminal Only Alt 6: Omni Cargo Terminal Alt 7: Nonshipping Use Terminal Acres 142 72 117 142 13 72 142 117 Annual Ship Calls 234 13 28 14 364 Annual TEUs 1,55, 46, 63, 94, 1, 39, 63, 51,/2, / 5,16, Cranes 1 5 9 4 5 Total Fill 2.54 2.54 1.3 1.3 2.54 New Wharves 2,5 1,576 2,124 1,2 2,5 -Proposed Project Impacts- Unavoidable Significant Impacts Air Quality and Meteorology (Construction, GHG, Criteria Pollutants, 24 HRA) Aesthetics and Visual Resources (Cranes) Biological Resources (Possible spills) Geology (Seismic) Noise (Construction) Water Quality (Discharges) Transportation (Possible Rail Delays) Impacts that are Less than Significant after Mitigation Groundwater and Soils Utilities and Public Services Less than Significant Impacts Cultural Resources Land Use Hazards and Hazardous Materials Marine Vessel Transportation Aesthetics Air Quality and Meteorology Biological Resources Cumulatively Significant Impacts Geology Noise Transportation/Circulation Water Quality Sediments/Oceanography -Project Mitigations- Project mitigation includes aggressive measures to reduced air emissions such as AMP, low sulfur fuel (.2% in main engines, auxiliary engines, and boilers), alternative and electric powered yard equipment, clean trucks. Measures to reduce greenhouse gas emissions include solar panels, LEED certified terminal buildings, and regular energy audits. This project also includes several community beautification initiatives, including the development of new community park in San Pedro (Plaza Park), implementing the Northwest Harbor Beautification Plan, and extensive landscaping along Front. A complete list of mitigation measures can be found on the next page. Re-Circulated Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR)

Aesthetics o MM AES-1: Landscape along Front Street and implement Northwest Harbor Beautification o MM AES-2: Color studies for cranes o MM AES-3: Implement beautification measures. o MM AES-4: Plaza park improvements o MM AES-5: Provide Harbor viewing areas within the Regional Center Air Quality: Construction o MM AQ-1: Clean Harborcraft Used During Construction o MM AQ-2: VSRP for Cargo Ships o MM AQ-3: Fleet Modernization for On-Road Trucks o MM AQ-4: Fleet Modernization for Construction Equipment o MM AQ-5: Best Management Practices o MM AQ-6: Additional Fugitive Dust Controls o MM AQ-7: General Mitigation Measure o MM AQ-8: Special Precautions near Sensitive Sites. Air Quality Operation o MM AQ-9: Alternative Maritime Power o MM AQ-1: Vessel Speed Reduction Program o MM AQ-11: Low-Sulfur Fuel Ship Auxiliary Engine, Main Engine and Boiler Fuel Improvement Program (.2%) o MM AQ-12: Slide Valves o MM AQ-13: Reroute Cleaner Ships o MM AQ-14: New Vessel Builds o MM AQ-15: Yard Tractors at Berth 97-19 Terminal (Alt fueled, low NOx and PM) o MM AQ-16: Yard Equipment at Berth 121-131 Rail Yard (Alt fueled, low NOx and PM) o MM AQ-17: Other Yard Equipment at Berth 97-19 Terminal (electric and low NOx, PM) o MM AQ-18: Yard Locomotives at Berth 121-131 Rail Yard o MM AQ-19: Clean Diesel Truck Program o MM AQ-2: LNG Trucks o MM AQ-21: Truck Idling Reduction Measure o MM AQ-22: Periodic Review of New Technology and Regulations o MM AQ-23: Throughput Tracking o MM AQ-24: General Mitigation Measure. o MM AQ-25: LEED Certification o MM AQ-26: Compact Fluorescent Light Bulbs o MM AQ-27: Energy Audit o MM AQ-28: Solar Panels o MM AQ-29: Recycling o MM AQ-3: Tree Planting Biology o MM BIO-1: LAHD shall apply 1.27 credits (= 2.54 Inner Harbor acres) available in the Bolsa Chica or Outer Harbor mitigation banks to compensate for loss of fish and wildlife habitat due to construction of fill in the West Basin o MM BIO-2: All ships calling at Berths 97-19 shall comply with the expanded VSRP of 12 knots between 4 nm from Point Fermin and the Precautionary Area starting 29 Cultural Resources o MM CR-1: In the unlikely event that any artifact, or culturally deposited bone, shell or non-native stone is encountered during construction, work shall be immediately stopped and relocated to another area. Geology o MM GEO-1: Emergency Response Planning Transportation o MM TRANS-1: Additional turn lanes at Avalon Boulevard and Harry Bridges Boulevard. o MM TRANS-2: Additional through lane at Alameda and Anaheim Streets o MM TRANS-3: Additional lanes and reconfiguration at John S. Gibson and I-11 Ramps o MM TRANS-:4 Additional lanes at Fries Avenue and Harry Bridges Boulevard. o MM TRANS-5: Additional lanes at Broad Avenue and Harry Bridges Boulevard. o MM TRANS-6: Additional lanes at Seaside and Navy Way. Noise o NOI-1: Construction Limitations o NOI-2: Installation of noise walls at the Project site or affected receiver Public Services and Utilities o MM PS-1: Recycling of construction materials o MM PS-2: Using materials with recycling content o MM PS-3: Would ensure long-term adequate solid waste management starting from 225

