The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

Similar documents
PRE FEASIBILITY REPORT

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

BALAJI AMINES LIMITED

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

PRE - FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

ANNEXURE A DETAILS OF PRODUCTS

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO

Pre-Feasibility Report For

SVL LIFE SCIENCE PVT. LTD. SY.NO

: Industrial Projects - 2. : 26th October, 2016

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR TERMS OF REFERENCES

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

List of Annexures S. No Description Page No. Other Annexures

SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO

S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA

PRE FEASIBILITY REPORT

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

Synthetic Organic Chemicals 5(f)

M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka

Environmental Management in Pharmaceutical Industry & for Environmental Protection

PRE FEASIBILITY REPORT

SARACA LABORATORIES LIMITED ENVIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT. No.: SEIAA/TS/MDK-38/ , dated: 20:05:2016.

ENVIRONMENTAL STATEMENT-FORM-V

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

NATCO PHARMA LIMITED CHEMICAL DIVISION

PRE FEASIBILITY REPORT

PREFEASIBILITY REPORT

PRE-FEASIBILITY REPORT

Amendment required in the existing EC

Sub: - An application for obtaining Environment Clearance for New Unit.

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

Pre-Feasibility Report

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

For TOR New. 1. Basic Information of the Project:

SUSTAINABLE WASTE MANAGEMENT

M/s. Shiva Dye Stuff Pvt. Ltd Plot No.: A2-11/6104, GIDC Estate, Ankleshwar, Dist: Bharuch. ID:

Pre-Feasibility Report

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

UNSATURATED POLYESTER RESIN

Kana Aroma Industries. Pre-Feasibility Report

Pre-Feasibility Report

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

PRE FEASIBILTY REPORT

Environment Consultant:

PRE FEASIBILITY REPORT

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

Rajasthan State Pollution Control Board

M/s. RAPID INTERMEDIATES

Zero Liquid Discharge for Pharma Challenges & Solutions

PRE-FEASIBILITY REPORT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PRE FEASIBILITY REPORT

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

Format for Appraisal-New:5

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II)

Hind Energy & Coal Beneficiation (India) Ltd.

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

Table of Contents. Paint production process Raw material storage details Hazardous waste quantity and proposed details

PRE FEASIBILITY REPORT

M/S. Dain Colour Chem

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

Mars Power & Steel Ltd.

BRIEF DESCRIPTION OF THE PROJECT

PRE-FEASIBILITY REPORT

2 x 300 MW (STAGE-I)

ELITE PHARMACEUTICALS PVT. LTD., SY. NO. 286 (Part) & 297 (Part), JAGDEVPUR VILLAGE & MANDAL, MEDAK DISTRICT

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

GRANULES INDIA LIMITED SY. NO. 533, 535 & 536, BONTHAPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA FORM I

EXECUTIVE SUMMARY. (Approved Consultant)

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Hind Energy & Coal Beneficiation (India) Ltd.

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Transcription:

1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad (M), Rangareddy (D), Telangana state. The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. The Ministry of Environment and Forests accorded Environmental Clearance to the industry vide Environmental Clearance File No: J- 11011/147/2005-IA.II(I) Dt: August 11,2005 to manufacture folic acid with a capacity of 96.0 TPA. Copy of Environmental clearance is enclosed as Annexure I. The unit obtained CFE for Change of Product mix vide order No. APPCB/HYD/KTN/311/CFE/HO/2009 dated 25.06.2010 and also vide order No. 311/TSPCB/CFE/RO-RR-I/HO/2014-1262 dated 20.03.2015. Copy of latest CFE is enclosed as Annexure II. Subsequently obtained CFO of the Board vide letter No. APPCB/10017/ZO-HYD/ HO/CFO/2014-112 dated 04.04.2014 with a total capacity of 8.0 TPM. Current CFO Copy is enclosed as Annexure III In order to meet the market demand it is now proposed to expand the production capacity from 96.0 TPA to 589.4 TPA. Applied for Certified Copy of Compliance Report from MoEF & CC, Government of India, Chennai Regional Office is enclosed at Annexure- IV 1

