Metro Wastewater Reclamation District Denver, Colorado March 2013

Similar documents
Biosolids Recycling at it's Finest

Chapter 2: Description of Treatment Facilities

So You ve Removed Your Phosphorus? Now What? JTAC Luncheon April 9 th, 2014

Crop Leases in River Valley District 2016 Survey Data from Clay, Cloud, Washington, and Republic Counties

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

TULARE LAKE COMPOST EXCEPTIONAL QUALITY COMPOST FOR THE CENTRAL VALLEY

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX

The Impact of Phosphorus Limiting Regulations on Land Application. A Contractor s Perspective

Frequently Asked Questions

TOTAL $ PURCHASED INPUTS PRICE SEED $ LBS $45.00 $45.00 MANURE $ TON $21.60 $21.60 LIVESTOCK FAC & EQUIP $5.00 $5.

WASSTRIP (Waste Activated Sludge. Stripping to Remove Internal. Phosphorus) complements Ostara s. Pearl nutrient recovery process in

DRIP IRRIGATION TRIPS, TIPS AND TRAPS BILL COX COXCO A G A AG. AG SERVICES, SERVICES INC IINC

Total Makeover for Biosolids Handling at DC Water s Blue Plains Advanced Wastewater Treatment Plant. February 2015

Applying Extractive Nutrient Recovery for Managing Phosphorus in Sidestreams and Biosolids

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

Appleton Wastewater Treatment Plant Biosolids Management Program

Bio-Recycling North Ranch

4 Labor Wage Rate: Equipment operators $/hour $8.55 WATER USE

Closing the Gap Reaching for Energy Independence in Water Reclamation

META-ECONOMICS OF COVER CROPS

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Focus. Analyzing the Impact of Drought Conditions on Texas High Plains Agriculture

WATER USE. Employee Liability Insurance $/$1,000 wages $ Employee Benefits percent/wages 18.00% Labor Downtime percent 25.

Quality agland located southwest of North Platte, Nebraska! Available for purchase as a turnkey operation or as individual tracts.

Dryland Wheat Enterprise Budget - Grain and Graze 1000 acres farmed, 160 acres for this budget. OSU Name. OKLAHOMA COOPERATIVE Farm Description

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

Item. NUMBER OF CROPS... 2 Labor Wage Rate: LAND USE Equipment operators $/hour $7.75 ACREAGE SUMMARY: (ACRES) General & Irrigators $/hour $7.

Third-Party Technology Verification of the Hydropath Technology at the Robert W. Hite Treatment Facility, Denver, Colorado

VERSION 1.0. COPYRIGHT (C) 1984 by NEW MEXICO STATE UNIVERSITY BOARD OF REGENTS

ITEM PRICE YIELD TOTAL GROSS RETURNS OAT HAY TONS (IN FIELD) TOTAL PURCHASED PURCHASED INPUTS PRICE QUANTITY INPUTS TOTAL

Dewatering Optimization Near-Term Savings and Long-Term Capital Planning

Total 2, ,519

PROGRESSIVE AGRICULTURE Energy Options for Ohio Agriculture

2017 Agricultural Land Valuation Study

Orange County Utilities ANNUAL BIOSOLIDS REPORT

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Land Application of Biosolids Rules, Regulations and Benefits EPA regulations, under Title 40 Code of Federal Regulations Part 503 (40 CFR 503) -

Capital Improvement Plan Update:

MWRD PWO Seminar - Berlin.pptx/ 1

2018 Crop Enterprise Budgets

Costa Brava Water Agency s sludge use programme

A Partial Budget Approach to Economic Decisions: Key Biomass Contract Issues. Benefits Less Costs = Profitability. Benefits

TABLE 1. Acreage Summary, San Juan County, TABLE 2. Basic cost information for San Juan County, Projected 2017 Projected 2017.

