Improvement Plant Layout Using Systematic Layout Planning (SLP) for Increased Productivity

Similar documents
Increased Productivity and Planning By Improved Plant Layout Using Systematic Layout Planning at NCRM Division, Bhushan Steels Ltd.

Plant Layout Management in an Industry using Kaizen

Improvement of Rubber Smoked Sheet Plant Using Arena Layout for Increasing Productivity

International Journal of Advance Engineering and Research Development

Applying Total Productive Maintenance in Aluminium Conductor Stranding Process

The Study of Managing Stock Level and Storage Space for Aircraft Spare Parts: The Case of Transpo Logistics Co., Ltd.

Analysis and Design of the Logistics System for Rope Manufacturing Plant

International Journal of Library and Information Studies

WISDRI CONTINUOUS CASTING DIRECT ROLLING SYSTEM FAN JINLONG*

SILAT SELECTS RUSSULA TO ENGINEER AND SUPPLY A 700,000 TPY STEEL PLANT*

Design and Simulation Plant Layout Using Systematic Layout Planning

1. Explain how design simplification can be applied to the manufacturing process.

An Optimization Model for Production Allocation in A Large Steel Manufacturing Company

SYSTEMATIC LAYOUT PLANNING: Improvement in the Layout Design of Pulse Processing Unit

PRODUCTION AND APPLICATION OF HIGH STRENGTH STEEL. Feng Yong Technology Center,Jinan Iron and Steel Co. Ltd., Jinan Shandong China

Productivity Improvement by Using Quality Control Tools A Case Study of Chartered Rubber Products

75 Scarsdale Road Toronto,Ontario M3B 2R2 Tel (416) Fax (416) ENGINEERING STUDIES PROJECT REFERENCE LIST

EXCELLENT PERSPECTIVES FOR THE IRANIAN ALUMINUM INDUSTRY

StudyofSystematicLayoutPlanningSLPConceptinShoeFactorytoMaximizeEfficiency

Overview and EE&C of Steel Industry in Japan

Evaluating the Role of Supply Chain over the Molds and Dies in the Production Process through Systematic Layout Planning

Control of connecting rods

Planning of a production facility for a component manufacturer

Overall Productivity Improvement in Casting Industry by Using Various Industrial Engineering Techniques

2.3 If Arc Furnace is operated as single charge, from one casting about 150 tons of liquid steel,

Chapter 2 Research on Logistics Center Layout Based on SLP

Special steel profiles

Transportation of part supply improvement in agricultural machinery assembly plant

A new design recycle agricultural waste materials for profitable use rice straw and maize husk in wall

THE YIELD IMPROVEMENT TECHNOLOGY A REVOLUTIONARY TOOL FOR TOTAL QUALITY MANAGEMENT (TQM)

CEYLON HEAVY INDUSTRIES AND CONSTRUCTION CO. LTD (CHICO)

Review Paper on Factors Affecting Plant Layout Using Case Study on

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Energy saving by direct rolling of hot billets through high speed casters

ROLLING INTO THE FUTURE, LONG ROLLING CONTROL SYSTEM UTILIZING THE CHANGING TRENDS IN TECHNOLOGY AND DIGITALIZATION *

The Production Scheduling for Job Shop Production in Parallel Machines ABSTRACT

A KOCKS 3-ROLL BLOCK SUITS ALSO AS A COMPACT ROUGHING MILL CHRISTOPH KLEBBA*

RISK ASSESSMENT AND SAFE ACCESS MANAGEMENT IN LONG PRODUCTS ROLLING MILL MACHINERY

Unit4 (Class10) Rolling

Pre-Audit Application Form

Production process flow optimisation at. Euro-Plastifoam (Pty) Ltd

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Dimensions. Philosophy


Furnace Monitoring and Billet Cutting System

Use of automation to improve productivity and quality in long product rolling mills

)

INDUSTRIAL MANAGEMENT

Total Quality Management. Quick and Accurate Response to Inquiries. As-Promised Deliveries. Fair and Competitive Prices

