Managing Schedule Change

Similar documents
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CRITICAL PATH METHOD SCHEDULE. CFS:BD 1 of 14 APPR:MB:JJG FHWA:APPR:

Design & Development of a Schedule Management Plan. Session #PRJ10

Schedule Design Planning for Schedule Development

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

REQUIREMENTS DOCUMENTATION

Principles of Schedule Contingency Management

CONSTRUCTION MANAGEMENT CORE COMPETENCIES

Meeting the Challenge of EPC Project Proposal Schedules. Project Proposal Schedules

Estimating and Scheduling

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

A Framework for Schedule Design Planning for Schedule Development

EXHIBIT 2-2-C SCHEDULES

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

Exposition Metro Line Construction Authority CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional

East Central College

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

BASELINE SCHEDULING BASICS Part 2: May 3, 2007

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

Timely Time Extensions: The Owner s Duty

Project Execution Plan For

Project Management Auditing Guide

SAMPLE. SCHEDULE LOGS TCM Framework: 10.1 Project Performance Assessment. AACE International Recommended Practice No. 93R-17

PROJECT EXECUTION PLANNING FOR COST AND SCHEDULE MANAGERS

Module #4 Time Impact Analysis

What Should an Owner Do With the Contractor s Schedules? Seminar for the FEFPA Ted Trauner Trauner Consulting Services, Inc.

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

James M. Bolin and Andrew Avalon, P.E., PSP

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

CONSTRUCTION STANDARD DOCUMENT

Program Management Procedure. Schedule Management

Chapter 4 State Requirements for Educational Facilities Section 4.1

Planning and Scheduling Training Program Course Brochure and Competency Matrix

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

jmt.com PROJECT CONTROLS Part of a diversified family of solutions

Identification Selection Definition Execution. Schedule.

Chapter 8 Project Monitoring and Control It s important to have a schedule, but it s more important to use it

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

FIRST MIDWEST GROUP JOB DESCRIPTION

Reflections on Planning & Scheduling By Chris Carson, PSP, CCM, PMP

CVEN 4087/4434. Construction Engineering Project Plan Assignment. Spring Context

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

ATTACHMENT D SCOPE OF SERVICES

PS.06. Claims Analysis Nested in Schedule Updates

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

Connoisseur Solutions Project Procurement Management

2017 Construction CPM Conference Ron Winter, PSP, FAACE Schedule Analyzer Software CPM ACTIVITY STATUS

Project Management Concepts, Tools & Techniques

Open Access Transmission Tariff ATTACHMENT K

QUALIFICATION MATRIX ADDENDUM:

Lessons Learned Schedule Updating and Maintenance using Primavera P6

1. These Rules pertain to the implementation of the City's Mentoring Program for MBEs and WBEs set forth in Section of the Municipal Code.

2016 National Tribal Transportation Conference

PMP Sample Questions Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope?

Downloaded from

Anticipated Completion Date and Contact. No. Finding Recommendations Previous Management Response(s) Status Update. Page 1 of 6

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

EXHIBIT 6 Preconstruction Work

Appendix K. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN ESTIMATING. Version 2.0

The Integrated Baseline Review (IBR)

Consulting Newsletter

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

NAPA SANITATION DISTRICT

A Structured Approach to Minimum Cost Recovery Scheduling

As part of the tasks and responsibilities of project control, the aspect of (time) control during the course of a project can be applied in many ways.

Construction Management Transportation

Ronald J. Rider, MBA

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Learn best practices with regard to contract administration and management; Identify the various phases of contract administration; Gain practical

Lessons Learned Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International

THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR CLARIFICATIONS:

Unit 3: Traditional Project Delivery Using IT Applications

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

LECTURE 8: Planning & Control Functions & Tools (Part II) Project Management BACA

Contract Administration in the Public Sector Course Syllabus. Welcome to Contract Administration in the Public Sector

Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management

Software Engineering

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Scope Management 3/11/2015. Chapter 5 Learning Objectives. Project Scope. 1) Conceptual development. Problem Statements. Statement of Work (SOW)

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

Schedule Guidance Document

Guten Tag. (good day)

Project Management Academy

AGENCY FOR STATE TECHNOLOGY

AACE Planning and Scheduling Professional (PSP) Certification Preparation Training Course Brochure and Competency Matrix

48R06 SCHEDULECONSTRUCTABI

Selection of Contractor Step 5. June 2013

Certificate IV in Project Management Student Assessment Guide

RFP SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES. 1. Is this a new solicitation? If not, please share the name of incumbent vendors.