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

FARM DIGESTERS AND MANURE PHOSPHORUS MANAGEMENT

Ammoniating Tube Wrapped Baleage. Peter Gaul, Tribute Farm Benton, MO October 2013

OUTDOOR PROPERTIES. Monroe Land & Livestock

2019 Crop Enterprise Budgets

BUDGET AREA... FARM SIZE IRRIGATION TYPE NUMBER OF CROPS.. Item

OPERATING INPUTS Units Price Quantity $/Acre Wheat Seed Bu./acre $ $ Custom Harvest Acre $ -

MANURE PHOSPHORUS MANAGEMENT: PROCESSING TECHNOLOGIES AND EFFICIENCY

STRUVITE HARVESTING: A UTILITY S PERSPECTIVE

D a Oregoa 's. Costs. 8Z.j983. Oregon State ersity Exte5j Service. EM 823k

Your Guide to the. Budd Inlet Treatment Plant

FAIRFIELD-SUISUN SEWER DISTRICT AND LYSTEK INTERNATIONAL A COLLABORATION TO DELIVER A SUSTAINABLE BIOSOLIDS PROGRAM

3 Labor Wage Rate: Equipment operators $/hour $8.55 WATER USE

BUDGET AREA FARM SIZE... IRRIGATION TYPE NUMBER OF CROPS. Item

Solids Master Plan Briefing June 22, 2017

BUDGET AREA... ROGERS-DORA AREA, ROOSEVELT COUN FARM SIZE... 1, ACRES IRRIGATION TYPE. DRYLAND NUMBER OF CROPS 2 VERSION 1.0

1,119+/- ACRES ANTELOPE COUNTY, NE

Lind Site, Conventional Tillage & No-Till

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM

Atlantic County Utilities Authority Wastewater Treatment Facility

TABLE 1. Basic cost information for Socorro County Projected 2017 BUDGET AREA... SOCORRO COUNTY Projected 2017

What is going on in hog industry? Slow down in growth Plain says 1.8% bigger YTD

Methods and Procedures of Estimating Rent for Crop Share, and Flexable Cash Leases.

CITY OF ALBANY BIOSOLIDS MANAGEMENT PROGRAM DEQ/EPA ANNUAL REPORT 2009

2,946+/- Acres Pratt and Kiowa Counties, Kansas Monday, February 1, :00 PM CDT (Storm Date Monday, February 8, 2016)

Kansas Custom Rates 2016

Focus. Panhandle Model Farms 2012 Case Studies of Texas. High Plains Agriculture

Roundaway Plantation

Focus. Panhandle Model Farms 2016 Case Studies of Texas. High Plains Agriculture. DeDe Jones Steven Klose

Update on Biosolids Regulatory & Market Trends. Michael D. Moore HDR Engineering, Inc.

Worksheet for Calculating Biosolids Application Rates in Agriculture

Competitiveness of U.S. Wheat: the Role of Productivity

$3,048 $1,524 $1,873 $2,800 $12,700 $2,502 $2,007 $0 $0 $1,657 $457 $191. Total $28,759

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

Poultry production is the number one agricultural

Farmer Speaks Winter 2018 Results

TR02-5. Technical Re.port. Application of Anaerobically Digested Biosolids to Dryland Winter Wheat

Report on Piloting of the Volute Dewatering Press at the Boonsboro WWTP in Boonsboro, MD July 25 th - July 29 th, 2016

Crop Production Costs

Guidelines for Estimating Crop Production Costs. in Manitoba

Focus. Panhandle Model Farms Case Studies of Texas High. Plains Agriculture

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

MICROCOMPUTER CROP COST AND RETURN GENERATOR

Hydrothermal Processing in Wastewater Treatment

Transitioning to a Thermal Drying Program at DWSD. March 3, 2015

High Value Resources from High Strength Wastes: Leveraging Food Production Byproducts to Reduce BNR Costs

Focus. Panhandle Model Farms 2018 Case Studies of Texas. High Plains Agriculture

SeRVice: Wastewater Treatment

4 Angles. Pilot-scale Evaluation of AirPrex for Phosphorus Management. Innovation Program Phosphorus Initiative JTAC 4/22/2017

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

EXISTING FACILITIES DESCRIPTION

SOIL MAPPING UNITS AND GRAZING INDICES

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

Sometimes Being Faced With A Challenge Can Lead To Greater Opportunities

Irrigating for Maximum Economic Return with Limited Water

Transcription:

Presented by: James E. Johnson, Technical Services Officer Resource Recovery & Reuse Department Metro Wastewater Reclamation District Denver, Colorado March 2013

Metro Wastewater Reclamation District Who is the Metro Wastewater Reclamation District What our Biosolids Management Program Entails Snapshots of a Successful Biosolids Management Program Opportunity for Questions & Answers 2

Who is Metro Wastewater? Regional Wastewater Treatment Agency Special District Formed under Colorado Law in 1961 Wholesale Wastewater Treatment 55 local governments 1.5 million people Area Served 380 square miles 250+ miles of interceptor sewers Treat 160 million gallons per day Produced 27,026 dry tons of biosolids in 2012 3

Wastewater Treatment Process Liquid Stream Preliminary Treatment Screening Grit Removal Primary Treatment Primary Clarifiers Secondary Treatment Aeration Basins Secondary Clarifiers Disinfection 4

Wastewater Treatment Process Solids Stream Primary Clarifiers Secondary Clarifiers Dissolved Air Flotation Thickening Blending Tanks Acid Anaerobic Digestion MesophillicAnaerobic Digestion Centrifuge Dewatering Dewatered Biosolids Storage Class B 5

Wastewater Treatment Process Solid Stream Blending Tank Cogeneration Primary Sludge Dissolved Air Flotation Anaerobic Digestion Dewatered Biosolids Storage (Cake Tower) Secondary Biological Sludge (WAS) Dewatering Centrifuges 6

Solid Stream -Cogeneration The District saved $0.05 per kwh by using Trigencogeneration power in place of Xcel electrical power. During 2012, the District saved approximately $1,580,000. 7

Biosolids Management Program -Attitude - Biosolids are a beneficial product worth money! Emphasize the positives of beneficial use We in the biosolids industry are Environmentalists Don t just do it, do it right Work cooperatively to develop a strong regional biosolids program Other generators (Littleton-Englewood) Regulators (EPA, State of Colorado) 8

Biosolids Management Program Biosolids Production 74 dry tons/day in 2012 Utilize In-House Resources Biosolids transport & application Vehicle & equipment maintenance 16 Tractors and 23 trailers 14 live bottom 4 end dump 3 belly dump 2 tankers 9

Transport 20.8 average truckloads per day in 2012 6 days/week Average 140 miles round-trip truckload Average load 363 wet tons/73.8 dry tons 10

Biosolids Management Program -Attitude When you charge money for biosolids, it puts a new meaning to customer service! Embrace the Biosolids EMS philosophy Program sustainability Best management practices Continual improvement Perform above & beyond minimal requirements 11

From Free to Pay Land application started in early 1980 s Originally a liquid application program until about 1986, then switched to cake Gave biosolids to farmers 1998 - Began charging farmers a minimal fee Some resistance, but not bad. Still a good deal. As of December 31, 1998: revenue received was $4,178.00 12

Status as of 2004 35% of annual biosolids production was applied to private land 12 different private farmers Located in 4 different counties in eastern Colorado Dry land and irrigated sites Charge was $3/acre for biosolids Total 2004 cake sales - $12,445.95 13

We Deliver 14

15

We apply 16

We incorporate 17

We Invoice 6450 York Street INVOICE Denver, CO 80229-7499 (303) 286-3000 Main Phone (303) 286-3028 Fax Send To: Invoice No.: Bill A. Farmer Invoice Date: 1 Headlight Road PO Number: ----- Old Ford, Colorado Terms: Net 30 District Contact: All Bets Roff METROGRO Cake 20% Grade 1.4-1.1-0.04 Guaranteed Analysis: Total Nitrogen (N) 1.4% Available Phosphate (P2O5)..1.1% Soluble Potash (K2O) 0.0.04% Derived from biosolids generated at the RWHTF Quantity Description Unit Price Amount Acres 65.59 SW ¼ SEC 23 T1S R02W DC 7, App Set No. 10, 240.86 dt applied $12.00 $787.08 Miles 4950 Fuel Surcharge is 2% of $3.3358 x miles $0.0667 $330.17 Subtotal: $1,117.25 Tax: $0.00 Total Due: $1,117.25 18

