Project Need and Evaluation

Similar documents
2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing

Chapter 3: Permit Procedures and Requirements

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

I. STREET CONSTRUCTION AND RECONSTRUCTION

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES

Sidewalk Repair Program. Charter Township of Canton Engineering Services

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011

Infrastructure Evaluation. Preliminary Scope and Cost Estimates

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

Task Order Authorization

General Legend Details...100

ENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner.

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS

Design Specifications & Requirements Manual

study for 2018 include:

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

T a b l e o f C o n t e n t s

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS

6 STORMWATER IMPROVEMENTS

SECTION GENERAL EXCAVATION

Division 33. Utilities

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

6 STORMWATER IMPROVEMENTS

Municipal Stormwater Ordinances Summary Table

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

Department of Street Services

Design Specifications & Requirements Manual

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings

UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER:

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

APPLICATION FOR A SITE CONSTRUCTION PERMIT

TOWN OF WINDSOR CONCRETE RATING GUIDE

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

N.J.A.C. 19: This file includes all Regulations adopted and published through the New Jersey Register, Vol. 50 No. 1, January 2, 2018

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

FOCUS ENGINEERING, inc. OLD VILLAGE PHASE 3 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 30TH STREET N 10TH STREET N

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

3.9 times the average 3.8 times the average 3.6 times the average

CITY OF GARLAND - ENGINEERING DEPARTMENT - PRIVATE DEVELOPMENT PAVING SUMMARY CASE NUMBER: PROJECT NAME: CONTRACTOR: PHONE NUMBER: (rev.

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

Addendum No. 1 Issue Date: March 29, 2016

BONDING REQUIREMENTS AND PROCEDURES

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

Appendix 3. POLICY & PROCEDURE No

STAFF REPORT. Honorable Mayor and City Council

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

4/23/2014 Item #10D Page 1

MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS

Engineering Status Report

2018 Utility & Street Reconstruction

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

Long-Term Capital Improvement Funding Plan. March 18, 2014 City Council Study Session

Curb and Gutter Replacement Project Phase I

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

CUYAHOGA COUNTY ENGINEER

CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

PUBLIC WORKS DEPARTMENT GENERAL NOTES

Improvement Plan Cost Estimate

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

Index to Technical Specifications

Index. Composition and Order of Plan Set. Utility Plan... 5

Stormwater line will be ABOVE ground corrugated pipe (No need to bury) running down to basin on NW 99 th St. It is simple and approved.

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Pavement Management Plan

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Project: Developer/Designer: Reviewer:

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD

Construction Specification for General Excavation

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Transcription:

City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011

Public Improvement Hearing: Special Assessments Local public improvements to the City s infrastructure t based on State t of Minnesota Statute Chapter 429. Palmer Lake East Area Street and Utility Improvements Project No. 2011-01, 01, -02, -03 and -04

Palmer Lake East Reconstruction Project

Capital li Improvement Program City Initiated Program in 1993 Reconstruct Aging Public Streets and Utilities 70.7 miles (67%) Completed 2011 will be the 18 th Consecutive Year Projected Completion 2021 34 Miles Remaining Est. Cost 2011-2025: 2025: $89 million

Project Planning Project Need and Evaluation Sanitary Sewer Water Main Storm Drainage Streets, Sidewalks/Trails Street Lights Other

Sanitary Sewer Collection System Collection System Installed in 1960-1965 1965 and 1978 Extensive Root Intrusion- root sawing required to maintain conveyance capacity Condition Survey / Televising Inspections (worn pipe, cracked pipe, sags) Proposed Improvements - new trunk sewers and services within streets

Water Distribution ib i System Distribution System Installed: 1960-1969 Cast Iron Pipe in relatively good condition (couple issue areas) Issue - Undermining Cast Iron Pipe (during sanitary sewer replacement) Proposed Improvements - Replace most valves and hydrants throughout project area - Replace Some Water Main (where adjacent to deep sanitary sewer replacement approx. 50%) - Replace Service Lines, Curb Stops

Storm Water Drainage System Storm sewer inlet locations fairly well developed throughout neighborhood with some isolated flat areas Improvements /repairs needed Coordination with water and sewer replacement Water quality treatment t t infiltration basins, underground facilities, outlet sediment removal and other improvements where feasible

Pavement Condition vs. Drainage (Typical) Pavement Condition Subgrade (Foundation) Condition Poor Drainage Material Deterioration

Street Reconstruction Proposed Improvements New Curb and Gutter Full Depth Pavement and Aggregate Base Reconstruction roadway to 30-ft wide Sidewalk Repairs

Street Reconstruction Sidewalk Safety Improvements Misc. sidewalk repairs Missing segments

Street Lighting Replace 26 lights

Public Right-of-Way Right-of-way and easements are dedicated to the public for construction and maintenance of streets and utilities Delineated on subdivision plats. Boundary of right-of-way extends beyond the edge of street pavement. Typical right-of-way width is 50 to 66. Other sidewalk and utility easements are adequate.

During Construction - Inconvenience

Preliminary Project Budget CIP Est. Project Amount Percent Total Special Assessments $ 1,798,000, 25% Water Utility $ 1,055,000 14% Sanitary Sewer Utility $ 1,330,000 18% Storm Drainage Utility $ 1,029,000 000 14% Street Light Utility $ 150,000 2% Street Reconstruction Fund $ 1,976,000 27% Total $ 7,338,000 100% Note: These are preliminary estimated amounts.

Proposed Assessment Area

Special Assessments - Estimated Amounts & Payment Options Full Street Reconstruction with New Curb and Gutter 2010 Assessment Rates: $3,559 (street) + $1,068(drainage) = $4,627 1. Pay in full - No interest between March & Sept. 30, 2011 2. Pay in full from Oct. 1 to Nov. 29, 2011 with interest from Oct. 1 3. Pay in installments with property taxes over a 10-year period starting in 2012. Partial prepayments cannot be accepted No Bill will be sent

Preliminary Project Schedule Neighborhood Info Mtg. January 11, 2011 Council Receives Report January 24, 2011 Public Hearing February 14, 2011 Project Bidding March 2011 Begin Construction May 2011 Substantial Completion October 2011 Tree Replacements Fall 2011/ Spring 2012

City of Brooklyn Center Palmer Lake East Area Neighborhood Street and Utility Improvements Project Staff Recommendations: -Authorize Project -Certify Special Assessments February 11, 2011