Aluminum recycling. Process for recycling beverage cans. Aluminum recycling

Report Number: QIP-ASI Audit Date : 20 Feb., 2013 Expiry Date : 19 Feb., 2014

Benefits of Advanced Configuration and Simulation Study

Improvement of Plant layout Design for Effective Production: A Case study

The Use of Benchmarking to Improve the Finished Goods Inventory Management for Food and Agricultural Product Manufacturer in Thailand

MEBA Technical Profile Nov 2014 Profile

Case on Manufacturing Cell Formation Using Production Flow Analysis

MAM5C/ OPERATIONS MANAGEMENT UNIT I -V

Improvement of Facility Layout Using Systematic Layout Planning


MARTIN AUER GFM Steyr, Austria

PCB Manufacturing System Overview. Tel: Fax:

B. GENERAL CONDITIONS

Master of Engineering Program in Logistics and Supply Chain Systems Engineering (LSCSE) (International Program)

OUR COMPANY KNOW-HOW. environment. sustainability. skills. Green Power SUPPORT QUALITY VERSATILITY. dynamism

Dr.V.V.PRATHIBHA BHARATHI 1 B. GURAVAIAH 2. 2,3,4,5 Students of Malla Reddy College Of Engineering

Influence of Shielding Gas on Aluminum Alloy 5083 in Gas Tungsten Arc Welding

HY55-PT PALLET TRUCK

Advanced Process and Quality Control in Hot Rolling Mills Using Eddy Current Inspection

International Journal of Advance Research in Engineering, Science & Technology

Experience on a Regulatory Clearance of Spent Steel Drums

METHOD STUDY. Definition: WHY:

OTOMES. MES for Steel Industry. Production Management Intelligence. Steel

Operations Management and Quality

Welcome to. The Gateway of Indian Drop Forging. An ISO 9001: 2008 Certified Company. Veraval Main Road, Veraval (Shapar) ,

Qadri Group Companies

INTRODUCTION AND CONCEPTS OF ROLLING, FORGING AND EXTRUSION

Dust fall in the residential air environment of northern part of Thailand: Chiang Mai, Lampang and Phitsanulok province

SIMULATION OF PRODUCTION PLAN AND MANAGEMENT FOR JOB SHOP PRODUCTION SYSTEM

WISDRI CONTINUOUS CASTING-DIRECT ROLLING SYSTEM FOR WIRE ROD AND BAR

PRODUCTION SCHEDULING PART-A

Legal Summary SHE-037 Handbook of Business Operation in Thailand s Industrial Estate Version 2

Charting and Diagramming Techniques for Operations Analysis. How to Analyze the Chart or Diagram. Checklist of Questions - Example

A Case Study on Implement Software Development Using Hybrid ISX

CSI. In this activity you ll use some great web resources to answer a big question and save energy as you do.

Products and Services

İŞL 343 Üretim İşlemler Yönetimi Bahar Dönemi. Chapter 6. Melike Meterelliyoz Kuyzu

PRODUCT DESIGNER Hourly

ASTM B363-06a Standard Specification for Seamless and Welded Unalloyed

- Rev 4 Date

TOPIC 2 : WORK METHODS 2.1 Elemental breakdowns 2.2 Performance rating 2.3 Personal, fatigue, unavoidable delay allowances 2.4 Workload and line balan

NTPEP. Mill: Name: Physical Address: Mailing Address: SAME AS ABOVE (if different from above) Primary Contact Name: Title: Telephone: Cell:

Course ID Course Name Course Outcome Technical Mathematics in Air Conditioning and Refrigeration

CHAPTER 3 FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. In determining the requirement of a facility, three important consideration are: Flow

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Department of Economics Fall Economics 121 SUGGESTED SOLUTIONS FOR MIDTERM EXAM

SITE MASTER FILE For MHRA

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification

Quality Control and Quality Assurance for Installation of Steel Deck

The Development of Personal Information System: A Case Study in the Faculty of Industrial Education and

Corso di Studi di Fabbricazione

Transcription:

Improvement Plant Layout Using Systematic Layout Planning (SLP) for Increased Productivity W. Wiyaratn, and A. Watanapa Abstract The objective of this research is to study plant layout of iron manufacturing based on the systematic layout planning pattern theory (SLP) for increased productivity. In this case study, amount of equipments and tools in iron production are studied. The detailed study of the plant layout such as operation process chart, flow of material and activity relationship chart has been investigated. The new plant layout has been designed and compared with the present plant layout. The SLP method showed that new plant layout significantly decrease the distance of material flow from billet cutting process until keeping in ware house. Keywords Plant layout, Systematic Layout Planning, Flow analysis, Activity relationship chart I. INTRODUCTION ITH rapid increasing of demand in production, Windustrial factories need to increase their potentials in production and effectiveness to compete against their market rivals. At the same time, the production process needs to be equipped with the ability to have lower cost with higher effectiveness. Therefore, the way to solve the problem about the production is very important. There are many ways i.e. quality control (QC), total quality management (TQM), standard time, plant layout to solve the problems concerning productivity. For example, a case studies from the lamp industry []. The found problem was that the staff did not work in orderly manner, resulting in confusion and no standard time nor facilitating tool. The staff spent too much time on work. The way to solve these problems was to improve the steps in working and the area where they worked through observation and fieldwork as well as proposing tools to facilitate the work to set balance and find the standardized time. In additional Yookkasemwong et al. [2] studied the production process for Cable box to form metal. The problem was that the work could not be finished within hours. The problem was then studied from data collection, the actual time W. Wiyaratn. is with the Production Technology education, Faculty of Industrial Education and Technology, King Mongkut s University of Technology Thonburi, Bangkok, Thailand (corresponding author to provide: e-mail: wisitsree.wiy@ kmutt.ac.th). A. Watanapa. is with the Production Technology education, Faculty of Industrial Education and Technology, King Mongkut s University of Technology Thonburi, Bangkok, Thailand (e-mail: anucha.wat@ kmutt.ac.th) load, improper plant layout, and the duration of the process. The principle of ECRS was adapted to reduce the waste and arrange the repeated steps, resulting in changes in plant layout and staff workload. The impact of improper plant layout on the manufacturing process for valve and metal parts production has been studied. The plant layout was changed to comply with the international standards through SLP method []. Sucharitkul et al. studied the possibility of plant layout and installing aluminum foundry []. As for the layout of plant, it was done in accordance with the steps in systematic plant layout design. Yujie et al. studied the general plane of long yards using SLP which the best layout showed the good workflow and practical significance []. According to the researches mentioned above, plant layout is one way to reduce the cost of manufacturing and increase the productivity. Also increases good workflow in production route. This research describes original plant layout, material flow analysis, which includes area and distance between operation A and B, through such a steel rod factory that was case study. From the experience in steel rod factory, it was found that there was wasted time or delay in manufacturing, that is to say, the movement of the material in long line and interrupted flow as well as useless area of the plant. According to these problems, the researchers would like to analyze the way to solve such problems and find the way to improve the plant layout. The basic industrial layout planning is applied to systematic layout planning (SLP) method in which showed step-by-step of plant design from input data and activities to evaluation of plant layout. This method provides the new plant layout that improves the process flow through the plant, and help to increase space in industries. II. PROCEDURE FOR PLANT LAYOUT PLANTING The data were collected and the number of tools/ equipment for manufacturing was counted in terms of the direction for raw materials and product. The operation process chart, flow of material and activity relationship chart have been used in analysis. The problem of the plant was determined and analyzed through SLP method to plan the relationship between the equipments and the area. The framework of SLP is shown in Fig.. Based on the data such as product, quantity, route, support, time and relationships between material flow from to chart and activity relation chart are 2

