April 8, 2015 Olympic Medical Center Rebecca Lawson, P.E. LHG. Connie Groven, P.E. Audrey Kuklok

Similar documents
Georgia-Pacific Mill Site DTSC Cleanup Update. Special City Council Meeting February 2, 2017 Town Hall, Fort Bragg, CA

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

Cleanup Action Plan Illahee Foods 5507 Illahee Rd NE Bremerton, WA Port of Illahee PO Box 2357 Bremerton, WA 98310

PROJECT OVERVIEW. Site Assessment for Proposed Coke Point Dredged Material Containment Facility at Sparrows Point

Lecture 1: Introduction to Soil Remediation Engineering

6.1 Koppers Oroville Wood Treatment Facility, California

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS

TABLE OF CONTENTS 1.0 SUMMARY OF SITE CONDITIONS Site History Summary of the Remedial Investigation Summary of Site Risks 12

Collect deeper soil samples and groundwater from beneath site?

Toronto Port Lands Community Based Risk Assessment. Meggen Janes, PMP, P. Eng., M.Sc. Project Manager, CH2M

PermeOx. Plus. Enhanced Aerobic Biodegradation

Sustainable and Innovative Remediation of the Remote and Historic Hay Camp Abattoir and Warden Station Wood Buffalo National Park

PROPOSED PLAN OF REMEDIAL ACTION FOR THE REICHHOLD CHEMICAL SITE CHESWOLD, DELAWARE

Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume

FACT PATTERN THE RESERVATION

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)

In-Well Stripping and Two-Phase Extraction Methods. Presenter Mehmet Pehlivan, PG, CHG Bays Environmental Remediation Management

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Central Plateau Inner Area Cleanup Principles

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b

Re: West of 4 th Site Agreed Order #DE10402 West of 4th Group s Proposed Path Forward for Remedy Selection

IXPER 70C Calcium Peroxide CASE STUDY

Mill Street Corridor Assessment/Cleanup Overview

Site Background December 2005

Portland Harbor Superfund Site - Introduction

NJDEP Vapor Intrusion Guidance

Bench- and Pilot-Scale Treatability Testing of ISCO and Surfactant Enhanced Biodegradation of Long Chain Petroleum Hydrocarbons

Fort George G. Meade

American Creosote Works Site

Former Georgia-Pacific Mill Site

Attenuation Factors for Hydrocarbons Associated With a Diesel Spill

Remediation of BTEX in Shallow, Silty Clay Soil Successes and Insights

Dr. Xiaosong Chen, PE

Transmitted via . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL

Solidification/Stabilization

Remediation of Hydrocarbon Contaminated Soils at MCAGCC, Twentynine Palms, CA

Construction Dewatering General Permit (GP) & Groundwater Remediation GP. Navigating the Permitting Process

87th Air Base Wing. Joint Base McGuire-Dix-Lakehurst Restoration Advisory Board 16 November 2017

Proposed Plan Closed Sanitary Landfill

REGULATED STORAGE TANK DIVISION CORRECTIVE ACTION PLAN FACILITY:

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES

Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California

Parcel E (Site 03) Treatability Study and Parcel C Remedial Action

Former Potrero Power Plant Site Remediation WELCOME. PG&E Community Open House

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE

Ellsworth Air Force Base Environmental Restoration Program announces the completion of its 2010 Five Year Review for Ellsworth Air Force Base

Phase 1 ESA Phase 2 ESA Site Assessment. Cleanup Planning Cleanup CNFA NFA. Gas Tank Removal at Closed Gas Station

85M102006D. The Shaw Group Inc.

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y

Fort George G. Meade. Performance Based Acquisition (PBA) Five-Year Summary. Restoration Advisory Board Meeting November 20, 2014

New York State Department of Environmental Conservation. Receive Site Fact Sheets by . See For More Information to Learn How.

Fort George G. Meade. Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014

Port Angeles Harbor Sediments Investigation Community Meeting. Peter defur, Ph.D. Laura Williams Environmental Stewardship Concepts, LLC May 7, 2012

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN

Results from the LLNL Gasoline Spill Cleanup

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards

APPLICATION OF SUBSURFACE VAPOUR ASSESSMENT AT HYDROCARBON IMPACTED SITES

2013 IPEC Conference San Antonio

Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater

REMEDIATION OF A PETROLEUM SPILL USING PURE OXYGEN

FIVE-YEAR REVIEW PROCESS CAMP RAVENNA

Public Presentation. Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard

FEASIBILITY STUDY FORMER SEWAGE TREATMENT PLANT SITE NAS SOUTH WEYMOUTH RAB MEETING NOVEMBER 9, Phoebe Call Tetra Tech NUS, Inc.