2. Introduction of the Project The salient features of the project are described in the table given below TABLE 1.0 Salient Features of the Project Location Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad (M), Rangareddy (D), Telangana Longitude and Latitude 17 o 11 58.6 N & 17 o 12 04.6 N Latitude 78 o 25 08.8 E & 78 o 25 18.3 E Longitude Year of Establishment 1988 Product Category 5(F) Bulk Drugs & Intermediates Project Category as per EIA A ( Not in notified Industrial Estate) notification Proposed Activity Capacity expansion from 96.0 TPA to 589.4 TPA Total investment on the plant Current - Rs. 31.85 Crores & Proposed Total Investment on Environmental Infrastructure Total area of the plant Total area of green belt Water requirement Rs.40.0 Crores Rs. 5.0 Crores (Current) Rs. 10.00 Crores ( Proposed) 12.0 Acres 5.0 Acres Total water requirement after expansion 802.30 KLD Fresh water requirement 552.3 KLD Recycled water 250.0 KLD Source of water Borewell Nearest habitation and distance Bahadurguda -1.71 Km from the site Nearest surface water bodies Rainfed water tank at a distance of 0.78 Km from site Nearest reserve forest Nearest Reserve forest is at a distance of 1.4 km. Environmentally sensitive areas within 10 km radius Any national parks, wild life sanctuaries within 10 km radius Nearest air port and distance Nearest railway station and distance None None Shamshabad, RGI-3 Km Umdanagar-7.43 Km 2

i) Introduction of the company and proponent Sri Krishna Pharmaceuticals Limited, unit-iii (Formerly Sri Krishna Drugs Limited) was incorporated as a public limited company under the Companies Act, 1956 at Hyderabad in the state of Andhra Pradesh, India during the year 1988. The company is engaged in the manufacturing of Active Pharmaceutical Ingredients (APIs) and API Intermediates for catering to the domestic as well as international market. The company recognized the vital role of R & D for becoming successful in the generic market. About Proponent The management at Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) consists of highly qualified and richly experienced persons who have given the company the edge in terms of quality, consistency, timely delivery and ability. The company is headed by Mr. V. V Krishna Reddy, Managing Director, having vast experience in various businesses. About the Unit Sri Krishna Pharmaceuticals Limited established this manufacturing unit in the year 1988 and obtained Environmental Clearance from Ministry of Environment with a capacity to manufacture Bulk Drugs with a capacity of 96.0 TPA. Quality Management: Strict quality control measures, Good Manufacturing Practices (GMP) are integrated throughout the manufacturing process to ensure strict adherence to the quality parameters for both in-process and finished products. 3

3. Project Description 3.1 Production Capacity Currently the unit is permitted to manufacture 11 drugs out of which 4 are regular products and 7 are campaign products (any 3 products can be manufactured at a given point of time) with a total capacity of 8.0 TPM as detailed below TABLE 2.0 LIST OF EXISTING PRODUCTS S.No Name of the Products Quantity in TPM Regular Products 1 Folic acid pharma 4.0 2 Metadoxine 0.50 3 Fenoverine 0.30 4 Tiemonium methyl sulphate 1.20 Campaign Products( Group B) an three products at a time 5 Doxylamine succinate 0.250 6 Enalapril Maleate 0.750 7 Iso Metheptene Mucate 0.5 8 Phenylephrine Hydrochloride 0.750 9 Meclazine Hydrochloride 0.50 10 Sodium Phenyl Butyrate 0.350 11 Butrorphanol Tartrate 0.02 Total ( Worst combination) 8.0 3.1.1 Proposed expansion: It is now proposed to expand the production capacity of the existing 1 product and to manufacture all the existing products. Below Table provides list of products and proposed capacities. 4

TABLE 3.0 PROPOSED PRODUCTS & CAPACITY S.No Name of the Products Quantity in TPM 1 Folic acid pharma 44.0 2 Metadoxine 0.50 3 Fenoverine 0.30 4 Tiemonium methyl sulphate 1.20 5 Doxylamine succinate 0.250 6 Enalapril Maleate 0.750 7 Iso Metheptene Mucate 0.5 8 Phenylephrine Hydrochloride 0.75 9 Meclazine Hydrochloride 0.50 10 Sodium Phenyl Butyrate 0.350 11 Butrorphanol Tartrate 0.02 Total 49.12 3.2 Manufacturing Process Brief process description and process flow charts are given at Annexure VI 3.3 Raw Materials List of raw material product wise is given at Annexure V 3.4 Water Requirement The water requirement will be met Ground water. The requirement for water in this unit is for process and domestic purposes. The water balance for daily consumption is presented below. 5

TABLE 4.0 Water Balance Current & Proposed S. No Stream 1 Process 2 Washings Water requirement in KLD Current 52.5 After Expansion 346.8 Waste Water discharge in KLD Current 55.387 After Expansion 369.9 3.0 3.0 3 Scrubbers 2.0 4.00 2.0 4.0 4 Boiler 17.5 117.5 2.5 12.5 5 DM/Softener -- 3.0 -- 3.0 6 Cooling & Regeneration 40.0 244.0 10.0 34.0 7 Domestic 18.0 54.0 8.0 33.0 8 Gardening 30.0 30.0 -- -- Proposed Method of Treatment and Disposal Stripper, MEE and ATFD (Condensate to RO) Stripper, MEE and ATFD (Condensate to RO) Stripper, MEE and ATFD (Condensate to RO) ETP followed by RO ( RO Reject to MEE) ETP followed by RO ( RO Reject to MEE) ETP followed by RO ( Ro Reject to MEE) ETP followed by RO ( Ro Reject to MEE) Total 160.0 802.3 77.88 459.4 3.5 Wastes generation and control systems 3.5.1 Liquid Effluents As detailed in Table 4.0 waste water generation after expansion would be 459.4 KLD. It is proposed to segregate effluents into high COD and High TDS stream and Low COD and Low TDS streams. 6