displayed. From the material flow and relationship activity in foundry production, the relation between each operation unit can be observed. Then the results were drawn through the comparison between the existing manufacturing process and the proposed way. Warehouse Scissors to divide Billet Data at P, Q, R, S, T levels and activities Re-heating Furnace. Material flow 2. Activity relationship Roughing mill Intermediate mill Plan A. Relational map. Needed space. Available space. Considerations for changes. Relational map of space Plan B. Practical limitations Plan C Choose the plant. Result evaluation layout Fig. Systematic Layout Planning Method [] III. ANALYSIS OF ORIGINAL PLANT LAYOUT In this study, the steel rod as production was mostly made to customer s order. The manufacturing process was shown in Fig. 2 along with the flow of the operation process. The size of the equipment was relational to the area as shown in Table and 2. The foundry would produce rod steel with sizes 0, and 20. According to the original plant layout, the flow of the material, the utility of the area in the plant and material handling equipment could be discussed as follows: Department Fig. 2 Flow of the operation for billet TABLE I RELATIONSHIP BETWEEN EQUIPMENT SIZE AND AREA Equipment type Finishing mill Finishing mill 2 0 miron bar cutter Steel bar bender Weighing Checking quality Warehouse Customer Number of equipment Equipment area/working area (m2) Total working area(m2 Cutting iron Dividing 2 2 scissors Re-heating Re-heating Furnace Roughing Roughing 20 stand Intermediate Intermediate process stand Finishing process Finishing stand Finishing process Finishing 2. 2 stand 2 Cutting 0 micron 0 micron bar. cutter Bending billet Billet bender 2 0 2

TABLE II THE AMOUNT AND SEQUENCE FOR MANUFACTURING THE BILLET WITH SIZE A=2 MM AND B=-20 MM Details A: Distance (m.) B: Distance (m.). Ware house - - 2. Billet was taken to cutting scissors 0 0. Cutting Billet - -. Putting Billet into furnace.2.2. Reheating Billet - -. Entering the process of Roughing.. stand R-R. Crossing the Roughing stand R-R 20.2 20.2. Taken to Intermediate step 0. 0.. Milling at Intermediate M-M.. 0. Entering finish process 22.2 22.2. Milling at finish F-F.. 2. Entering finish 2 process. -. Milling the sign at finish2 F-F.0 -. Attending 0 m... Entering the process for cutting 0.. m.. Dividing 0 m iron bar - -. Entering the bending... Bending 0 m iron bar - -. Taken to be weighed.2.2 20. Weighing - - 2. The metal was randomly picked up.. for checking quality 22. Checking quality - - 2. Being stored at Ware house.0.0 2. Keeping at Ware house - - Total 22. 2.2 A. The Flow of Materials Raw materials were carried with long distance and that means a waste in time and energy, resulting in high cost as shown in Table, 2 such as moving the steel bar from warehouse to scissors to divide billet for 0 meters, resulting wasted time and more energy. B. Utility of the Area The area was not used to the full potential because old machine and remaining materials were still there in the working area, resulting in useless area of the plant. The department of maintenance was still spacious and adjacent to the area where the raw materials were kept, resulting in limited area for storing raw materials The area to store raw materials before moving to the process of dividing billet was limited so the area could contain only 00 billets per day. The plant needed to move the raw materials inside regularly until there were 0 billets per day. Thus, this affected the cost of energy. C. Material handling equipment The material handling equipment of the raw materials was not good enough, that is to say, fork lift was used to move in one direction and the pathway was not flexible enough due to untidy arrangement of the things. This was the reason why the raw materials were to be carried for a long distance. D. Storage area of billet Actually warehouse for billet or the raw materials was,020 square meters. One pile of billet took up m 2 so the plant could contain billet for,0 tons per month. The plant at the present time could contain only,000 tons per month. After the improvement, it had more space to contain billet or raw materials. IV. ANALYSIS PLANT LAYOUT BASED ON SLP According to the study of the manufacturing process, it was found that the long distance could be reduced for moving raw materials and the problem about useless area could be solved. The way to improve the plant was to apply SLP method to make the work flow continually by arranging the important sequence of the manufacturing. Then the relationship of each activity in closeness area was considered to make the relationship of each activity in the graph from to chart as shown in Fig, and the closeness value are defined as A = absolutely, E = especially important, I = important, O= ordinary closeness, U= unimportant. The details for each activity were described in Table, as follows: A: Billet warehouse B: Scissors to divide Billet C: Re-heating Furnace D: Roughing mill E: Intermediate mill F: Finishing mill G: Finishing mill 2 H: 0 m. iron bar cutter I: Steel bar bender J: Weighing K: Checking quality Fig. Relational graph of each activity