RISK.03. Project Management Oversight: An Effective Risk Management Tool for EPC/Design-Build Projects

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

AACE Certified Cost Professional (CCP) Certification Preparation Training Course Brochure and Competency Matrix

Florida PALM Quarterly Project Oversight Report: Comprehensive Review For April - June 2015

NAVSEA STANDARD ITEM. 1.1 Title: Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

Document Synopses by Series

Transcription:

Managing Schedule Change Ted Douglas, CCP, PSP, FAACE CPM Construction Conference Orlando, Florida January 11, 2017 Managing Schedule Change Outline Change Drivers Contract Changes Clause Schedule Change Control Questions & Discussion ACTPMA Consulting 1

Why Schedule Change Management? Time is a resource that cannot be stored and reused on a Project. The Project Triangle PCTS Relationship Performance Cost/ Resources Time Scope of Work You can pick any three! ACTPMA Consulting 2

The Project Schedule The Project Schedule serves several purposes: Project Planning (and Communication) Monitoring Progress and Changes Evaluate Time Impacts Forecasting: Acceleration and Recovery Plans Historic Record of What Happened on the Project. Changes ~ Observation Changes on an engineering and construction project can be expected, but those directing the change must understand the potential for cost and schedule consequences of those changes. - Construction Industry Institute (CII) ACTPMA Consulting 3

Opportunity for Influence Major Influence Rapidly Decreasing Influence Low Influence Level of Influence Influence Scope Definition Expenditures Project Expenditures Conceptual Analysis & R&D Pre-Project Planning Basic Data & Scoping Project Authorization Project Life Cycle Production Engineering & Procurement Construction Engineering Complete Turnover & Start-up Change Management Planning & Design Phase Changes made during the planning and engineering phase of a project are more cost effective. Construction Industry Institute (CII) ACTPMA Consulting 4

Change Management Planning & Design Phase Owner should freeze the scope as early as possible in the design process. - Construction Industry Institute (CII) Review The Contract No Damage for Delay Clauses Ownership of Project Float Treatment of Concurrent Delays Notification Requirements Definitions & categories of Delays Accepted Methods of Time Impact Analysis ACTPMA Consulting 5

Contract Considerations Risk Allocation in Construction Contracts Timely Written Notice Project (Schedule) Documentation Format for Dispute Resolution Potential Schedule Impacts & Risks Weather days adjustments for seasonal averages? Severe or Adverse Weather? Acceleration options to improve schedule Time versus Cost comparison with Budget Is Schedule Contingency included? ACTPMA Consulting 6

Schedule Progress Reporting & Updating Frequency of Status updates Level of Detail - reported upward to Owner Method of Reporting Impacts and/or delays Incorporation of Change Orders Method of Highlighting Schedule Issues Float Ownership and Use Schedule Integration Integration of Engineering, Procurement Deliveries, Owner Furnished Fixtures or Equipment (FFE), or Commissioning by Others Integration and Coordination with Subcontractors Master Project Schedule Who is responsible? Owner s Representative? Construction Manager? or General Contractor? Schedule Revision process ACTPMA Consulting 7

Why a Change Process? The owner will have the right to order changes. The contractor will be required to make changes in return for an equitable adjustment in the contract price and time. Arthur F. O Leary A Guide to Successful Construction What are Change Sources? Scope Changes: are any additions, modifications or deletions to the end product or service. Baseline Change sources can be: Client driven Regulatory driven Internal sources External sources ACTPMA Consulting 8

Change Source ~ Client Drivers Client Drivers may: Alter the scope (end product or service) Increase or decrease the project cost Alter the schedule by either: Advancing project or milestone completion Delaying project dates Change Sources ~ Regulatory Regulatory Drivers: Originate from organizations having authority to mandate directives on the project. Federal State Local Quasi-governmental ( i.e. ASTM) ACTPMA Consulting 9

