Franklin County Communique to the Planning Board

Similar documents
PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

# Teckler Boulevard Self Storage Preliminary PUD Project Review for Planning and Zoning Commission

Charter Township of Garfield Grand Traverse County

Chair Thiesse and Planning Commission Members Dour Reeder, Interim City Administrator. Jeremy Barnhart, Community Development Director

Total Height. Solar Panel. Racking Structure. Existing Ground Level

Zoning Ordinance Chapter 7

CHARTER TOWNSHIP OF PORT HURON

SECTION ENVIRONMENTAL SUB-INDEX TREE PROTECTION PRESERVATION AND HARVESTING

# Space Management Annexation Project Review for Planning and Zoning Commission

Staff Report. Conditional Use

City of Lafayette Staff Report

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT October 21, 2011

914. "I-1", LIGHT INDUSTRIAL DISTRICT


ADMINISTRATIVE HEARING STAFF REPORT

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013

ADMINISTRATIVE HEARING STAFF REPORT

# Central States Tower/ Verizon Wireless Special Use Permit & Zoning Variation Project Review for Planning and Zoning Commission

Town of Worcester Local Law No. 1 of 2018 Solar Energy Systems

ORDINANCE NO

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017

Request. Recommendation

Application Number: SP Project Name: Lidl Grocery Store, Major Site Plan

7 April 11, 2012 Public Hearing APPLICANT:

Proposed Boykins Substation Microwave Tower May 31, 2017

ARTICLE LAKE ERIE MARINA DISTRICT

TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO ADOPTED: October 1, EFFECTIVE: October 22, 2018

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red.

Fence and Wall Requirements

MOBILE SOUTH BUSINESS PARK SUBDIVISION, UNIT ONE, RESUBDIVISION OF LOTS 2, 3 & 4 OF THE RESUBDIVISION OF LOTS 4 & 12

3 August 13, 2014 Public Hearing

Proposed Southampton Substation Microwave Tower May 31, 2017

Planning Commission Staff Report Project Plan Approval Hearing Date: June 24, 2015

Morgan County Planning Commission. Petition for: Text Amendment. Article 7, Regulations for Specific Uses

Sec Development Standards in P-N-T Districts.

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

ARTICLE 5: BUSINESS ZONES

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Acreage: 5.99 acres Special Use Permit: Section TMP:

Fence, Wall & Column Information Packet

PLAN COMMISSION STAFF REPORT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

Administrative Hearing Staff Report. CLEARWIRE XEROX BUILDING CONDITIONAL USE PLNPCM East 500 South Hearing date: November 12, 2009

CHAPTER 725. Solar Farms.

Special Use Permit Application Martin Street Property

Ordinance No Lot Surface Drainage

1. APPLICANT: RSA Architecture is the applicant for this request.

MOBILE HOME DISTRICT OR "MH" DISTRICT AND MOBILE HOMES EXCLUSIVE OF MOBILE HOME DISTRICTS (Ord.No )

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

LOCAL LAW #4 OF 2018 OF THE TOWN OF TYRE TOWN OF TYRE SOLAR ENERGY LAW

a. The following regulations shall apply to all guest ranches:

Application Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan)

Residential Building Permit Checklist

Box Elder County Land Use Management & Development Code WIND ORDINANCE

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

ARTICLE VI GENERAL PROVISIONS

Request Conditional Use Permit (Bulk Storage Yard) Staff Recommendation Approval. Staff Planner Jonathan Sanders

STAFF REPORT. About percent depending on how much is added in the outdoor storage area (max allowed where storm sewer exists is 90 percent).

CITY OF LOMPOC PLANNING COMMISSION STAFF REPORT

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

MEMORANDUM. SUBJECT: Application for Special Use Permit, The Graduate, 105 Kenan Street (Project # ) DESCRIPTION OF THE APPLICATION

City of Lafayette Staff Report

Introduction to Photovoltaic (PV) Facilities

Article 6 District Intensity Standards

SECTION 3.322: NESKOWIN LOW DENSITY RESIDENTIAL ZONE (NeskR-1)

a. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards:

181 State Road 415, New Smyrna Beach. Railey Harding & Allen, P.A. Barcelo Developments, Inc. Scott Ashley, AICP, Planning Manager

Washoe County PLAN SUBMITTAL

ALAMANCE COUNTY MODULAR HOME PERMIT APPLICATION

Hodgson Road. Randolph Road Variable Public Right of Way VICINITY MAP NOT TO SCALE. 50' Public Right of Way

SOLAR ENERGY CONVERSION FACILITIES. Carroll County Code of Public Local Laws & Ordinances As of December 1, 2015

SCREENING & FENCING PERMIT ISSUANCE PROCEDURES. 1) Complete all parts of the Screening and Fencing Application Form.