High TDS and High COD stream would be treated in stripper followed by MEE and ATFD. The resultant sludge would be disposed to TSDF, Hyderabad. The Low TDS stream would be treated along with MEE/ATFD condensates in biological ETP followed by RO. The RO rejects would be fed back to MEE. The Permeate from RO would be used for cooling tower make up. Thus the treatment system proposed is based on Zero Liquid Discharge (ZLD) Concept The schematic diagrams of ETP proposed are given in Figure 1.1 and Figure 1.2 below 7

Fig 1.1 Schematic Treatment Scheme of High TDS Effluents Effluent from Process and Washings, Scrubber Equalization Tank Neutralization Tank Settling Tank Stripper Cement RO Reject Aq. Distillate to Plant/TSDF Recovery To TSDF MEE Condensate to Biological Treatment ATFD Condensate to Biological Treatment Sludge to TSDF 8

Fig 1.2 Low TDS Effluent Treatment System Domestic effluent Effluents from utilities & MEE condensate Screen Chamber Screen Chamber Equalization Tank Neutralization Tank Clarifier 1 Aeration Tank1 Aeration Tank2 Clarifier 2 Holding Tank Sludge Holding Tank Sand filter Sludge to TSDF Sludge Cake Filter Press Carbon Filter Permeate for re-use RO Ultra filtration Rejects to MEE 9

3.5.2 Solid wastes management Hazardous and non - hazardous wastes generated from the proposed expansion project are detailed below. Mode of disposal are also identified and listed. Adequate storage of hazardous waste is ensured at the site TABLE 5.0 Solid Wastes and Disposal Quantity S.N o Description Current TPM After Expansion TPM Remarks 1 MEE salts/ Gypsum/ Calcium Chloride equivalent salts 93.332 593.33* Sent to TSDF, Dundigal 2 Inorganic salts -- 13.15 Sent to TSDF, Dundigal 3 Distillation bottom Residue/In soluble organic residue 3.887 5.46 Authorized cement plants for coprocessing/ TSDF, Dundigal 4 Spent carbon 0.157 5 ETP sludge -- 0.21 9.0 Sent to TSDF, Dundigal 6 Iron sludge 4.758 7 Spent Nickel 0.08 Total 102.214 52.28 0.80 674.23 Authorized cement Industries For re-processing 8 Boiler Ash -- 600.0 Sold to brick manufacturers 9 Waste oil 70.0 LPM 100.00 Authorized recyclers/ reprocessors 10 Detoxified Container and container liners 50 No s/month 100.00 After complete detoxification it shall be disposed to the outside agencies 10

Of hazardous waste chemicals 11 Used lead acid batteries 10 Nos/Year 10.00 Authorized recyclers on buy back basis 12 Spent solvents 10 KL/ month 20.00kl/month To authorized recyclers/cement industries for co-processing *Includes salts from MEE and Neutralization salts. TSDF facility is about 70 KM from the site in Rangareddy District which is created for catering the industries in this area. Transport of Hazardous wastes to TSDF is done by the Ramky. In case other hazardous wastes, authorized recyclers will transport the wastes 4. Site Analysis 4.1 Plant Location M/S Sri Krishna Pharmaceuticals Limited, unit-iii Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad (M), Rangareddy (D), Telangana state. The site is situated at 17 o 11 58.6 N and 17 o 12 04.6 N Latitude and 78 o 25 08.8 E and 78 o 25 18.3 E Longitude. The land area of the plant is 11.3 acres. The nearest habitation from the site is bahadurguda (V) at a distance of 1.71 km. The nearest railway station located at Umdanagarat 7.43 KM from the Plant. There are no ecologically sensitive areas like national parks, sanctuaries within 10 km radius of the site. Following are the surroundings of the site North Private lands South Approach road followed by industry s own land with guest house East Private lands West - Outer ring road 11

Following 9 reserve Forests are there within 10 KM radius of the site Table 6.0 Reserve Forests in the study area S.No Reserve Forest Direction Distance from the from the site site (KM) 1 RF E 1.4 2 RF S 2.0 3 Maisaram SE 5.5 4 Lemur SE 5.8 5 Kongarkala SE 9.6 6 Jallapalli NE 9.6 7 Domnair NW 9.7 8 RF W 5.0 9 RF NE 3.7 Topo graphic features of the site and 10 KM study area and base map are given at Fig 1.3 & 1.4. Plant & Green Belt Photographs are given at Fig. 1.5 Site lay out map is given at Fig 1.6 12