Kirtland Air Force Base Fuel Spill Cleanup October 23, 2014

Limited Remedial Action Reference Documentation For Site Professionals

Remediation Strategies: Protecting Assets and Managing Cashflow. Presented by Dan Felten, PE, LSP, LEP

TABLE NO. 2 Industrial-Commercial

Managing a MGP Site Containing 121,000 Tons of Soils Containing Highly Impacted and Multiple Contaminates Of Concern (COC) Clinton, Iowa

The total estimated project costs and funding sources are summarized in the table below. Description Total Project Expenditures 20

The Port of Bellingham

Installation Restoration Program Framework: Introduction to CERCLA

Revised Risk Management Plan

How You Can Participate

INVESTIGATIONS AND ABATEMENT OF PRODUCED WATER IMPACTS AND SEEPS TO SURFACE WATER

RISK BASED CLOSURE ALTERNATIVE TO REMEDIATION AT AN URBAN SITE. Brian H. Hackett CP, EMS LLC January 17, 2011

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

Transmitted via . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL

Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY

What is Ethylene Dibromide (EDB)?

Ex-situ Treatment & CAMU Implications at the Springvilla Site

5 SURVEY PLANNING AND DESIGN

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures

Prepared by Ken Summerour, P.G.

SR (Sustained Release) ISCO Reagent CASE STUDY

ATHENS COUNTRY STORE REVISED MODIFIED CORRECTIVE ACTION PLAN REPORT ATTF CP-21

Presenters' Contact Information

HAZARDOUS MATERIAL SPILLS INFORMATION REQUEST

EXECUTIVE COUNCIL 14 NOVEMBER 2006

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania

Fort Detrick Remedial. Study. US Army Corps of Engineers Baltimore District

CITIZENS GUIDE Proposed soil cleanup plans for Lockheed Martin s Middle River Complex. Introduction. In This Guide

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting

Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016

Comparing Apples to Apples with Ground-water, NAPL, and Soil Data

Risk-Based Cleanup Actions for Closure of a Brownfield Site

Vapor Intrusion Pathway Feasibility Study

None of the samples collected from any of the areas contained concentrations of lead greater than the residential soil PRG of 400 mg/kg.

Valentine-Clark State Superfund Site Bridal Veil Pond Open Space Operable Unit City of Minneapolis, Hennepin County, Minnesota

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases:

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake

Transcription:

April 8, 2015 Olympic Medical Center Rebecca Lawson, P.E. LHG. Connie Groven, P.E. Audrey Kuklok

Overview of harbor cleanup projects Rayonier Mill Update Western Port Angeles Harbor Update K Ply Mill Draft Remedial Investigation/Feasibility Study Draft Cleanup Action Plan Draft Agreed Order Other Documents SEPA and Public Participation Plan Questions

Port Angeles Cleanup Sites 1 2 3 Port Angeles Sediments Investigation Rayonier Mill Study Area Marine Portion Upland Portion Rayonier Mill Off-Property Soil Dioxin Study 4 5 6 7 Marine Trades Area K Ply Unocal Bulk Plant #0601 Western Port Angeles Harbor

Getting to Study Area Cleanup Collect additional soil and groundwater data Ecology finishes Harbor Sediments Investigation Upland data summary report (Volume I) Marine data summary report (Volume II) Preliminary cleanup standards section Development of alternatives section Evaluate Interim Action alternatives (Volume III) Draft Interim Action Plan Public Comment Period

Next Steps Ecology reviewing: Agency Review Draft (ARD) Interim Action Alternatives Evaluation Report (Vol III) Feb 2015 Rayonier will submit: Public Review Draft (PRD) Interim Action Alternatives Evaluation Report (Vol III) Summer 2015 Anticipated public comment period Fall 2015 Final Upland, Marine, & Alternatives Reports Early 2016 ARD Interim Action Plan Spring 2016 Anticipated public comment period Summer 2016

Getting to Western Harbor cleanup Supplemental Harbor Sediments Investigation Remedial Investigation/ Feasibility Study Selection of Cleanup Action Site Cleanup

Progress Agreed order and work plan signed May 2013 Sampling plan approved June 2013 Fieldwork completed July 2013 White Paper and RI/FS extension for technical issues May 2014 Next Steps PLPs will submit: Agency Review Draft RI/FS 90 days after resolution of issues Public Review Draft RI/FS 60 days after receipt of comments A cleanup plan will be developed and implemented under a separate legal agreement.