Charter Township of Plymouth Zoning Ordinance No. 99 Page 176 Article 17: OR Office Research District

(1) The proposed commercial solar energy generation facility is either

Chapter 516 Shoreland Districts

City of Valdosta Land Development Regulations

Addition to Section 4 - Special Use Regulations

THE MOBILE COMMERCE PARK, PHASE I, RESUBDIVISION OF LOT 4, RESUBDIVISION OF LOT 3, AND LOT 4-B

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT June 26, 2012

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Section 1 Non-Conforming Structures and Uses Allowed to Continue. 12

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

TOWN OF STOWE DEVELOPMENT REVIEW BOARD Findings of Fact & Conclusions of Law

Monterey County Planning Commission

CHIPPEWA COUNTY LAND AND RELATED RESOURCE MANAGEMENT ORDINANCE SECTION 16 SOLAR POWER MANAGEMENT TABLE OF CONTENTS SUBDIVISION 1.

Requirements for Submittal of Application for the Watershed Protection Permit

Napa County Planning Commission Board Agenda Letter


CITY OF ST. MICHAEL WRIGHT COUNTY, MINNESOTA ORDINANCE NO THE CITY COUNCIL OF THE CITY OF ST. MICHAEL HEREBY ORDAINS:

PROPOSED TEXT AMENDMENT TO THE EATON COUNTY LAND DEVELOPMENT CODE

PROPOSED TEXT AMENDMENT TO THE EATON COUNTY LAND DEVELOPMENT CODE

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

Transcription:

Franklin County Communique to the Planning Board PETITIONER(S): Name of Petitioner: Carolina Solar Energy II, LLC Address: 400 W. Main St. Suite 503 City/State/Zip: Durham, NC 27701 LOCATION: REQUEST FOR SPECIAL USE 16-SUP-04 Fox Creek Farm Solar, LLC OWNER(S): Name of Owner: The Minerva Group, LLC Address: 107 Riverbend Circle City/State/Zip: Louisburg, NC 27549 ATTACHMENTS: Special Use Application Site Plan Decommissioning Plan Staff Report to the Planning Board Page 1

PARCEL INFORMATION OWNER PARCEL # ZONING AREA The Minerva Group LLC 2816-55-8745 Agricultural Residential (AR) 278 2816-24-6935 2816-64-9320 TOTAL 278 Acres ADJACENT PROPERTY SITE DATA ZONING LAND USE Subject AR Agricultural-Residential (Farm) Property North AR Agricultural-Residential (Farm/Wooded) South AR Residential East AR and (Town of Louisburg ETJ) Agricultural-Residential (Farm/Ball s Airport) West AR Residential PROJECT OVERVIEW STAFF ANALYSIS Special Use Request: Carolina Solar is requesting a Special Use Permit to construct a solar energy farm on 278 +/- acres of approximately 701.40 acres located off T.K. Allen Rd. in the Louisburg Township. Special Use Request Analysis: Carolina Solar Energy proposes to construct a solar energy farm on 278+/- acres of approximately 701.40 acres located off T.K. Allen Rd. in the Louisburg Township. The application states the solar facility will be built to meet all local, state, and fire codes. The applicant has indicated the site will be visited by Technicians once a quarter to ensure safety, proper operation, maintenance, and aesthetics. The application further states that the facility poses minimum impact to the parcel and the land can be easily restored to its original use upon completion of the lease. Additionally within the application, the applicant has provided a financial assurance for decommissioning. The submitted site plan indicates there will be no outdoor lighting, and reflects the landscaping and buffer strips, fencing, and required parking. In addition to requirements listed in the Franklin County UDO, the following items will be required if the special use permit is approved. Evidence of approval of erosion control from the NC Dept of Environment & Natural Resources, the subject property is located within the Tar-Pamlico River basin and is required to meet nutrient regulations for nitrates and phosphates for new improvements exceeding one-half acre, NC Department of Transportation driveway permit, approval from the NC Utilities Commission, approval from the local fire department of a knox box, and an engineering estimate for the removal of the solar facility will need to be submitted in addition to a financial surety prior to issuance of building permits. Staff Report to the Planning Board Page 2

PLANNING & ZONING Land Use Plan: The Comprehensive Land Use Plan has designated this area as Agriculture/ Residential. Setback and Lot Size: District Existing AR Min. Square Footage 40,000 Sq. Ft. (non-res) Min. Road Min. Front Min. Side Min. Rear Frontage Setback Setback Setback 150 40 30 50 Proposed N/A N/A N/A N/A N/A N/A Water/Sewer Service: Public water and sewer is not available to this property. 1. Environmental Issues: The subject property is located within the Tar-Pamlico river basin and is required to meet nutrient regulations for nitrates and phosphates. There is a stream with at 50 foot riparian buffer and 100 year flood zone located within the center of the property that appears to be located outside the proposed solar array. A determination letter shall be obtained from the Department on Environmental and Natural Resources (NCDENR) for any impacted streams or crossings. UDO: Listed below are minimum requirements for Solar Energy Farms as stipulated within the UDO. Note 16. Solar Energy Farms. (1) A Special Use Permit is required as outlined in Article 9 (Special Uses) for Solar Energy Farms locating in the following zoning districts: AR, R-1, R-8, R-15, R-30, R-40, and R- 80. *Solar Energy Farms are allowed as a permitted use within the Light and Heavy Industrial Districts. (2) Structures shall not exceed twenty-five (25) feet in height, as measured from finished grade at the base of the structure to its highest point. (3) Solar farm facilities and structures shall conform to the principal building setbacks of the underlying zoning district which they are located. (4) Solar farm facilities shall be enclosed by a six (6) foot high fence. (5) Solar farm facilities shall not create a visual safety hazard for passing motorist. (6) Lighting. Lighting shall be such that it is not directed onto any adjacent properties or right-of-ways. (7) Screening. Shall conform to Article 14, Landscape Requirements. Staff Report to the Planning Board Page 3

