TILE ROOF INSTALLATION MANUAL ADDENDUM

Similar documents
RIGID SOLAR INSTALLATION MANUAL

Installation Manual. Read the complete installation manual and Owners Manual before beginning the installation.

SOLAR PANEL INSTALLATION GUIDE AND OWNERS MANUAL. May, Enerworks

1850 x 40/50mm Raised Shower Tray Kit

25 m2 (270 sq ft) Extension Kit

Installing Solar Water and Pool Heating Systems Objectives and Task Analysis for Solar Water and Pool Heating Systems Installation Contractor

Making Shell Blinkers

PORTRAIT WARNING HOT GLASS WILL CAUSE BURNS. DO NOT TOUCH GLASS UNTIL COOLED. NEVER ALLOW CHILDREN TO TOUCH GLASS. 569 Ledge Front

1 PVC or ABS drain with strainer

YOUR SPLASH PAD RESOURCE

30mm Height Linear Drain Shower Trays

.2 Flashings at grade to extents shown on the Drawings. .3 Membrane and polyethylene slip sheets at perimeter of walls.

TYPICAL ROOF CONDITION LAYOUT

Installation Instructions

Solar Attachment. for Flat Roofs. Roof Mounts. Pipe & Conduit Supports. Roof Repair Tape. Roofing Fasteners

DESCRIPTION SAFETY: WARNINGS ORDERING INFORMATION T01-B INSTALLATION INSTRUCTIONS DROP-IN AND FREESTANDING BATH K-11343T / K-11344T

ROOF MOUNT KIT OWNERS MANUAL

Valance Installation. For Units with Beam Style Coils

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

ROOF MOUNT KIT OWNERS MANUAL

SECTION FLUID-APPLIED WATERPROOFING

ROOF OWNER'S OPERATION AND MAINTENANCE MANUAL

SQUARE SUN TUNNEL INSTALLATION INSTRUCTION

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM

N Scale Double Track Lift Bridge v1.2

Design & Installation Manual

use Solar thermal for hot water production

use Solar thermal for hot water production DESIGN APPROACHES

TRUCK HOIST A TOP Safety Requirements Please Read!

Installation Overview:

INSTALLATION MANUAL MOSER STAINLESS STEEL KITCHEN FAUCET MODEL MANCHESTER

Substation #9 Instructions for Assembly of the HO scale kit. v1.1

Modular Coldroom Installation Manual

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

Pipe Flashing Systems

Installation Instructions

Renewables. Vacuum Tube Solar Systems. Solar Energy to the Power of

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

fusion shower pan on wood joists installation guide

SOLAR DEHYDRATOR PLANS

SECTION PLUMBING EQUIPMENT AND SPECIALTIES

How To Construct a Ferro Cement Tank

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

Original Scandinavian rainwater system

Liner Replacement Instructions:

THE BRITE THING TO DO

INSTALLATION, MAINTENANCE & WARRANTY GUIDELINES

Installation manual Number TV 02/2016 HE floor coverings Date Pages 5. Tarkett Vinisin Branch of Kalush

HOME SYSTEMS CONSTRUCTION PROCEDURE

Shower Installation Manual APF Barrier Free Shower Models

premium click optimum click

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

Installation Guide. PrivacyShield Outdoor Enclosure

SOUNDGUARD INSTALLATION MANUAL

COUNTY BLOCK. Construction Guidelines on County Block Steps. Special Considerations When Building Steps. Natural Beauty Absolute Strength

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

SOLAR GREENHOUSES Calling a greenhouse solar is somewhat redundant, since all greenhouses are solar heated to some extent. The greenhouse itself

COMPATIBLE WITH: APPLICABLE CODE: 2010 FLORIDA BUILDING CODE ASCE7-10

PIPING SPECIALTIES (PLUMBING) A. American Society for Testing and Materials (ASTM):

adjustable fusion shower pan on wood joists installation guide

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Basementsaver BP1 & BP2 Battery Backup Sump Pumps Installation

Instructions on how to install a Pre casted Calabrese oven kit September 2017

DISCLAIMER. If you require a copy of the Rhino Black Warranty, please send an with a request to

Installation Instructions

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

lindab we simplify construction LindabRoofDrainageSystem Lindab Rainline A solution that is as right as rain

QuietRock 530 RF Application Notes

EXIRA EXPOSED PIPE SHOWER INSTALLATION

Property Inspection Report

Central Station Air Handler Specification

Before You Get Started, You Will Need

EXPLORER Product demonstration prop building instructions

TITAN Quadcopter Assembly Instructions 1

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

Thermotube. Installation Guide YOUR STEP-BY-STEP GUIDE TO THE PERFECT INSTALLATION

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Technical Guide to Solar Thermal. Better World Energy. How to harness the sun s energy and create hot water with a Solar Thermal System

A. Submit the following within 30 days of award of contract under provisions of Division 1 and according to the Conditions of the Contract:

Architectural Roof and Wall Products Guide Specifications

SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE

SECTION CHAIN LINK FENCES AND GATES (PARK)

AWI MANUFACTURING. Quality Products Since USDA Certified. Stainless Steel Floor Drains

Siding and Soffit Installation Guidelines

Building a Simple At-home Aquaponics System

Evaporative Cooling System End Feed

G October 2018

1. PREPARATION 2. INSTALLATION 3. FINISHING 4. MAINTENANCE

379 Quick Installation Guide

CYCLONE Steel gutters and rainwater system. A steel rainwater system designed to protect in the toughest weather

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

C&O Standard Brick Cabin Instruction Manual

Niagara / DLG-85 Shower Cabin Installation and User s guide

WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

SECTION 07530CP EPDM MEMBRANE ROOFING

APPLICATION GUIDELINE

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc

INSTALLATION Instructions EcoFitness Interlocking Tile

Lithia Dodge East 5500 L St. Omaha, NE

Transcription:

Distributed and serviced in the USA by Hot Sun Industries Inc 1440 N. Benson Ave Unit D Upland CA 91786 858-683 0800 e-mail: ken@h2otsun.com web site: http://www.h2otsun.com TILE ROOF INSTALLATION MANUAL ADDENDUM Note: In winter ensure all piping slopes downhill to drain and all drains are left open (unless you live where it won t freeze.) Hot Sun s flexible fin-tubing can freeze full of water without concern. 2009-2017 copyright Hot Sun Industries Inc (USA) and Hot Sun Industries Ltd (Canada) All rights reserved WEAR EYE PROTECTION AND GLOVES WHEN WORKING WITH THE SPECIAL CA ADHESIVE. FOLLOW PROPER SAFETY PROCEDURES WORKING ON A ROOF. DO NOT ATTEMPT THIS WORK IF YOU ARE NOT TRAINED AND CERTIFIED IN FALL PROTECTION. REFER TO HOT SUN GENERAL INSTALLATION MANUAL. Make sure you know the plumbing scheme recommended for your unique situation. Consult Hot Sun or your dealer. Background information is at www.h2otsun.com/pools. Hot Sun solar pool heaters come with full design support and warranty. This technology is tricky. 1

Read the general installation manual. It covers how to attach headers to fin tubes and other important instructions that apply to all systems. This manual only discusses the methods unique to tile roofs. Biggest mistake people make is gluing the manifolds to each other and doing that plumbing before gluing the fin tubes to the headers. ALWAYS glue fin tubes to headers (CA adhesive) before gluing header manifolds together (via PVC pipe and fittings). The fin tubing comes in 88 foot lengths, 3.75 inches in width, including 6 water flow tubes. Three of these strips of the fin tubing fit on one row of tile. A single header manifold corresponds to the same one row of tile. A header manifold is 13.5 inches long. In most cases headers will alternate meaning the male ends are connected via couplings (removable or glue-one) and the female ends are connected via lengths of 1.5 pvc pipe. These lengths are determined by the tile row spacing. You want to match the header manifolds to the fin tubes one row of tile at a time. 2

If your tile spacing is tighter than 13.5 you can steal and extra inch by gluing the male end to the female end of two adjacent headers but don t glue too many together like this. You want to be able to service it. Read the main installation manual for instructions on the use of pvc cement. We recommend heavy body grey pvc cement for the connections to the headers (no primer). 1) Once its laid out and you know which row to do first without wasting fin tubing (see main manual) attach the first header to the first 3 strips of fin tubing. 2) Roll out the 3 fin tubing strips and begin gluing it to the roof starting about a foot from that first header manifold (that is already glued to the fin tubes) Gluing the fin tubing to the roof is done with Loctite (or Lepages) PL Premium 3x. This mastic is runny and things may slide around while the mastic sets up. Depending on air temperature this can take days. If the roof is steep enough that gravity takes over and things won t stay in place alternate with beads of Loctite Powergrab (we call it PG) and Loctite PL Premium (which we call PL). Glue down every crest of every tile or every 12-16 side to side. PG is tacky and sticks and holds things in place initially while the alternating bead of PL can set up. PG is poor structurally long term so think of it as the tack and PL as the structural. An alternate method is to stitch the material to the roof as seen in the tile roof video at www.h2otsun.com/videos.html. Stitching allows you to avoid adhesive entirely or add the adhesive later and either remove the stitching or not. Florida hurricane code requires the use of PL every 8 side to side but this is gross overkill for non hurricane zones. The strap is made by separating one or two tubes of Powerstrip material. It tears along a perforation once started. 3