Draft Remedial Investigation/Feasibility Study Draft Cleanup Action Plan Draft Agreed Order State Environmental Policy Act (SEPA) review Public Participation Plan

1926 1941 1971 1989 2007 2010-11 Port s log yard Peninsula Plywood (PenPly) Rayonier s PenPly K Ply Pipeline General Petroleum/ExxonMobil Potentially Liable Persons (PLPs) Port of Port Angeles Rayonier ExxonMobil

Site Background 1920s today: Bulk fuel plants at various times 1990 order: Rayonier hydraulic oil and PCP spill 2005 order: Marine Trades Area order with port and Chevron 2012 order: Split K Ply from MTA

Media Contaminants Soil Groundwater Indoor Air Gasoline COC COC COC Diesel COC COC COC BTEX COC COC COC Heavy Oil COC COC Pentachlorophenol Dioxins/furans COC COC

Prevent harm to aquatic organisms & consumers of organisms Prevent direct contact by workers Prevent inhalation by future workers Vadose Zone Smear Zone Remove free product

Contaminant of Concern Soil (mg/kg) Groundwater (µg/kg) Diesel 2,000 500 Gasoline 30 500 Heavy Oil 2,000 800 Benzene 0.3 51 Ethylbenzene 6 Toluene 7 Xylenes 9 Pentachlorophenol 330 Dioxins/furans 0.00059

Soil Standard POC: Throughout the site Groundwater Conditional POC: At the bulkhead Air Standard POC: Throughout the site. Assess indoor air with vapor assessment prior to future construction.

Gasoline, Benzene and Heavy Oil Results in Soil

Gasoline and benzene in groundwater

Alternative 1 Alternative 2 Alternative 3 Alternative 4 Air Sparge Curtain remove hot spots Chemical oxidation capping remove hot spots bioremediation if needed Removal of all contaminated soil above water table partial removal below water table enhanced bioremediation Removal of all contaminated soil enhanced bioremediation Benefit score: 15 $2.4 million Benefit Score: 16 $7.0 million Benefit Score: 19 $5.2 million Benefit Score: 22 $7.4 million

Harmless

Bulkhead Area Benzene Area Smear zone Concrete Pad Area

Cleanup Area During construction After construction Bulkhead excavation area Concrete pad excavation area Benzene groundwater area Remaining smear zone soil Excavation of vadose and smear zone soils to cleanup levels Bioremediation Excavation of vadose soils to cleanup levels and smear zone soils to remediation levels Bioremediation Bioremediation injections Monitoring of soil and groundwater Additional bioremediation through injections or infiltration galleries Monitored/enhanced natural attenuation of remaining soils

Cleanup Area During construction After construction Former stack area Excavate and relocate Pentachlorophenal area Hog fuel storage areas Excavation and disposal off-site Excavation and disposal off-site Log pond area Institutional Controls, Further studies

Implements the Cleanup Action Plan o Task 1: Engineering Design Report o Task 2: Construction o Task 3: Groundwater and soil monitoring o Task 4: Log pond fill area investigation o Task 5: Institutional controls o Task 6: Progress reports Outlines schedule

Action Finalize RI/FS, CAP and AO Draft Engineering Design Report (EDR) Final EDR Construction Construction completion report Install wells and recheck groundwater Quarterly GW monitoring Due Date and Triggering Event After public comment period 60 days after signature of AO and final CAP 30 days after Ecology comments Begin within 120 of EDR approval 90 days after construction Within 90 days after construction Begins within 14 days after wells installed Estimated Calendar dates May/June 2015 August 2015 (May 2015) October 2015 (June 2015) March 2016 (August 2015) September 2016 December 2016 January 2017

Action Long term monitoring Draft log pond fill study Final log pond fill study Supplemental investigation of log pond Draft Environmental Covenant Quarterly and Annual Report Five year reviews Due Date and Triggering Event Every 5 years for soil, according to monitoring plan for GW. 90 days prior to lease end 30 days after receipt of Ecology s comments Begin within 60 days of removal of log debarker 30 days after construction completion report approved Quarterly for 2 years, then annual 5 years after covenant recording Estimated Calendar dates Until cleanup levels are met Late 2016 Early 2017 Spring 2017 October 2016 2015 until end Every 5 years

SEPA Determination of Nonsignificance Public Participation Plan

April 2 May 4, 2015 Agreed Order Draft Cleanup Action Plan (CAP) Remedial Investigation/Feasible Study (RI/FS) State Environmental Policy Act (SEPA) review Public Participation Plan Send written comments to Site Manager Connie Groven through May 4, 2015 Connie.Groven@ecy.wa.gov https://fortress.wa.gov/ecy/gsp/sitepage.aspx?csid=28 Questions?