(8)Minimum lot area. Minimum lot area shall be the same as required by the underlying zoning district. (9)Parking. There must be an area designated outside of DOT right-of-way to accommodate a minimum of three maintenance vehicles. (10) Solar farm facilities shall be removed, at the owner s expense within one hundred eighty (180) days of a determination by the Administrator that the facility is no longer being maintained in an operable state of good repair. Financial assurance may be required of the applicant to provide for the removal of solar facilities. SPECIAL USE PERMIT CHECKLIST CIA In order to issue a Special Use Permit, the Board shall consider each of the following conditions, and based on the evidence presented at the hearing(s) make findings of fact in regards to each and must find that the issuance of the Special Permit is in the best interest of the County. (A) The use or development is located, designed, and proposed to be operated so as to maintain or promote the public health, safety and general welfare; (B) The use or the development complies with all required regulations of this Unified Development Ordinance and all applicable specific standards and regulations; (C) The use or development is located, designed and proposed to be operated so as to maintain or enhance the value of contiguous property, or that the use or development is a public necessity; (D) The use or development conforms with general plans for the physical development of the County s planning jurisdiction as embodied in this chapter, the Franklin County Comprehensive Development Plan, or other development policies as adopted by the Board of Commissioners; (E) The location and arrangement of the use on the site, screening, buffering, landscaping, and pedestrian ways harmonize with adjoining properties and the general area and minimize adverse impacts; (F) The type, size, and intensity of the proposed use, including such considerations as the hours of operation and number of people who are likely to utilize or be attracted to the use, will not have significant adverse impact on adjoining properties or the neighborhood; (G) Utilities, school, fire, police, and other necessary public and private facilities and services will be adequate to handle the proposed use; Staff Report to the Planning Board Page 4

If the Board approves the Special Use Permit, it may, as part of the terms of such approval, impose any additional reasonable conditions and safeguards as may be necessary to insure that the criteria for the granting of such a permit will be compiled with and to reduce or minimize any potentially injurious effect of the use on adjoining properties, the character of the neighborhood, or the health, safety, morals, or general welfare of the community. Where appropriate, such conditions may include requirements that street and utility right-of-way be dedicated to the public and that provisions be made for recreational space and facilities. PLANNING STAFF RECOMMENDED PLANNING BOARD DISCUSSION ITEMS Review proposed Special Use request, solicit comments or questions and make a recommendation regarding the special use request. PLANNING STAFF RECOMMENDATION TO THE PLANNING BOARD Review proposed Special Use request, solicit comments or questions and make a recommendation regarding the special use request. Should the Planning Board recommend approval of the Special Use request, planning staff would recommend that it be done so with the following conditions: 2. Prior to securing building permits from the County, documentation from all other applicable state and federal agencies shall be submitted to the Franklin County Planning & Inspections Department verifying permit approval. 3. Approval of stormwater management plan if there is land disturbance of.50 acres or greater. 4. An engineering estimate for the removal of the facility will need to be submitted in addition to a financial surety prior to the issuance of building permits. 5. Approval of a NC Department of Transportation driveway permit. 6. No lighting shall be installed without approval from the Franklin County Planning & Inspections staff. 7. Screening shall conform to Article 14. Landscape Requirements and Article 8., Section 8-1, Note 6. Buffer Strips. (As shown on the site plan, existing vegetation is being used where feasible to satisfy this requirement. It shall remain in place or landscaping shall be installed at a minimum of six (6) feet tall at time of planting.) Planning Staff may require additional landscape buffering around the perimeter of the site if existing vegetation is not sufficient. This shall be installed prior to final inspection and approval. 8. Approval from local fire department for knox box. 9. Approval of final layout and design of all solar panels and associated structures shall be submitted for review to the Franklin County Planning Department prior to the issuance of building permits. 10. A determination letter shall be obtained from the Department on Environmental and Natural Resources (NCDENR) for any impacted streams or crossings. 11. Recombination survey shall be recorded combining PIN s 2816-24-6935 and 2816-55- 8745 prior to issuance of zoning and building permits. Staff Report to the Planning Board Page 5