Use regular solid electrical wire (12 gage). Just cut pieces about 8 long, bend one end 90 degrees, lift tile with a screwdriver, slide the bend end between tiles until you can rotate the wire 90 degrees so it grabs the top of the tile below. See video under videos at www.h2otsun.com This wire can secure the strap. This positions and secures all the fin tubing. You can glue it all down later with construction mastic or use a strap every tile trough negating the need to glue the fin tubing down at all. This is called stitching the system to the roof. 3) Attach the second header to its fin tubes and roll those fin tubes out and strap them down part way. Attach this header manifold to the first one and secure the assembly to the roof. This row of headers will sit in a trough. Its very important that the fin tubes come off the headers at the same angle and that the fin tubes don t touch the roof next to headers. The headers will expand and contract with temperature and this movement against the tile will wear the fin tubing and a leak will develop. See repair manual under manuals on www.h2otsun.com. 4

The supplied riveted plate (a ss strap bracket riveted to a ss plate supplied by Hot Sun) can be slipped between tiles. Secure this plate by gluing it to the tile above and below. Gluing is done with PL (Loctite or Lepages PL Premium 3x). Other methods can be employed. Continue until your entire row of headers is complete. Note the reason you attach a header before stitching the fin tube to the roof is so you don t have to trim the fin tubing to length. The reason you attach fin tubes to headers before connecting headers together is ease of assembly. Its easy to glue headers together. The work and the challenge is gluing (see general manual) the fin tubes to the headers fully. You have to inspect from all angles and you can t do that if the header is glued in place first. Take the weight of the headers. One good way is to slip ppa coated ss strap through a strap bracket as shown above left. Then just slip it between tiles (lift tiles with a screwdriver). Note we glued the cap to the end of the row of headers via an elbow so we had an easy way to hang it. Another good way is to secure to the wood you will find under the ridge cap as seen below left.. Secure the headers down every 2 headers to prevent lifting in wind. Remember the headers still need to expand and contract as they change temperature so don`t lash them down tight. Below right is a plate with a strap bracket riveted to it, glued between tiles using construction mastic. Then a loop of ppa coated ss strap goes around the header and the loop is completed with a strap clamp. 5

If you strip the 6 tube wide strips into individual tubes you can twist it to go around bends as shown above right. Separating into individual tubes at the end and attaching each tube individually to the header allows you to angle the headers. The headers do not need to be perpendicular to the flow! If the headers are angled it simply means there is a longer stub of pvc pipe between female ends. You`ll need a glue-on PVC coupling for each male to male end or you can alternate where male ends are connected via pvc couplings and female ends are glued together via varying lengths of pvc pipe to line things up. Always paint any piping exposed to the sun. We recommend paint that comes in a can as opposed to spray paint. Acrylic based paint is best for pvc. For more on corners and angled headers refer to the main installation manual. 6

4) Assemble the headers at the other end to the fin tubes first, then to each other and secure to the roof using the same methods described. It s very important you don t try to glue the headers to each other first. Attach headers to fin tubes first then to each other. Complete the stitching to the roof or the gluing with alternating beads of PL and PG as described earlier (or both). The straps go every trough which is approximately every foot and stitch to the roof at every single row of tiles. Its one stitch for every square foot. You might want to complete the plumbing first and run water thru the system to keep the surface cool as you crawl around on it. Hot Sun collectors can be very hot in hot sun. ¼ copper tube drains dead corner The vacuum breaker should be teed off the pipe entering the bottom corner of the bank of collectors. If the vacuum breaker being used attaches with a rubber removable coupling then it needs to go onto the male header manifold end at the top of the row of header manifolds at the feed side. Do not use rubber removable couplings on PVC pipe because PVC can t take the stress with the heat. Actually you can but don t squeeze the hose clamps too tight and use CA adhesive to prevent the rubber from slipping off the pvc. Its not removable this way but the rubber can be carved off with a knife. Recognize that water freezes inside a black surface exposed to the night sky at an air temperature of 42F not 32F. There s one place that water gets trapped and that s the dead lower corner of the bank. You can put a drain there that has to be opened (nah) or you can plumb from there to the return pipe with a ¼ copper tube (see main manual) or you can install an automatic freeze dump valve that we can supply. Once system is plumbed, check pressure at vacuum breaker location with solar off and with solar on. It should be zero with solar off and no more than 3 with solar on. If not read the main installation manual or consult with Hot Sun or your dealer. Flexibility is absolutely key to longevity of a solar heater like this and Hot Sun collectors are the only flexible collectors made in North America that are not epdm synthetic rubber and therefore do not break down in pool chemistry guaranteed. See www.h2otsun.com/warranty.pdf Note above several different methods are discussed. The standard best practice at the time of writing this manual (June 2017) is to not stitch at all. It is to alternate beads of PL and PG on crests of tiles or every 12-16 side to side. There are many subtleties to this method. Its normally only done by experienced professionals so if this is your first installation (and we know it is because you wouldn t read this manual otherwise) please study up and then discuss it all on the phone with us. Hot Sun experts with decades of experience are at your service so you are wise to take advantage of it. 7

8