-Community Concerns- lbs/day 2 18 16 14 12 1 8 6 4 2 -Criteria Pollutants- Peak Daily Emissions (no mitigation) Baseline Thresholds 25 215 23 245 NOX SOX PM1 PM25 lbs/day 14 12 1 8 6 Mitigated Peak Daily Emissions Baseline Thresholds 25 215 23 245 4 2 NOX SOX PM1 PM25 Re-Circulated Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR)

-Community Concerns- -Health Risk Assessment (HRA)- Cancer, Chronic (non-cancer) and Acute (non-cancer) Proposed Project (No Mitigation) Proposed Project (Mitigated) (24-273) -29-278 HRA- Because the HRA for this project includes past emissions that present and future mitigation measures cannot reduce, a second HRA was completed for this Project to present the results of health risk from 29-278. The results are provided for information purposes only and were not used to determine significance. However, the 29-278 HRA results indicate that the mitigation measures imposed by the Port starting in 29 (the start of phases II and III) would reduce the maximum residential cancer risk to less than 1 per million for the CEQA increments. Mitigated Proposed Project Health Risk Health Impact 24-273 Cancer Risk Receptor Type Residential Proposed Project Maximum Predicted Impact CEQA Baseline CEQA Increment 19 in a million 14 in a million 11 in a million Occupational 13 in a million 11 in a million 13 in a million 29-278 Cancer Residential 9.3 in a million 14 in a million 7.5 in a million Risk Occupational 1 in a million 11 in a million 1 in a million Chronic Hazard Residential.18.14.6 Index Occupational.59.43.32 Acute Hazard Index Residential 1.11.13 1.9 Occupational 1.7.22 1.68 Significance Threshold 1 in a million 1 in a million *The maximum increments might not necessarily occur at the same receptor locations as the maximum impacts. This means that the increments cannot be determined by simply subtracting the baseline impacts from the Project impact. 1 1 Re-Circulated Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR)

-Community Concerns- -Cranes- The proposed Project includes 1 new cranes which will block some views of the Vincent Thomas Bridge. Although considered an unavoidable significant impact, mitigation has been applied including crane color studies to reduce potential contrasts, a beatification project along John S. Gibson Blvd. and Pacific Ave. at Channel St. (including landscaping and undergrounding utility lines), and Plaza Park improvements. Baseline Conditions (21) Proposed Project with 1 Cranes Views from Plaza Park Re-Circulated Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR)

The Corps and the Port will use the contents of the DEIS/EIR in deciding whether to approve a project or project alternative. The steps in the process and opportunities for public input are identified below: Step 1 - Notice of Intent/Preparation (NOI/NOP) This NOI/NOP was published for public review on October 22, 23. A Draft EIS/EIR was released in August 26. Comments received on both documents were used in the preparation of the Re-circulated DEIS/EIR. Step 2 - Draft EIS/EIR (DEIS/EIR) The Draft EIS/EIR was released on April 3, 28 for a 6-day review period, which ends on June 3, 27. Availability: The Draft EIS/EIR is available for review at the following locations: Los Angeles Public Library, Central Branch 63 West 5th Street Los Angeles CA 971 Los Angeles Public Library, San Pedro Branch 921 South Gaffey Street San Pedro, CA 9731 Los Angeles Public Library, Wilmington Branch 13 North Avalon Blvd. Wilmington, CA 9744 Port of Los Angeles Administration Building 425 South Palos Verdes Street San Pedro, CA 9731 The DEIS/EIR is available on line at www.portoflosangeles.org. A limited number of printed copies of the DEIS/EIR are also available at the Port s Environmental Management Division offices to purchase. The DEIS/EIR is also available on CD for no charge. Public Meeting: There will be a public meeting to receive oral and written comments on Thursday, June 5, 27 at 6: p.m. at Banning s Landing Community Center located at 1 E. Water Street in Wilmington. This meeting is to be conducted in English with simultaneous English/Spanish translation services provided. Written Comments: Written comments on the Draft EIS/EIR can be provided at the Public Meeting or sent any time prior to close of business on June 3, 27 to both of the addresses below: U.S. Army Corps of Engineers, Los Angeles District Regulatory Division c/o Spencer D. MacNeil D.Env. ATTN: CESPL-RG-23-129-SDM P.O. Box 532711 Los Angeles, California 953-2325 Dr. Ralph G. Appy Port of Los Angeles 425 South Palos Verdes Street San Pedro, CA 9731 Comments can also be sent electronically to: ceqacomments@portla.org Step 3 - Final EIS/EIR (FEIR/EIS) A FEIS/EIR will be prepared following receipt of oral and written public comments received. The FEIS/EIR will include responses to all of the comments received on the DEIS/EIR and will include any changes required to the DEIR/EIS as a result of public comment. Staff anticipates this will occur in the fall of 28. Step 4 - Approval Action(s) Following completion of the FEIS/EIR, a public hearing(s) will be held by the Port where the Board of Harbor Commissioners will deliberate on whether to certify the FEIR and whether or not to approve a project or project alternative. Comments from the public will be taken by the Board at that hearing. Port staff anticipate this hearing will be held in the fall of 28. The Corps is expected to prepare a Record of Decision within 6 days of publication of FEIS.