Fig 1.3 Topo Sheet of the 10 KM study area 13

Fig 1.4 Base map of the study area 14

Fig 1.5 Plant & Green Belt Photographs 15

Fig 1.6 Site Lay Out Plan 16

5.0 Planning in Brief The project is envisaged to be completed by December 2016, and the production shall be initiated thereon. Consultants are identified for preparing the detailed project report. 6. Resource requirements 6.1 Power Requirement and Supply/Source The total power requirement is 6000 KVA. TSCPDCL and D.G sets as alternative to Power failure. It shall be sourced from 6.2 Production facilities, Utilities and effluent handling facilities Apart from the existing facilities it is proposed to add additional production facilities, utilities and effluents treatment infrastructure with an additional investment of Rs.40.0 Crores. The details are outlined in the below table TABLE 7.0 Production facilities/utilities/etp Existing & Proposed S.NO Details Production facilities Capacity/ No Current Additions After expansion 1 Production Blocks No s 9 5 13 2 Clean Rooms No s 30 5 35 Utilities 3 Boilers (Coal Fired) TPH 6 15 21 4 DG sets KVA 1 X500, 1000 1880 1 X 380 5 Cooling Towers TR 670 1500 2170 6 Softener/DM plant M 3 /hour 4000 4000 8000 Effluent handling & treatment facilities 7 collection tanks- KL 4 4 8 Storage 8 Neutralisation tanks KL 1 1 2 9 Stripper, MEE, ATFD KLD 150 400 550 12 RO & Biological treatment KLD 150 400 550 17

6.3 Land Requirement The unit currently has 12.0 acres of land and out of which 5.0 acres of green belt is developed. The land requirement for proposed expansion activities will be 2.0 Acres which can be met from existing open area. Below table provides the land statement. Detailed site lay out plan outlining current and proposed expansion activities is given at Figure 1.6 Table 8.0 Land Statement S.No Purpose Units Extent 1 Built up area Acres 2.0 2 Green belt Acres 5.0 3 Open area Acres 5.0 Total Acres 12.0 4 Area required for Proposed expansion Acres 2.0 7.0 Air Pollution The Sources of air emissions from the plant are 6 TPH coal fired Boiler and proposed 15.00 TPH coal fired boiler and additional DG sets The process emissions from the second phase containing SO 2, CH 4, NH 3 & HCl are scrubbed with caustic and scrubbed waste send to MEE. Below Table gives current proposed emission sources from the plant Table 9.0 Emission Source Current & Proposed S.N o Parameter Capacity Fuel Anticipated emissions Existing 1 Process --- -- HCl, SO 2, NH3, Cl2 2 Boiler Stack 6 TPH Coal SPM, SO 2, Control system Scrubber NO x meters, bag Stack Ht 30 filter & cyclone dust collector 3 DG sets 1x 500 KVA Diesel SPM,SO 2 Stack Height 18

and 1 X 380 KVA &NO x 4.5 & 3.9 Mts, Acoustic enclosures Proposed (additions) 1 Boiler 15 TPH Coal SPM,SO 2 &NO x Stack Height 30 meters 2 DG set 1000 KVA Diesel SPM, SO 2, NO x 8.0 Bulk Chemical Storages: Stack height of 6.3 meters & acoustic enclosure Following bulk chemical storage facilities are proposed for expansion activity Table No 10.0 Storage facilities of bulk chemicals Sr Capacity Name of the No (KL) solvent/chemical MOC Existing 1 15 Methanol MS Tank 2 30 Acetone MS Tank 3 15 Tolune MS Tank 4 15 IPA MS Tank 5 6.0 Chloroform Drums Other Major chemicals 6 30 tons chlorine MS cylinder 7 10 HCl HDPE 8 40 H2SO4 MS Proposed 9 10.00 Toluene MS Tank 19

9. Project Financial The estimated cost of the expansion project is approximately 40.0 Crores. Out of this Rs. 10.00 Crores will be for effluents treatment facilities and rest for other process equipment and safety equipment Project cost Rs. In Crores Plant& machinery 15.00 Civil & Structural 5.00 Pipe lines & insulation Electricals & instrumentation Erection & commissioning & painting Total 20.00 20% on plant & machinery 4.00 10% on plant & machinery 2.00 8% on plant & machinery and structures 1.60 Safety & Environment 10.00 Furniture, fixtures, computers, lighting etc 0.50 Contingencies & pre-operative expenses Project cost say 40.00 Crores Total 38.10 1.90 20