TABLE III SHOWS THE WORKFLOW OF THE MANUFACTURING PROCESS IN DOUBLE STAGE Product (Per month) Routing Billet with the size of A Billet with the size of B Billet with the size of C,000 A-B-C-D-E-F-G-H-I-J-K,00 A-B-C-D-E-F-H-I-J-K,000 A-B-C-D-E-F-H-I-J-K The important sequence of each activity was rearranged from the most important one to the least important one as shown in Fig. The intensities of flow from each activity to another were developed in Fig. A B 2 0 K J I H G F E D C B A Fig. The sequence of activities in the manufacturing process Fig. The intensities of flow in the manufacturing process Based on modifying plant layout and practical limitations, a number of layouts were developed. There were 2 choices to improve the plant layout as shown in Fig. The original plant layout represents A, while modified plant layout represents B and C. C 2 0 2 0 Fig. Plant layout between origin and improvement According to the analysis of the workflow for the billet with the size of 0 (Table ), it was found that the distance from the moving out of the warehouse to dividing the billet and to keeping at warehouse was 0.0 m., reduced from 22. m. or reduced by. m. As for the billet with sizes, 20 in the new plant layout, the distance for moving materials was.0 m, reduced from 2.2 m. or reduced by 2. m. Finally, rearrange layout decreased flow of material, resulting in increased production.

TABLE IV WORKFLOW OF THE MANUFACTURING PROCESS FOR BILLET WITH THE SIZE OF A MM IN THE DOUBLE STAGE PLANT (NEW LAYOUT) Details Distance (meters). Ware house - 2. Billet was taken to cutting scissors. Cutting Billet -. Putting Billet into furnace.2. Reheating Billet -. Entering the process of Roughing. stand R-R. Crossing the Roughing stand R-R 20.2. Taken to Intermediate step 0.. Milling at Intermediate M-M. 0. Entering finish process 22.2. Milling at finish F-F. 2. Entering finish 2 process.0. Milling the sign at finish2 F-F.0. Attending 0 m.. Entering the process for cutting 0. m.. Dividing 0 m iron bar -. Entering the bending.. Bending 0 m iron bar -. Taken to be weighed.2 20. Weighing - 2. The metal was randomly picked up for checking quality 22. Checking quality - 2. Being stored at Ware house 0 2. Keeping at Ware house - Total 0.0 REFERENCES [] S. Tenwong et al., Productivity improvement for the lamp manufacturing, a dissertation for Master s degree in Manufacturing Systems Engineering, School of Engineering, King Mongkut s University of Technology Thonburi,. [2] S. Yookkasemwong, S. Pitchaya-anankul and Areerat Bussarakamwadee, Process Improvement for increasing efficiency of Cable Box Process, a project for Bachelor s degree in Industrial Engineering, School of Engineering, King Mongkut s University of Technology Thonburi, 200. [] M. Khansuwan and C. Poowarat, A Study on Plant Layout Improvement : A Case Study at Kritchai Mechanical Company Ltd., a project for Bachelor s degree in Industrial Engineering, Faculty of Engineering, Thaasat University,. [] T. Sucharitkul et al., The feasibility study and aluminium foundry plant layout design : a case study : Sathien Plastic and Fibre, a dissertation for Master s degree in Manufacturing Systems Engineering, School of Engineering, King Mongkut s University of Technology Thonburi,. [] Y. Zhu, and F. Wang,, Study on the General Plane of Log Yards Based on Systematic Layout Planning, IEEE. Computer Society, vol., pp. 2, 200.