lbs/day 2 18 16 14 12 1 8 6 4 2 Berth 97-19 [China Shipping] Draft EIS/EIR: Peak Daily Emissions No Mitigation Baseline Thresholds 25 21 215 23 245 NOX SOX PM1 PM25 Berth 97-19 [China Shipping] Draft EIS/EIR: Peak Daily Emissions with Mitigation lbs/day 16 14 12 1 8 6 Baseline Thresholds 25 21 215 23 245 4 2 NOX SOX PM1 PM25

2, Peak Daily Operational Emission Rate (lb/day) 18, 16, 14, 12, 1, 8, 6, 4, 2, Proposed Project Without Mitigation Mitigated Project Alternative 1 (No Project) CEQA Significance Threshold (Baseline + SCAQMD Threshold) CEQA Baseline 25 21 215 23 245 Project Year Source: Castle Environmental Consulting, LLC Figure 3.2-1 NO x Emission Trends for the Proposed Project Relative to the CEQA Baseline Berth 97-19 Container Terminal Project EIS/EIR TB9271SCO18121.1.4 CS_aq1 ai 11/7

14, Peak Daily Operational Emission Rate (lb/day) 12, 1, 8, 6, 4, 2, Proposed Project Without Mitigation Mitigated Project Alternative 1 (No Project) CEQA Significance Threshold (Baseline + SCAQMD Threshold) CEQA Baseline 25 21 215 23 245 Project Year Figure 3.2-2 SO x Emission Trends for the Proposed Project Relative to the CEQA Baseline Berth 97-19 Container Terminal Project EIS/EIR Source: Castle Environmental Consulting, LLC TB9271SCO18121.1.4 CS_aq2 ai 11/7

2, Peak Daily Operational Emission Rate (lb/day) 1,8 1,6 1,4 1,2 1, 8 6 4 2 Proposed Project Without Mitigation Mitigated Project Alternative 1 (No Project) CEQA Significance Threshold (Baseline + SCAQMD Threshold) CEQA Baseline 25 21 215 23 245 Project Year Figure 3.2-3 PM 1 Emission Trends for the Proposed Project Relative to the CEQA Baseline Berth 97-19 Container Terminal Project EIS/EIR Source: Castle Environmental Consulting, LLC TB9271SCO18121.1.4 CS_aq3 ai 11/7

6, Peak Daily Operational Emission Rate (lb/day) 5, 4, 3, 2, 1, Ships &Tugs - Transit Ships - Hoteling Trucks Trains & Railyard Equipment Terminal Equipment Worker Commute Vehicles Source: Castle Environmental Consulting, LLC TB9271SCO18121.1.4 CS_aq4 ai 11/7 25 21 215 22 225 23 235 24 245 Project Year Note: Emissions from ships, trucks, and trains are within the entire South Coast Air Basin Figure 3.2-7 NO x Emissions by Source Category for the Mitigated Project Berth 97-19 Container Terminal Project EIS/EIR

4,5 4, Peak Daily Operational Emission Rate (lb/day) 3,5 3, 2,5 2, 1,5 1, Ships &Tugs - Transit Ships - Hoteling Trucks Trains & Railyard Equipment Terminal Equipment Worker Commute Vehicles 5 Source: Castle Environmental Consulting, LLC TB9271SCO18121.1.4 CS_aq5 ai 11/7 25 21 215 22 225 23 235 24 245 Project Year Note: Emissions from ships, trucks, and trains are within the entire South Coast Air Basin Figure 3.2-8 SO x Emissions by Source Category for the Mitigated Project Berth 97-19 Container Terminal Project EIS/EIR

45 4 Peak Daily Operational Emission Rate (lb/day) 35 3 25 2 15 1 Ships &Tugs - Transit Ships - Hoteling Trucks Trains & Railyard Equipment Terminal Equipment Worker Commute Vehicles 5 Source: Castle Environmental Consulting, LLC TB9271SCO18121.1.4 CS_aq6 ai 11/7 25 21 215 22 225 23 235 24 245 Project Year Note: Emissions from ships, trucks, and trains are within the entire South Coast Air Basin Figure 3.2-9 PM 1 Emissions by Source Category for the Mitigated Project Berth 97-19 Container Terminal Project EIS/EIR