We save money on fuel 19

2008 price increase 2008 Pricing Under 75lb/acre PAN - $8/acre Over 75lb/acre PAN - $12/acre Also added a fuel supplement Calculation charge = fuel ($/gallon) x (2%) x (miles rt) Total 2008 cake sales - $40,148.94 20

Current Status Currently have 201 approved private sites. 57 private landowners participating. Total active private acres approved: 18,194.91 irrigated acres 39,274.69 dryland acres 57,469.60 total private acres Waiting list of farmers currently 14 Five counties. 21

Current Sales 2012 Class B cake sales - $69,349.16 2012 Fuel Surcharge $33,719.46 Total 2012 revenue - $103,068.62 2013 sales as of February 5th Class B cake sales - $19,431.56 Fuel Surcharge - $6,950.33 Total 2013 invoiced - $26,381.89 22

METROGRO 2012 Biosolids Distribution METROGRO Farm 34.40% Private Composter 59.10% Private Farms 6.50% 23

Future Pricing? May go to a $/lbpan structure Avoids unfairness in billing Farmers pay for the nitrogen they receive Current 2013 price for anhydrous ammonia is $ 0.49/lb PAN New products Liquid N fertilizer? Granular phosphate fertilizer? Already pilot tested a process. 24

METROGRO Farm Purchased between 1993 and 2000 52,000 acres (81 square miles)of agricultural property east of Deer Trail, CO Farm never was intended to be a profit center (good thing!) 25

METROGRO Farm 26

Satellite View 27

Ground View Installed perpendicular to prevailing (winter) wind direction in 1998 Used on steep or long slopes Reduces soil erosion by reducing wind speed and distance traveled across soil surface Alternate fields of growing crop and fallow 28

METROGROFarm Farmed by Tenant farmer who is responsible for all farming & grazing operations through lease agreement Approximately 26,000 to 28,000 acres are farmable In any given year, approximately one half of the farmable acreage is planted in various crops No irrigation drylandonly No-till crop/fallow rotationallows for soil moisture to accumulate Chemical weed control to eliminate transpiration in fallow ground 29

METROGROFarm Support Facilities Grain Bins Five grain bins Constructed in 1999 Combined storage capacity of 174,000 bu Truck scale 30

METROGRO Farm Support Facilities Maintenance Shop Vehicle and Equipment Storage 31

METROGRO Farm Support Facilities Diesel fueling station both storage and dispensing Chemical mixing station Air strip 32

$700,000 METROGRO Farm - Wheat Revenue $600,000 $500,000 Dollars $400,000 $300,000 $200,000 $100,000 $0 YEAR 33

$40,000 METROGRO Farm- Forage Revenue $35,000 $30,000 $25,000 Dollars $20,000 $15,000 $10,000 $5,000 $0 YEAR 34

$80,000.00 METROGRO Farm - Corn Revenue $70,000.00 $60,000.00 $50,000.00 Dollars $40,000.00 $30,000.00 $20,000.00 $10,000.00 $0.00 YEAR 35

$70,000.00 METROGRO Farm- Millet Revenue $60,000.00 $50,000.00 Dollars $40,000.00 $30,000.00 $20,000.00 $10,000.00 $0.00 YEAR 36

$800,000.00 METROGRO Farm - Total Revenue To District $700,000.00 $600,000.00 $500,000.00 Dollars $400,000.00 $300,000.00 $200,000.00 $100,000.00 $0.00 YEAR 37

Big Game Outfitter Hunting of pronghorn antelope, deer, and elk on the METROGRO Farm. Revenue to District from the outfitter is $12,000 per year for 2010 2012. 38

The Future? 2012 total revenue is not compiled yet. Current lease agreement with tenant farmer expires in 2015. What then? Re-negotiate lease? Go out for bids? District may consider taking over farming operations. Current terms of lease are not favorable to the District. Planting, chemical application and harvesting can all be done via contract operations. 39