Change Sources ~ External External Drivers: are changes that affect the project environment: Economic Political Social Change Sources - Internal Internal Drivers: are forces within the project: Technical difficulties Problems meeting schedule Costs exceed client funding Resource limitations ACTPMA Consulting 10

Change ~ Observation The overall change process must be managed efficiently during all stages: Planning and Design, Bid/ Award, and Construction. - Construction Industry Institute (CII) Change Process Advance coordination with Owner NO Added Time approve Modify Schedule Execute change reject Trend Identify Change (scope, schedule, budget) Prepare Change Package Owner Review & Approve Change Review TIMELINESS of REVIEW & APPROVAL NO Added Cost approve Modify Budget & Execute Change reject ACTPMA Consulting 11

Change Process Thoughts The earlier that a project resolves the change process, the more likely the project will be able to effectively manage changes. - Construction Industry Institute (CII) Schedule Changes Contract Change Process Notification, Submittal, and Approval time frame and Process Format for Schedule Change Approval Is a Time Impact Analysis or a Fragnet Required? What else? ACTPMA Consulting 12

Trends and Change Control The ability of the Project to successfully deal with change drivers is improved by establishing a viable Trend and Change Control program. Trend Program The Trend Program is an Early Warning System to detect any real or perceived change in project scope, schedule or cost which may cause an addition or reduction to the project baseline estimate, including corrections for scope or estimate omissions. ACTPMA Consulting 13

Trends & Project Controls Project Controls Responsibilities: Coordinate implementation Develop Trend Procedure Serve as Trend Administrator Schedule & Conduct Trend Meetings Maintain Trend Database & Log System Administrative Changes Minor changes which do not impact scope or cost or contract milestones do not require formal change control processing. The ABC log is maintained to document administrative baseline changes. ACTPMA Consulting 14

Cost Reduction Changes Cost reduction changes could reduce time of performance. Cost reduction changes may be due to better design definition, reduced system requirements, improved technology, or project progress. Cost reduction change proposals usually require less preparation and supporting documentation. Schedule Change Control Schedule change control is an important element of the Project change control program. Schedule changes must be approved and documented as part of the Project record. ACTPMA Consulting 15

Changes During Construction Changes should be resolved in a timely manner as they occur. Do not defer changes resolution until the end of a project. The Schedule Submittal Applicable for the Baseline and the Updates Submit Complete Hardcopy Reports Submit Electronic Copy of Schedule Submit written Schedule Narrative Maintain a complete file copy of all submittals ACTPMA Consulting 16

Document the Schedule Basis A Graded Approach Scope of Work Work Breakdown Structure Key assumptions and constraints Issues and Impacts (Risk) Inclusions and specific Exclusions Schedule Change Process Integration & Progress Reporting Process Key Procurements and Submittals Review The Baseline Schedule Verify that the Baseline matches the Contract Bid assumptions Clarify Scope; Details & Responsibilities Ensure that the Baseline is incorporated into the Subcontracts (and vice versa) Ensure Vendor Deliveries match the Baseline Review the predecessor/successor logic ACTPMA Consulting 17

The Scheduler & Updates How to obtain Progress and Status? What about Changes, Delays, Impacts? Who maintains the record of As-Built Facts? Refer to Daily Reports / Weather Reports Recording Change Directives Meeting Minutes / Project Correspondence The Scheduler s Rules To maintain Project Schedule integrity: Revise only as directed by management Revise only when an approved change order affects activity or project durations. Provide recommendations to project management on schedule-related strategies. Communicate changes to project team Retain electronic copies for the project historical record. ACTPMA Consulting 18

Schedule Time Impacts Obtain Schedule with Current Status Incorporate - Changes, Delays, Impacts Obtain / Record As-Built Facts Daily Reports / Weather Reports Change Directives Meeting Minutes / Project Correspondence Photographs or Video records (Key areas or critical events) Change Orders & Project Closeout All outstanding change orders and any potential change orders must be identified and resolved in a timely manner. ~ CII Change Management Research Team ACTPMA Consulting 19

Conclusion When the schedule is accurately maintained and changes are documented, it is a vital element for successful project management. Managing Schedule Change Summary Contract Changes Clause Change Drivers Schedule Change Control Questions & Discussion? ACTPMA Consulting 20